Loading...
HomeMy WebLinkAboutNCS000101_Sig Authority_20191011 INTERNATIONALS PAPER RIEGELWOOD MILL JOHN L.RIEGEL ROAD RIEGELWOOD,NC 28456 October 11, 2019 Water Quality Permitting Section Division of Water Resources R F C P I\,"/F l) 1617 Mail Service Center OCT 23 2019 Raleigh,NC 27699-1617 Certified Mail: 7017 1450 0001 1342 7104 DENR-LAND QUALITY STORMWATER PERM!PERMITTING Stormwater Permitting Section Division of Energy, Minerals, and Land Resources 1612 Mail Service Center Raleigh,NC 27699-1612 Certified Mail: 7017 1450 0001 1342 7111 Subject: Delegation of Signature Authority International Paper—Riegelwood Mill NPDES Permit No. NC0003298 (wastewater) and NCS000101 (stormwater) To Whom It May Concern: As indicated in the attached letter from Clay Ellis, VP of Manufacturing the Mill Manager of IP's Riegelwood, North Carolina facility has signatory authority for all permit applications, discharge monitoring reports, and other information relating to the operations at IP Riegelwood Mill as required by all applicable federal, state, and local environmental agencies specifically with the requirements for signatory authority as specified in 15A NCAC 2B.0506 for permit NC 0003298 and Part III.B.3.b of Permit NCS000101. Effective immediately, Kevin Driscoll is now the Mill Manager of the Riegelwood facility. If you have any questions regarding this letter, please feel free to contact me at 910-362-4880. Sincer ly, Kevin Driscoll Mill Manager—Riegelwood Mill Attachment cc: Brian Lambe,NC DEQ Wilmington Regional Office (via e-mail) Tom Tharrington,NC DEQ Wilmington Regional Office (via e-mail) S:IGroupslEnvironmentall Wastewater\NPDES PermitlSignatory Authority DelegationlDelegation of Authority DWO SWP NPDES lUl l l9 dnrx INTERNATIONAL tE,Ar PAPER 6400 Poplar Ave. Memphis,TN 38197 Cl llis Business(901)419-9000 VICE PRESIDENT OF MANUFACTURING Fax(901)214-0850 NORTH AMERICAN PAPERS&PULP clay.ellis@ipaper.com March 15,2016. Subject Signatory Authority Delegation-International Paper Riegelwood Mill To: All Concerned L Clay Ellis,Vice President of Manufacturing for International Paper's North American Papers&Pulp Business, am responsible for principle business functions,policies,and decisions for all North American Papers&Pulp sites,and do hereby authorize the following: o The Mill Manager at the Riegelwood Mill is authorized to certify and submit in the name of and on behalf of International Paper all environmental permit applications,reports,documentation,plans or other information relative to the Riegelwood Mill as required by federal,state,or local permit issuing authorities as allowed under appropriate regulations. 0 The Environmental Health,&Safety Manager at the Riegelwood Mill is authorized to certify and submit in the name of and on behalf of International Paper all environmental permit applications,reports, documentation,plans or other information relative to the Riegelwood Mill as required by federal,state,or local permit issuing authorities as allowed under appropriate regulations. Please refer any questions or correspondence regarding environmental matters to the local contact. Sincerel • • Clay girls VICE PRESIDENT OF MANUFACTURING • _NORTH AMERICAN PAPERS&PULP INTERNATIONAL PAPER