HomeMy WebLinkAbout20091173 Ver 1_More Info Received_20091117Hobbs, Upchurch & Associates, P.A.
Consulting Engineers
300 S.W. Broad Street • Post Office Box 1737 • Southern Pines, NC 28388
November 13, 2009
NCDENR NO V 1 7 2009
1650 Mail Service Center DFNR- WATER QUAL;Ty
Raleigh, NC 27699 WETLANDS AND STORMWATER BRANCH
Re: City of Rockingham: East Rockingham Sewer Outfall
DWQ project # 09-1173
Dear Ms. Karolyn,
This letter is in response to your letter dated November 9, 2009 for additional information. The
following has been addressed:
1. There are no new or undeveloped parcels for this project.
2. The proposed sewer must cross twice because of a permanent garage and a storage
building obstructing the path on the north side of Jennie's Creek. See enclosed revised
8x1 Isheet with crossing W8 and W9 showing the garage and storage building.
3. The stream crossing are required by the erosion control permit. All stream crossing and
geotextile fabric are deemed temporary in nature and shall be removed as soon as the
project is stabilized.
4. The PCN application table was not correct. See enclosed copies of page 4 (and
additional page 4) showing the change from 0.91 acres of impact to 0.38 acres of impact.
The drawings that were sent in the previous package are correct.
If you require any additional information please contact me at this office.
Sincerely,
HOBBS, UPCHURCH & ASSOCIATES, P.A.
E:1
?6ct a?t?F?
Dana Crawford
Southern Pines, NC Telephone 910-692-5616 - Fax 910-692-7342 • e-mail: info@hobbsupchurch.com
Hampstead - Nags Head • Charlotte • Beaufort
D?- ?V13 ?12@20wgb
Ai Ill ,
C. Proposed Impacts Inventory "
1. Impacts Summary DENT wATERQUALTY
MAANO
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ®T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .008
W2 ? P ®T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .014
W3 ? P ® T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ 19
W4 ? P ® T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .10
W5 ? P ® T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .03
W6 ? P ®T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .008
2g. Total wetland impacts see attached
sheet
2h. Comments: see attached sheet for additional wetland impacts
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ®T Sewer Main Jennies Branch ® PER
? INT ® Corps
® DWQ 4 3.80
S2 ? P ®T Sewer Main Jennies Branch ® PER
? INT ® Corps
® DWQ 5 4.50
S3 ? P ® T Sewer Main Jennies Branch ® PER
? INT ® Corps
® DWQ 4.8 4.20
S4 ? P ® T Sewer Main Jennies Branch ® PER
? INT ® Corps
® DWQ 8 10.50
S5 ? P ® T Sewer Main Jennies Branch ® PER
? INT ® Corps
® DWQ 10 12.30
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 35.30 LF
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W7 ? P ®T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .007
W8 ? P ®T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .008
W9 ? P ® T Sewer Main forested - riparian ® Yes
? No ® Corps
® DWQ .010
- ? P ? T ? Yes ? Corps
? No ? DWQ
- ? P ? T ? Yes ? Corps
? No ? DWQ
- ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0.38
2h. Comments: There are 9 total wetland crossing. see other sheet
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - or
(PER)
(Corps - 404, 10
stream
length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ? T ? PER ? Corps
? INT ? DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts F
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
MH #64 WATER TIGHT
........
275
MH #63
........ _.ST4....69+3i
WATER TIGI-..
NHi tK i iuNT RIM ELEV '273.50'
52.51 5-8 1 275
T_
272.00'