Loading...
HomeMy WebLinkAbout20200174 Ver 1_B-5534_Permit_Drawings_20200204Submitted on 2/4/2020 \ H hwa North Carolina Department of Transportation ti StOYY 7wdteY Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 55034.1.1 TIP No.: B-5534 County(ies): Duplin Page 1 of 1 General Project Information WBS Element: 55034.1.1 TIP Number: B-5534 Project Type: Bridge Replacement iDate7 9/30/2019 NCDOT Contact: Mason Herndon Contractor / Designer: Kimle -Horn Address: Highway Division 3 Address: 421 Fayetteville Street Suite #600 Raleigh, NC, 27601 5501 Barbados Blvd. Castle Ha ne, INC, 28429 Phone: 910 341-2036 Phone: 919 653-6623 Email: tmherndon ncdot. ov Email:,vance.blanton kimle -horn.com City/Town: Pink Hill Count ies : Duplin River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): .303 miles Surrounding Land Use: Rural/Coastal Proposed Project Existing Site Project Built -Upon Area ac. 0.9 ac. 0.9 ac. Typical Cross Section Description: 2 @ 12' wide lanes w/ 8' paved shoulders and 6:1 side slopes Number of Spans: 3 Span Arrangement: 30', 50', 25', 36" GIRDER DECK w/ 4' caps and 90 skew Bridge Length: 105' Number of Spans: 2 Span Arrangement: 32'3 Bridge Length: 65' Annual Avg Daily Traffic (veh/hr/day): Design/Future: 7600 Year: 2040 Existing: 6100 Year: 2020 General Project Narrative: (Description of Minimization of Water Quality Impacts) The bridge replacement on NC 11/111 conveys Burn Coat Creek from North to South and ultimately drains into the Northeast Cape Fear River. The existing bridge, overall length CAL = 65' and width 30' will be replaced with a bridge having an DAL = 105' and width = 30'. The new bridge is longer than the existing bridge to accommodate the spatial difference between the previous bridge location to the new Iocation.The proposed bridge and roadway improvements minimized the existing overtopping condition and maintain a minimal transition between existing and new roadway. Runoff from the bridge is captured on the low side of the bridge in shoulder berm gutter and traffic bearing 1 GI's on either side of the road. The 18" pipe systems are designed to outfall (with rip rap outlet protection) outside of buffer zones 1 and 2. Burn Coat Creek is a FEMA stream that is shown on Flood Insurance Rate Map (FIRM) panel 370254-2563-K, dated 06/20/2018. A hydraulic analysis on Burn Coat Creek was performed to assess the potential flood level increases associated with this project. Based on this analysis, the proposed bridge replacement project was shown to have a maximum base flood level increase of 0.1' after the bridge and a maximum decrease in base flood elevation of 0.1' before the bridge. This project qualifies for an MCA Type 2d. Additionally, rock platting has been used on slopes of 1.5:1 to prevent increased impacts to the existing wetlands. Waterbody Information Surface Water Body (1): Burn Coat Creek NCDWR Stream Index No.: 18-74-17 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters SW Other Stream Classification: L None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? iYes Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) .qi ihmittPrl nn 9iaigngn 4PA1� "ATW M.- RP86R- N0. NO. PH STATIC OF NORTH CARO INN B-5534 � F;�: � DIVISION OIF HIGH YS P.E. � \_ 5504.1.. 