HomeMy WebLinkAbout20200183 Ver 1_401 Application_20200130REPAIR & MAINTENANCE PROJECTS (DIVISION SEVEN)
LINEAR
ROAD NAME
PROJECT
RIVER
FEET OF
DATE
COUNTY
& #
DESCRIPTION
BASIN/STREAM
PIPE/BRIDGE
LATITUDE
LONGITUDE
NEW
NOTES
NAME
STREAM
IMPACTS
Stabilize bank at outlet
10ftof
De -watering will occur to allow for repair
8/17/17
Rockingham
Tyne Rd/SR
end of pipe that failed
Roanoke/Hickory
Bank
30.5069452o N
80.0013611 o W
temporary
work. All BMP practices will be followed.
1355
from recent storm
Creek
Stabilization
No riprap will be placed below Ordinary
event
impacts
High Water.