Loading...
HomeMy WebLinkAboutNC0088722_Authorization to Construct_20200203ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Mr. Donald V. Chamblee, P.E. Director of Public Works Lincoln County 115 West Main Street Lincolnton, North Carolina 28092 Dear Mr. Chamblee: NORTH CAROLINA Environmental Quality February 3, 2020 SUBJECT: Authorization to Construct A to C No. 088722A03 Lincoln County Killian Creek WWTP NPDES Permit No. NCO088722 A letter of request for an Authorization to Construct was received on September 23, 2019, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 3.35 MGD Killian Creek WWTP, with discharge of treated wastewater into Killian Creek in the Catawba River Basin. This authorization results in an increase in design and permitted capacity to 6.6 MGD, and is awarded for the construction of the following specific modifications: Installation of new headworks consisting of one (1) mechanical cylindrical bar screen system with inclined manual bypass screen rated for 8.4 MGD at peak hourly flow, one (1) grit removal system rated for 8.4 MGD at peak hourly flow consisting of one (1) vortex grit removal chamber with air scouring, one (1) grit air lift pumping system, one (1) grit washer/classifier and one (1) screw conveyor, one (1) influent parshall flume, one (1) new influent splitter box, piping and controls; installation of new phosphorous control chemical feeding system including one (1) 8,000 gallon chemical storage tank, one (1) 44 GPM at 22 ft TDH recirculation pump and three (3) 70 GPH at 60 PSI peristaltic chemical metering pumps with VFD, containment, piping and controls; installation of two (2) 1,814,100-gallon sequencing batch reactors (SBR) with jet aeration, including two (2) floating decanters, four (4) 60 HP, 6590 GPM at 19 TDH jet motive pumps, two (2) 700 GPM at 26 TDH submersible sludge wasting pumps, four (4) 1300 SCFM aeration blowers with VFDs, piping and controls; installation of one (1) 437,000 gallon post - equalization basin with four (4) 7.5 HP submersible mixers, five (5) 1150 GPM submersible pumps with VFD, piping and controls; construction of one (1) new ®� ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROLINA A o.wntemole"—ww,u\ 919.707.9000 Mr. Donald V. Chamblee, Director of Public Works February 3, 2020 Page 2 of 4 Effluent Filter Building with two (2) effluent rotary disc filters, two (2) 10 HP centrifugal effluent filter backwash pumps, relocation of three (3) existing effluent disk filters with backwash pumps to new Effluent Filter Building, piping and controls; installation of two new (2) UV disinfection banks each rated for 4.2 MGD at peak hourly flow, piping and controls; installation of new. aerobic sludge digestion system including one (1) 488,700 gallon aerobic digester with jet aeration, one (1) 640,000 gallon aerobic digester with jet aeration, one (1) 267,100 gallon sludge holding tank with jet aeration, one (1) 700 GPM at 26 TDH submersible sludge transfer pump, one (1) 700 GPM at 25 TDH submersible sludge transfer pump, one (1) 700 GPM at 24 TDH submersible sludge transfer pump, four (4) 2929 GPM at 19 TDH jet aeration submersible pumps, and four (4) 1300 SCFM aerobic digestion blowers, piping and controls; installation of one (1) new rotary drum thickener rated for 3,000 dry lbs per hour with polymer feed system, two (2) 400 GPM at 40 TDH centrifugal rotary drum thickener feed pumps with VFDs, one (1) 200 GPM at 30 PSI rotary lobe, rotary drum thickener discharge pump with VFD, one (1) 9 GPH at 100 PSI progressive cavity polymer feed pumps with VFD, piping and controls; installation of a new sludge pump station including one (1) 600 GPM sludge macerator, three (3) 120 GPM at 50 PSI rotary filter press feed pumps with VFDs, one (1) 44 GPM at 22 TDH caustic recirculation pump, five (5) 55 GPH at 60 PSI peristaltic caustic metering pumps with VFDs, piping and controls; installation of one (1) new sludge dewatering building including two (2) 9 GPH at 100 PSI progressive cavity polymer feed pumps with VFDs, two (2) new rotary sludge filter presses, each rated at 510 dry tons per hour, two (2) horizontal screw conveyors, one (1) inclined screw conveyor, piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0088722 issued effective February 3, 2020, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0025984. It is the Owner's responsibility to ensure that the as -constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the- facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Mr. Donald V. Chamblee, Director of Public Works February 3, 2020 Page 3 of 4 The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, "must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, of ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Nick Coco at telephone number (919) 707-3609. Mr. Donald V. Chamblee, Director of Public Works February 3, 2020 Page 4 of 4 Sincerely, /xt`' XV- S. Daniel Smith Director, Division of Water Resources With Engineer's Certificate attached: cc: DWR Mooresville Regional Office, Water Quality Programs Central Files ecopy: Charles R. Froneberger, P.E. WK Dickson @ Co, Inc. Email: bfroneberger@wkdickson.com NPDES File Without Engineer's Certificate attached: cc: Lincoln County Health Trupti Desai, DWI Lincoln County Killian Creek WWTP Authorization to Construct No. 088722A03 Issued February 3, 2020 NPDES Permit No. NCO088722 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Killian Creek Wastewater Treatment Plant, located in Lincoln County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of new headworks consisting of one (1) mechanical cylindrical bar screen system with inclined manual bypass screen rated for 8.4 MGD at peak hourly flow, one (1) grit removal system rated for 8.4 MGD at peak hourly flow consisting of one (1) vortex grit removal chamber with air scouring, one (1) grit air lift pumping system, one (1) grit washer/classifier and one (1) screw conveyor, one (1) influent parshall flume, one (1) new influent splitter box, piping and controls; installation of new phosphorous control chemical feeding system including one (1) 8,000 gallon chemical storage tank, one (1) 44 GPM at 22 ft TDH recirculation pump and three (3) 70 GPH at 60 PSI peristaltic chemical metering pumps with VFD, containment, piping and controls; installation of two (2) 1,814,100-gallon sequencing batch reactors (SBR) with jet aeration, including two (2) floating decanters, four (4) 60 HP, 6590 GPM at 19 TDH jet motive pumps, two (2) 700 GPM at 26 TDH submersible sludge wasting pumps, four (4) 1300 SUM aeration blowers with VFDs, piping and controls; installation of one (1) 437,000 gallon post -equalization basin with four (4) 7.5 HP submersible mixers, five (5) 1150 GPM submersible pumps with VFD, piping and controls; construction of one (1) new Effluent Filter Building with two (2) effluent rotary disc filters, two (2) 10 HP centrifugal effluent filter backwash pumps, relocation of three (3) existing effluent disk filters with backwash pumps to new Effluent Filter Building, piping and controls; installation of two new (2) UV disinfection banks each rated for 4.2 MGD at peak hourly flow, piping and controls; installation of new aerobic sludge digestion system including one (1) 488,700 gallon aerobic digester with jet aeration, one (1) 640,000 gallon aerobic digester with jet aeration, one (1) 267,100 gallon sludge holding tank with jet aeration, one (1) 700 GPM at 26 TDH submersible sludge transfer pump, one (1) 700 GPM at 25 TDH submersible sludge transfer pump, one (1) 700 GPM at 24 TDH submersible sludge transfer pump, four (4) 2929 GPM at 19 TDH jet aeration submersible pumps, and four (4) 1300 SCFM aerobic digestion blowers, piping and controls; installation of one (1) new rotary drum thickener rated for 3,000 dry lbs per hour with polymer feed system, two (2) 400 GPM at 40 TDH centrifugal rotary drum thickener feed pumps with VFDs, one (1) 200 GPM at 30 PSI rotary lobe, rotary drum thickener discharge pump with VFD, one (1) 9 GPH at 100 PSI progressive cavity polymer feed pumps with VFD, piping and controls; installation of a new sludge pump station including one (1) 600 GPM sludge macerator, three (3) 120 GPM at 50 PSI rotary filter press feed pumps with VFDs, one (1) 44 GPM at 22 TDH caustic recirculation pump, five (5) 55 GPH at 60 PSI peristaltic caustic metering pumps with VFDs, piping and controls; installation of one (1) new sludge dewatering building including two (2) 9 GPH at 100 PSI progressive cavity polymer feed pumps with VFDs, two (2) new rotary sludge filter presses, each rated at 510 dry tons per hour, two (2) horizontal screw conveyors, one (1) inclined screw conveyor, piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Date Registration No. Mail this Certification to: Attn: Min Xiao Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617