55034.1.1 55034.2.1 RW & UTILITIES E D UPLIN COUNTY L PERMSHEET DRAWING1 OF7 V N ' LOCATION: BRIDGE 82 OVER BURNT COAT CREEK ON NC 111 TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE I � �j z WETLAND AND SURFACE WATER a © IMPACTS PERMIT SITE I oo VICINITY ,VAP SEPTEMBER 3, 2019 z z 4 M 5 z� END BRIDGE -L- Sta. 22+21.00 END TIP PROJECT B-5534 BEGIN BRIDGE -L- Sta. 29+78.00 -L- Sta. 21 + 16.00 NC 1VI11 NC — TO PINK HILL _ BRIDGE NO. 82 it �G Q�, O BEGIN TIP PROJECT B-5534 -L- Sta. 13+78.00 THIS PROJECT IS NOT WITHIN A MUNICIPAL BOUNDARY UNLESS ALL SIGNATURES COMPLETED �' • CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR Kimley>>)Horn HYDRAULICS ENGINEER 50 25 0 50 100 AADT 2020 = AADT 2040 = K = 6,100 7,600 9% LENGTH ROADWAY TIP PROJECT B-5534 = 0.283 MILES THE NCDOT BY.-c), roe woeryo 2018 STANDARD SPECIFICATIONS PLANS D 55% LENGTH STRUCTURES TIP PROJECT B-5534— = 0.020 MILES JEFFREY W. MOORE,P.E. P.E. 50 25 0 50 100 T V = * 11%* 60 MPH TOTAL LENGTH TIP PROJECT B-5534 0.303 MILES RIGHT OF WAY DATE: AUGUST 8, 20I9 s P> PROJECT ENGINEER SETH DENNEY, P.E. SIGNATURE: ROADWAY DESIGN ENGINEER (TTST 8% + DUAL 3%) TW LM PROFILE (HORIZONTAL) LETTING DATE: PROJECT DESIGN ENGINEER O FUNCTIONAL RURAL MAJOR V 10 5 0 10 20 CLASSIFICATION: COLLECTOR JUNE I6, 2020 DAVID STUTTS,RE. STRUCTURES MANAGEMENT UNIT STATEWIDE TIER PROJECT ENGINEER PROFILE (VERTICAL) P.E. IL PCEPROGRAM MANAGEMENT SIGNATURE: w Z O NICHOLS 52 `- DIST�URBED,`� '\LIP POSSIBLE uic \\ '_� ' /JUNCTION BOX II D II I TOP=72.0om? -L- PL Sto /6+37.50 Pl Sto 23+85.79 Pl Sto 26+73.45 A = 2622' 00.6" (RT) A = 10' 59' 17.3' (RT) A = /0' 59' /7-T (LT) D = 3' 28' 20.9" D = 3' 49' llA' D = 3' 49' 11D L = 7593' L = 287.67' L = 287.67' T = 386 0' T = 144.28, T = 144.28, R = 16 000' R = 1.500.00' SE = A4 SE = 0.04 RO RO = 108' R = 1.500.00' SE = 0.04 RO = l08' " /08' / I I PERMIT DRAWING SHEET 2 OF / Kimley>>> Horn DENOTES FILL IN WETLAND 421 SUITE 600 RALEIGH N C.2L76001REET, DETAIL 1 DENOTES MECHANIZED CUT DITCH Nab=�bl CLEARING own I F� Gr••m 7y D Min. D=1.5 F1. DENOTES HAND FROM STA. 19+00 TO STA. 21+16 (FM CLEARING DETAIL 2 TOE( PROTECTION Elw ro Smb) DENOTES TEMPORARY t� o IMPACTS IN SURFACE WATER b= 2R. Gm eMile QN Q Type of U... = CUSS 'B' Rip-k p FROM STA. 25+48 TO STA. 27+00 (LT) CJ Z N Z 0 CLASS II RIP RAP TO ELEV. 72.0' Q Z (STRUCTURES PAY ITEM, TYP.) SITE O FAISON D. SMITH D: WOODS 0.r��sr�/1�' rrr�iro�.io�.s� yr_;��_ �ir — II _7,-� - ``II'' ``II'' __II'' `I' ``II''�I' ``II'' ``II'' `I' TOP=71.68't� �/ I, zm/-h/ Y Y Y Y 1 Y1' Y Y \1 `IRL•—-�i011 % P ' 4 _k Do TEMPORARY / 41 JL Y Y CUT DITCH J `I' ``II'' `I' SEE DETAIL 1 \'•.` CLASS R RIP RAP EST 1 TONS EST 5 SY GFD Y TEMPORARY J 2 CLASS B RIP RAF \\ JEAN PATTERSON SMITH EST I TONS EST 5 SY GFD \ DB 1349 / 259 LINDA GRADY SMITH DB 787 / 274 PROJECT REFERENCE NO. I SHEET NO. RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED EXIST ROADWAY FILL EXCAVAT/ON.TYP (SEE CROSS —SECTIONS) O LINDA MARIE BASS DB 1597 / I81 TOE PROTECTION CLASS 'B' RIPRAP EST 35 TONS EST 70 SY GFD SEE DETAIL 2 I F 6 N f. F ----- s�F_ F -- —\ \ \, REMOVE XISTI G R/� PU�� SHED BEGIN APPROACH SLAB c -L- Sto.21+01.00 p N BEGIN BRIDGE END B 2 Z -L- Sto.21+16.00 -L- SI c9 � V 00 Z Q -L- EIVE Nc ////// -L- Z TYPE TYPE 8' z; Ir 40` z; Ir ~ s� TYPE TYPE 111 111 TL-3 W ti O SEE SHEET 6 FOR -L - PROFILE DETAIL SHOWING BRIDGE /PAVEMENT RELATIONSHIP Submitted on 2/4/2020 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 15+87.74 to 25+10.60 105' BRIDGE 0.87 0.12 0.11 0.02 69 TOTALS*: TO.87 1 0.12 1 0.11 1 0.02 0 69 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb