Loading...
HomeMy WebLinkAboutNCC200424_ESC Approval Submitted_20200203ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director County of Robeson Attn: Kellic Blue, Manager 701 North Elm Street Lumberton, NC 28358 NORTH CAROLINA Environmental Quality September 18, 2019 LETTER OF APPROVAL WITH MODIFICATIONS RE: Project Name: Robeson County County -Wide Water System, Water Main Extensions —2019-2 Acres Approved: 1.32 Project 1D: ROBES-2020-004 County: Robeson, City: Lumberton, Address: Rev. Bill Road River Basin: Lumber Stream Classification: HQW Submitted By: Koonce, Noble & Associates, Inc. Date Received by LQS: August 19, 2019 Plan Type: New Dear Ms. Blue: This office has reviewed the subject erosion and sedimentation control plan and herebyissues this Letter ofApproval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S.113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The N01 form may be accessed at deck nc.govJNCG01. Please direct questions about the N01 form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul. clarlc ncdenr. ov. After you submit a complete and correct N01 Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality 1 Division of Energy. Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 rayetteville, North Carolina 28301 CH0.4-B. 300 Letter of Approval with Modifications County of Robeson September 18, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: l . The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-6 1. 1(a) of our right of periodic inspection to insure compliance. with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S1 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, -` di Pace, El Regional Engineering Assistant Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet cc: Koonce, Noble & Associates, Inc. (electronic copy) Jody Allen, Building Inspector (electronic copy) Fayetteville Regional Office file Letter of Approval with Modifications County of Robeson September 1Q, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Robeson County County -Wide Water System, Water Main Extensions — 2019-2 Project ID: ROBES-2020-004 County: Robeson The following permanent groundcover provision, for HQW zones, must be on the plan: Permanent groundcover will be provided for all disturbed areas within 15 working days or no more than 60 calendar days [whichever is shorter]. The temporary groundcover must be provided within 7 days on ALL areas as this is a HQW zone. Please provide a PDF of the revised sheets. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Fact Sheet on the New NCG41 Permit April 2019 The NC Construction General Permit (also known as "NCGOV') was: renewedon April 1, 2019. The updated permit dues not significantly change the measures that are required to be implemented on construction sites. However, there are some organi.7ational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates° If you have questions, contact Annette Lucas at Annette.tucasO ncdenr. ov or (919) 707-3639. Organizational Updates The new permit: Repeats state requirements for E&SC Plans and organizes them with federal construction activity requirements; Is clearly organized by topic; and Has less text and more tables. Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p'. 2-4);' • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p. 11-14);2 • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously 0.5 inch);' and W • Excludes weekends, state and federal holidays from normal business hours unless construction activities take place (p. 23). 1 This list is based on website guidance by the DEMLR Sediment Program. z The number of calendar days was selected to be as equivalent as possible with the previous permit. 3 The intent is to provide predictability to the inspection schedule. Acronyms to Know COC: Certificate of Coverage, proof of coverage under an NCG01 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI: Notice of Intent, application form for the NCG01 permit e-NOT: Notice of Termination, form for closing out the NCG01 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 The NCGOI Process The new NCG 3 applies to permits approved on or after April 1, 2019. Permittees will no longer receive a copy of the NCG01 permit in the mail with their E&SC Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an NOI on each construction project and issue each construction project its own CDC. Under the new NCGO1 process, construction sites will continue to receive approval for E&SC Plans from either DEMLR or the delegated local E&SC program just like before. After receiving E&SC Plan approval, permittees will officially obtain coverage under the NCG01 by completing an e-NOI (available at deG.nc.ov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. Initially, there will be no charge associated with applying for an NCG01 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annual general permit fee as required per §143-215.3D, DEMLR is working o,n creating a single application form that will allow an applicant to simultaneously apply for an E&SC.permit and an NCG01 CDC. That effort is part of a larger Permit Transformation project at DEMLR. Why do construction sites have to do this extra application step? DEIVIILR is required by the EPA to issue a specific COC to every construction site that disturbs one acre or more. DEMLR is working to create a form that combines the E&SC plan approval and e-NOI processes, but that will take more time. For now, DEMLR has created an efficient e-NOI process. If an E&SC Plan is approved before April 1, which permit applies? Projects with already approved E&SC Plans will automatically follow the new NCG01 permit, but will not need to fill out an e-NO1 or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01.? Yes, DEMLR will provide two sample plan sheets at deq.nc. ov N G01 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. How will the new a-NOI submittal and COC process work.? Permittees will apply for E&SC Plan approvals from either DEMLR or the delegated local E&SC program like before. The E&SC approval letter will instruct the permittee to visit de .nc, ov NCG01 to submit an e-NOI form to DEMLR. The permittee may begin the construction activity after submittal of the e-NO1. The permittee is required to print a copy of the permit and retain it on site. Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an e-NOl form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV,13.6 of the NCG01 permit. Additional signatory options are set forth in IV.13,6 of the permit. It is possible for consultant to prepare the e-NOI, save it as a draft, and email it to the responsible entity for signature & submittal. What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit 4e .nc,_,Bov NCG01 to submit an e-NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&SC Plan approval letters and list servs. If a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an e-NOI after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. How does the new NCGO1 affect the delegated local E&SC Programs? Local programs will continue to review and approve E&SC plans. However, they Will no longer send copies of the NCG01 with E&SC Plan approvals. DEMLR will provide sample language to use in local E&SC Plan approvals to advise permittees that they must submit an e-NCI to DEMLR, Local programs are not required to check if permittees have submitted e- NOIs to DEMLR. However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for them to view a list of construction projects that have submitted e-NOls. When local programs close out an E&SC Plan, the close-out letter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&SC plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCG01 requirements. However, their permittees will be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCG01 permit,