Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Revised_Allen CBE - Appendix C _20200129
APPENDIX Cl STORMWATER AECOM Job Duke Energy —Allen Closure by Project No. 60603204 Sheet 1 of 6 Excavation Description Stormwater Calculations Computed by NSF Date 1/15/20 Checked by DMB Date 1/15/20 The purpose of this analysis is to provide preliminary conveyance designs for managing surface water runoff from the 25-year, 24-hour and the 100-year, 24-hour storm event over the proposed final grades of the Allen Steam Station Active Ash Basin (AAB) and Retired Ash Basin (RAB) under post -closure conditions. The location of conveyance channels, culverts, detention ponds, and existing and proposed spillways are shown in Attachment Cl-A. SITE AND PROJECT DESCRIPTION The AAB and RAB are located south of the Allen Steam Station and adjacent to Lake Wylie/the Catawba River. They are situated between topographic divides located along South Point Road to the west, along Plant Allen Road and the RAB north dike to the north, and the Duke Energy property boundary to the south. The natural topography at the site generally slopes downward from these divides to the Ash Basin and subsequently toward Lake Wylie/the Catawba River. The total drainage area contributing to the existing AAB outlet is approximately 293 acres, and the total drainage contributing to the existing RAB outlet is approximately 233 acres (URS, 2014). The land area outside of the existing AAB and RAB water level boundaries consists primarily of suburban homes, vegetation consisting of grasses and wooded areas, coal ash management facilities, and closed landfills and structural fills with vegetative covers. Storm and process water from the AAB previously discharged through a weir box outlet structure located in the southeast corner of the basin. The weir box and spillway system was constructed in 2016 as a replacement to the prior reinforced concrete riser structure and associated RCP piping. The discharge flow was conveyed through a 48-inch HDPE pipe system which ties into the pre- existing 42-inch diameter RCP near the downstream toe -of -slope via a reinforced concrete manhole structure (AECOM, 2018). As of February 9, 2019, process flows no longer enter the AAB. Decanting of the AAB began on June 3, 2019. Storm water from the RAB discharges through its primary spillway via a headwall structure (Outfall SW015) located in the ditch in the southeast corner of the basin (AECOM, 2018). The primary spillway was constructed in 2016 as a replacement to the prior reinforced concrete riser structure and associated RCP piping. The discharge flow is currently conveyed through a 54-inch and 42-inch diameter HDPE pipe system (AECOM, 2018). The primary spillway ties into the existing 36-inch diameter RCP near the downstream toe -of -slope via a reinforced concrete manhole structure. In addition to the primary spillway, an emergency spillway was installed for the RAB in 2015 (AECOM, 2018). The Allen Closure Project (closure project) will consist of removing the free water from the AAB, excavating the existing CCR materials (in the AAB and in the existing RAB landfill) to support the AECOM Job Duke Energy —Allen Closure by Project No. 60603204 Sheet 2 of 6 Excavation Description Stormwater Calculations Computed by NSF Date 1/15/20 Checked by DMB Date 1/15/20 construction of a two new landfills (one in the AAB and one in the northwest corner of the RAB), and constructing several channels and detention basins to convey drainage of stormwater from the final closure grades to one of two outfall locations along Lake Wylie. The AAB dam will be breached at the location of the existing spillway and a detention basin will be constructed upstream of the breach. The southern portion of the AAB landfill will be graded to drain to this new detention basin which will then discharge directly to Lake Wiley/the Catawba River. Within the RAB, the existing RAB landfill will be removed and a new detention basin will be constructed in the northeast corner of the RAB. The northern portion of the AAB landfill and then entire RAB area will be graded to drain to this new detention basin which will then discharge directly to Lake Wiley/the Catawba River. The RAB dam will be breached in this location prior to the installation of this new detention basin. No flows are proposed to drain towards or discharge through the existing primary and emergency spillways in the RAB. The final designs will include stormwater conveyance channels that collect runoff from the drainage basin and safely convey stormwater flows to the two detention basins. The existing AAB and RAB spillways will be abandoned. For the proposed channels, detailed design of the geometry and the armoring has not yet been conducted and is not included in this analysis. Conceptual results are shown in Attachment CI-B. The following sections summarize the design criteria, procedures, assumptions, and results of the channel and culvert design activities. DESIGN CRITERIA The design criteria for the project are applicable to the stormwater conveyance channels, detentions basins, and spillways on and adjacent to the closure area. These criteria include requirements established for ash basin closure, and requirements from the North Carolina Department of Environmental Quality (NCDEQ) Erosion and Sediment Control Planning and Design Manual (NCDEQ, 2013). Channel Design Criteria The design requirements include conveyance of runoff from the 25-year, 24-hour storm event with a minimum of 6 inches of freeboard from the water surface elevation (WSE) within the proposed channels to the cover system lateral drainage layer outlet (as applicable) in the side of the channel, while also conveying the 100-year, 24-hour storm event without overtopping the channel bank. The channels are proposed to be constructed in a manner to convey stormwater runoff throughout the AAB and RAB and to direct this runoff to one of the three detention basins and their respective outfalls. AECOM Job Duke Energy — Allen Closure by Project No. 60603204 Sheet 3 of 6 Excavation Description Stormwater Calculations IV. Computed by NSF Date 1/15/20 Checked by DMB Date 1/15/20 The NCDEQ Erosion and Sediment Control Planning and Design Manual (NCDEQ, 2013) requires channels to convey runoff for the design storm (25-year, 24-hour storm event) while providing protection from erosion for the design velocities within the channel. Detailed design of the stormwater channels will be completed in a future submittal. Detention Basin Design Criteria The detention basins will be sized to attenuate the peak stormwater flows from the 100-year, 24- hour storm event with a minimum of 1 foot of freeboard in the proposed conditions. The detention basins will also be sized to convey stormwater through the outlet culverts without activating the emergency spillway during the 100-year, 24-hour storm event. Spillway Design Criteria The existing AAB and RAB spillways will be abandoned and both dams will be breached, so neither will be required to pass the Probable Maximum Precipitation (PMP) storm event in the proposed conditions. PpnrF:ni iRF Channel and Detention Basin Desi The proposed topography of the site was used to estimate slopes for the conveyance channels and culverts. The minimum channel slopes will be 0.5%. A conceptual proposed stormwater management plan used for the channel and detention basin calculations in this report is included in Attachment Cl-A. HydroCAD (Version 10.00) modeling software was used to conduct the hydrologic and hydraulic calculations for this analysis. To start the analysis, conceptual drainage areas were established at various locations within the AAB and RAB from the two outfalls upstream through the proposed drainage channels and culverts. Design inputs to the model were based on the drainage areas, runoff curve numbers, length of reaches between sub -drainage areas, channel and culvert geometry, rainfall data, and Manning's coefficients. Generation of hydrographs within the model was based on methodology and criteria provided in the Natural Resources Conservation Service's (NRCS) Technical Release 55 (NRCS, 1986). The model was used to generate peak flow rates, velocities, and depth of flow within the proposed channels and detention basins during the design storms. The HydroCAD model output can be found in Attachment C1-13. NOTES/ASSUMPTIONS The following is a list of key notes and assumptions made in completing this analysis. AECOM Job Duke Energy — Allen Closure by Project No. 60603204 Sheet 4 of 6 Excavation Description Stormwater Calculations V. Computed by NSF Date 1/15/20 Checked by DMB Date 1/15/20 • The 25-year and 100-year storm rainfall amounts were obtained from the NOAA Atlas 14 Point Precipitation Frequency Data Server. The rainfall amounts were applied within the model according to the 24-hour NRCS Type II distribution. • Within the HydroCAD program, runoff was calculated using the Soil Conservation Service (SCS) TR-20 method. • Runoff curve numbers (CNs) used in the analysis were 80 for cover system areas. A CN of between 60 and 75 was used for areas outside of the cover system as appropriate based on their land use and hydrologic soil group per tables provided in NRCS Technical Release 55 (NRCS, 1986). In general, most areas outside of the basin can be characterized as residential or wooded areas in good condition with hydrologic soil group B. • The time of concentration was calculated using HydroCAD, which includes inputs for each drainage area for the longest hydraulic flow path and average land slope. • Manning's "n" factors used were 0.045 for grass lined channels, 0.025 for Fabriform or equivalent structural lined channels, 0.012 for concrete box culverts, and 0.013 for smooth interior corrugated PE culverts. • The values provided in this submittal may change as the design is refined and updated in future submittals. SUMMARY OF RESULTS Channels All channels in the proposed conditions have been preliminarily sized based on the conceptual stormwater management plan in Attachment Cl-A; however, they have not been analyzed in detail. Detailed design of the stormwater channels will be completed in a future submittal. Detention Basin The detention basins have been sized to attenuate the peak stormwater flows from the 100-year, 24-hour storm event in the proposed conditions. Each detention basin is also below the minimum height and storage volume (25 feet and 50 acre-feet, respectively) for a structure to be classified as a dam as outlined in the North Carolina Dam Safety Law of 1967 (NC General Statutes, 1967). See Table 1 below for a summary of the detention basins and their peak discharges during the 100-year, 24-hour storm event. The values shown below may change as the design is refined and updated in future submittals. AECOM Job Duke Energy — Allen Closure by Excavation Description Stormwater Calculations Project No. 60603204 Computed by NSF Checked by DMB Table 1— Detention Basin Summary Sheet 5 of 6 Date 1/15/20 Date 1/15/20 Detention Height (ft) Storage Outlet Discharge Peak 100- Basin Volume (ac- Structure Location year ft) Discharge (cfs) Upstream of 16 48 Two 20-inch Lake Wiley 73 AAB dam Culverts breach Upstream of 16 48 Two 36-inch Lake Wiley 247 RAB dam Culverts breach Additional detailed results can be found in the HydroCAD model output report in Attachment Cl- B. VI. CONCLUSIONS The proposed grading of the closed AAB and RAB, in combination with the design of the proposed channels and detention basins is sufficient to safely control and convey their respective design storms as presented above. The detentions ponds have a minimum of 1 foot of freeboard and convey stormwater through the outlet culverts without activating the emergency spillway during the 100-year, 24-hour storm event. Wave action has not be analyzed at this time; however, 1 foot of freeboard is anticipated to be adequate based on the size of the detention basins. VII. ATTACHMENTS Attachment Cl-A: Figures Attachment Cl-B: HydroCAD Report AECOM Job Duke Energy —Allen Closure by Project No. 60603204 Sheet 6 of 6 Excavation Description Stormwater Calculations Computed by NSF Date 1/15/20 Checked by DMB Date 1/15/20 VIII. REFERENCES AECOM, 2018. Phase 2 Reconstitution of Ash Pond Designs Report (Rev. 4), Allen Steam Station. April 26, 2018. Applied Weather Associates. (2019). Site -Specific Probable Maximum Precipitation Study, Allen Basin, North Carolina, 2019. Natural Resources Conservation Service (NRCS). (1986). "Urban hydrology for small watersheds." Technical release No. 55, U.S. Dept. of Agriculture, Washington, D.C. North Carolina Department of Environmental Quality (NCDEQ). (2013). Erosion and Sediment Control Planning and Design Manual, May 2013. North Carolina General Statutes, Chapter 143. (1967). North Carolina Dam Safety Law of 1967. NOAA, National Weather Service (2018) Precipitation -Frequency Atlas of the United Stated Point Precipitation Frequency Estimates by NOAA Atlas 14, Volume 2, Version 3; (NOAA website: https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html Probable Maximum Precipitation Estimates, United States East of the 105th Meridian. Hydrometeorological Report No. 51. NOAA. June 1978. http://www.nws.noaa.gov/oh/hdsc/studies/pmp.html#PMP documents URS Corporation (URS). (2014). Hydrologic and Hydraulic Analysis, Allen Steam Station Ash Ponds. December 2014. ATTACHMENT Cl-A FIGURES \ \ \\ \-4 \ \ 111 1 \I I, ��l I \11 \\\ \\\ ��� I \ \ ` `\ \ `\ IN \ \ rl \\ \ \ \ 0 1 t IN III \ // 1 \ �o / `� ,__, _ ` 1 A \ �\` ®� ALLEN STEAM STATION III 1 ( \\\\\ 1 OE n , \\��\, i100 \ l NN V. // l_ \^`\ /�11 `J� II Lam �y \\ _-- -- I — --- T ALA RD '—' _', _ _— ------ \,/ n / �i /r.