HomeMy WebLinkAboutNCG200510_DMR June 2019_20191119 12/90
RECEIVED
NOV 19 2019
DENR-LAND QUALITY
STORMWATER PERMITTING
November 7, 2019
North Carolina Department of Environmental Quality
Division of Energy, Mineral and Land Resources
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Attention: Central Files
Reference: Tier III Stormwater Discharge Monitoring Report (June 2019)
TT&E Iron & Metal, Inc., Garner, North Carolina
Permit No. NCG2000000, Certificate of Coverage NCG200510
S&ME Project No.4305-15-142C
To Whom It May Concern:
S&ME Inc. (S&ME) is submitting the attached Tier III Stormwater Discharge Outfall (SDO) Monitoring Report on
behalf of TT&E Iron and Metal, Inc. (TT&E). TT&E is currently permitted to discharge stormwater consistent with
General Permit No. NCG200000 and Certificate of Coverage No. NCG200510.
The stormwater discharge outfall (SDO) monitoring report for June 2019 is attached. The June 2019 sampling
event and the corresponding Tier III response will be documented in TT&E's Stormwater Pollution Prevention Plan.
If you have any questions, please call Claudia Irvin with S&ME, Inc. at (919) 872-2660.
Please contact us at (919) 872-2660 if you have any questions.
Sincerely,
S&ME, Inc.
Claudia Irvin Edmund Woloszyn Jr., R.E.M.
Project Professional Principal Scientist/Project Manager
Attachments: June 2019 Stormwater Discharge Outfall (SDO) Monitoring Report Form
T:\Projects\2015\ENV14305-15-142C TT&E 2019-20201Working_Documents102-Monthly Sampling\June 2019 Monthly Sampling\NCDEQ Cover Letter-
JUNE 2019.docx
S&ME, Inc.13201 Spring Forest Road I Raleigh, NC 27616 j p 919.872.2660 j www.smeinc.com
Semi-annual Stormwater Discharge Monitoring Report (DMR) i
for North Carolina DEMLR General Permit No. NCG200000 — Scrap Metal Recycling
Date submitted July 15, 2019
CERTIFICATE OF COVERAGE NO. NCG200051 SAMPLE COLLECTION YEAR 2018
FACILITY NAME TT&E Iron & Metals, Inc. SAMPLE PERIOD Jan-June July-Dec
COUNTY Wake or ® Monthly' JUNE (month)
PERSON COLLECTING SAMPLES DISCHARGING TO CLASS ( IORW HQW I 'Trout ❑PNA
LABORATORY ESC Lab Sciences Lab Cert. # ENV375 I 'Zero-flow nWater Supply I ISA
Comments on sample collection or analysis: USaltwater ®Other Class C, a NSW
in Neuse River Basin
PLEASE REMEMBER TO SIGN ON THE REVERSE -*
Part A: Stormwater Benchmarks and Monitoring Results
No discharge this period?'
Outfall No. Date Sample 24-hour rainfall pH Non-polar oil&grease
Collected' amount, Total Suspended Chemical Oxygen EPA Method 1664 Copper, Lead, Zinc,
(mo/dd/yr) Inches3 Solids Demand (SGT-HEM) Total Total Total
Benchmarks - - 100 mg/L or 0.010 mg/L or 0.075 mg/L or 0.126 mg/L or
==> 50 mg/L4 120 mg/L 15 mg/L 0.005 mg/Ls 0.210 mg/Ls 0.090 mg/L5
SDO-1 6/7/2019 0.5 6.46 27 58.2 <5.44 0.0718 _ 0.0174 0.239
SDO-2 6/7/2019 0.5 7.27 23.5 154 <5.56 0.0594 0.202 1.00
SDO-3 6/7/2019 0.5 7.20 22.8 51.4 <6.17 0.0130 0.00796 0.102
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
a See General Permit text, Table 3 or Table 4, identifying protected receiving water classifications where the more protective TSS benchmark applies.
5 Stormwater discharges into receiving waters classified as saltwater are subject to the second listed benchmark.
Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-
numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the
detection limit, reporting limit, quantitation limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
Permit Date:02/02/2015-12/31/2019 SWU-256, last revised 1/28/2015
Page 1 of 2
I No discharge this period?'
Outfall No. Date Sample 24-hour rainfall
Collected' amount, Non-polar O&G by EPA
(mo/dd/yr) Inches3 1664(SGT-HEM) Total Suspended Solids
Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L4
Footnotes from Part A also apply to this Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit.
FOR PART A AND PART B MONITORING RESULTS:
• A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ® NO El
REGIONAL OFFICE CONTACT NAME: Mr. Danny Smith, MCDENR Regional Supervisor in writing on 3/14/2013 and in voice mail on 3/18/2013.
Mail an original and one copy of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
I I - 7- l9
(Signature of Permittee) (Date)
Permit Date:02/02/2015-12/31/2019 SWU-256, last revised 1/28/2015
Page 2 of 2