HomeMy WebLinkAbout20000404 Ver 1_COMPLETE FILE_20000328State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Todd Smith Hite Associates 1530 East Fourteenth Street Greenville, NC 27858 Dear Mr. Smith: 4? AMMON now NCDENR Division of Water Quality September 5, 2000 Subject: West Johnston County High School DWQ Project No. 000404 Johnston County The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional information is necessary to complete the technical review process. The required additional information is as follows: Forebay The berm for the forebay (whether above or below the surface of the pond) should extend across the pond so the forebay will contain sediment. Please revise the engineering plans to reflect the change. Wet Detention Pond and Dry Detention Pond Calculations The dimensions of both basins have changed. Please submit updated sizing information (see attached worksheets). 4. Level Spreader The level spreaders should be designed to discharge along the length of the berm in order to maximize the length of buffer utilized for stormwater assimilation. The plans do not show this. Please feel free to call me at (919) 733-9584 to discuss this matter. Division wetlands unit staff will strive to complete a final technical review within 10 working days of receipt of the requested information. If you have any questions or would like to discuss this project, please contact me at (919) 733-9584. Attachments cc: John Dorney, Wetlands/401 Unit Raleigh Regional Office File Sincerely, odd St. ?h , APE Environmental Engineer 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director e?? NGDENR Division of Water Quality June 26, 2000 Mr. Todd Smith Hite Associates 1530 East Fourteenth Street Greenville, NC 27858 Subject: West Johnston County High School DWQ Project No. 000404 Johnston County Dear Mr. Smith: The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional information is necessary to complete the technical review process. The required additional i formation is as follows: 1. Forebay All stormwater wet detention basins are required to have a forebay to facilitate TSS removal. The forebay should be approximately 20% of the total basin volume. Reference Stormwater Best Management Practices Manual, April 1999 (http://h2o.enr.state.nc.us/su/Manuals_Factsheets.htm). Please revise the engineering plans to meet this requirement. Inlet/Outlet Structure Location The inlet and outlet structures must be placed to minimize short circuiting. A long flow path will help to maximize the settling efficiency of the water quality structure. The submitted design of the pond labeled "wet detention #1" will be subject to short circuiting. This issue may be addressed through structure relocation, baffles, forebays, etc. Vegetated Side Slopes The basin side slopes of the basin labeled "stormwater detention #2" indicate the side slopes are 3:1. The plans appear to actually have side slopes of 2.5:1. The side slopes should be no steeper than 3:1 (horizontal to vertical). Also, please specify landscape/seeding information on engineering the plans for both ponds. Level Spreader The level spreaders should be designed to discharge along the length of the berm in order to maximize the length of buffer utilized for stormwater assimilation. Please provide calculations to show that the length of the level spreaders is adequate. Also, the use of properly sized forested buffers as filters strips may allow both basins to be designed as dry detention basins and still meet the 85% TSS removal required in the subject Water Quality Certification. Also, please feel free to call me at (919) 733-9584 to discuss this matter. 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper 5. Vegetative Shelf A vegetative shelf around the perimeter of the wet detention pond (#1) is required. The shelf shall be gently sloped (6:1 or flatter) and shall consist of native vegetation. Please specify this on the engineering plans. 6. Sediment Removal If the basins are proposed to be used as sediment basins during construction, the plans must clearly indicate that accumulated sediment will be removed prior to implementation as a stormwater basins. 7. Operation and Maintenance Agreement An operation and maintenance agreement is required. ' A stormwater control structure will not operate as designed without regular maintenance. Typical requirements for an operation and maintenance plan include the following: • Vegetation management/mowing schedule • Semi-annual inspections • Debris check after every storm event • Benchmark for sediment removal (specific elevations listed) • Designation of a responsible party The operation and maintenance agreement must also be signed by the responsible party and notarized. Division wetlands unit staff will strive to complete a final technical review within 10 working days of receipt of the requested information. If you have any questions or would like to discuss this project, please contact me at (919) 733-9584. Sincerely Todd St. John, P Environmental gineer ^ cc: John Dorney, Wetlands/401 Unit Raleigh Regional Office File nspection and Maintenance Agreement 3ond name: _ocation: vlonthly inspection A. Remove debris from primary and emergency spfilways B , Check groundcover fot signs of erosion or failure 1. 