// li111 PLAN ��\ \II �� n I + 1\/ '� \\� ^\ /' COAL YARD 0IL %. LINED ` � III \\\ / 1 `\�frl� I)l�d JAI HOLDING O ° ---- --------' �` / �\\ \ , f ,,a \ \ \, \ l! f !� BASIN \ \ �� ) \ ,\ \ S�'/// III -W --625_ --- \\ -- / / \` \ \ \ \\ II \II , / \ SR- _® � \ �� \\ \ \ \ it /J I \ti\- � ! fill --____'__if /lt) ill O / ^n/ $ Q i \\ ` _ 600''-----_— -�\\\\ \ ��\\ CO C.0 I I I W NN IN. CONCEPTUAL INITIAL LANDFILL O \' \� ��\\`\��\\�` `\ `�--'� i `\\ �__'--J FOOTPRINT/GRADING SEE \ `� \\\ 11\ ` � _ --- ,� ( TL 1A606\\\ 111\\\ 1 \ \ \ \_--------_--- 1 I I NOTE 1.2 IN GENERAL NOTES, ) (100kV DRAWING NO ALN_C999.001.012) ' w I,J en I TL 5N5 v W /' I I \�_� \:� . ---'�i -' — — _. _` _. 1 1 r� 4--� 1 \ ��=r _ \ �� \ ---- // IIIIIII ��II �� 1 ` IIII I'i I col CHANNEL GRADING NOT \ (500kV) i III1111111I111i1111 I SHOWN SEE NOTE 8 / 6SO— i ` \I i� ��i� liill�liil it ( ) ' / ( \ / 1 \ / W �♦ / \\ ♦ / / Ij ' 11j l lll' IIII I I I , / -'------' II }, t� /— , W1J /r' Il �I if IIIIIIII IIII �I� I W / i `\ \ `\_�__-_ _�\ \ i I `� / 1 IIII (IIII (IIIIIII 1 �/ O / CHANNEL GRADING NOT \ \ \ \ I / I (IIII IIII II III --'' — _ / — ----- T-- — TL 2A10 —' .' SHOWN (SEE NOTE 8) lliilil Iliill -r' `. \ I ' /// '// IIII IIII �Iljlll+ I I I (230kV) `� ) % i/i i / � -'1 IIII( (IIII IIII �I� + I I / F I �d W f `---------' I / /'\ . � W,- -- ^\-- \ �-----'bLi-J''� ,' �--__-'' Co III Co CDI I l �Gj/ i ICI IIII �I�jIII \ l t ^�} I W / �' ' , 111 III I IIII S \I �i \ \ \ r� /� ♦'� / I IIII IIII II I \ \\ \ Ld c \\ \ r"[, �_ \ ` \\ \� �• r-� �`------'' i / / / / // i'�i I II III III I �•� \ \\ �-_� ri/ � -� ____' I ��`�� I II IIII I��j II I'� TL 1A482I if \ --_ — — L '`: \ : �,, / ,�, I `\ `, 1 ►� II1� (IIII 1 — ----__ 1 \ O — � \/.�------- ---------- (100kV) •� \ � � /../// I / \ \ ��\ wj - \ \\ (IN / I \` ♦\ __ _ _/ _ill/I/I -� \\ ," `===ice �\ \./ CHANNEL GRADING NOT, _---__.\ \\ \ r�i-- ��`--\ SHOWN (SEE NOTE 8) �0�� rah / —B NOV, —TH DIKE 0 A` ] � , � �/ f'�� I I�III�II III � I Ij I \�\ `iiill fill o \ ` \—♦ —� � � \ j % i // I�IIIjIIpIIIII IIII OWN l RETIRED ASH BASIN DIKE (GASTO-016) CONCEPTUAL DAM BREACH GRADING (SEE NOTE 1.3 IN GENERAL NOTES, DRAWING NO. ALN_C999.001.012) PROPOSED DETENTION BASIN 2-36" CULVERT OUTLETS. INLET ELEVATION 566.0 FT. EMERGENCY SPILLWAY ELEVATION 581 FT. LAKE WYLIE/ CATAWBA RIVER NORMAL W.S.E. 565.7 FT. 100-YEAR FLOOD ELEVATION: 571.3 FT. EMERGENCY SPILLWAY (TO BE ABANDONED) 625 --62! ALN C999.001.027 wv. A LEGEND PROPOSED MAJOR CONTOUR (25 FOOT) PROPOSED MINOR CONTOUR (5 FOOT) EXISTING MAJOR CONTOUR (25 FOOT) EXISTING MINOR CONTOUR (5 FOOT) DUKE ENERGY PROPERTY BOUNDARY APPROXIMATE LIMITS OF IMPOUNDED ASH APPROXIMATE ASH BASIN WASTE BOUNDARY �•�••� LIMITS OF WATER 100—YR 100 YR FLOOD LINE STORMWATER FLOW DIRECTION 0 PERMITTED SPILLWAY (TO BE ABANDONED) NOTES NPDES OUTFALL SWO15 ;il COAL YARD SUMP DISCHARGE 00,(IIIIIII „III I I I 11 (ABANDONED) iiC) U') IIII III I I �� O III�j �IIIIIj II o'iill��lliilll jllllll O LA co co r- I� I� O co 0 0 0 I \� I I I I I Y r IIIIIII II I III CONCEPTUAL AAB LANDFILL I \ lill Q l— Ili ill I ' %J — ---- — \ FOOTPRINT/GRADING (SEE `Y I\ilii w Q 1.1l� \\ I IN I NOTE 1.2 IN GENERAL NOTES, DRAWING NO ALN_C999.001.012) i'(d i (.0 / I 1► \1 ' 1 % r'�\ \\ \ `\ �`� - I I I IIII I l if l \ ► ' + I I � I 1 \ h \-~___ � IIIIIII I III / / / / I I 1 / \ 1 � � r- I i' III I I •I l ,1 �\ ]I I I l 111 I •� /�'; y �- _ /,J,1 oW oW \ �o Ali I O� � ili600 I iliiii � II11 11625► ICI IIII + / / ,/ _,-� I iillliir�iiili IIIIIII � II I I II I I II - \;(IIII III IIII III 11 I � --- � � � \�(IIIIIII I I I Illll \ \ \\ �III��/I�j Jill I III LTV r ' � \\ \ ` / ' / \ `\ �\ - __• \ 6S 62 i /� / / / r / / / WTS PAD / II / --- ///i i / / CHEMICAL E \ S /.- - j// / 1 1 / I BUILDING / / / N i (REMOVED)JI IN 6'I� /I `I� Cp \I \\ � O \ / /�-625 IN \NN11 / I ice---- I zz PROPOSED DETENTION BASIN 2-20" CULVERT OUTLETS. INLET ELEVATION 566.0 FT. 1�T EMERGENCY SPILLWAY ELEVATION 581 FT. 1� CONCEPTUAL DAM BREACH GRADING (SEE NOTE 1.3 IN GENERAL NOTES, DRAWING NO. ALN_C999.001.012) ft JURISDICTIONAL STREAM HATCH LEGEND WETLAND (SEE NOTE 4) POTENTIAL HABITAT - SCHWEINITZ'S SUNFLOWER (SEE NOTE 3) PROPOSED DETENTION BASIN 1. LIMITS OF IMPOUNDED ASH ARE APPROXIMATE. 2. REFER TO SHEET ALN_C999.001.012 FOR REFERENCES. 3. POTENTIAL HABITAT FOR SCHWEINITZ'S SUNFLOWER WAS IDENTIFIED BY AMEC'S JUNE 24, 2015 NATURAL RESOURCES TECHNICAL REPORT. PRIOR TO LAND DISTURBANCE, THE U.S. FISH AND WILDLIFE SERVICE MAY REQUIRE A BIOLOGICAL SURVEY OF THESE D AREAS. r z 4. POTENTIAL JURISDICTIONAL WATERS (STREAMS/WETLANDS) WERE IDENTIFIED BY I AMEC'S JUNE 24, 2015 NATURAL RESOURCES TECHNICAL REPORT AND SURVEYED BY MCKIM & CREED IN FEBRUARY 2016. CONFIRMATION IS PENDING U.S. ARMY CORPS OF ENGINEERS REVIEW. C4 5. WORK WITHIN THE 100-YEAR FLOODPLAIN ALONG THE SHORELINE OF THE CATAWBA RIVER MAY REQUIRE PERMITTING. Q 6. EXISTING TRUCK WASH AND SCALES TO THE NORTH OF ASH FILL 1 MAY NOT BE LOCATED WITHIN THE ASH BASIN LIMITS SHOWN ON THE DRAWINGS. THIS WILL NEED • TO BE VERIFIED PRIOR TO CONSTRUCTION. O N 7. THE INTENT IN BREACHING THE RAB AND AAB DIKES IS TO REMOVE THE DIKES FROM REGULATION AS DAMS. THIS WILL BE ACCOMPLISHED BY PERFORMING A FULL LOCAL BREACH, I.E. TO REMOVE A PORTION OF THE DIKE COMPLETELY DOWN TO NATIVE GROUND AT ITS LOWEST POINT SUCH THAT THE DIKE WILL NOT IMPOUND WATER OR CCR MATERIAL. A SEPARATE NEW BERM WILL BE BUILT AROUND THE FUTURE STORMWATER MANAGEMENT AREA FOR LONG-TERM STORMWATER TREATMENT. 8. STORMWATER CHANNEL GRADING IN THE RAB AND NORTH/NORTHWEST PART OF THE AAB IS NOT SHOWN ON THIS PLAN. THIS GRADING HAS BEEN CONSIDERED AT A CONCEPT LEVEL TO VERIFY ITS FEASIBILITY AND WILL BE SHOWN AS PART OF FUTURE • DETAILED DESIGN. 0 300 600 900 — LAKE WYLIE LAKE WYLIE/ NOT FOR CONSTRUCTION 100-YEAR CATAWBA RIVER FLOOD NORMAL W.S.E. GRAPHIC SCALE (IN FEET) ELEVATION: 565.7 FT. 571.3 FT. TITLE FINAL SURFACE WATER MANAGEMENT PLAN - NPDES OUTFALL 002 ALLEN STEAM STATION PERMITTED SPILLWAY CCR SURFACE IMPOUNDMENT CLOSURE PLAN DRAWINGS - CBE (TO BE ABANDONED) GASTON COUNTY, NORTH CAROLINA N.C. ENGINEERING LICENSE NO. FOR ISSUED FOR APPROVAL F-0342 — JURISDICTIONAL STREAM SEAL SCALE: AS SHOWN DES: ANR DUKE DWG TYPE:. DWG DFTR: AMC ENFlkGY® DATE: 01 - 1 - 0 ENGR: JDM FILENAME: ALN-C999.001.027 FINAL SURFACE WATER MANAGEMENT PLAN.DWG APPD: JDM DWG SIZE DRAWING NO. REVISION ANSI 22.0"x34.0" ALN C999.001.027 A — INCHES TENTHS i0 1 ATTACHMENT C1-6 HydroCAD Modeling Output — M 2035 POW • �L 208R NED 7 .] r, F 2045 aaE ta�auu n.ea ��� io471 n 0 sre.o_ - E.'SpII imso mssa 4 Fa - 1o4 104s } Subcat Reach on Link a Routing Diagram for Closure Plan HydroCAD model 1.13.20 Prepared by AECOM, Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 18.541 60 (102S) 31.826 80 (102S) 18.639 61 >75% Grass cover, Good, HSG B (102S, 107Sa) 85.277 74 >75% Grass cover, Good, HSG C (106S, 201 S, 202S, 203S) 177.910 80 Final Cover (103S, 104S, 105Sa, 106S, 107Sa, 107Sb, 108S, 201 S, 202S) 50.505 74 Pasture/grassland/range, Good, HSG C (204S) 68.566 75 Residential (106S, 107Sa, 201 S) 48.379 60 Woods (106S, 201 S) 14.233 60 Woods, Fair, HSG B (202S) 513.877 74 TOTAL AREA Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 32.872 HSG B 102S, 107Sa, 202S 135.783 HSG C 106S, 201 S, 202S, 203S, 204S 0.000 HSG D 345.222 Other 102S, 103S, 104S, 105Sa, 106S, 107Sa, 107Sb, 108S, 201 S, 202S 513.877 TOTAL AREA Closure Plan HydroCAD model 1.13.20 Prepared by AECOM HvdroCAD® 10.00-25 s/n 09114 © 2019 HvdroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground (acres) (acres) (acres) (acres) (acres) (acres) Cover Allen CbE Jan. 2020 Printed 1/15/2020 Paae 4 Subcatchment Numbers 0.000 0.000 0.000 0.000 50.367 50.367 102 S 0.000 18.639 85.277 0.000 0.000 103.916 >75% Grass cover, Good 102 S, 106 S, 107 Sa, 201 S, 202 S, 203 S 0.000 0.000 0.000 0.000 177.910 177.910 Final Cover 103 S, 0.000 0.000 50.505 0.000 0.000 0.000 0.000 0.000 0.000 68.566 0.000 0.000 0.000 0.000 48.379 104 S, 105 Sa, 106 S, 107 Sa, 107 Sb, 108 S, 201 S, 202 S 50.505 Pasture/grassland/range, Good 204 S 68.566 Residential 106 S, 107 Sa, 201 S 48.379 Woods 106 S, 201 S Closure Plan HydroCAD model 1.13.20 Prepared by AECOM HvdroCAD® 10.00-25 s/n 09114 © 2019 HvdroCAD Software Solutions LLC Ground Covers (all nodes) (continued) HSG-A HSG-B HSG-C HSG-D Other Total Ground (acres) (acres) (acres) (acres) (acres) (acres) Cover Allen CbE Jan. 2020 Printed 1/15/2020 Paae 5 Subcatchment Numbers 0.000 14.233 0.000 0.000 0.000 14.233 Woods, Fair 202 S 0.000 32.872 135.783 0.000 345.222 513.877 TOTAL AREA Closure Plan HydroCAD model 1.13.20 Prepared by AECOM HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Allen CbE Jan. 2020 Printed 1/15/2020 Page 6 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 100P 566.00 565.00 100.0 0.0100 0.013 20.0 0.0 0.0 2 103P 565.00 564.00 100.0 0.0100 0.013 20.0 0.0 0.0 3 104P 566.00 565.00 100.0 0.0100 0.013 36.0 0.0 0.0 4 107P 565.00 564.00 100.0 0.0100 0.013 30.0 0.0 0.0 5 108P 611.00 606.00 50.0 0.1000 0.012 42.0 0.0 0.0 6 200 570.20 566.40 114.3 0.0332 0.012 36.0 0.0 0.0 7 200 606.12 570.20 56.3 0.6380 0.013 42.0 0.0 0.0 8 200 609.10 606.12 27.3 0.1092 0.013 42.0 0.0 0.0 9 200 611.09 609.10 20.5 0.0971 0.013 54.0 0.0 0.0 Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 7 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points x 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 102S: DA 102 Runoff Area=2,301,379 sf 0.00% Impervious Runoff Depth=2.89" Flow Length=850' Tc=10.2 min CN=72 Runoff=233.68 cfs 12.712 of Subcatchment 103S: DA 103 Runoff Area=1,375,819 sf 0.00% Impervious Runoff Depth=3.66" Flow Length=1,200' Tc=11.8 min CN=80 Runoff=165.48 cfs 9.644 of Subcatchment104S: Area Draining to 104 Runoff Area=1,224,363 sf 0.00% Impervious Runoff Depth=3.66" Flow Length=1,000' Tc=13.9 min CN=80 Runoff=137.58 cfs 8.583 of Subcatchment 105Sa: Area draining to 105 Runoff Area=914,000 sf 0.00% Impervious Runoff Depth=3.66" Flow Length=2,150' Tc=32.6 min CN=80 Runoff=63.27 cfs 6.407 of Subcatchment 106S: DA 106 Runoff Area=3,568,027 sf 0.00% Impervious Runoff Depth=2.79" Flow Length=1,935' Tc=24.2 min CN=71 Runoff=226.60 cfs 19.074 of Subcatchment107Sa: Northwest AAB Runoff Area=1,934,630 sf 0.00% Impervious Runoff Depth=2.79" Flow Length=1,050' Tc=14.1 min CN=71 Runoff=165.45 cfs 10.342 of Subcatchment 107Sb: NW of North face of Runoff Area=513,700 sf 0.00% Impervious Runoff Depth=3.66" Flow Length=1,050' Tc=14.1 min CN=80 Runoff=57.27 cfs 3.601 of Subcatchment 108S: Area draining to 102 Runoff Area=924,571 sf 0.00% Impervious Runoff Depth=3.66" Flow Length=750' Tc=10.0 min CN=80 Runoff=118.38 cfs 6.481 of Subcatchment201 S: DA 201 Runoff Area=4,998,000 sf 0.00% Impervious Runoff Depth=2.89" Flow Length=750' Tc=28.7 min CN=72 Runoff=293.94 cfs 27.607 of Subcatchment202S: DA 202 Runoff Area=1,830,000 sf 0.00% Impervious Runoff Depth=2.79" Flow Length=400' Tc=22.8 min CN=71 Runoff=120.15 cfs 9.783 of Subcatchment203S: DA 203 Runoff Area=600,000 sf 0.00% Impervious Runoff Depth=3.08" Flow Length=700' Tc=14.2 min CN=74 Runoff=56.45 cfs 3.531 of Subcatchment204S: RAB Landfill Area Runoff Area=2,200,000 sf 0.00% Impervious Runoff Depth=3.08" Flow Length=100' Slope=0.0200 '/' Tc=10.0 min CN=74 Runoff=239.25 cfs 12.946 of Reach 102R: Ditch 102 Avg. Flow Depth=1.86' Max Vet=5.94 fps Inflow=454.15 cfs 38.267 of n=0.025 L=2,400.0' S=0.0054 '/' Capacity=1,916.64 cfs Outflow=392.71 cfs 38.267 of Reach 104: Ditch 104 Avg. Flow Depth=0.77' Max Vet=3.65 fps Inflow=137.58 cfs 8.583 of n=0.025 L=1,550.0' S=0.0058'/' Capacity=2,039.57 cfs Outflow=118.45 cfs 8.583 of Reach 106R: Ditch 106 Avg. Flow Depth=1.35' Max Vet=4.71 fps Inflow=226.60 cfs 19.074 of n=0.025 L=1,210.0' S=0.0050'/' Capacity=1,833.82 cfs Outflow=217.35 cfs 19.074 of Reach 107Ra: Ditch 107_Shallow Avg. Flow Depth=1.35' Max Vet=5.55 fps Inflow=261.46 cfs 20.350 of n=0.025 L=870.0' S=0.0069 '/' Capacity=1,739.55 cfs Outflow=254.49 cfs 20.350 of Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 8 Reach 107Rb: Ditch 107_Steep Avg. Flow Depth=0.73' Max Vet=10.85 fps Inflow=254.49 cfs 20.350 of n=0.025 L=570.0' S=0.0561 T Capacity=4,963.15 cfs Outflow=253.84 cfs 20.350 of Reach 109R: Ditch 105 Avg. Flow Depth=0.66' Max Vet=8.82 fps Inflow=118.38 cfs 6.481 of n=0.025 L=950.0' S=0.0442 '/' Capacity=2,959.13 cfs 0utflow=116.03 cfs 6.481 of Reach 206Ra: Channel 201 Avg. Flow Depth=1.56' Max Vet=5.15 fps Inflow=293.94 cfs 27.607 of n=0.025 L=1,800.0' S=0.0050'/' Capacity=8,724.30 cfs Outflow=278.61 cfs 27.607 of Reach 206Rb: Channel 201 Avg. Flow Depth=2.26' Max Vet=6.36 fps Inflow=571.87 cfs 60.902 of n=0.025 L=2,430.0' S=0.0049 '/' Capacity=8,670.28 cfs Outflow=528.74 cfs 60.902 of Reach 207R: Channel 202 Avg. Flow Depth=0.91' Max Vet=3.73 fps Inflow=120.15 cfs 9.783 of n=0.025 L=1,300.0' S=0.0050'/' Capacity=8,724.30 cfs 0utflow=111.86 cfs 9.783 of Reach 208R: Channel 202 Avg. Flow Depth=1.04' Max Vet=4.04 fps Inflow=143.68 cfs 13.313 of n=0.025 L=1,100.0' S=0.0050'/' Capacity=8,724.30 cfs Outflow=138.94 cfs 13.313 of Pond 10OP: SE Detention Option 1 Peak Elev=576.13' Storage=1,214,565 cf Inflow=643.02 cfs 56.493 of Primary=61.30 cfs 57.339 of Secondary=0.00 cfs 0.000 of Outflow=61.30 cfs 57.339 of Pond 103P: SW Detention Option 2 Peak EIev=566.00' Storage=35,000 cf Inflow=0.00 cfs 0.000 of Primary=4.65 cfs 0.530 of Secondary=0.00 cfs 0.000 of Outflow=4.65 cfs 0.530 of Pond 104P: NE Detention Option 1 - Peak EIev=576.24' Storage=1,108,735 cf Inflow=666.63 cfs 74.216 of Primary=201.18 cfs 74.973 of Secondary=0.00 cfs 0.000 of Outflow=201.18 cfs 74.973 of Pond 107P: East SW Detention Option 3 Peak EIev=566.00' Storage=35,000 cf Inflow=0.00 cfs 0.000 of Primary=3.12 cfs 0.529 of Secondary=0.00 cfs 0.000 of Outflow=3.12 cfs 0.529 of Pond 108P: RAB Ex. Spillway (no storage) Peak EIev=0.00' Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Tertiary=0.00 cfs 0.000 of Pond 200: RAB Outlet Pond (no storage) Peak EIev=0.00' Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Tertiary=0.00 cfs 0.000 of Link 102L: Lake Wylie/Catawba River Link 104L: Lake Wylie/Catawba River Inflow=61.30 cfs 58.398 of Primary=61.30 cfs 58.398 of Inflow=201.18 cfs 74.973 of Primary=201.18 cfs 74.973 of Total Runoff Area = 513.877 ac Runoff Volume = 130.709 of Average Runoff Depth = 3.05" 100.00% Pervious = 513.877 ac 0.00% Impervious = 0.000 ac Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 102S: DA 102 Runoff = 233.68 cfs @ 12.02 hrs, Volume= 12.712 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN DescriDtion 807,646 60 107,375 61 >75% Grass cover, Good, HSG B 1,386,358 80 2,301,379 72 Weighted Average 2,301,379 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0500 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 3.6 750 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 10.2 850 Total Subcatchment 102S: DA 102 Hydrograph ❑ Runoff 0 240 24 233.68 cfs t I t I t 230 220 210 t 200 190 180 It �ItIt1 t 170 160 It tltItI t 150 v10 3 130 t O t t 0 120 1110 100 t �t1tI t 90 80 t tI t1 t 70 60 50 _ 1t + l t 40 20 t 10 t-I �-� I-t I -t � -t I J�Y�� j I 7j�-r� t t It I-�5Lye "folk—tYJ81"t Runoff �� 8V H Ht1-4 ip� FaLen4i I :T tc!