Loading...
HomeMy WebLinkAbout310828_Compliance Evaluation Inspection_20200116:. ,W Division of Water Resources Facility Number O Division of Soitand, Water'Conservation ��. O OthbrAgency Type of Visit: 7Routine pliance Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: (353 Departure Time: a S County: Farm Name: pl W Vrse-f4 S a+e.4 ok (5—$) Owner Email: �f A 2 / Owner Name: P,,. -1 � G� Q-��o�^'''� Phone: E ©� �.'8L7—MA Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: i j � MR4 &Lj�r RA J Back-up Operator: Location of Farm: Swine, can to Finish can to Feeder seder to Finish grow to Wean grow to Feeder grow to Finish Gilts Boars Other Other Title: Latitude: Phone: Integrator: Region: W I RO Certification Number: I no I 1'�_ I a Certification Number: Longitude: 'Design. ' Current " . A .. • Design Current Capacity, Pop. Wet Poaltry Capacity Pop.. Cattle° Layer Non -Layer Design " Current ` Dry poultry Capacity. Pon." Layers Non -Layers Pullets Turkeys Turkey Poults Other Design' Current Capacity op. Dairy Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes o ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes o ❑ NA ,❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes rNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: 71.) 1 - B Date of inspection: - "06AO Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes E21No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): 9 5 Observed Freeboard (in): 3� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes eNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [2/No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ['No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes dNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E340 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift _ ❑ Application Outside of Approved Area 12. Crop Type(s): , r ,, J0. f�Ii'o 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [2"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes U'/No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes VN ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes eNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑Stocking ❑Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - "Fa Date of inspection: 01- 6- d6olD 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes dNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes &No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes O No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes [ZI'No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E�No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes dNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes dNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA [2(NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes allo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [ �No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). JA)00n ► P-:=0,a( S,b �'� C'k IS 11i� �] 74r� Sa 5ys PuN PLAT wi+k ly, 5 3 t��rs Reviewer/Inspector Name: :Yaw t) 2r.,� Phone: e jjo) 613-95-77- Reviewer/Inspector Signature: /���/y Date:dk 16' R 0Q C_;1 Page 3 of 3 21412015