Loading...
HomeMy WebLinkAbout20200183 Ver 1_401 Application_20200130REPAIR & MAINTENANCE PROJECTS (DIVISION SEVEN) LINEAR ROAD NAME PROJECT RIVER FEET OF DATE COUNTY & # DESCRIPTION BASIN/STREAM PIPE/BRIDGE LATITUDE LONGITUDE NEW NOTES NAME STREAM IMPACTS Stabilize bank at outlet 10ftof De -watering will occur to allow for repair 8/17/17 Rockingham Tyne Rd/SR end of pipe that failed Roanoke/Hickory Bank 30.5069452o N 80.0013611 o W temporary work. All BMP practices will be followed. 1355 from recent storm Creek Stabilization No riprap will be placed below Ordinary event impacts High Water.