=1L t1 t1 It It I t t I t I t ic-"�:T? t t H t 1-1 1 t 1 t1 t t IF71 I t I-q t 7 1 t t F-I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 10 Summary for Subcatchment 103S: DA 103 Eastern Face of Mound Runoff = 165.48 cfs @ 12.03 hrs, Volume= 9.644 af, Depth= 3.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 1,375,819 80 Final Cover 1,375,819 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0500 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 5.2 1,100 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 11.8 1,200 Total Subcatchment 103S: DA 103 Hydrograph 165.48 cfs — I ❑Runoff 4 1 1 4I �-I �-I 145ly6""fi-1W5JOL't l3u 120 110Lt L LI El LIR"'7` T�fyZill 190 c = T T T Ft L1 LL 80 70 1-7 - - T I T I T F1 F-I I7 1-� I - 7 1 41.&:inf 6050 40 1� t I t I t t-I �-I I� I 1-� I t I t I t I �I 30 I� + 1 +1 H H H 1-t 1 + I i-I 120 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 11 Summary for Subcatchment 104S: Area Draining to 104 Runoff = 137.58 cfs @ 12.06 hrs, Volume= 8.583 af, Depth= 3.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 1,224,363 80 Final Cover 1,224,363 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.3 900 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.9 1,000 Total Subcatchment 104S: Area Draining to 104 Hydrograph I� �I�IL LI i� I-4 -1LI L -I 150 140 137.58 cfs L 1 L 1 L LI LI IL IL I L L I +� J�.jj , 120 rt t I t I tl t-I �I I� 1-15!rte"airi i=- 5JW _ 110 I �- I �-1 �-1 I-Rulnpff $klrpa��t?? 41,:�6� 0 190 L �R w v Runoff Depth= 66" LL 80 1� 4 1 1 LI H H I� 1� F�o�v� le ith=4J,66� 60 Ill. 50 j t I t I t- H H H 1-tI J I I t I t� I 40 30 L�LLLLLL1�11 L I LL 20 rtl�lfil _ I I �I I� ICI I I I'�I I ILI1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 12 Summary for Subcatchment 105Sa: Area draining to 105 Runoff = 63.27 cfs @ 12.28 hrs, Volume= 6.407 af, Depth= 3.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 914,000 80 Final Cover 914,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.5 950 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 18.5 1,100 0.0200 0.99 Shallow Concentrated Flow, shallow 2 Short Grass Pasture Kv= 7.0 fps 32.6 2,150 Total Subcatchment 105Sa: Area draining to 105 Hydrograph + + 6511 1 63.27 cfs I L I L I L I LI -LI LI LI L 11 60{ I-f I t I t I t I t I t I t I 11�1tr� t-I _ ai Rla i nlf l ll= '} 55 V / 50 1 — — — 1 1 1 1 1 1 1 1 — — 1 I I I I — I I — I I — — — — — — — — I fthdff Atela#9114�0100 isf 45 1 F�° Y-CI14pf` 7 40 3 35 l 1 1 1 1 I 1 1 1 nlI�� �1 `- 4 �p �W th=L- 50 LL 30 14 1+1 T1 T1 �I `en H H N 1-4I ' 25 20 T IT 1 T I T I TI TI c-�i F-I FI 1t I-F I7 tTM6-td 15 I_� ICI T1 4_1 �_1 �_1 �_1 N 1_t 14 14 14 1�1 10 F T I T 171 TI F-I FI n I-t IT IT IT IT 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 106S: DA 106 Area that drains using HydroCAD catchmentarea +38.75 acres to the southwest of the basin by the pond Runoff = 226.60 cfs @ 12.18 hrs, Volume= 19.074 af, Depth= 2.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 1,208,372 60 Woods 962,761 75 Residential 305,686 74 >75% Grass cover, Good, HSG C 1,091,208 80 Final Cover 3,568,027 71 Weighted Average 3,568,027 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.5 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 14.1 1,235 0.0436 1.46 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.6 600 0.0100 17.56 1,264.11 Trap/Vee/Rect Channel Flow, Bot.W=30.00' D=2.00' Z= 3.0 '/' Top.W=42.00' n= 0.012 24.2 1,935 Total Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 14 Subcatchment 106S: DA 106 Hydrograph r itltIti I I tl tl It i I I t I t I t I tl t 250 240 230 220 226.60 cfs--F + I t I t I t t t t 1 t I t 1 200 t 1 t 1 t l D CI It 45Lie"" fid- kiF5JO t 1 180 t t I t 1 t 1 t t IR4np# lrfl ate,§Q1,97 0 150 It 1- I t I t I t l �I �I Iut160 140 RunoffVC 7�� 0 120 It i- t I t I t l tl tl It It 14D 1 1 110 100 1t - - 1 t I t t t t t 1 t t Ali 90 80 70 60 50 1t t I tI tl -1 H It 1--tI- t I t I tl tl t 40 20 It t I t �-I �-I It 1-4 14 t 1 t 14-1 4-1 �I 10 0 0 2 4 6 8 10 12 14 16 1820 22 24 26 28 30 32 34 Time 36 38 40 42 44 46 48 50 52 54 56 58 60 62 6466 6870 72 (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 15 Summary for Subcatchment 107Sa: Northwest AAB Runoff = 165.45 cfs @ 12.06 hrs, Volume= 10.342 af, Depth= 2.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 456,118 80 Final Cover 704,538 61 >75% Grass cover, Good, HSG B 773,974 75 Residential 1,934,630 71 Weighted Average 1,934,630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.5 950 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 14.1 1,050 Total Subcatchment 107Sa: Northwest AAB Hydrograph 180 170 165.45 cfs 1 � I �I �I I� I-4 14 4 17 + L� �. 160 150 I� 4 1 4-1 4- �1 �1 _ I� 1�5 140 130 z � u# ►M'ga��9�41,Q3Q 110 Lt - I I L I L I LI El I ul "-Ir l' 12 a�f 100 so� —— - -Io -IIFoLi IRIn ff Dh=2.7 " — —�eL j LL 80 70 _ I- I T I T I T E1 F-I I7 17 17 7 1 U 4.-inf 6050 IG"71 4030 t I t I t I t-I �-I II I t l fi l fit �I 120 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 16 Summary for Subcatchment 107Sb: NW of North face of AAB Runoff = 57.27 cfs @ 12.06 hrs, Volume= 3.601 af, Depth= 3.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 513,700 80 Final Cover 513,700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.5 950 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 14.1 1,050 Total Subcatchment 107Sb: NW of North face of AAB Hydrograph 60 57.27 55� 50 IH I -t It I t I t I t I HI HI — — — — — — — — — — — — — — — 45 1 1 11 1 1 111WHIMI I fthuff a Lela-5113�7100 isf — — — — — — — — — — — — — — — 40 IH 1 14 1 1 1 _�_I HI H�Lq offVnIqr p=3-6iO 11_paf 3 35 H H H H H%norI�e1h1=3:. 30 OW' en }hamn/ •1LV G ■ SL �jLV 25 I I I I I I I I I I I I I I I I I I II I I ICI ���I� 20 1-LIHI-LILI HI HI H H IH U Ht-W 15 10 + IHIHIHIHI HI HI HI H IH IH IH IHIHI 5 I,II 71III11111111111111-1 111111 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 17 Summary for Subcatchment 108S: Area draining to 102 Runoff = 118.38 cfs @ 12.01 hrs, Volume= 6.481 af, Depth= 3.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 924,571 80 Final Cover 924,571 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0500 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 3.1 650 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 9.7 750 Total, Increased to minimum Tc = 10.0 min 13 12 11 10 Subcatchment 108S: Area draining to 102 Hydrograph - - I -I -M M M _7 I—T 7 -7I 7 118.38 CfS ❑Runoff III J- I �-I �-I Ou 70 I� 3 I- 60 .° 50 40 30 20 10 ar ain i l t l t l t l t-1 �1 -RWr off Ar*a=92145711 Jsf �De h-��unl�f 1W ILen� th=. 50l I- T I T I � 1 F1 F-1 I7 1-7 7 ITT LT .6nj IIIIIIIIIIIIIIIIII11111tk�=" �I+I+1-HH H H I-tI4I4I+II-�-.11 L�I11111111111111111111111111 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 18 Summary for Subcatchment 201S: DA 201 Area that drains using HydroCAD catchmentarea +38.75 acres to the southwest of the basin by the pond Runoff = 293.94 cfs @ 12.22 hrs, Volume= 27.607 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 899,000 60 Woods 1,250,000 75 Residential 2,239,000 74 >75% Grass cover, Good, HSG C 610,000 80 Final Cover 4,998,000 72 Weighted Average 4,998,000 100.00% Pervious Area Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 20.8 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.41" 3.5 150 0.0200 0.71 Shallow Concentrated Flow, shallow Woodland Kv= 5.0 fps 4.4 500 0.0740 1.90 Shallow Concentrated Flow, shallow Short Grass Pasture Kv= 7.0 fps 28.7 750 Total Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 19 Subcatchment 201 S: DA 201 Hydrograph 320 I� rt 14 1� 1 -T—I � I � I H I i r I+ 14-1 ❑Runoff 30o 300 293.94 cfs � � � � � � � � � -L I l � I 1I� 260 TI �I �I I� T P I -fill` 15LeWF�arifi=�J8t 240 I� � � I � I � I �I �I �I I�ulpl�#�°►�"��f��I�Q �# 220AL 200 _ _ 1 J- I t-I �-I _ -�rfTjv l �u r 1-7 180 160 T T T -I -I I- 97 I- R-- = I -ii l 0 _ i�h LL 140 t I t I t l -I H 1-t I 11�d= 120 100 4-1 -kI �I 1-4 14 4 14- 14- P�=T� 80 60 I11 TIT I 1111111111111111' 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 20 Summary for Subcatchment 202S: DA 202 Area that drains using HydroCAD catchmentarea +38.75 acres to the southwest of the basin by the pond Runoff = 120.15 cfs @ 12.16 hrs, Volume= 9.783 af, Depth= 2.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN DescriDtion 620,000 60 Woods, Fair, HSG B 570,000 74 >75% Grass cover, Good, HSG C 640,000 80 Final Cover 1,830,000 71 Weighted Average 1,830,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.41" 2.0 300 0.2500 2.50 Shallow Concentrated Flow, shallow Woodland Kv= 5.0 fps 22.8 400 Total Subcatchment 202S: DA 202 Hydrograph �ITIT T �I �I I� I-4 1- TT T �I 1301/1120.15 120 fl- cfs T T T T I T Tp+�_1, 110 1 L 1 LI LI LI -�5�y�Okal 6fAk-�.18t 100 T I T I �-I Ruin-o"r"F-I-'OAQOQ 0 80 11 hl��'�-g'1� 70 Runoff Depth--�3.79" T 1o, 6en6ih 460 60 50 4030 H 1-4 1+4-I�-II 20 10 1 1 11 TI TI TI IT IT IT T I T TI TI TI 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 21 Summary for Subcatchment 203S: DA 203 Runoff = 56.45 cfs @ 12.07 hrs, Volume= 3.531 af, Depth= 3.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 600,000 74 >75% Grass cover, Good, HSG C 600,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.5 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 2.5 150 0.0200 0.99 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.8 200 0.3333 4.04 Shallow Concentrated Flow, shallow Short Grass Pasture Kv= 7.0 fps 1.4 250 0.1800 2.97 Shallow Concentrated Flow, shallow Short Grass Pasture Kv= 7.0 fDs 14.2 700 Total Subcatchment 203S: DA 203 Hydrograph so 56.45 55 50 TI -TITITITIT 45 IIIIII IIIIIIIII 40 I -I 4IIIIT w 35 I� rt Irtlrtl�lT _;30 "25 20 j 14 1 1T1- 15 I� t I t I f- 10 54/1 I TI H H H I-1 71 TI I I I fth6ff a tela�--60%0100 isf TI � ttgoff��3f 31 - �I -I�jjr,Riep�h=-�.n" law Le!�-� tl 0o ( I I I I I I I I I I�c�41 TI �-I �-j I-1 I-1 " TI t-I tI N I-1 I-t It it I III "IF (IIIIIIIIT' 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 22 Summary for Subcatchment 204S: RAB Landfill Area Runoff = 239.25 cfs @ 12.02 hrs, Volume= 12.946 af, Depth= 3.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.87" Area (sf) CN Description 2,200,000 74 Pasture/grassland/range, Good, HSG C 2,200,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.5 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 9.5 100 Total, Increased to minimum Tc = 10.0 min Subcatchment 204S: RAB Landfill Area Hydrograph 260 240 239.25 cfs 1 T I T I T I T-I 1I I 220 I I I L LI L1 145� y66""f�li =1�-J&t � u"Y1' 1 `� ����099 0 180 160 1 1 1 1 1 1 1 1 1 1 1 1 I�ulrri°�o` 1 7T 2I- 1 11 `= 140RunoffD" � _ 00" � L�e1n i�h='� LL 120 100 fi fil �I r1 I-1 1- Irt Mope=�b1010� 80 1 1 Tc1=19.9 O n 60 �I H 1-4 1 4 1 + 1 4- F 1- 40 20 I�LT T T �I �I I7 I� T T T l it 0 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 Time (hours) ❑ Runoff Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Summary for Reach 102R: Ditch 102 [62] Hint: Exceeded Reach 106R OUTLET depth by 0.79' @ 12.05 hrs [62] Hint: Exceeded Reach 109R OUTLET depth by 1.42' @ 12.21 hrs Inflow Area = 155.968 ac, 0.00% Impervious, Inflow Depth = 2.94" for 25-year event Inflow = 454.15 cfs @ 12.05 hrs, Volume= 38.267 of Outflow = 392.71 cfs @ 12.12 hrs, Volume= 38.267 af, Atten= 14%, Lag= 4.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 5.94 fps, Min. Travel Time= 6.7 min Avg. Velocity = 1.24 fps, Avg. Travel Time= 32.3 min Peak Storage= 158,610 cf @ 12.12 hrs Average Depth at Peak Storage= 1.86' Bank -Full Depth= 4.50' Flow Area= 195.8 sf, Capacity= 1,916.64 cfs 30.00' x 4.50' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 57.00' Length= 2,400.0' Slope= 0.0054 T Inlet Invert= 608.00', Outlet Invert= 595.00' Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 24 Reach 102R: Ditch 102 Hydrograph 0 I�Ifilfil17I 454.15 cfs HI-tIT TI Li I—�Ifilfilfilt-I ■ Inflow ■outflow 48 H H I4 14 + 1 � 460 ago 392.71 cfs :FI F] I-T IT T I A�r j.] 400 360 �I b I-t I - -r1 �1 n "��5�4 30 34 320 1 H H I-1 It t I t-I H I- - t 300 3 26o I �--I H I-+ 14 1 -1 H H-+ 240 LL 220 - -I Q I- - 7-�a a �i 1 19 — 180 I� �1 LI t- I--L I- t 1 LI Ll Ll I-L I I I t1 L 140 120 100 - H - - - - 1-� - - - - - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 25 Summary for Reach 104: Ditch 104 Inflow Area = 28.108 ac, 0.00% Impervious, Inflow Depth = 3.66" for 25-year event Inflow = 137.58 cfs @ 12.06 hrs, Volume= 8.583 of Outflow = 118.45 cfs @ 12.12 hrs, Volume= 8.583 af, Atten= 14%, Lag= 3.7 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 3.65 fps, Min. Travel Time= 7.1 min Avg. Velocity = 0.81 fps, Avg. Travel Time= 32.0 min Peak Storage= 50,290 cf @ 12.12 hrs Average Depth at Peak Storage= 0.77' Bank -Full Depth= 4.00' Flow Area= 208.0 sf, Capacity= 2,039.57 cfs 40.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 64.00' Length= 1,550.0' Slope= 0.0058 T Inlet Invert= 588.00', Outlet Invert= 579.00' Reach 104: Ditch 104 Hydrograph 150 1408.�68�c i- � � 137.58 cfs - ❑Inflow ❑ outflow 130CI118.45 cfs _1 F _1 IT 120 110 14 4-1 H H 14 1 �-lak Vei1*3.65 fosl 100 l L 1 LI 1-1 IL I L L I L I L IL I L Leh=a.2251 90 80 — �I n Irt rt LI �_l rt rt " 60 / I- H I4 14 L 1 - It I �I TI005 1 �1 50 fit Capaci,�9� '�1 �lnf sl 40 30 . rtIt TIfi1 1 1- rtITIfiI tl i it 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 26 Summary for Reach 106R: Ditch 106 Inflow Area = 81.911 ac, 0.00% Impervious, Inflow Depth = 2.79" for 25-year event Inflow = 226.60 cfs @ 12.18 hrs, Volume= 19.074 of Outflow = 217.35 cfs @ 12.23 hrs, Volume= 19.074 af, Atten= 4%, Lag= 2.9 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 4.71 fps, Min. Travel Time= 4.3 min Avg. Velocity = 1.16 fps, Avg. Travel Time= 17.4 min Peak Storage= 55,779 cf @ 12.23 hrs Average Depth at Peak Storage= 1.35' Bank -Full Depth= 4.50' Flow Area= 195.8 sf, Capacity= 1,833.82 cfs 30.00' x 4.50' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 57.00' Length= 1,210.0' Slope= 0.0050 T Inlet Invert= 614.00', Outlet Invert= 608.00' 21 14 13 0 12 LL 11 Id Reach 106R: Ditch 106 Hydrograph 226.6o cfs 1 217.35 cfs H H .61 1H�( I �-I H I-4 1 4- Ij��'L ilW� jo�-_ �I�Ial�l� HI HI H IH IH �I H H I4 1� _T _F1 771 H I_T IT � - IHIHIHIH 9• hllaHxl 514.1 plc H I H I H IH H 1 +0=�Q-R � 4- �IH IHI4�€j� T I T1 H IH 1-g111�1� HI+-IHIHIHIHIHIH 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Inflow ■ outflow Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 27 Summary for Reach 107Ra: Ditch 107_Shallow Inflow Area = 77.188 ac, 0.00% Impervious, Inflow Depth = 3.16" for 25-year event Inflow = 261.46 cfs @ 12.08 hrs, Volume= 20.350 of Outflow = 254.49 cfs @ 12.10 hrs, Volume= 20.350 af, Atten= 3%, Lag= 1.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 5.55 fps, Min. Travel Time= 2.6 min Avg. Velocity = 1.31 fps, Avg. Travel Time= 11.1 min Peak Storage= 39,917 cf @ 12.10 hrs Average Depth at Peak Storage= 1.35' Bank -Full Depth= 4.00' Flow Area= 168.0 sf, Capacity= 1,739.55 cfs 30.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 54.00' Length= 870.0' Slope= 0.0069 7' Inlet Invert= 628.00', Outlet Invert= 622.00' Reach 107Ra: Ditch 107 Shallow Hydrograph 280 F261.46 254.49 H❑ cfs TI T T I T 1 I� 1❑ rl- cfs�PP—C Inflow outflow 260 240 HI H IH 1 220 rlllax dell �.55 f0s1 200 18o H H H H H H H I H HI H H I +0=:Q.M 160 J H IL I L I LI L 11 IL I _LLI F"�1 LL 120 N Irt I t fi I fit fi 1010pp?-�,� 180 ---�1 a-1 HI H I I � '?�CI'7 5S 60 `1 71 T T IT T I T I T IH T IT T I HI 1 40 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Summary for Reach 107Rb: Ditch 107_Steep [61] Hint: Exceeded Reach 107Ra outlet invert by 0.73' @ 12.11 hrs Inflow Area = 77.188 ac, 0.00% Impervious, Inflow Depth = 3.16" for 25-year event Inflow = 254.49 cfs @ 12.10 hrs, Volume= 20.350 of Outflow = 253.84 cfs @ 12.11 hrs, Volume= 20.350 af, Atten= 0%, Lag= 0.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 10.85 fps, Min. Travel Time= 0.9 min Avg. Velocity = 2.69 fps, Avg. Travel Time= 3.5 min Peak Storage= 13,333 cf @ 12.11 hrs Average Depth at Peak Storage= 0.73' Bank -Full Depth= 4.00' Flow Area= 168.0 sf, Capacity= 4,963.15 cfs 30.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 54.00' Length= 570.0' Slope= 0.0561 T Inlet Invert= 622.00', Outlet Invert= 590.00' E9 Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 29 Reach 107Rb: Ditch 107_Steep Hydrograph 280 I-r I T-I 1 1 I-T 17 7 I 1 1 1 1 1 1 1 1 1 T 1 ■ Inflow ■outflow 260 253.84 cfs LU� T L 1 I ii8la li> 111 iv �►ri"e . 240 fi N I t t *4 AFi�ni�e--p-L-1� 20 1 1 1 MeikV-W .95 f0sl 200 18oZ. -i - 7 T fiI 1- 7 Tm•45 160 u-1 14 T I t-I I- 7 I 3 140 LL 120 1 1 TI n 7 I T T I T F1 I-t Y 180 1 --IsI`�111,11f5p1-- 1�I N Inc I�'T �ls 60 T 1 71 I -I I7 IT 1 T 1 T 1 71 1- 7 IT I T I F 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 30 Summary for Reach 109R: Ditch 105 Inflow Area = 21.225 ac, 0.00% Impervious, Inflow Depth = 3.66" for 25-year event Inflow = 118.38 cfs @ 12.01 hrs, Volume= 6.481 of Outflow = 116.03 cfs @ 12.03 hrs, Volume= 6.481 af, Atten= 2%, Lag= 1.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 8.82 fps, Min. Travel Time= 1.8 min Avg. Velocity = 2.09 fps, Avg. Travel Time= 7.6 min Peak Storage= 12,488 cf @ 12.03 hrs Average Depth at Peak Storage= 0.66' Bank -Full Depth= 4.00' Flow Area= 120.0 sf, Capacity= 2,959.13 cfs 18.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 42.00' Length= 950.0' Slope= 0.0442 T Inlet Invert= 650.00', Outlet Invert= 608.00' Reach 109R: Ditch 105 Hydrograph 130 118.38 cfs 120 116.03 cfs 1 }il" 1A1 r"1: AI cl_ 110 14 T-- 100IT TI TIT 1 T T T TM-a7x Vdl*8.8_2 0sl 90 80 ! ! ! �I I� rhl•51 6011 1 x A A 11 l j 1 —S,=�0 50 Capacity=2,959.13 c#s, 40 HIHIHI-I 30 Illi IIIIIIIIII �IIIII 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Inflow ❑ outflow Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 31 Summary for Reach 206Ra: Channel 201 Inflow Area = 114.738 ac, 0.00% Impervious, Inflow Depth = 2.89" for 25-year event Inflow = 293.94 cfs @ 12.22 hrs, Volume= 27.607 of Outflow = 278.61 cfs @ 12.30 hrs, Volume= 27.607 af, Atten= 5%, Lag= 4.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 5.15 fps, Min. Travel Time= 5.8 min Avg. Velocity = 1.46 fps, Avg. Travel Time= 20.6 min Peak Storage= 97,327 cf @ 12.30 hrs Average Depth at Peak Storage= 1.56' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,724.30 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 90.00' Length= 1,800.0' Slope= 0.0050 '/' Inlet Invert= 598.00', Outlet Invert= 589.00' Reach 206Ra: Channel 201 Hydrograph 320 300 I I 293.94 I I I I I I I I I I I I I I I I I I I I 1 cfs -1 ❑ Inflow ❑outflow 280 278.61 cfs 1 1 1 11 1 1 1 1 1 11 A�6_1016"l le fft=1 �561 260 240 �--1 n Irt I rt -r I fiI �-1 "Otl--545 fps- 220 200 14 HHH1++1-1HHI-fI+� � 180 160 14 1 �I N I-4 1 4-1 �1 1-4I� 11�0 .` 5 / 0 LL 140 l —o.i- LI Ll H _1 1- 11 1£ � Ig17124136J 120 100 1 1 r I T-1 n I-T IT Ti T_ 1�_l 1_ I I T I_r I rI 80 60 1 _�_l H it t t 1 tl ti 1--f _t I t I t1 H 1] 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 32 Summary for Reach 206Rb: Channel 201 [62] Hint: Exceeded Reach 107Rb OUTLET depth by 0.66' @ 12.30 hrs [62] Hint: Exceeded Reach 206Ra OUTLET depth by 1.06' @ 12.08 hrs Inflow Area = 242.432 ac, 0.00% Impervious, Inflow Depth = 3.01" for 25-year event Inflow = 571.87 cfs @ 12.08 hrs, Volume= 60.902 of Outflow = 528.74 cfs @ 12.19 hrs, Volume= 60.902 af, Atten= 8%, Lag= 6.6 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 6.36 fps, Min. Travel Time= 6.4 min Avg. Velocity = 1.67 fps, Avg. Travel Time= 24.3 min Peak Storage= 202,085 cf @ 12.19 hrs Average Depth at Peak Storage= 2.26' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,670.28 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 90.00' Length= 2,430.0' Slope= 0.0049 T Inlet Invert= 589.00', Outlet Invert= 577.00' Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 33 Reach 206Rb: Channel 201 Hydrograph I I I I I I I I 571.87 Cfs I I I I I I I I I I I I I I I I I I I I I I I I i outf oW 550 528.74 Cfs rI F-I I7 1 T T I -A /r6j 0-1-6vv-FDIe-�jh-=12J-61 500 LI L 1L L I LI L MOXY07-0•LG fPO 450 400 �--I H -1 I + + I +-I H 1- I + � �I 350 1 , It LL 250 200 II fit H Irt I t t I t1 1� 1-1 rt 1 rt 150III IIIIIIIIIIIIIIIIIIIIIIIIIIII 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Summary for Reach 207R: Channel 202 Inflow Area = 42.011 ac, 0.00% Impervious, Inflow Depth = 2.79" for 25-year event Inflow = 120.15 cfs @ 12.16 hrs, Volume= 9.783 of Outflow = 111.86 cfs @ 12.23 hrs, Volume= 9.783 af, Atten= 7%, Lag= 3.9 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 3.73 fps, Min. Travel Time= 5.8 min Avg. Velocity = 1.12 fps, Avg. Travel Time= 19.3 min Peak Storage= 38,932 cf @ 12.23 hrs Average Depth at Peak Storage= 0.91' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,724.30 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 90.00' Length= 1,300.0' Slope= 0.0050 T Inlet Invert= 590.00', Outlet Invert= 583.50' Reach 207R: Channel 202 Hydrograph 130 120.15 cfs T 120 111.86 cfsI 110 100 L 90 1 LI L IL 80 N 70 3 60 E 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Inflow ❑ outflow Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Summary for Reach 208R: Channel 202 [62] Hint: Exceeded Reach 207R OUTLET depth by 0.15' @ 12.09 hrs Inflow Area = 55.785 ac, 0.00% Impervious, Inflow Depth = 2.86" for 25-year event Inflow = 143.68 cfs @ 12.17 hrs, Volume= 13.313 of Outflow = 138.94 cfs @ 12.22 hrs, Volume= 13.313 af, Atten= 3%, Lag= 3.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 4.04 fps, Min. Travel Time= 4.5 min Avg. Velocity = 1.20 fps, Avg. Travel Time= 15.3 min Peak Storage= 37,837 cf @ 12.22 hrs Average Depth at Peak Storage= 1.04' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,724.30 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 90.00' Length= 1,100.0' Slope= 0.0050 T Inlet Invert= 583.50', Outlet Invert= 578.00' E9 Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 36 Reach 208R: Channel 202 Hydrograph 150 150 143.68 138.94 I I I I I I I I I I I I I I I I I I I I I I I I I I I I cfs H H H I H H 1 H Iilc�i�v Aria-55.85 Inflow ■ outflow arc Cfs140 130 TIN I� T IA�g�ioW-b - 120 _III l l l l l l l l l l 1 1 c l Vd 1 4.04 fplsl 110 100 - TI r1 I� T T T TI I- rt I ToI•5 3 $o -L I TI H I4 14 T 1 T T IT 41,�10(�Q' LL70 �I�Iu I� I�I�1� � 60 50 1 1 TI TIT 1 T To 40 30 1 i t1 N I fi fi I fi 1 1� I� I fi l fi I �I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 37 Summary for Pond 10OP: SE Detention Option 1 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification Inflow Area = 215.660 ac, 0.00% Impervious, Inflow Depth = 3.14" for 25-year event Inflow = 643.02 cfs @ 12.09 hrs, Volume= 56.493 of Outflow = 61.30 cfs @ 13.50 hrs, Volume= 57.339 af, Atten= 90%, Lag= 84.4 min Primary = 61.30 cfs @ 13.50 hrs, Volume= 57.339 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 567.00' Surf.Area= 110,000 sf Storage= 36,667 cf Peak Elev= 576.13' @ 13.50 hrs Surf.Area= 148,908 sf Storage= 1,214,565 cf (1,177,898 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 222.2 min ( 1,071.2 - 849.0 ) Volume Invert Avail.Storage Storage Description #1 566.00' 2,169,341 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 566.00 0 0.0 0 0 0 567.00 110,000 1,340.0 36,667 36,667 142,891 582.00 177,000 1,630.0 2,132,675 2,169,341 214,960 Device Routing Invert Outlet Devices #1 Primary 566.00' 20.0" Round Culvert X 2.00 L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 566.00' / 565.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 2.18 sf #2 Secondary 581.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 Width (feet) 50.00 56.00 80.00 Primary OutFlow Max=61.30 cfs @ 13.50 hrs HW=576.13' TW=565.70' (Dynamic Tailwater) L1=Culvert (Barrel Controls 61.30 cfs @ 14.05 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=567.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Page 38 Pond 100P: SE Detention Option 1 Hyydrograph I- I+ I H 1 I� I- H I+ I ■ Inflow 643.02 cfs I J-I 14 � I 4-1 I+�jl" � � $. � outflow 700 Secondary 650 T I� TI T I� TFI� ��'1 550 500 450 / �400 0 350 I� I I t I t� II H I t I H ff fil LL 300 _fiI _fiI 250 / I �-I 4 I I I4 14-I k4 I-� I 14 I -P 200 an f1fq 150Al 61.30 cfs IIII IIII IIII IIII Ili 0.00 cfs 0 2 4 6 8 1012141618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 39 Summary for Pond 103P: SW Detention Option 2 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Outflow = 4.65 cfs @ 0.00 hrs, Volume= 0.530 af, Atten= 0%, Lag= 0.0 min Primary = 4.65 cfs @ 0.00 hrs, Volume= 0.530 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 566.00' Surf.Area= 105,000 sf Storage= 35,000 cf Peak Elev= 566.00' @ 0.00 hrs Surf.Area= 105,000 sf Storage= 35,000 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert Avail.Storage Storage Description #1 565.00' 2,989,805 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 565.00 0 0.0 0 0 0 566.00 105,000 1,310.0 35,000 35,000 136,564 581.00 170,000 1,600.0 2,043,019 2,078,019 207,177 586.00 195,000 1,690.0 911,786 2,989,805 232,135 Device Routing Invert Outlet Devices #1 Primary 565.00' 20.0" Round Culvert X 2.00 L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 565.00' / 564.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 2.18 sf #2 Secondary 585.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 Width (feet) 50.00 56.00 80.00 Primary OutFlow Max=4.65 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) L1=Culvert (Outlet Controls 4.65 cfs @ 2.44 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 40 Pond 103P: SW Detention Option 2 Hydrograph Ill i� l--� l 4-1 � l 4- l -i l-4 l14 l �-4 l� 71Miiiiiiiiii1111i�t6�r666I:=i3151,666Id + I H Wi-I H I+ I -H I-iI+I H IC I+ -I H 0 2 4 6 8 1012 1416 18 20 22 24 2628 30 32 34 36 38 40 42 4446 48 50 52 54 56 58 60 6264 66 68 70 72 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ■ Secondary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 41 Summary for Pond 104P: NE Detention Option 1 - Pond 1 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification Inflow Area = 298.217 ac, 0.00% Impervious, Inflow Depth = 2.99" for 25-year event Inflow = 666.63 cfs @ 12.20 hrs, Volume= 74.216 of Outflow = 201.18 cfs @ 12.88 hrs, Volume= 74.973 af, Atten= 70%, Lag= 40.6 min Primary = 201.18 cfs @ 12.88 hrs, Volume= 74.973 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 567.00' Surf.Area= 98,000 sf Storage= 32,667 cf Peak Elev= 576.24' @ 12.88 hrs Surf.Area= 136,074 sf Storage= 1,108,735 cf (1,076,068 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 55.8 min ( 919.2 - 863.4 ) Volume Invert Avail.Storage Storage Description #1 566.00' 5,085,589 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 566.00 0 0.0 0 0 0 567.00 98,000 1,310.0 32,667 32,667 136,564 582.00 163,000 1,600.0 1,936,941 1,969,608 207,177 601.00 165,000 1,610.0 3,115,981 5,085,589 237,779 Device Routing Invert Outlet Devices #1 Primary 566.00' 36.0" Round Culvert X 2.00 L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 566.00' / 565.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf #2 Secondary 581.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 20.00 Width (feet) 50.00 56.00 80.00 80.00 Primary OutFlow Max=201.18 cfs @ 12.88 hrs HW=576.24' TW=565.70' (Dynamic Tailwater) L1=Culvert (Inlet Controls 201.18 cfs @ 14.23 fps) te2 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=567.00' TW=565.70' (Dynamic Tailwater) =Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 42 Pond 104P: NE Detention Option 1 - Pond 1 Hydrograph / I Illllllllli��llii�li�l�ll_ 661 cfs I fit fi �j�l�yl� q-� � .� 7 �d 700 I+1 I41 +-I H I+I H 1414-FORV�' M� 241 650 j ICI -600 I� 1 J-1 � ICI I� 1 Ir � �� 'I 550 � IIIII IIIIIIIIIIIIIIIIIIIIIIIIII _ 500 450 400 rt Irt fit rt I rt 11-1 Irt fit r � rt 11-1 Irt I T- 350 u_ qni 1 R 300 250 201.1cfs 8 I� � 1 � I " j I � I I-4 � I �--I 1� I 200 / III IIII IIII IIII III 150 / 100 0.06 cfs / 0 2 4 6 8 1012141618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ In 7 Outflow ❑ Primary i Secondary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 43 Summary for Pond 107P: East SW Detention Option 3 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Outflow = 3.12 cfs @ 0.00 hrs, Volume= 0.529 af, Atten= 0%, Lag= 0.0 min Primary = 3.12 cfs @ 0.00 hrs, Volume= 0.529 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 566.00' Surf.Area= 105,000 sf Storage= 35,000 cf Peak Elev= 566.00' @ 0.00 hrs Surf.Area= 105,000 sf Storage= 35,000 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert Avail.Storage Storage Description #1 565.00' 2,078,019 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 565.00 0 0.0 0 0 0 566.00 105,000 1,310.0 35,000 35,000 136,564 581.00 170,000 1,600.0 2,043,019 2,078,019 207,177 Device Routing Invert Outlet Devices #1 Primary 565.00' 30.0" Round Culvert L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 565.00' / 564.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 4.91 sf #2 Secondary 580.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 Width (feet) 50.00 56.00 80.00 Primary OutFlow Max=3.12 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) L1=Culvert (Outlet Controls 3.12 cfs @ 2.52 fps) te2 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) =Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Page 44 3.12 cfs 3 w 2 u 3 0 LL 1- 0.0 0.00 cfs Pond 107P: East SW Detention Option 3 Hydrograph i i l i l i i l i l l i l i i i i l i i l i l i i l i l I I I I I I I I I I I I I I I I I I I�tb�rag�e��315I,bbb ICf IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII 0 2 4 6 8 1012 1416 18 20 22 24 2628 30 32 34 36 38 40 42 4446 48 50 52 54 56 58 60 6264 66 68 70 72 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ■ Secondary Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type // 24-hr 25-year Rainfall=5.87" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Summary for Pond 108P: RAB Ex. Spillway (no storage) [43] Hint: Has no inflow (Outflow=Zero) Device Routing Invert Outlet Devices #1 Primary 611.00' 42.0" Round Culvert L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 611.00' / 606.00' S= 0.1000 '/' Cc= 0.900 n= 0.012, Flow Area= 9.62 sf #2 Secondary 618.90' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 5.00 Width (feet) 20.00 60.00 #3 Tertiary 624.25' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 5.00 Width (feet) 200.00 200.00 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L1=Culvert ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' (Free Discharge) L3=Custom Weir/Orifice ( Controls 0.00 cfs) Pond 108P: RAB Ex. Spillway (no storage) Hydrograph ❑ Primary ❑ Secondary ■ Tertiary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 46 Summary for Pond 200: RAB Outlet Pond (no storage) [43] Hint: Has no inflow (Outflow=Zero) Device Routing Invert Outlet Devices #1 Primary 570.20' 36.0" Round RCP Culvert L= 114.3' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 570.20' / 566.40' S= 0.0332 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 606.12' 42.0" Round 42" Culvert Steep L= 56.3' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 606.12' / 570.20' S= 0.6380 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 9.62 sf #3 Device 2 609.10' 42.0" Round 42" Culvert Shallow L= 27.3' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 609.10' / 606.12' S= 0.1092 '/' Cc= 0.900 n= 0.013, Flow Area= 9.62 sf #4 Device 3 611.09' 54.0" Round 54" Culvert L= 20.5' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 611.09' / 609.10' S= 0.0971 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 15.90 sf #5 Secondary 618.90' Emergency Spillway, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.25 Width (feet) 20.00 28.00 36.00 44.00 52.00 60.00 60.00 #6 Tertiary 624.25' 260.0' long x 40.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L1=RCP Culvert ( Controls 0.00 cfs) L2=42" Culvert Steep ( Controls 0.00 cfs) Lt42" Culvert Shallow ( Controls 0.00 cfs) 4=54" Culvert ( Controls 0.00 cfs) te5 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) =Emergency Spillway ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L6=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type/1 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 47 Pond 200: RAB Outlet Pond (no storage) Hydrograph N Primary 1 i Secondary ■ Tertiary I�eail� E���v-b.bb 3 0 LL 0.00 Cfs 0 0 2 4 6 8 10 1214 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 48 Summary for Link 102L: Lake Wylie/Catawba River Inflow Area = 215.660 ac, 0.00% Impervious, Inflow Depth = 3.25" for 25-year event Inflow = 61.30 cfs @ 13.50 hrs, Volume= 58.398 of Primary = 61.30 cfs @ 13.50 hrs, Volume= 58.398 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Fixed water surface Elevation= 565.70' Link 102L: Lake Wylie/Catawba River Hydrograph i—I -L I H HI H IlllllllilllillllllI + Ian 16' �A rel- =ii �-. O6"c HI H H I H I H I H HI IH I I I 1 I 11111111111111111111111_ HIHIHIHIHIHIIHHHW 1 1 ill H I4 7IIII111111111111 I M 1 1 1 141�-1 �-I 1 1 H 1 1 1 1 1 1 1 1 1 1-t H I+1+1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Inflow ❑ Primary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type // 24-hr 25-year Rainfall=5.87" Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 49 Summary for Link 104L: Lake Wylie/Catawba River Inflow Area = 298.217 ac, 0.00% Impervious, Inflow Depth = 3.02" for 25-year event Inflow = 201.18 cfs @ 12.88 hrs, Volume= 74.973 of Primary = 201.18 cfs @ 12.88 hrs, Volume= 74.973 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Fixed water surface Elevation= 565.70' Link 104L: Lake Wylie/Catawba River Hydrograph � I I IH I IHI � Hlrt ❑Inflow ❑Primary 210 201.18 cfs HI �--j H 1 11 11 �I Ifl,1.-�, ,,1 j� VW � IA_L 11�CccQ�i �MQ..J L�`...►►aa�Il I L lli 200 190 H H H HHIHH H HH1+1H H 1 180 170 H H - H - H 160 - - - - - - 140 �� IHI H I-4I-IHIHI H 1-4141�1�1 H 1 w 130 — I HI H H IH HI HI H I-t IH I HI H1 H ; 1120 10 -00 u_190 I� H H I-TITIHIH H HIHIHIH H 80 70 HI H IH I H H I HI H IH 1 H 1 H 1 HI H 60 An I1I1 HIH H H H H H E 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 50 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points x 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 102S: DA 102 Runoff Area=2,301,379 sf 0.00% Impervious Runoff Depth=4.16" Flow Length=850' Tc=10.2 min CN=72 Runoff=335.39 cfs 18.331 of Subcatchment 103S: DA 103 Runoff Area=1,375,819 sf 0.00% Impervious Runoff Depth=5.06" Flow Length=1,200' Tc=11.8 min CN=80 Runoff=225.62 cfs 13.307 of Subcatchment 104S: Area Draining to 104 Runoff Area=1,224,363 sf 0.00% Impervious Runoff Depth=5.06" Flow Length=1,000' Tc=13.9 min CN=80 Runoff=187.79 cfs 11.842 of Subcatchment 105Sa: Area draining to 105 Runoff Area=914,000 sf 0.00% Impervious Runoff Depth=5.06" Flow Length=2,150' Tc=32.6 min CN=80 Runoff=86.86 cfs 8.840 of Subcatchment 106S: DA 106 Runoff Area=3,568,027 sf 0.00% Impervious Runoff Depth=4.05" Flow Length=1,935' Tc=24.2 min CN=71 Runoff=330.94 cfs 27.672 of Subcatchment107Sa: Northwest AAB Runoff Area=1,934,630 sf 0.00% Impervious Runoff Depth=4.05" Flow Length=1,050' Tc=14.1 min CN=71 Runoff=240.21 cfs 15.004 of Subcatchment 107Sb: NW of North face of Runoff Area=513,700 sf 0.00% Impervious Runoff Depth=5.06" Flow Length=1,050' Tc=14.1 min CN=80 Runoff=78.21 cfs 4.968 of Subcatchment 108S: Area draining to 102 Runoff Area=924,571 sf 0.00% Impervious Runoff Depth=5.06" Flow Length=750' Tc=10.0 min CN=80 Runoff=161.21 cfs 8.942 of Subcatchment201 S: DA 201 Runoff Area=4,998,000 sf 0.00% Impervious Runoff Depth=4.16" Flow Length=750' Tc=28.7 min CN=72 Runoff=427.16 cfs 39.810 of Subcatchment202S: DA 202 Runoff Area=1,830,000 sf 0.00% Impervious Runoff Depth=4.05" Flow Length=400' Tc=22.8 min CN=71 Runoff=175.42 cfs 14.193 of Subcatchment203S: DA 203 Runoff Area=600,000 sf 0.00% Impervious Runoff Depth=4.38" Flow Length=700' Tc=14.2 min CN=74 Runoff=80.07 cfs 5.032 of Subcatchment204S: RAB Landfill Area Runoff Area=2,200,000 sf 0.00% Impervious Runoff Depth=4.38" Flow Length=100' Slope=0.0200 '/' Tc=10.0 min CN=74 Runoff=338.55 cfs 18.451 of Reach 102R: Ditch 102 Avg. Flow Depth=2.34' Max Vet=6.79 fps Inflow=660.68 cfs 54.945 of n=0.025 L=2,400.0' S=0.0054 '/' Capacity=1,916.64 cfs Outflow=587.28 cfs 54.945 of Reach 104: Ditch 104 Avg. Flow Depth=0.94' Max Vet=4.14 fps Inflow=187.79 cfs 11.842 of n=0.025 L=1,550.0' S=0.0058 '/' Capacity=2,039.57 cfs Outflow=166.22 cfs 11.842 of Reach 106R: Ditch 106 Avg. Flow Depth=1.69' Max Vet=5.39 fps Inflow=330.94 cfs 27.672 of n=0.025 L=1,210.0' S=0.0050 '/' Capacity=1,833.82 cfs Outflow=320.26 cfs 27.672 of Reach 107Ra: Ditch 107_Shallow Avg. Flow Depth=1.66' Max Vet=6.27 fps Inflow=371.86 cfs 28.812 of n=0.025 L=870.0' S=0.0069 '/' Capacity=1,739.55 cfs Outflow=364.26 cfs 28.812 of Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 51 Reach 107Rb: Ditch 107_Steep Avg. Flow Depth=0.90' Max Vet=12.37 fps Inflow=364.26 cfs 28.812 of n=0.025 L=570.0' S=0.0561 T Capacity=4,963.15 cfs Outflow=363.52 cfs 28.812 of Reach 109R: Ditch 105 Avg. Flow Depth=0.79' Max Vet=9.85 fps Inflow=161.21 cfs 8.942 of n=0.025 L=950.0' S=0.0442 '/' Capacity=2,959.13 cfs Outflow=158.57 cfs 8.942 of Reach 206Ra: Channel 201 Avg. Flow Depth=1.95' Max Vet=5.87 fps Inflow=427.16 cfs 39.810 of n=0.025 L=1,800.0' S=0.0050'/' Capacity=8,724.30 cfs Outflow=409.13 cfs 39.810 of Reach 206Rb: Channel 201 Avg. Flow Depth=2.83' Max Vet=7.22 fps Inflow=841.89 cfs 87.073 of n=0.025 L=2,430.0' S=0.0049 '/' Capacity=8,670.28 cfs Outflow=785.90 cfs 87.073 of Reach 207R: Channel 202 Avg. Flow Depth=1.15' Max Vet=4.30 fps Inflow=175.42 cfs 14.193 of n=0.025 L=1,300.0' S=0.0050 '/' Capacity=8,724.30 cfs Outflow=166.07 cfs 14.193 of Reach 208R: Channel 202 Avg. Flow Depth=1.32' Max Vet=4.66 fps Inflow=214.10 cfs 19.225 of n=0.025 L=1,100.0' S=0.0050'/' Capacity=8,724.30 cfs Outflow=208.34 cfs 19.225 of Pond 10OP: SE Detention Option 1 Peak EIev=580.09' Storage=1,840,776 cf Inflow=940.07 cfs 80.093 of Primary=73.00 cfs 80.939 of Secondary=0.00 cfs 0.000 of Outflow=73.00 cfs 80.939 of Pond 103P: SW Detention Option 2 Peak EIev=566.00' Storage=35,000 cf Inflow=0.00 cfs 0.000 of Primary=4.65 cfs 0.530 of Secondary=0.00 cfs 0.000 of Outflow=4.65 cfs 0.530 of Pond 104P: NE Detention Option 1 - Peak EIev=580.67' Storage=1,756,812 cf Inflow=991.55 cfs 106.298 of Primary=247.01 cfs 107.055 of Secondary=0.00 cfs 0.000 of Outflow=247.01 cfs 107.055 of Pond 107P: East SW Detention Option 3 Peak EIev=566.00' Storage=35,000 cf Inflow=0.00 cfs 0.000 of Primary=3.12 cfs 0.529 of Secondary=0.00 cfs 0.000 of Outflow=3.12 cfs 0.529 of Pond 108P: RAB Ex. Spillway (no storage) Peak EIev=0.00' Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Tertiary=0.00 cfs 0.000 of Pond 200: RAB Outlet Pond (no storage) Peak EIev=0.00' Primary=0.00 cfs 0.000 of Secondary=0.00 cfs 0.000 of Tertiary=0.00 cfs 0.000 of Link 102L: Lake Wylie/Catawba River Link 104L: Lake Wylie/Catawba River Inflow=73.00 cfs 81.998 of Primary=73.00 cfs 81.998 of Inflow=247.01 cfs 107.055 of Primary=247.01 cfs 107.055 of Total Runoff Area = 513.877 ac Runoff Volume = 186.391 of Average Runoff Depth = 4.35" 100.00% Pervious = 513.877 ac 0.00% Impervious = 0.000 ac Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall= 7.39 " Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Summary for Subcatchment 102S: DA 102 Runoff = 335.39 cfs @ 12.02 hrs, Volume= 18.331 af, Depth= 4.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN DescriDtion 807,646 60 107,375 61 >75% Grass cover, Good, HSG B 1,386,358 80 2,301,379 72 Weighted Average 2,301,379 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0500 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 3.6 750 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 10.2 850 Total Subcatchment 102S: DA 102 Hydrograph 3n� 340 335.39 cfs 320 300 L 1 L 280 260 II 1 1 IIIII L 240 220 T 7ITITI T 0 u 18 0 0 t t t 140 120 inn 1—t t I t I �-I �-I - i , I � I � 1 4-1 4-1 �-I LI L 1-1 1-1 I I I �p� j I _ LI LI 1-60Ly6e ak rif�lk= r-13t't El El M T T I- ugnp""Inp7�81'�31 �1 Rund f D-epffi 16" T Le;4i -T l rt l T-6 416.Al t-I �-I I-1 1-t I-t I I t 1 fiC-N�:T� 1-1 t i t i t I -I H 1� 1-t 1-� It I t i -H t i t-I +I +' t--I H k' H H I-� I-� I+' I H 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 53 Summary for Subcatchment 103S: DA 103 Eastern Face of Mound Runoff = 225.62 cfs @ 12.03 hrs, Volume= 13.307 af, Depth= 5.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 1,375,819 80 Final Cover 1,375,819 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0500 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 5.2 1,100 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 11.8 1,200 Total Subcatchment 103S: DA 103 Hydrograph 250- 11 I Li L—I I --L 1 240 220 225.62 cfs - - - — - - - ' 210 200 I� I- 1 T- I �I �I FI I� 1:60�y�e a�i' ifAi4130 t ,70 I� - - -I -I -I I�ulni�#�►�"��,� I, -�# 160 150 1----t - 4 4-1 — -k I -k �I k — I ul " w 140 Runoff Dep#h=5.06" 0 1130 20 I� I _ t t l �I �I I� 1� IF-o�v to n�thL 10 ! 110 100 I� 4 I -1 + 1 �I H H I� 1� 14 4 1 f6w"A-im n 80 70 - III I� II 60 — 50 1—t t I t I t -1 H I� 1—t I t I t I t I t 1 h 40 20 I� I - -LI �—i I —I I —I 1—t 14 4 1-L1 4-1 4-1 �I 10 � 0 0 2 4 6 8 10 12 14 16 18 20 2224 2628 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 54 Summary for Subcatchment 104S: Area Draining to 104 Runoff = 187.79 cfs @ 12.06 hrs, Volume= 11.842 af, Depth= 5.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 1,224,363 80 Final Cover 1,224,363 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.3 900 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 13.9 1,000 Total Subcatchment 104S: Area Draining to 104 Hydrograph 210 1 1 I I 1 T II — �:I I —I I — ZI D 200 190 187.79 cfs � I �- 14- I �-I 1-4 1 -� 14 1 L� 180 170 4 I -� I �- 14I �-I �-I 1-60Lyeill4katrif�li=t130t 160 150 — 1- '- I + 1 + 1 +-I �-1 �-I I �I # ►� ,� I, � # 140 10 — t I t I t- t-I � _ ��°� 1°�fufi�u w 120 110 190 — rt rt fil �I �I Runoff VCh� OV I� Igrt IJLl LL o 80 I� ZZ1Z1LE1E1❑11 1II� ,-Lin M 70 60 I� - 1 J- I t t-I �-I I� 1-t 1- 4 1 -t-I � PVr-" 50 40 1� -� I �- I �-I �-I 1-4 14 -4 1 �- 14-1 �-I �-I 30 20 1 4-1 1 H H H i 4 l4- 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 55 Summary for Subcatchment 105Sa: Area draining to 105 Runoff = 86.86 cfs @ 12.28 hrs, Volume= 8.840 af, Depth= 5.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 914,000 80 Final Cover 914,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.5 950 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 18.5 1,100 0.0200 0.99 Shallow Concentrated Flow, shallow 2 Short Grass Pasture Kv= 7.0 fps 32.6 2,150 Total Subcatchment 105Sa: Area draining to 105 Hydrograph HIH I� I� 1 HI HI L H 95 90 85 86.86 cfs 1HIHIHIHI HI I� � HI HI H H�p 111: � � 5 7 70 H I 1 H 1 H H 1 H H H-Maid# Atela#M010"f 60 H + + H FF "pff Q U 50 IH H H I H I H I HI HI HI nll'l 0 45 W _Len =� 1 50 LL 40 35 1 H 1 H 1 H 1 H HI HI HI H IH Ilc�ii mi� 30 1+ 1 H 1+ 1+- 1 HI HI H H H H IHt-W6-M 25 20 HHIHH H H H H H H H HHI 15 10 / IH 1 I H I H 1 H H HI H H IH IH I H 1 H 1 H 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment 106S: DA 106 Area that drains using HydroCAD catchmentarea +38.75 acres to the southwest of the basin by the pond Runoff = 330.94 cfs @ 12.18 hrs, Volume= 27.672 af, Depth= 4.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 1,208,372 60 Woods 962,761 75 Residential 305,686 74 >75% Grass cover, Good, HSG C 1,091,208 80 Final Cover 3,568,027 71 Weighted Average 3,568,027 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.5 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 14.1 1,235 0.0436 1.46 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.6 600 0.0100 17.56 1,264.11 Trap/Vee/Rect Channel Flow, Bot.W=30.00' D=2.00' Z= 3.0 '/' Top.W=42.00' n= 0.012 24.2 1,935 Total Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 57 Subcatchment 106S: DA 106 Hydrograph 360 —4 I rt i—+ I� I 4-1 H H 1-4 1 --t-I rt I� � 1 4— � I H ❑Runoff 340 330.94 cfs 1 � 1 4I �I �I I� 1-4 14 14 1 T � jiI-i4_f� 320 300 4 4-1 -k I t-I 280 260 22o L LI LI El I�ow In TI'1Lil o ,8o I— i- — — TI -I -I ❑ unoff � l I— RFI L o E 160 140 Ft TITI F FI F-I 1t F 17 1 U 44.1-ini 120 fi t-r I-r l �I r-I I-1 1- rt I rt I T 1 1 GG"71 100 80 1 t I t I t 1 t-I �-I I� I� 1-� 1 t I t I t I fit t-1 60 40/ I� 1+IiIt-IHH1-tI-�1-�I+Ii-I I�-1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall= 7.39 " Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Summary for Subcatchment 107Sa: Northwest AAB Runoff = 240.21 cfs @ 12.06 hrs, Volume= 15.004 af, Depth= 4.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 456,118 80 Final Cover 704,538 61 >75% Grass cover, Good, HSG B 773,974 75 Residential 1,934,630 71 Weighted Average 1,934,630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.5 950 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 14.1 1,050 Total Subcatchment 107Sa: Northwest AAB Hydrograph I —T I I I I I—r I -r- 240.21 cfs I� - III I I L I� 1 -ICI+I i- -" 140 + 3 LL 120 + t 100 fi 80 IIIIII 60 1--F 40 20 F1 F-I I-T I-T 17 1 TTYp�+l _ 1. LI LI 1-60Ly ill4R"f�li 4.130't -�-1 �-I IA4np# r4► a�r+,9�41,Q3Q 0 IRulnp�o�[u�r�'1'�� I- (Runoff Depth --*.Or t--I r-I I-1 1-t I rt rt 11Td 4.IFinlrii IIIIIII I I I I ICM=71 P 1-1 1-4 1- -+ I � I 4--1 �-I T T FI 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 59 Summary for Subcatchment 107Sb: NW of North face of AAB Runoff = 78.21 cfs @ 12.06 hrs, Volume= 4.968 af, Depth= 5.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 513,700 80 Final Cover 513,700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0500 0.17 Sheet Flow, Grass: Dense n= 0.240 P2= 3.41" 4.5 950 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 14.1 1,050 Total Subcatchment 107Sb: NW of North face of AAB Hydrograph 85 — I .� I I L 14 1 Runoff 1 78.21 cfs I I I J- I I I �I I —I 1� �I 75 11 4-h1` 75 70 L I LI LlL 1 bb-aiRnIl.�i�'� 60 7 L TI L Riilf#'ela'Ifi3�7fOp# 55 t It t I t 1 t 1 _fit 1�yp°I�1 Y�I���f� 3 45 I� �I �I �I%njoaffl ePTI 0 40 — — W L " 35 1� I i I - �I �I 1 I �I �I L-I u 1� e��# i ��' SA 30Ci�. 1� 25 11111 L I L I L I LL LL It I—L I—L MI6-" 20 15 IT �I �I rI 1—I �I I� 1-1Irt 17 10 / t I t 1 -1 I tI �� i--I 11 II� I t I t 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 60 Summary for Subcatchment 108S: Area draining to 102 Runoff = 161.21 cfs @ 12.01 hrs, Volume= 8.942 af, Depth= 5.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 924,571 80 Final Cover 924,571 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0500 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 3.1 650 0.2500 3.50 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fDs 9.7 750 Total, Increased to minimum Tc = 10.0 min Subcatchment 108S: Area draining to 102 Hydrograph 180 I1 -F I T I T I P F 11 —[F T I ❑Runoff 170 160 161-21 cfs rt fi fi �I l rt rt ��I - 150 - - - - - - -� ar— Ql — — 130 4 -RJMn'II' /I"'��IIe6#97=`I"1' ;U0 110 � 1 4-I �I fff -T °r Y° i Ig'T9 � 0 190 I � 1 4I �I �I I —I I�� I° I�� II-5 0 1 LL 80 70 ! 1 11 El El low Lin h=�5Q El It I - _L60 50 - - - -I -II- I- - -T— 30 20 / fi t t-1 I t t tI t-I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 61 Summary for Subcatchment 201S: DA 201 Area that drains using HydroCAD catchmentarea +38.75 acres to the southwest of the basin by the pond Runoff = 427.16 cfs @ 12.22 hrs, Volume= 39.810 af, Depth= 4.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 899,000 60 Woods 1,250,000 75 Residential 2,239,000 74 >75% Grass cover, Good, HSG C 610,000 80 Final Cover 4,998,000 72 Weighted Average 4,998,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.41" 3.5 150 0.0200 0.71 Shallow Concentrated Flow, shallow Woodland Kv= 5.0 fps 4.4 500 0.0740 1.90 Shallow Concentrated Flow, shallow Short Grass Pasture Kv= 7.0 fps 28.7 750 Total Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 62 Subcatchment 201 S: DA 201 Hydrograph 460 --4I --+ 14 4 fi �I 1- � 14 1 � 14 � ❑Runoff 4 440 20 427.16 cfs fi �I HH I F ps + � _ 1 400 380 1 T- I � I �I �1 I� IVOLy-ye"Aifi]&4136t 360 340 1-t + I + I t-I �-1 -R4np"r"4,q"1,0Q 0 �ur_w H 280 260 - c�„ Run L�cpt��'F 1 F� 220 I� I- - - - -I -I — I— -Fi �I ,h�ii4 _2 200 v. 180 r71 CI 17t 1- 1 1 7"X 1 140 0 1-� 1+ 1� I H H I� H 14 4 1+ 1 4- ��T? 120 10 80 1 11 L LI L I� 1- 1 111 -LI -LI L 40 I� I- �I �I �I I� 1� 14 4 1 � 1 4-1 �--I �I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 63 Summary for Subcatchment 202S: DA 202 Area that drains using HydroCAD catchmentarea +38.75 acres to the southwest of the basin by the pond Runoff = 175.42 cfs @ 12.16 hrs, Volume= 14.193 af, Depth= 4.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN DescriDtion 620,000 60 Woods, Fair, HSG B 570,000 74 >75% Grass cover, Good, HSG C 640,000 80 Final Cover 1,830,000 71 Weighted Average 1,830,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 100 0.0200 0.08 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.41" 2.0 300 0.2500 2.50 Shallow Concentrated Flow, shallow Woodland Kv= 5.0 fps 22.8 400 Total Subcatchment 202S: DA 202 Hydrograph � 4- -i -4+ � 190 180 170 175.42 cfs T- 4 -k �I I 1-4 I I417 p�+I LL��FF ff 1 60 150 140 1- 1 + 1 4-I H �-1 -Rulnp# r"F,1�$�Q,Q0Q 0 130 120 _ 1- 1- + I + 1 4 �-_4-0 u�l l �uIT' w 110 �noff �Orl 0 100 � 90 � � � � � � � N � 1+wpfh L1Gn�ih �6 LL 80 4+ I+ H H N —fi I- 4 4 1 fd=:i�.-infnl 70 60 — - 50 40 + I + I HHH1—fI + -IH 30 20 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 64 Summary for Subcatchment 203S: DA 203 Runoff = 80.07 cfs @ 12.06 hrs, Volume= 5.032 af, Depth= 4.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 600,000 74 >75% Grass cover, Good, HSG C 600,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.5 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 2.5 150 0.0200 0.99 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.8 200 0.3333 4.04 Shallow Concentrated Flow, shallow Short Grass Pasture Kv= 7.0 fps 1.4 250 0.1800 2.97 Shallow Concentrated Flow, shallow Short Grass Pasture Kv= 7.0 fDs 14.2 700 Total Subcatchment 203S: DA 203 Hydrograph LI LLI 80 1 8 111 cfs 17 L L 17 17-I r1 1i ri rt II � It t L L L I fi fit- 1 770 65 H I- I L I L L I- -I �-R th6 f AdtelaOMAO"f 60 55 4 14 1 L I - -I ��"Clff��I 45 I� �I �I �I n1°1 nnj low �wt 00 LL 40 35 L 1 L I L I LI LI �1 LI LI L IL 130 25 ITITITITI TI FI FI ❑ I—T 17 I720 �� 15 rt IL L fit fit �I �I I� Irt Irt IL L 10/ It I LILIL I tI t I—t It ILILI 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) ■ Runoff Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 65 Summary for Subcatchment 204S: RAB Landfill Area Runoff = 338.55 cfs @ 12.02 hrs, Volume= 18.451 af, Depth= 4.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-year Rainfall=7.39" Area (sf) CN Description 2,200,000 74 Pasture/grassland/range, Good, HSG C 2,200,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.5 100 0.0200 0.18 Sheet Flow, Grass: Short n= 0.150 P2= 3.41" 9.5 100 Total, Increased to minimum Tc = 10.0 min Subcatchment 204S: RAB Landfill Area Hydrograph ILi �I LI LI LI LI L 360 340 ,338.55 cfs L III L El El ❑ I1 1 11 I � �f 320 300 Ft -L — — LL ❑ �� —I ��I3- �O� T+ 280 260 I-7 1 -T ITI L I L T—I F—I I140W ► F AOI,90Q 10 22o I� rt rt LI �I �I Iulp1°r 1'71 1 � no��-F1�wlp�h � 38 � o ,so —F 111 Le:� LL 160 rt t I t I t l �I �I I-1 I� I rt I M6pte�46 010� 140 120 I—t I t I L I L I �I �—I I� 1- t ITrq -R•q-I 100 80 h t I t I t I �I H I� 1� 1 1 t I t F r 60 40 I� + I L I 0 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 Time (hours) ❑ Runoff Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall=7.39" Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Summary for Reach 102R: Ditch 102 [62] Hint: Exceeded Reach 106R OUTLET depth by 0.98' @ 12.05 hrs [62] Hint: Exceeded Reach 109R OUTLET depth by 1.79' @ 12.19 hrs Inflow Area = 155.968 ac, 0.00% Impervious, Inflow Depth = 4.23" for 100-year event Inflow = 660.68 cfs @ 12.04 hrs, Volume= 54.945 of Outflow = 587.28 cfs @ 12.11 hrs, Volume= 54.945 af, Atten= 11 %, Lag= 3.9 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 6.79 fps, Min. Travel Time= 5.9 min Avg. Velocity = 1.36 fps, Avg. Travel Time= 29.3 min Peak Storage= 207,687 cf @ 12.11 hrs Average Depth at Peak Storage= 2.34' Bank -Full Depth= 4.50' Flow Area= 195.8 sf, Capacity= 1,916.64 cfs 30.00' x 4.50' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 57.00' Length= 2,400.0' Slope= 0.0054 T Inlet Invert= 608.00', Outlet Invert= 595.00' Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 67 Reach 102R: Ditch 102 Hydrograph 700 I I TI 660.68 cfs T I I N 1 1 1 1 T T 1 1 1 T1 I i I I I JII--�� 11 ■ Inflow ■outflow 650 soo 587.28 cfs I A%/ j 1 046"I�#���1 550 T T T IT T I T 1 T X-VO�Q � V 450 T TI H I4 1 T T 1 TI H 1- I4 1 T� Q•��51 S-0 �5 / G 300 1 TI H I-t I T T I tda�a�ii ill 19tl 6�4 �is� 250 1 LI T T T 1T TI TI T T IT ITI TI T 200 150 T I TI T I T IT T I -1-1 1-1 IT I T IT -1-1 TI 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 68 Summary for Reach 104: Ditch 104 Inflow Area = 28.108 ac, 0.00% Impervious, Inflow Depth = 5.06" for 100-year event Inflow = 187.79 cfs @ 12.06 hrs, Volume= 11.842 of Outflow = 166.22 cfs @ 12.11 hrs, Volume= 11.842 af, Atten= 11 %, Lag= 3.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 4.14 fps, Min. Travel Time= 6.2 min Avg. Velocity = 0.87 fps, Avg. Travel Time= 29.6 min Peak Storage= 62,215 cf @ 12.11 hrs Average Depth at Peak Storage= 0.94' Bank -Full Depth= 4.00' Flow Area= 208.0 sf, Capacity= 2,039.57 cfs 40.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 64.00' Length= 1,550.0' Slope= 0.0058 T Inlet Invert= 588.00', Outlet Invert= 579.00' Reach 104: Ditch 104 Hydrograph 200 1 187.79 c� H HI I4 1 _� I H 11�fl" I�r��a 81. id8 ( 190 170 166.22 cfs H1 H IH I H H I Vat-Ojoly�- �06-iffb,ImA 160 150 fi l HI r1 Irt rt H l fit H xl Vd1*4.U4 0%C 140 130 1-1 H H F1 I_T 11 H I D H 17 7 1 T0:9-R! 110 1� �-IHIHI41� 4-1�1H1�I��� � 1oo 90 14 HI H H IH 1 H H 1 HI H IH II11�I� � -I - Irt rt���' 670 0 4050 - HI ElH ElHI id 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Inflow ■ outflow Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 69 Summary for Reach 106R: Ditch 106 Inflow Area = 81.911 ac, 0.00% Impervious, Inflow Depth = 4.05" for 100-year event Inflow = 330.94 cfs @ 12.18 hrs, Volume= 27.672 of Outflow = 320.26 cfs @ 12.22 hrs, Volume= 27.672 af, Atten= 3%, Lag= 2.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 5.39 fps, Min. Travel Time= 3.7 min Avg. Velocity = 1.28 fps, Avg. Travel Time= 15.8 min Peak Storage= 71,931 cf @ 12.22 hrs Average Depth at Peak Storage= 1.69' Bank -Full Depth= 4.50' Flow Area= 195.8 sf, Capacity= 1,833.82 cfs 30.00' x 4.50' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 57.00' Length= 1,210.0' Slope= 0.0050 T Inlet Invert= 614.00', Outlet Invert= 608.00' $ \ ppr, Reach 106R: Ditch 106 Hydrograph 360 330.94 cfs 320.26 H HI H, H I- IH I - I H I [�fl" lk"" 61•6111�c1 In Inflow ❑ outflow 340 cfs 320 00 �I H H 14 Ig�ni��t��l9' 280 �-1 HI H I4 1 + + I I WI*5.39 fOsl 260 240 I� �-1 HI H I4 14 1 1 H H I4 1 rhol•4�51 220 3200 H 4-1 H H H H 4-1+-1 H H 4"11211�LT 180 LL 14 H H H H 4-1 +-1 H H 1160 40 100 H 1 HI H I4 14 1 l ' I�� ' T sl 80 , —1 HI H I-4 1 � 1 4-14-1 HI 1- 4 1 4"HI 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall= 7.39 " Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Summary for Reach 107Ra: Ditch 107_Shallow Inflow Area = 77.188 ac, 0.00% Impervious, Inflow Depth = 4.48" for 100-year event Inflow = 371.86 cfs @ 12.07 hrs, Volume= 28.812 of Outflow = 364.26 cfs @ 12.10 hrs, Volume= 28.812 af, Atten= 2%, Lag= 1.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 6.27 fps, Min. Travel Time= 2.3 min Avg. Velocity = 1.44 fps, Avg. Travel Time= 10.1 min Peak Storage= 50,498 cf @ 12.10 hrs Average Depth at Peak Storage= 1.66' Bank -Full Depth= 4.00' Flow Area= 168.0 sf, Capacity= 1,739.55 cfs 30.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 54.00' Length= 870.0' Slope= 0.0069 7' Inlet Invert= 628.00', Outlet Invert= 622.00' Reach 107Ra: Ditch 107 Shallow Hydrograph 411 • i• cfs • 1 •1% 1 11 . ■ I 11 280- ;; i% a-22D FL 180z I� t I// 11 : 1 . / D ■ 1 11 t- 1 1�il " 'Xr"1771. �6"( t "g�#1111_a�41J601*1. 11 E E:N[d Ve11*6.27 f0 t I +_I __� Ili �109P i0 -rI �1 C 1,7"�'f7,7- �11 11 :EI El El I1 11I :EI D 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Inflow ❑ Outflow Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall=7.39" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 71 Summary for Reach 107Rb: Ditch 107_Steep [61] Hint: Exceeded Reach 107Ra outlet invert by 0.90' @ 12.10 hrs Inflow Area = 77.188 ac, 0.00% Impervious, Inflow Depth = 4.48" for 100-year event Inflow = 364.26 cfs @ 12.10 hrs, Volume= 28.812 of Outflow = 363.52 cfs @ 12.10 hrs, Volume= 28.812 af, Atten= 0%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 12.37 fps, Min. Travel Time= 0.8 min Avg. Velocity = 2.93 fps, Avg. Travel Time= 3.2 min Peak Storage= 16,745 cf @ 12.10 hrs Average Depth at Peak Storage= 0.90' Bank -Full Depth= 4.00' Flow Area= 168.0 sf, Capacity= 4,963.15 cfs 30.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 54.00' Length= 570.0' Slope= 0.0561 T Inlet Invert= 622.00', Outlet Invert= 590.00' E9 Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 72 Reach 107Rb: Ditch 107_Steep Hydrograph 400 lrAI t t I I t l t 1 t—I E Inflow ■ Outflow 380 363.52 cfsI 11 rt IA 1�fl" �r"1 iT ii"cl 360 340 1:1 ZI ❑ ❑ II IIpg4-gE$j"b b]gbo 320 300 1 1 �-I u I-� I I �-I MakV-61 .37 fosl 280 260 Imo_ � I �I ❑ I4 14 + 1 +-1 H ❑ I4 1 ��I.N5 240 3 200 I� 1 �--I H 1 + + 1 +-1 H 1- I LL 1 rt fit N I rt It t I fi t 1i I- �i=- U� 1180 60 140 1� -E I ❑ ❑ I1 11 :E I 91PLICE'r I f 7s1 120 100 80 1 4-1 u I::1 I: z I :F-I F 1: I:T I T- I :F-I :�:I 1-4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 73 Summary for Reach 109R: Ditch 105 Inflow Area = 21.225 ac, 0.00% Impervious, Inflow Depth = 5.06" for 100-year event Inflow = 161.21 cfs @ 12.01 hrs, Volume= 8.942 of Outflow = 158.57 cfs @ 12.03 hrs, Volume= 8.942 af, Atten= 2%, Lag= 1.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 9.85 fps, Min. Travel Time= 1.6 min Avg. Velocity = 2.27 fps, Avg. Travel Time= 7.0 min Peak Storage= 15,288 cf @ 12.03 hrs Average Depth at Peak Storage= 0.79' Bank -Full Depth= 4.00' Flow Area= 120.0 sf, Capacity= 2,959.13 cfs 18.00' x 4.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 42.00' Length= 950.0' Slope= 0.0442 T Inlet Invert= 650.00', Outlet Invert= 608.00' Reach 109R: Ditch 105 Hydrograph IH IH iM 180 170 161.21 cfs 158.57 cfs 71 1-1I7 1 i T 1441" I7r"lil C 160i`-� 150 I 140 130 It H H H H It fi I H HMxl mall*9. f os 120 110 I� fiI HI H I� It t I fiI HI IH IH I to=�Q-M 1 90 H H H H H H H H H H H—�� 3 `0 8o HI H H H H H HI !� �I � 1 `7 � H H H H I � 1HC'i—tTy 50 40 / � I HI H I H I H I 4-1 H I HI 1-4 1 4-1 H 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ❑ Inflow ❑ outflow Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall= 7.39 " Printed 1/15/2020 HvdroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Paae 74 Summary for Reach 206Ra: Channel 201 Inflow Area = 114.738 ac, 0.00% Impervious, Inflow Depth = 4.16" for 100-year event Inflow = 427.16 cfs @ 12.22 hrs, Volume= 39.810 of Outflow = 409.13 cfs @ 12.29 hrs, Volume= 39.81Oaf, Atten= 4%, Lag= 4.1 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 5.87 fps, Min. Travel Time= 5.1 min Avg. Velocity = 1.58 fps, Avg. Travel Time= 18.9 min Peak Storage= 125,528 cf @ 12.29 hrs Average Depth at Peak Storage= 1.95' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,724.30 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 90.00' Length= 1,800.0' Slope= 0.0050 '/' Inlet Invert= 598.00', Outlet Invert= 589.00' Reach 206Ra: Channel 201 Hydrograph 460 440420 400 427.16 409.13 c�:�j cfs 1 HI H H I-t IH I t 14 H 380 360 - 1 �1 H 1 T 340 320 300 14 --1 H H H I H 280 240 H H 3 0 220 200 — IH — H 1 H H IH I H 180 10 140 H HH H _TIT 120 100 / — I — I-t It I t I H "0#7-5 47 fO= H HI HI IH IH H 9�•�� TI�H HS . II_0 �- 5 / H I tdai a �i 817+ 4j.3b JdiE * I _171 H H I_T IT TI H * I fi I ti IH It l fit t_I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Inflow ■ outflow Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall=7.39" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 75 Summary for Reach 206Rb: Channel 201 [62] Hint: Exceeded Reach 107Rb OUTLET depth by 1.06' @ 12.27 hrs [62] Hint: Exceeded Reach 206Ra OUTLET depth by 1.32' @ 12.07 hrs Inflow Area = 242.432 ac, 0.00% Impervious, Inflow Depth = 4.31" for 100-year event Inflow = 841.89 cfs @ 12.08 hrs, Volume= 87.073 of Outflow = 785.90 cfs @ 12.17 hrs, Volume= 87.073 af, Atten= 7%, Lag= 5.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 7.22 fps, Min. Travel Time= 5.6 min Avg. Velocity = 1.82 fps, Avg. Travel Time= 22.2 min Peak Storage= 264,461 cf @ 12.17 hrs Average Depth at Peak Storage= 2.83' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,670.28 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 '/' Top Width= 90.00' Length= 2,430.0' Slope= 0.0049 T Inlet Invert= 589.00', Outlet Invert= 577.00' Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 76 Reach 206Rb: Channel 201 Hydrograph ■ Inflow 900 841.89 cfs � u � � � � ■outflow 850 soo 785.90 cfs � �l 750 700 I �-I u I I �-I �-j WX- O17-7-U 14 00 650 600 �� �-� �—I I-4 I-� I �I �-I �-j I- I� I PIT- I'P�550 •O� 500 H I - 4- I -�-I �— �nn�� 0 450 A.004 LL H � 14 k I 350 350 _ 300 �I N I-1 14 -k I I �-I I-4 14 14 -kI �I 250 200 �-I N I4 14 -k I I �-I IA 14 I -kI �I 150 ift 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 77 Summary for Reach 207R: Channel 202 Inflow Area = 42.011 ac, 0.00% Impervious, Inflow Depth = 4.05" for 100-year event Inflow = 175.42 cfs @ 12.16 hrs, Volume= 14.193 of Outflow = 166.07 cfs @ 12.21 hrs, Volume= 14.193 af, Atten= 5%, Lag= 3.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 4.30 fps, Min. Travel Time= 5.0 min Avg. Velocity = 1.21 fps, Avg. Travel Time= 17.9 min Peak Storage= 50,166 cf @ 12.21 hrs Average Depth at Peak Storage= 1.15' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,724.30 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 90.00' Length= 1,300.0' Slope= 0.0050 T Inlet Invert= 590.00', Outlet Invert= 583.50' Reach 207R: Channel 202 Hydrograph 1-4 10 180 175.42 cfs H H I4 1+ 1 I- I �� �PP�1—•�'IC 160 166.07 fs c170 H - - fi ,q9. oil-bew �� •t�� 150 140 t I LI N II It I I t I Yell*4.30 f0sl 130 120110 �- �I r1 Irt rt l fi l fi l 1� I� rt l �'h l•R 51 1 0 1 71 n 7-1 1-1 7�� �Q " 80 I -T VE 111 El I 1 11 Z I D El El I ZSI=10 10 1P?7 60 1� �41�Cr l�'r -�T �lA-fsl 50 _ 40 W W 14 1 1 W I_ 1 4-1 W 30 E 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) ■ Inflow ■ outflow Closure Plan HydroCAD model 1.13.20 Prepared by AECOM Allen CbE Jan. 2020 Type 1124-hr 100-year Rainfall=7.39" Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Summary for Reach 208R: Channel 202 [62] Hint: Exceeded Reach 207R OUTLET depth by 0.20' @ 12.08 hrs Inflow Area = 55.785 ac, 0.00% Impervious, Inflow Depth = 4.14" for 100-year event Inflow = 214.10 cfs @ 12.16 hrs, Volume= 19.225 of Outflow = 208.34 cfs @ 12.21 hrs, Volume= 19.225 af, Atten= 3%, Lag= 2.8 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 4.66 fps, Min. Travel Time= 3.9 min Avg. Velocity = 1.30 fps, Avg. Travel Time= 14.1 min Peak Storage= 49,185 cf @ 12.21 hrs Average Depth at Peak Storage= 1.32' Bank -Full Depth= 10.00' Flow Area= 600.0 sf, Capacity= 8,724.30 cfs 30.00' x 10.00' deep channel, n= 0.025 Side Slope Z-value= 3.0 7' Top Width= 90.00' Length= 1,100.0' Slope= 0.0050 T Inlet Invert= 583.50', Outlet Invert= 578.00' E9 Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 79 Reach 208R: Channel 202 Hydrograph H H I H 1--� 1 4— 1 -t--- I H I-4 1 4 1-t- 1 4-1 H Inflow 230 220 214.10 cfs 208.34 cfs H H H It t 1�#�" Atr"15T546"H C ■ outflow 200 I- 1 H I-4 I-4 1 4 I,q�,lg j �� 190 110 70 1- I H H I--L I- t I H LAV4k Vd1*4.fi6 fills 10 150 H 1 -I H I4 1 1 1 -1 H IH 14 1 0�I.4251 Z 140 3120 I- IHHI�11111�IHIH a���Q 'I 100 I� 1 H H I H I H H I -H H IH 1 1 1 15 1 1 IT 1 T-I H I::� z 7 f��-�T SI 70 60 a° I H it t 1 t 1 H IH I-t It t 1 t—I fl 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 80 Summary for Pond 10OP: SE Detention Option 1 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification [62] Hint: Exceeded Reach 104 OUTLET depth by 0.92' @ 13.75 hrs Inflow Area = 215.660 ac, 0.00% Impervious, Inflow Depth = 4.46" for 100-year event Inflow = 940.07 cfs @ 12.08 hrs, Volume= 80.093 of Outflow = 73.00 cfs @ 13.69 hrs, Volume= 80.939 af, Atten= 92%, Lag= 96.1 min Primary = 73.00 cfs @ 13.69 hrs, Volume= 80.939 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 567.00' Surf.Area= 110,000 sf Storage= 36,667 cf Peak Elev= 580.09' @ 13.69 hrs Surf.Area= 167,601 sf Storage= 1,840,776 cf (1,804,110 cf above start) Plug -Flow detention time= 301.9 min calculated for 80.086 of (100% of inflow) Center -of -Mass det. time= 290.5 min ( 1,128.1 - 837.6 ) Volume Invert Avail.Storage Storage Description #1 566.00' 2,169,341 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 566.00 0 0.0 0 0 0 567.00 110,000 1,340.0 36,667 36,667 142,891 582.00 177,000 1,630.0 2,132,675 2,169,341 214,960 Device Routing Invert Outlet Devices #1 Primary 566.00' 20.0" Round Culvert X 2.00 L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 566.00' / 565.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 2.18 sf #2 Secondary 581.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 Width (feet) 50.00 56.00 80.00 Primary OutFlow Max=73.00 cfs @ 13.69 hrs HW=580.09' TW=565.70' (Dynamic Tailwater) L1=Culvert (Barrel Controls 73.00 cfs @ 16.73 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=567.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 81 Pond 10OP: SE Detention Option 1 Hydrograph 940.07 cfs 1,050 / 1,000 / 950 / 900 / 850 / 800 / 750 / 700 / 650 w 600 550 0 500 / M 450 / 400 350 / / 300 / 250 / 200 / 73.00 cfs 150 / 0.00 cfs H 1- -I 1-+ 141" ai - 1 E IH EI IH I �I �0 F;-1pyz1j8%0qt + H 14 -I 14 1 -I H 1 +1 H 1+ 1 H I+ 1 I r] 1: ]--I 1:1 1 tl ::� I II t:� 1:1-- 1 n 1:r + I4-1 14 I -I 14 I -I H 1 +1 H 1+ 1 H I+ 0 2 4 6 8 1012 141618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) IMInflow utflowimarycondary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 82 Summary for Pond 103P: SW Detention Option 2 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Outflow = 4.65 cfs @ 0.00 hrs, Volume= 0.530 af, Atten= 0%, Lag= 0.0 min Primary = 4.65 cfs @ 0.00 hrs, Volume= 0.530 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 566.00' Surf.Area= 105,000 sf Storage= 35,000 cf Peak Elev= 566.00' @ 0.00 hrs Surf.Area= 105,000 sf Storage= 35,000 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert Avail.Storage Storage Description #1 565.00' 2,989,805 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 565.00 0 0.0 0 0 0 566.00 105,000 1,310.0 35,000 35,000 136,564 581.00 170,000 1,600.0 2,043,019 2,078,019 207,177 586.00 195,000 1,690.0 911,786 2,989,805 232,135 Device Routing Invert Outlet Devices #1 Primary 565.00' 20.0" Round Culvert X 2.00 L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 565.00' / 564.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 2.18 sf #2 Secondary 585.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 Width (feet) 50.00 56.00 80.00 Primary OutFlow Max=4.65 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) L1=Culvert (Outlet Controls 4.65 cfs @ 2.44 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 83 Pond 103P: SW Detention Option 2 Hydrograph Ill i� l--� l 4-1 � l 4- l -i l-4 l14 l �-4 l� 71Miiiiiiiiii1111i�t6�r666I:=i3151,666Id + I H Wi-I H I+ I -H I-iI+I H IC I+ -I H 0 2 4 6 8 1012 1416 18 20 22 24 2628 30 32 34 36 38 40 42 4446 48 50 52 54 56 58 60 6264 66 68 70 72 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ■ Secondary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 84 Summary for Pond 104P: NE Detention Option 1 - Pond 1 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification [62] Hint: Exceeded Reach 206Rb OUTLET depth by 2.43' @ 13.05 hrs [62] Hint: Exceeded Reach 208R OUTLET depth by 2.19' @ 12.97 hrs Inflow Area = 298.217 ac, 0.00% Impervious, Inflow Depth = 4.28" for 100-year event Inflow = 991.55 cfs @ 12.18 hrs, Volume= 106.298 of Outflow = 247.01 cfs @ 12.93 hrs, Volume= 107.055 af, Atten= 75%, Lag= 44.7 min Primary = 247.01 cfs @ 12.93 hrs, Volume= 107.055 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 567.00' Surf.Area= 98,000 sf Storage= 32,667 cf Peak Elev= 580.67' @ 12.93 hrs Surf.Area= 156,563 sf Storage= 1,756,812 cf (1,724,145 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 73.2 min ( 924.1 - 850.9 ) Volume Invert Avail.Storage Storage Description #1 566.00' 5,085,589 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 566.00 0 0.0 0 0 0 567.00 98,000 1,310.0 32,667 32,667 136,564 582.00 163,000 1,600.0 1,936,941 1,969,608 207,177 601.00 165,000 1,610.0 3,115,981 5,085,589 237,779 Device Routing Invert Outlet Devices #1 Primary 566.00' 36.0" Round Culvert X 2.00 L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 566.00' / 565.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf #2 Secondary 581.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 20.00 Width (feet) 50.00 56.00 80.00 80.00 Primary OutFlow Max=247.01 cfs @ 12.93 hrs HW=580.67' TW=565.70' (Dynamic Tailwater) L1=Culvert (Inlet Controls 247.01 cfs @ 17.47 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=567.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 85 1,100 1,050 1,000 950 900 850 800 750 700 650 u 600 3 550 c 500 LL 450 400 350 300 250 200 150 0.00 cfs Pond 104P: NE Detention Option 1 - Pond 1 Hydrograph �9�91.55 11 L 1a � 12 1L f cfs H I- HI IH 141" b"a6 kild a is Z� I ITI I: :F-I I:T I :F-I TOOK P[OYM�8%67� 4 I I+I H W -H H 1-I H 1+I H I+1 H H I1I ICIH 111V 11ICI HI11 HHIH I-L H H IH HI IH HI H 1 + 1 H 1+ 1 H IH 247.01 cfLAWALs - I I� �I I: TI H I T-I H 1� I 1 H 0 2 4 6 8 1012 141618 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) IMInflow utflowimarycondary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 86 Summary for Pond 107P: East SW Detention Option 3 Keeping pond below 25 feet in height and 50 acre-feet of storage to avoid dam classification Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Outflow = 3.12 cfs @ 0.00 hrs, Volume= 0.529 af, Atten= 0%, Lag= 0.0 min Primary = 3.12 cfs @ 0.00 hrs, Volume= 0.529 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 566.00' Surf.Area= 105,000 sf Storage= 35,000 cf Peak Elev= 566.00' @ 0.00 hrs Surf.Area= 105,000 sf Storage= 35,000 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert Avail.Storage Storage Description #1 565.00' 2,078,019 cf Custom Stage Data (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 565.00 0 0.0 0 0 0 566.00 105,000 1,310.0 35,000 35,000 136,564 581.00 170,000 1,600.0 2,043,019 2,078,019 207,177 Device Routing Invert Outlet Devices #1 Primary 565.00' 30.0" Round Culvert L= 100.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 565.00' / 564.00' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 4.91 sf #2 Secondary 580.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 5.00 Width (feet) 50.00 56.00 80.00 Primary OutFlow Max=3.12 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) L1=Culvert (Outlet Controls 3.12 cfs @ 2.52 fps) te2 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=566.00' TW=565.70' (Dynamic Tailwater) =Custom Weir/Orifice ( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Page 87 3.12 cfs 3 w 2 u 3 0 LL 1- 0.0 0.00 cfs Pond 107P: East SW Detention Option 3 Hydrograph i i l i l i i l i l l i l i i i i l i i l i l i i l i l I I I I I I I I I I I I I I I I I I I�tb�rag�e��315I,bbb ICf IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII 0 2 4 6 8 1012 1416 18 20 22 24 2628 30 32 34 36 38 40 42 4446 48 50 52 54 56 58 60 6264 66 68 70 72 Time (hours) ■ Inflow ❑ Outflow ❑ Primary ■ Secondary Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 88 Summary for Pond 108P: RAB Ex. Spillway (no storage) [43] Hint: Has no inflow (Outflow=Zero) Device Routing Invert Outlet Devices #1 Primary 611.00' 42.0" Round Culvert L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 611.00' / 606.00' S= 0.1000 '/' Cc= 0.900 n= 0.012, Flow Area= 9.62 sf #2 Secondary 618.90' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 5.00 Width (feet) 20.00 60.00 #3 Tertiary 624.25' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 5.00 Width (feet) 200.00 200.00 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L1=Culvert ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L2=Custom Weir/Orifice ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' (Free Discharge) L3=Custom Weir/Orifice ( Controls 0.00 cfs) Pond 108P: RAB Ex. Spillway (no storage) Hydrograph ❑ Primary ❑ Secondary ■ Tertiary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 89 Summary for Pond 200: RAB Outlet Pond (no storage) [43] Hint: Has no inflow (Outflow=Zero) Device Routing Invert Outlet Devices #1 Primary 570.20' 36.0" Round RCP Culvert L= 114.3' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 570.20' / 566.40' S= 0.0332 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 7.07 sf #2 Device 1 606.12' 42.0" Round 42" Culvert Steep L= 56.3' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 606.12' / 570.20' S= 0.6380 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 9.62 sf #3 Device 2 609.10' 42.0" Round 42" Culvert Shallow L= 27.3' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 609.10' / 606.12' S= 0.1092 '/' Cc= 0.900 n= 0.013, Flow Area= 9.62 sf #4 Device 3 611.09' 54.0" Round 54" Culvert L= 20.5' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 611.09' / 609.10' S= 0.0971 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 15.90 sf #5 Secondary 618.90' Emergency Spillway, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.25 Width (feet) 20.00 28.00 36.00 44.00 52.00 60.00 60.00 #6 Tertiary 624.25' 260.0' long x 40.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L1=RCP Culvert ( Controls 0.00 cfs) L2=42" Culvert Steep ( Controls 0.00 cfs) Lt42" Culvert Shallow ( Controls 0.00 cfs) 4=54" Culvert ( Controls 0.00 cfs) te5 Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) =Emergency Spillway ( Controls 0.00 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=0.00' TW=565.70' (Dynamic Tailwater) L6=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 11 24-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HydroCAD®10.00-25 s/n 09114 ©2019 HydroCAD Software Solutions LLC Page 90 Pond 200: RAB Outlet Pond (no storage) Hydrograph N Primary 1 i Secondary ■ Tertiary I�eail� E���v-b.bb 3 0 LL 0.00 Cfs 0 0 2 4 6 8 10 1214 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall= 7.39 " Prepared by AECOM Printed 1/15/2020 HvdroCADO 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 91 Summary for Link 102L: Lake Wylie/Catawba River Inflow Area = 215.660 ac, 0.00% Impervious, Inflow Depth = 4.56" for 100-year event Inflow = 73.00 cfs @ 13.69 hrs, Volume= 81.998 of Primary = 73.00 cfs @ 13.69 hrs, Volume= 81.998 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Fixed water surface Elevation= 565.70' Link 102L: Lake Wylie/Catawba River Hydrograph —t I fi l fi l fi l l I t--1 I--� I—t I fi l fi l fi ■ Inflow ■Primary 73.00 cfs __4 1 14 I I I 1-1��I C 92 T LI LJ -L — — — — I -L I -L I L I LI It I-L I -L11 FI7I7ITIFIFII-1I-1 iT � . 21 ' 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Allen CbE Jan. 2020 Closure Plan HydroCAD model 1.13.20 Type 1124-hr 100-year Rainfall=7.39" Prepared by AECOM Printed 1/15/2020 HydroCAD® 10.00-25 s/n 09114 © 2019 HydroCAD Software Solutions LLC Paae 92 Summary for Link 104L: Lake Wylie/Catawba River Inflow Area = 298.217 ac, 0.00% Impervious, Inflow Depth = 4.31" for 100-year event Inflow = 247.01 cfs @ 12.93 hrs, Volume= 107.055 of Primary = 247.01 cfs @ 12.93 hrs, Volume= 107.055 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Fixed water surface Elevation= 565.70' Link 104L: Lake Wylie/Catawba River Hydrograph 260 247.01 cfs H H IH I H H I�i-ilow Area=298.217 ac ❑ Inflow ❑ Primary 240 IIII Illllllllllllllllll�lllillli 220 200 IH HI H IH 1 H H 1 HI H IH 14 H 1 HI HI 180 IIII IIIIIIIIII1-IF 1-1 111111111 160 140 — H HI H IH 1 H H 1 H H IH 14 1 H 1 HI — H I- 3 LL120 IIIIIIIIIIIIIIIIIIIIIIIIIII 100 80 H 1 H IHIHIHIHI H IH141 1HI H 60 -1 IT TIT n 17 17 1 TI T1 11 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) APPENDIX C2 Borrow Soil Quantities AECOM Job Description Duke Energy — Allen Closure Soil Borrow Quantities Closure by Excavation Project No. 60572629 Sheet 1 of 2 Computed by AMC Date 1/14/20 Checked by ANR Date 1/17/20 The purpose of this memorandum is to summarize the results of the borrow soil demand quantity calculations for closure -by -excavation of the Allen Steam Station Ash Basins. As the design is further developed, these quantities will be refined. The quantities included herein are to be considered a rough -order -of magnitude. Soil borrow demand quantities that were calculated at this stage of the design include the following: - Fill: Backfill in closure -by -excavation areas following removal of CCR materials to promote surface water drainage and to stabilize these areas. - Cut: Breaching the RAB North Dike and AAB East Dike. - Cut: Excavation of perimeter stormwater channels and detention ponds. Required borrow soil volumes were calculated using AutoCAD. The net cut balance of borrow soil is represented as a soil surplus. This analysis shows that sufficient quantity of soil borrow is anticipated to be generated by the project, however additional material, if necessary, is assumed to be available in other locations on the Duke Allen property (confirmation pending). The estimated borrow soil demand quantities are summarized in Table 1 below, along with additional assumptions and notes. AECOM Job Duke Energy — Allen Closure Project No. 60572629 Sheet 2 of 2 Description Soil Borrow Quantities Computed by AMC Date 1/14/20 Closure by Excavation Checked by ANR Date 1/17/20 Table 1— Summary of Borrow Soil Cut/Fill Quantities Retired Ash Basin (RAB) Description Quantity Unit Notes Cut 808,000 CY - 38K CY cut for breaching RAB North Dike - 620K CY cut for excavation of RAB channels - 150K CY cut for Detention Pond Fill 394,000 CY - - 394K CY fill for backfill of CbE areas RAB soil surplus 414,000 CY - Cut minus fill Active Ash Basin (AAB) Description Quantity Unit Notes Cut 583,000 CY - 81K CY cut for breaching AAB East Dike - 460K CY cut for excavation of perim. Channels - 42K CY cut for excavation of Detention Pond Fill 230,000 CY - 230K CY fill for backfill of CbE areas AAB soil surplus 353,000 CY - Cut minus fill Total Soil Surplus (RAB + AAB) 767,000 CY Assumptions: 1. No adjustments were used for material swelling, shrinkage, settlement, and waste. 2. Material quantities generated by removal of the RAB Landfill are excluded. 3. Material quantities for construction of the proposed AAB and Initial Landfills are excluded. 4. Material quantities for backfill of CbE areas based on one foot of cut and soil replacement in areas outside of proposed landfill boundaries, and within the CCR Unit Boundary, in addition to fill required for construction of perimeter channels.