6n embankment 2 in pond C. Check draw down pipe for blockage IWaY and underdratn for signs of seepage or erosion ? D. lnsped the embankment, primary sp< 1. If seepage Is found, note•approximate flow rate, color of discharge, location of slumps, wetness on slope, eta 2 Draw a map of the structure noting any erosion, wetness, slumps, eta Quarterly Inspedion A. Remove debris for undercutting. Replace rip rap and repair broken pipes. p B. Check pipes p C. Reseed grass swaies, the dwml between the forebay and permanent pool, and the pond embankment r' 6 Month Inspection A. Remove accumulated sediment from the permanent pool, time forebay and the outlet of the pond. oral maintenance Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of ?e grass. m cattails from dogging the pond and spillways. -inane Requirements s Pape 1 o(2 57 v. .....:aa7 Tf_ ANDS GROUP i West Johnston High School 8-04-00 Calculations for level spreader Wet De tention in the front of the School Q = 27.7 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLHA1.5 Weir equation C = 3 constant H = ?ft to be computed H = (013.OL)A0.66 H = 0.18 ft V = Q/A A = LH = 22.08 sf V = 1.25 fps OK less than 3 fps Detenti on Behind the Athletic Fields Q = 27.2 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH^1.5 Weir equation C = 3 constant H = ?ft to be computed H = (Q/3.OL)^0.66 H = 0.18 ft V = Q/A A = LH = 21.82 sf V = 1.25 fps OK less than 3 fpsr. 1 nspection and Maintenance AgreementO pond name: j ??l r ?.?fLf L?flir.l er _ocation:i vtonthly Inspection A. Remove debris from primary and emergency spillways B. Check groundcover for signs of erosion or failure 1. On embankment 2 In pond 3 C. Check draw down pipe for blockage 3 D. Inspect the embankment, primary spillway and underdrain for signs of seepage or erosion 1. If seepage is found, note-approximate flow rate, color of dirge, Iocation of slumps, wetness on slope, eta 2 Draw a map of the structure noting any erosion, wetness, slumps, eta :)uarteriy Inspection A. Remove debris 3 g, Check pipes for undercutting. Replace rip raP and repair broken pipes- 3 C. Reseed grass swales, the dhannel between the forebay and permanent pool, and the Pond embankment 3 Monti (nspedion A. Remove accumulated sediment from the permanent pool, the forebay and the outlet of the pond. -iral maintenance Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of v grass. I cattails from dogging the pond and spillways. finance Requirements Page 1 o(2 57 ijgE 'LANDS GROUP A hereby acknowledge that I am the financially responsible party for maintenance and inspection of this detention pond I will perform the maintenance as outlined above, to comply with the Johnston County Stormwater Management Ordnance and the Stormwater Management permit received for this project Furthermore, I attest that this Inspection and Maintenance Agreement is on file with the Register of Deeds. Signature Alf All I 'Y Y/ fjA" J a Notary Public for state of I, Co of , do reby certify that _ personally before me this day of ,1c9 '? and aclmo a the due execution of the foregoing instrument Witness my hand and official seal, My commission ?a?`°? 'E W. c ?0TA zlc?p to Page 2 of 2 63 revised 10/98 West Johnston High School 8-04-00 Calculations for level spreader Wet De tention in the front of the School Q = 27.7 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH"1.5 Weir equation C = 3 constant H = ?ft to be computed H = (Q/3.OL)°0.66 H = 0.18 ft V = Q/A A = LH = 22.08 sf V = 1.25 fps OK less than 3 fps Detenti on Behind the Athl etic Fields Q = 27.2 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH"1.5 Weir equation C = 3 constant H = ?ft to be computed H = (Q/3.OL)"0.66 H = 0.18 ft V=Q/A A=LH= V= 1.25 fps 21.82 sf OK less than 3 fps Nx? Hite associates ARCHITECTURE / ENGINEERING / PLANNING LETTER of TRANSMITTAL T g TO: NCDENR - Division of Water Quality 4401 Reedy Creek Road Raleigh, NC 27607 ATTN: Mr. Todd St. John, PE DATE: August 23, 2000 RE: West Johnston High School We are sending via UPS the following plans: COPIES DWG DATE DESCRIPTION NOTES: 3sets Site Plans/Grading and Erosion Control/Details 1 Letter from Division of Water Quality response 1 Reports from Engineer J.S. Janowski l SnsPcc.fia?, MA7n?u,anc?. ?gvtt?rl?'E This information is transmitted for approval unless noted otherwise. REMARKS: Drawings: 0001-Overall Site Key Plan 0002-Site Phasing Plan C201-Site Grading and Erosion Control - South C202-Site Grading and Erosion Control - North C203-Site Grading and Erosion Control - Entrance C204-Site Grading and Erosion Control C401-Site Details: Storm Sewer/ Sanitary Sewer C402-Site Details: General Notes / Erosion Control C403-Site Details: Storm Water Detention Boxes C404-Site Details: Wet Detention / Storm Water Detention C405-Site Details: Curb and Gutter / Asphalt & base / Parking C406-Site Details: Athletic Field Improvements C407-Site Details: Athletic Field Improvements / Misc. IGNED: ith copy: Steve Janowski, P.E. Ms. Ann Williams, Johnston County Schools Mr. Ray Debruhl, TPFG file: C408-Site Details: Dugouts C409-Site Details: Water Services C410-Site Details: Concrete Steps C501-Road Widening 9 h a - G 2 52000 WIRLANDS GROUP M QWLl -?r SECT!^" 2600 Meridian Drive / Greenville, NC 27834 / tel 252.757.0333 / fax 252.757.1330 / e-mail: tsmith@hiteassoc.com Project No. DWQ Project Name: W. Johnston High pond 1 SUBMITTED DESIGN: REQUIRED DESIGN: elevations status Bottom of Basin (ft) 194 Permanent Pool (ft) 198 4 ft. depth ok Temporary Pool (ft) 199.12 1.12 ft. depth ok areas Permanent Pool SA (sq ft) 37324 19476 sq. ft. ok Drainage Area (ac) 23 Impervious Area (ac) 13.14 57.1 % volumes Permanent Pool (cu ft) 39228 Temporary Pool (cu ft) 130153 47103 cu. ft. ok Forebay (cu ft) 0.0 % check forebc other parameters SA/DA 0 1.94 - Orifice Diameter (in) 3 0.18 cfs drawdown - Design Rainfall (in) 1 8.5 day drawdown check drawc Linear Interpolation of Correct SA/DA*** % Impervious Next Lowest 50 Project Impervious 57.1 Next Highest 60 4 ft. Permanent Pool Depth SA/DA from Table 1.73 1.94 2.03 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Todd Smith Hite Associates 1530 East Fourteenth Street Greenville, NC 27858 Dear Mr. Smith: A 4? Ad 111111111111L NCDENR Division of Water Quality October 11, 2000 Subject: West Johnston County High School DWQ Project No. 000404. Johnston County The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional information is necessary to complete the technical review process. The required additional information is as follows: 1. Forebay The berm for the forebay (whether above or below the surface of the pond) should extend across the pond so the forebay will contain sediment. Please revise the engineering plans to reflect the change. Please refer to page 9 of the NC DENR Stormwater Best Management Practices Manual, April 1999. 2. Level Spreader The level spreaders should be designed to discharge along the length of the berm in order to maximize the length of buffer utilized for stormwater assimilation. The plans do not show this. Please feel free to call me at (919) 733-9584 to discuss this matter. Please refer to page 77 of the NC DENR Stormwater Best Management Practices Manual, April 1999. Division wetlands unit staff will strive to complete a final technical review within 10 working days of receipt of the requested information. If you have any questions or would like to discuss this project, please contact me at (919) 733-9584. Sincerely 14?_ ;1/l,,/ „ n ?t To t. John, PE Environmental Engineer cc: John Dorney, Wetlands/401 Unit Raleigh Regional Office File 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. G. Douglas Jones PO Box 1132 Edenton, NC 27932-1132 Dear Mr. Jones: NCDENR Division of Water Quality September 15, 2000 Subject: Albemarle Baptist Church DWQ Project No. 991266 Chowan County This Office is in receipt of the plans dated September 1, 2000 for the stormwater management basin and grassed Swale at the subject facility submitted to the Division on September 5, 2000. Staff from the Wetlands Unit reviewed the plans and found them acceptable as long as the stormwater facilities are constructed and functioning before any structure associated the proposed fill is occupied per the subject 401 Water Quality Certification dated December 2, 1999. Also, for this approval to be valid, a signed and notarized Operation and Maintenance Agreement must be approved in writing by this Office. Please note that this approval shall not be construed as an approval of the dam design for Dam Safety purposes. If you have any questions regarding this matter, please contact Mr. Todd St. John at (919) 733-9584. 4etl R. Domey ands Unit Su ervisor cc: Mr. Todd St. John, Wetlands Washington Regional Office File 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper Project No. DWQ 1 (to be provided by DWQ) DIVISION OF WATER QUALITY -401 WEB DE?TON BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATI (please complte the following information): Project Name : Contact Person: Phone Number: Z ?' lv '07 For projects with multiple basins, specify which basin this worksheet applies to: 1.x/04.I Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area IQ?•m ft. ft. 199.•/ ? ft. r? sq. ft. ac. ac. (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) Permanent Pool Volume Temporary Pool Volume Forebay Volume ?? 2 28 cu. ft. cu. ft. cu. ft. (combined volume of main basin and forebay) (volume detained on top of the permanent pool) SA/DA used 2.41 hlof ' -;,W X 144M(surface area to drainage area ratio) Diameter of Orifice in. (draw down orifice diameter) H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. KA submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. E) E The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. j ._ Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the 0&M plan. A debris check is specified in the 0&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. A responsible party is designated in the O&M plan. 100 09/97 Page 1 of 1 Project No. DWQ_ (to be provided by DWQ) DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a dry detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : Contact Person: > Phone Number: / For projects with multiple basins, specify which basin this worksheet applies to:J?rtg T (p ?L Drainage Area: Zf, lJ acres Percent Impervious Area: L % H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and .Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H.1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials 1-2 Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. 9fl The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A small, permanent pool atoutlet orifice is provided to reduce clogging. An emergency drain to completely empty the basin is provided. -0Wegetation plan prepared by a licensed professional is specified. Basin-to be stabilized within 14 days of construction is specified. 11, d l*, Z ` . Sediment storage (20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85% TSS removal efficiency is provided. Access for clean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. V or --I Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. :Z#E If used as a temporary basin, plans indicate clean-out prior to final operation. A site specific operation and maintenance plan with the following provisions is provided. - Mow grass at least twice annually - Remove trash and debris upon accumulation and at least twice annually - Inspect for proper operation at least twice annually including: - outlet clogging or too rapid a release - erosion on banks a- , _. . i not indicate that we received them. Please provide us with documentation that that was done. Please review the DWQ Interim Internal Guidance documents for mitigation monitoring protocols (http://h2o.enr.state.nc.us/ncwetlands/) or contact Todd St. John or Dave Penrose with my staff for additional details. However, we recommend that you consider assessing the following items as part of any mitigation monitoring plan: ¦ Determination of dominant channel forming discharge. ¦ Determination of proper bed, banks, and flood plain cross-section geometry. ¦ Determination of morphological stream classification. ¦ Determination of sediment transport, yield, and delivery budgets. ¦ Determination proper bed, bank, slope, and flood plain planform. geometry. mmum information should include specific numbers for the reference reach and design channels. ¦ Establishment of riparian buffer zones. ¦ Proper selection, density, and placement of vegetation. ¦ Briefly discuss basic soil types and properties. Recall that the 401 Certification for this project specifically mentions that mitigation monitoring protocols shall include assessment of channel stability and benthic macroinvertebrate communities. These monitoring protocols must be included in the mitigation plan. ? Section 7 of the 401 Certificate mentions that DOT shall submit a stormwater and on-site stream enhancement plan to DWQ by 6 June, 1998 for written DWQ approval. Our files indicate that this has not been done. Again if you find that DWQ has been delinquent in our record keeping, please note these delinquencies and provide us with dated material addressing this. Thank you for your attention to these matters and we look forward to working with you on this project. Sincerely, o Dorney Cc: Todd St. John and Dave Penrose, Wetlands Unit Mark Cantrell, US Fish and Wildlife Service, Asheville Bob Johnson, US Army Corps of Engineers, Asheville Frank McBride, NC Wildlife Resources Commission Cynthia Van Der Wiele, Wetlands Unit Bill Gilmore, NC Department of Transportation . File Copy Central Files . , -w I. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director 1•• NOOK NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 15 September, 2000 Mr. Mark Ashness CE Group P.O. Box 219 Pittsboro, North Carolina 27312 Dear Mr. Ashness; Regarding: Environmental Monitoring Program Harris Tract, Chatham County DWQ # 991233 Thank you for the opportunity to review the Environmental Monitoring Program for the Preserve at Jordan Lake Golf Club (DWQ # 991233). This appears to be a very comprehensive monitoring program that will address most of the concerns noted during the public hearing 27, April 2000 and addressed in the 401 Certification. Staff members of the Division of Water Quality have reviewed this document and have the following comments/concerns. Please respond to these issues by October 31, 2000. Many of the potential water quality problems associated with this project are non-point source perturbations and as such will be most noticeable during, or immediately following, spate events. Sections 2.2 and 3.2 discuss the sample frequency for surface water samples. We recommend that these samples be collected during each of the four collection periods during both Phase I and Phase II of this monitoring program. We recognize that water levels may present problems with collection at some stations during low rainfall periods. Every attempt should be made to collect these samples following significant rain events to effectively assess the non-point source perturbations. In addition, baseflow conditions also should be sampled and noted. These latter data will serve as low-flow background information. Other comments include the following: ? Please add a List of References to this document where appropriate. It is strongly recommended that surface water samples also be collected from the collection location noted on Figure 1 as Sediment 3/Monitoring Well 3 near the western portion of the project. Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 . Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/10%n post consumer paper v 61 STORM WATER MANAGEMENT PLAN WEST JOHNSTON HIGH SCHOOL JOHNSTON COUNTY, NORTH CAROLINA Proj. No. 20013 June 6, 2000 'f- vov prepared by: J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 (252)756-8918 Narrative This site is a proposed high school. It is situated on a 101 acre tract of land off the east side of SR 1330 and south of Beaverdam Branch. The property is not located in the ESOD. The site is classified as commercial in accordance with the classification that Johnston County Director of Infrastructure and Engineering assigned to this school in a joint meeting on April 4, 2000. The impervious limits for commercial areas is 60%. The existing slopes of the land are between 5 and 10 % with drainage in two directions. The proposed drainage plan also manages storm water in the two separate basins. There is a total of 22.70 acres of impervious area on this site which is 22.5% impervious. In the front of the site, a wet detention basin is designed to attenuate the post development peak discharge of the 2 year 24 hour storm to that of the predeveloped flow and to detain the first 1" of runoff and release it between 2 and 5 days. The estimated predevelopment peak rate of runoff is 28.6 cfs: The estimated postdevelopment rate of runoff is 81.9 cfs. The effluent pipe into the basin is a 54"RCP at a flat slope of 0.5% to minimize velocities. The outlet control pipe is a 3" pvc pipe with a small 3.5 R weir opening to control the 2 year storm. The principal spillway is an 8'x8' concrete box. The dam is approximately 15' wide 3:1 front side slopes and 3:1 back side slopes. A 30 foot emergency spillway is cut around the north of the basin to handle the 100 year design storm. The basin is designed to remove 85% TSS prior from the runoff. The downstream impacts are mitigated as a result of the detention basin. In the athletic field site, another detention basin is designed to attenuate the post development peak discharge of the 2 year 24 hour storm to that of the predeveloped flow. The estimated predevelopment peak rate of runoff is 36.6 cfs. The estimated postdevelopment rate of runoff is 62.7 cfs. The effluent pipe into the basin is a 3" pvc pipe to detain the first 1" of runoff and release it over a 2 to 5 day period. This basin is designed as an extended dry detention basin to remove 50 % TSS. It has a level spreader downstream of the outlet to remove another 35% TSS for a total of 85% TSS removal. The outlet control pipe is a 54" RCP with a small, 10 foot wide dam, with 3:1 front side slopes and 3:1 back side slopes. A 30 foot emergency spillway is cut around the west of the basin to handle the 100 year design storm. A 6.5 foot weir is formed into an 8'x8' box in order to control the 2 year storm. The basin is designed such vegetation will be allowed to grow freely and provide for additional nutrient intake. Maintenance for the facility will include inspections of the dam and control devices. The downstream impacts are mitigated as a result of the detention basin. SOIL EROSION AND SEDIMENTATION CONTROL PLAN NARRATIVE WEST JOHNSTON HIGH SCHOOL JOHNSTON CO , NORTH CAROLINA 20013 J.S. JANOWSKI AND ASSOCIATES 105 C EAST VICTORIA COURT GREENVILLE, NC 27858 252-756-8918 This project includes the construction of appro)dmately 205,630 5F of new buildings for the school on a portion of a 101 acre site. Approximatey 75.5 acres of land will be disturbed. The site has slopes averaging 5-10%. Overall, elevations vary from a high point of 242 msl to a low point of less than 176 msl. The site is currently farmed . The soil type is a silty day. III ADJACENT PROPERTY The property is bourxled on the , south and east by undeveloped property, bounded on the west by Raleigh Rd (SR 1330) and on the North by Beaver Branch. IV. PLANNED NORM WATER MANAGEMENT AND EROSION AND SEDIMENTATION CONTROL MEASURES TEMPORARY GRAVEL CONSTRUCTION ENTRANCE A Temporary Gravel Construction Entrance is to be used at street connection to SR 1330 TEMPORARY SILT FENCE Temporary Silt Fences are to be placed at the toe of fill sites adjacent to the property line to collect sediment laden runoff. Due to the abundance of fill slopes the silt fence will provide an excellent barrier to protect off-site facilities from sediments. Sediment fence will be installed around all catch basins and drop inlets to prevent sediment from entering the storm drainage system. L: ; I:M:IN1 L*]3-Ml Temporary Rods Check Dam will be used in the Consbvction of new ditches. STORM INLET SEDIMENT TRAP Storm inlet sediment traps will be used at concentrated runoff points associated with drop inlets as shown on plans. GRASS LINED CHANNEL Grass lined channels with temporary straw-net liners will be constructed in roadside ditches. STORM WATER DETENTION BASIN AND ROCK DAM SEDIMENT TRAP At the end of the major storm drainage outfall a storm water detention basin including a sediment trap will be installed in order to reduce the peak outflow and to trap sediment that may escape inlet control measures. A rock dam will be placed at the inlet of the outlet pipe for the detention facilities to trap sediment. 1.OBTAIN PLAN APPROVALS AND ALL APPLICABLE PERMITS. 2. FLAG LIMITS OF ROUGH GRADING FOR BUILDING SITE, PARKING LOTS AND ESTABLISH GRADE LIMITS AS NEEDED. 3. HOLD PRECONSTRUCTION MEETING WITH GRADING CONTRACTOR, EROSION CONROL ADMINISTRATOR, PROJECT ENGINEER AND OWNER. 4. INSTALL SEDIMENT TRAPS AND THE PERIMETER SEDIMENT FENCES AS THE FIRST CONSTRUCTION ACTIVITY. 5. INSTALL STORM DRAINAGE FOR OUTFALL, INSTALL RELATED EROSION CONTROL MEASURES AND END OF DAY MEASURES 6. PREPARE TEMPORARY CONSTRUCTION ENTRANCE, STRIP AREA OF TOP SOIL AND STOCKPILE AS NEEDED FOR FINAL LANDSCAPING. INSTALL SEDIMENT FENCES AROUND PERIMETER OF STOCKPILE AREAS. 7. INSTALL RIP RAP OUTLET PROTECTION OUTLET. 8. BEGIN AND COMPLETE ROUGH GRADING OPERATIONS INCLUDING ENTRY ROADS. 9. INSTALL TEMPORARY SEDIMENT CONTROL MEASURES IN THE ROADSIDE DITCHES. 10. INSTALL STORM DRAINAGE FOR PARKING AREA, AND BUILDING PERIMETER INSTALL RELATED EROSION CONTROL MEASURES AND END OF DAY MEASURES 11. BRING BUILDING AND PARKING AREA TO WITHIN 2" OF FINAL SUBGRADE, TEMPORARILY SEED THESE AREAS TO PREVENT EROSION UNTIL SUCH TIME OWNER 15 READY TO PROCEED WITH FINAL CONSTRUCTION. 12. BRING LANDSCAPED AREAS TO WITHIN 6" OF FINAL GRADE, RE-DISTRIBUTE 6" OF TOP SOIL. 13. INSTALL TEMPORARY STAW-NET LINERS IN ROADSIDE SWAIES 14. FINE GRADE, PERMANENTLY SEED AND MULCH ALL LANDSCAPED AREAS. 15. STABILIZATION SHALL OCCUR WITHIN 15 DAYS OF COMPLETION OF GRADING OPERATIONS. 16. REMOVE SEDIMENT TRAP AND INSTALL REMAINING STORM DRAINAGE, REGRADE AREA AND SEED AND MULCH. 17. ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED BY THE STATE OR OWNER IF DEEMED NECESSARY. 18. AFTER SITE IS STABIMED, REMOVE ALL TEMPORARY MEASURES, FINE GRADE DISTURBED AREAS, AND INSTALL PERMANENT VEGETATION ON THE DISTURBED AREAS. 19. MAINTAIN PERMANENT VEGETATION BY TOP DRESSING WITH 700 LBS PER ACRE OF FERTILIZER EVERY 6 MONTHS UNTIL THE COMPLETION OF THE PRO3ECr. 20. REMOVE ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES UPON COMPLETION AND STABILIZATION OF PROJECT. VI. MAINTENANCE PLAN 1. All erosion and sediment control practices will be dlecked for stability and operation following every run-off producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the silt fence when it becomes 0.5 feet deep. 3. Sediment will be removed from the sediment trap when the storage has been approbmately 50% filled. Gravel will be deaned and replaced when the sediment pool no longer drains properly. 4. All seeded areas will be fertilized, re-seeded as necessary, and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. Yll. VICINITY PLAN See Erosion Control Plan VIII. VEGETATION PLAN A. PERMANENT SEEDING AFTER APRIL 15 AND BEFORE SEPTEMBER 15 SEEDING MIXTURE COMMON BERMUDAGRASS 80 (2 LB/1000 SF) SOIL AMENDMENTS APPLY 3000 LEI/ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB/ACRE 10-10-10 FERTILIZER. MULCH USE JUTE, EXCELSIOR MATTING OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGE NOT REQUIRING TEMPORARY LINING, APPLY 4000 LB/ACRE GRAIN STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIAL MUST NOT BEALLOWED TO BE WASH DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECT AND REPAIR MULCH FREQUENTLY. RE-FERTILIZE THE FOLLOWING APRIL WITH 50 LB/ACRE NITROGEN. B. PERMANENT SEEDING AFTER SEPTEMBER 15 AND BEFORE APRIL 15: SEEDING MIXTURE TALL FESCUE 80 LB/ACRE COMMON BERMUDA GRASS 40 LB/ACRE KOBE LESPEDEZA 40 LB/ACRE SEEDING DATES FROM SEPT. 1- MARCH 1, USE UNSCARIFIED BERMUDA GRASS SEEDING DATES BEST POSSIBLE EARLY SPRING. FEB. 15 - MAR. 20 FEB. 15 -APRIL 30 FALL SEPT I - SEPT. 30 SEPT. 1- OCT. 31 SOIL AMENDMENTS APPLY LIMEAND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 5000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LBIACRE 10-10.10 FERTILIZER MULCH APPLY 4000 LBIACRE GRAIN STRAW ON EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS AN ANCHORING TOOL MAINTENANCE IF GROWTH IS LESS THAN FULL ADEQUATELYRE-FER77UZE IN THE SECOND YEAR ACCORDING TO THE SOIL TEST OR TOP DRESS WITH 500 LBIACRE 10-10-10 FERTILIZER AND MOW AS NEEDED. WHEN SERICEA IS OMITTED FROM THE MIXTURE, RE-SEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. C. TEMPORARY SEEDING AFTER SEPTEMBER 15 AND BEFORE APRIL 15. SEEDING MIXTURE RYE GRAIN 120 LB/ACRE KOBE LESPEDEZA 50LBIACRE OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE SEEDING DATES COASTAL PLAIN -DEC. 1-APRIL 15 SOIL AMENDMENTS APPLY UME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 2000 LBIACRE GROUND AGRICULTURAL LIMESTONEAND 750 LB/ACRE 10.10-10 FERTILIZER MULCH APPLY 4000 LB/ACRE GRAIN STRAW ON EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRA W BY TACING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY SR41GHT CAN BE USED AS AN ANCHORING TOOL MAINTENANCE IF GROWTH IS LESS THAN FULL ADEQUATELY RE-FERTILIZE RE-SEED, RE-FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. D. TEMPORARY SEEDING BEFORE SEPTEMBER 15 AND AFTER APRIL 15. SEEDING MIXTURE GERMAN MILLET 40 LBIACRE SEEDING DATES APRIL 15-AUGUST 15 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURAL LIMESTONEAND 750 LB/ACRE 10-10-10 FERTILIZER MULCH APPLY 4000 LB/ACRE GRAIN STRAW ON EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY SRAIGHT CAN BE USED AS AN ANCHORING TOOL MAINTENANCE IF GROWTH IS LESS THAN FULL ADEQUATELY RE-FERTILIZE RE-SEED, RE-FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. IX. SPECIFIC ATIONS AND DETAILS A. 6.02 ....................................................Land Grading B. 6.06 ....................................................Temporary Gravel Construction Entrance C. 6.14 ....................................................Mulching D. 6.30 . ...................................................Grass- lined channels E. 6.51 . ....................................................Fabric Drop Inlet Protection (Temporary) F. 6.60 ....................................................Temporary Sediment Trap G. 6.62 .....................................................Temporary Sediment Fence H. 6.83 . ....................................................Rock Check Dam CULVERT CROSSING DESIGN FOR WEST JOHNSTON HIGH SCHOOL MAIN ENTRY ROAD 100 YR - 24 HOUR 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 %kill ZAq SEALS 'v ?- 12324 FN? West Johnston High School 20013-1 Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall 0.95 0.3 CN= CN= C. 187.00 acres 98 37.00 acres 73 150.00 acres C 5000 feet 79 feet 8.4 inches Design Hydrograph Formulation Composite CN S=10001CN -10 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) 77.9 2.83 5.76 inches Time of Concentration channel flow (not overland) Tc=(L"3M)"0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) 27.2 R 9 h 2 132 18 10 203 22 25 246 23 100 302 25 27.2 minutes 0.43 5.8 inches per hr Peak Discharge Q=CIA 463.7 cfs Time to peak Tp= Vol/(1.37 Qp) 102.5 minutes Based on Analysis of a 2 - 72" culverts the Headwater Elevation = 197.73 Top of the Road = 198.84 Road is designed to not overtop in the 100 year storm Outlet Velocity = 8.8 fps Design Outlet Protection Use Chart pg 8.06.3 for 232 cfs per barrel and 72" dia pipe use La = 30 feet West Johnston High School -20013-2 PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 5, 2000 PROGRAM INPUT DATA DESCRIPTION Culvert Diameter (ft) ....................................... FHWA Chart Number ........................................... FHWA Scale Number (Type of Culvert Entrance) ................ Manning's Roughness Coefficient (n-value)..... ' .............. Entrance Loss Coefficient of Culvert Opening ................ Culvert Length (ft) ......................................... Invert Elevation at Downstream end of Culvert (ft).......... Invert Elevation at Upstream end of Culvert (ft)............ Culvert Slope (ft/ft) ....................................... Starting Flow Rate (cfs) .................................... Incremental Flow Rate (cfs) ................................. Ending Flow Rate (cfs) ...................................... Starting Tailwater Depth (ft) ............................... Incremental Tailwater Depth (ft) ............................ Ending Tailwater Depth (ft) ................................. COMPUTATION RESULTS Flow Tailwater Headwater (ft) Normal Critical Rate Depth Inlet Outlet Depth Depth (cfs) (ft) Control Control - ---- (ft) --------- (ft) ---------- ------- 100.0 ---------- 4.0 ----------- 3.82 ---- - 3.99 1.94 2.69 150.0 5.0 4.92 5.18 2.41 3.33 200.0 6.0 6.0 6.45 2.83 3.87 250.0 7.0 7.22 7.99 3.23 4.33 300.0 8.0 8.47 9.65 3.63 4.73 350.0 9.0 10.09 11.43 4.03 5.07 400.0 10.0 11.96 13.33 4.47 5.33 450.0 11.0 14.07 15.35 5.03 5.53 500.0 12.0 16.44 17.49 6.0 5.67 550.0 13.0 19.05 19.75 6.0 5.77 600.0 14.0 21.91 22.13 6.0 5.83 VALUE 6.0 1 1 0.012 0.1 55.0 188.0 188.51 0.0093 100.0 50.0 600.0 4 0 1.0 14.0 Depth at Outlet Outlet Velocity (ft) --------- (fps) --------- 4.0 4.99 5.0 5.96 6.0 7.07 6.0 8.84 6.0 10.61 6.0 12.38 6.0 14.15 6.0 15.92 6.0 17.68 6.0 19.45 6.0 21.22 ---- - ----------- HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996 Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069 Phone:(281)440-3787, Fax:(281)4.40-4742, Email:software@dodson-hydro.com All Rights Reserved. p= 1, RX, r. 50 O -?? ° rl imr .-S son ro pp I\', ? I ?! J r ? ! ?J 200 00 7$p i I eo VI \ ? '. `\\ J I , ? 1 ,`?'•! ? \\?ArII J, I \ ?•\' \\ 11 N: 2)43 "P 15 lc: X223 11-= "`J `? \ ?''1 ,? t -•?' 00 V-+J I ?? .., ? o' ? ins C\ 1 /? i / -? ? \ - ? rur '" -??-? -??''? ?. .? ?Z "c\ t :Cerfy %. \ \ Cem a . y o / - "/'•` - f _ roc ??/? rv > \ V\ _ ' • ???w 250 ?`•\-? , ?_.'' -? V" ?: // ? ? !I ?'`\ ?l?1 "'?7 I I /fit \} i ,- \t{' r- -\ `?1 'l . \?K? - / % ?' ?TJ. \ ?'._' -?' ?- ?- i' \` /?/f i???.yy??I?/? V \ ,? 1- ?. %? 011 1 - \`? \ J \Q? \li?J ,'? \ ' ?-?-? i\\• OSSI'O$ `-J? ? II: (?/ - ? ? I ; ?\. - ? 1 _ _ ? ? ? per' i ? 0 ? ? 240 n\\ \\SO f i \) Beaea 2t, II C II ` ii D It i m ISO//`?/ 'It• beth BM- i 50 722 32'30" 1 7pgooom.? • INTERIOR-GEOLOGICAL SURVEY, RESTON• VIRGINIA-199 FOUR OAKS 6 M/.-Ik;, 1 MILE ROAD CLASSIFICATION 000 5000 6000 7000 FEET Medium-duty ...... _.._ Light-duty >a 1 KILOMETRE Unimproved dirt 0 FEET O State Route %ATUM OF 1929 1 i West Johnston High School 8-04-00 Calculations for level spreader et De tention In the front of the School Q = 27.7 cis outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH"1.5 Weir equation C = 3 constant H = ?ft to be computed H = (013.OL)"0.66 H = 0.18 ft V = Q/A A = LH = 22.08 sf V = 1.25 fps OK less than 3 fps Detenti on Behind the Athl etic Fields Q = 27.2 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH"1.5 Weir equation C = 3 constant H = ?ft to be computed H = (Q/3.OL)"0.66 H = 0.18 ft V = Q/A A = LH = 21.82 sf V = 1.25 fps OK less than 3 fps A SLOPE ?. •: _ _ _ _ ...'.. : _ :.. • TRANSMON TO 3 A8-' _ .. /.` ............... ...... Design Flow (cfs) Entrance Width Depth End Width Length 10 2D-3. , '11 2 I.0 3' ?o LEVEL SPREADER SCALE: NONE c1C5 - GJ U H t Wet Detention Study front of School-2 year 24 hour WET DETENTION FOR WEST JOHNSTON HIGH SCHOOL FRONT OF THE BUILDING 2 YR - 24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 6-6-00 rev 9-13-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 `????ruur N s 2324 b? 0 .? JANO ??nnr0M0 West Johnston High School -20013-1 t Site Conditions Predevelopment Wet Detention Study front of School-2 year 24 hour Total watershed area Area Impervious C= Area grass or woods C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channelflow Tc=(L"3/H)A0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.9 X 23.00 acres CN= 98 0.00 acres CN= 73 23.00 acres C 1220 feet 40 feet 3.7 inches OVERLAND 2 E 9 h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School -20013-2 13.9 minutes 0.3 4.1 inches per hr 28.6 cfs Storage Required Wet Detention Study front of School-2 year 24 hour Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface diff. Elevation am gift 198.00 37924 2.00 200.00 43925 2.00 202.00 51021 accum. StOEM strM Elevation 0 198 81849 81849 200.00 94946 176795 202.00 Z Std SUM LN(st rno LN(UWJ SUV 0 0 ERR ERR 0.00 81,849 2 11.31 0.69 2.00 176,795 4 12.08 1.39 4.00 b= 1.1110408 Ks= 37892.807 1/b Z= (S/K,)^ Predicted Water Surface Elevation for 2 year 24 hour storm= Predicted Surface Area= elev = 198.00 To capture the first 1" of runoff Drainage Area = 23 ac % imperv area = 57.00° 28.6 cis 81.9 cfs 94,699 cf RM 0 198.00 =water surface 2 4 200.28 feet msl 37924 sf West Johnston High School -20013-4 1 4 Wet Detention Study front of School-2 year 24 hour Average pool depth = 3 ft SAIDA= 2.30% Required Surface Area= 23023 sf Surface Area Provide= 37924.0 sf Volume to be controlled by 1" storm =1"(Rv=0.05 + 0.009(I))(DA) = 47005 cf Temporary Water Quality Pool Elevation = 199.12 Discharge of volume in 48 hours = 0.3 cfs Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. _ proposed water surface elev. available head (h) _ discharge (d) = 0.3 - coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)"1/2 0.0 198.00 feet mst 198.10 feet msl 200.28 feet msl 2.18 feet 0.3 cfs 0.6 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 28.6 cfs L = 8 ft Q=CwLH^3/2 H = 1.12 ft Top of Emergency Spilivr a 1.12 msl 5 West Johnston High School -20013-5 Inflow HWkOgmph Peak Inflow = Time to Peak = I Wme min) 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 Wet Detention Study front of School-2 year 24 hour Additional Row 81.9 29.6 37.0368384 0 (cfA 0 2.1 8.0 17.2 28.9 41.7 54.5 65.8 74.7 80.3 81.8 79.3 72.9 64.2 56.3 49.3 43.2 37.9 33.2 29.1 25.5 22.4 19.6 17.2 15.1 13.2 11.6 10.2 8.9 7.8 6.8 6.0 5.3 4.6 4.0 3.5 3.1 2.7 2.4 0.0 West Johnston High School -20013-6 Wet Detention Study front of School-2 year 24 hour L= 3.5 Stormwater routing 3 Spillway inch 199.12 L(time min) Q(dj) Stomas egg O utflow Elevation orifice bL?iC 0 0 0 0.00 0.0 198.00 3 2.1 0 0.00 0.0 198.00 0.0 0.0 6 8.0 369 0.02 0.0 198.02 0.0 0.0 9 17.2 1809 0.06 0.0 198.06 0.0 0.0 12 28.9 4913 0.16 0.0 198.16 0.0 0.0 15 41.7 10110 0.30 0.0 198.30 0.0 0.0 18 54.5 17616 0.50 0.0 198.50 0.0 0.0 21 65.8 27417 0.75 0.2 198.75 0.2 0.0 24 74.7 39236 1.03 0.2 199.03 0.2 0.0 27 80.3 52650 1.34 1.3 199.34 0.3 1.1 30 81.8 66855 1.67 4.6 199.67 0.3 4.3 33 79.3 80760 1.98 8.7 199.98 0.3 8.4 36 72.9 93468 2.25 13.0 200.25 0.3 12.6 39 64.2 104261 2.49 17.2 200.49 0.4 16.8 42 56.3 112717 2.67 20.6 200.67 0.4 20.3 45 49.3 119130 2.80 23.3 200.80 0.4 22.9 48 43.2 123823 2.90 25.3 200.90 0.4 24.9 51 37.9 127048 2.97 26.8 200.97 0.4 26.4 54 33.2 129044 3.01 27.7 201.01 0.4 27.3 57 29.1 130043 3.03 28.1 201.03 0.4 27.7 60 25.5 130226 3.04 28.3 201.04 0.4 27.9 63 22.4 129722 3.03 28.1 201.03 0.4 27.7 66 19.6 128691 3.01 27.7 201.01 0.4 27.3 69 17.2 127242 2.98 27.0 200.98 0.4 26.6 72 15.1 125473 2.94 26.2 200.94 0.4 25.8 75 13.2 123477 2.90 25.3 200.90 0.4 24.9 78 11.6 121298 2.85 24.3 200.85 0.4 23.9 81 10.2 119014 2.80 23.3 200.80 0.4 22.9 84 8.9 116659 2.75 22.2 200.75 0.4 21.9 87 7.8 114261 2.70 21.2 200.70 0.4 20.9 90 6.8 111845 2.65 20.2 200.65 0.4 19.9 93 6.0 109433 2.60 19.3 200.60 0.4 18.9 96 5.3 107044 2.55 18.3 200.55 0.4 18.0 99 4.6 104693 2.50 17.4 200.50 0.4 17.0 102 4.0 102394 2.45 16.5 200.45 0.4 16.1 105 3.5 100159 2.40 15.6 200.40 0.4 15.2 108 3.1 97996 2.35 14.7 200.35 0.4 14.3 111 2.7 95914 2.31 14.0 200.31 0.3 13.6 114 2.4 93888 2.26 13.1 200.26 0.3 12.8 117 2.1 91955 2.22 12.5 200.22 0.3 12.1 120 1.8 90090 2.18 11.8 200.18 03 11.5 123 1.6 88297 2.14 11.2 200.14 0.3 10.8 126 1.4 86580 2.10 10.5 200.10 0.3 10.2 129 1.2 84940 2.07 10.1 200.07 0.3 9.7 132 1.1 83353 2.03 9.4 200.03 0.3 9.1 West Johnston High School -20013-7 Wet Detention Study front of School-2 year 24 hour 135 1.0 81849 2.00 9.0 200.00 0.3 8.7 138 0.8 80402 1.97 8.5 199.97 0.3 8.2 141 0.7 79013 1.94 8.1 199.94 0.3 7.8 144 0.6 77684 1.91 7.7 199.91 0.3 7.4 147 0.6 76415 1.88 7.3 199.88 0.3 7.0 150 0.5 75208 1.85 6.9 199.85 0.3 6.5 153 0.4 74061 1.83 6.6 199.83 0.3 6.3 156 0.4 72953 1.80 6.2 199.80 0.3 5.9 159 0.3 71906 1.78 5.9 199.78 0.3 5.6 162 0.3 70898 1.76 5.7 199.76 0.3 5.4 165 0.3 69928 1.74 5.4 199.74 0.3 5.1 168 0.2 68997 1.71 5.1 199.71 0.3 4.8 171 0.2 68127 1.70 4.9 199.70 0.3 4.6 174 0.2 67274 1.68 4.7 199.68 0.3 4.4 177 0.2 66460 1.66 4.5 199.66 0.3 4.2 180 0.1 65684 1.64 4.2 199.64 0.3 3.9 183 0.1 64947 1.62 4.0 199.62 0.3 3.7 186 0.1 64247 1.61 3.9 199.61 0.3 3.6 189 0.1 63565 1.59 3.7 199.59 0.3 3.4 192 0.1 62921 1.58 3.6 199.58 0.3 3.3 195 0.1 62294 1.56 3.3 199.56 0.3 3.1 198 0.1 61704 1.55 3.2 199.55 0.3 3.0 201 0.1 61131 1.54 3.1 199.54 0.3 2.9 204 0.0 60575 1.53 3.0 199.53 0.3 2.8 360 0.0 32579 0.87 0.2 198.87 0.2 0.0 720 0.0 28161 0.77 0.2 198.77 0.2 0.0 1080 0.0 24047 0.66 0.2 198.66 0.2 0.0 1440 0.0 20298 0.57 0.2 198.57 0.2 0.0 1800 0.0 16875 0.48 0.1 198.48 0.1 0.0 2160 0.0 13813 0.40 0.1 198.40 0.1 0.0 2520 0.0 11113 0.33 0.1 198.33 0.1 0.0 2880 0.0 8775 0.27 0.1 198.27 0.1 0.0 3240 0.0 6798 0.21 0.1 198.21 0.1 0.0 3600 0.0 5268 0.17 0.1 198.17 0.1 0.0 3960 0.0 4127 0.14 0.0 198.14 0.0 0.0 4320 0.0 3405 0.11 ERR 198.11 ERR 0.0 4680 0.0 ERR ERR ERR ERR ERR 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 28.3 cis Peak Stage= 3.04 ft Water Elevation= 201.04 msl Peak Storage = 130226 cf Design Spillway 199.12 ms! Length of weir 30 ft West Johnston High School -20013-8 Inflow outflow hydrograph ......:........................;........................; ................... 90 ............................ ................ ...:......................... ............. ............................ 80 ................................................................... 70 ...................... ........... ....................... ............ ........................ 60 ..................... ...... ................ ................. ............................... ................................................. ....................... ................... 50 ..................... .. .......................................... ` ..........--------- ........................ '..-........... ...........................-. _ ................. i 0 LL 40 ..................... . ----------------------- ............................... ................ ................................................. ........................ ................--- 30 ........................................ .................. ..... ........................ ........................ ..................... ................... 20 10 0 0 15 30 45 60 75 90 105 . Time (minutes) -?- Inflow Hydrograph -A- Outflow Hydrograph Wet Detention Study front of School-100 year 24 hour WET DETENTION FOR WEST JOHNSTON HIGH SCHOOL FRONT OF THE BUILDING 100 YR - 24 HOUR NCDENR BMP FIRST V OF RUNOFF 20013 5-25-00 rev 9-13-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 West Johnston High School -20013-1 Wet Detention Study front of School-100 year 24 hour Site Conditions Predevelopment Total watershed area Area Impervious Area grass or woods SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channel flow To=(L^3/H)^0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA C= 0.95 C= 0.3 6.9 X 23.00 acres CN= 98 0.00 acres CN= 73 23.00 acres C 1220 feet 40 feet 8.4 inches OVERLAND 2 B 9 h 2 132 18 10 203 22 25 246 23 100 302 25 13.9 minutes 0.3 7.8 inches per hr 53.6 cis West Johnston High School -20013-2 . t Storage Required Wet Detention Study front of School-100 year 24 hour Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface dill. Elevation area AY stomp. 198.00 37924 2.00 81849 200.00 43925 2.00 94946 202.00 51021 accum. stomp 0 81849 176795 Y Stomp S-Ug LN orM) LN(Stage) Rap 0 0 ERR ERR 0.00 81,849 2 11.31 0.69 2.00 176,795 4 12.08 1.39 4.00 b= 1.1110408 Ks= 37892.807 1/b Z= (g/KS)n Predicted Water Surface Elevation for 100 year 24 hour storm= To capture the first 1" of runoff Drainage Area = 23 ac % imperv area = 57.00% 53.6 cfs 120.2 cfs 231,990 cf Elevation 198 0 198.00 =water surface 200.00 2 202.00 4 203.11 feet msl West Johnston High School -20013-4 Wet Detention Study front of School-100 year 24 hour Average pool depth = 3 ft SA/DA= 2.30% Required Surface Area= Surface Area Provide= Volume to be controlled by 1" storm =1"(Rv=0.05 + 0.009(I))(DA) Temporary Water Quality Pool Elevation = Discharge of volume in 48 hours = Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. _ proposed water surface elev. _ available head (h) _ discharge (d) = 0.3 - coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)^1/2 0.0 23023 sf 37924.0 sf 47005 cf 199.12 0.3 cfs 198.00 feet msl 198.10 feet msl 203.11 feet msl 5.01 feet 0.3 cfs 0.6 0.18 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 53.6 cfs L = 8 ft Q=CwLH^3/2 H = 1.71 ft Top of Emergency Spiiiwc 1.71 msl West Johnston High School -20013-5 Wet Detention Study front of School-100 year 24 hour 135 25.4 131061 3.06 30.7 201.06 0.4 28.4 138 23.8 130104 3.04 29.3 201.04 0.4 27.9 141 22.2 129118 3.01 27.7 201.01 0.4 27.3 144 20.8 128136 2.99 27.3 200.99 0.4 26.9 147 19.4 126972 2.97 26.8 200.97 0.4 26.4 150 18.2 125642 2.94 26.2 200.94 0.4 25.8 153 17.0 124201 2.91 25.5 200.91 0.4 25.1 156 15.9 122662 2.88 24.9 200.88 0.4 24.5 159 14.9 121039 2.84 24.1 200.84 0.4 23.7 162 13.9 119379 2.81 23.5 200.81 0.4 23.1 165 13.0 117658 2.77 22.6 200.77 0.4 22.3 168 12.1 115921 2.74 22.0 200.74 0.4 21.7 171 11.4 114141 2.70 21.2 200.70 0.4 20.9 174 10.6 112364 2.66 20.4 200.66 0.4 20.1 177 9.9 110596 2.62 19.7 200.62 0.4 19.3 180 9.3 108844 2.58 18.9 200.58 0.4 18.5 183 8.7 107114 2.55 18.3 200.55 0.4 18.0 186 8.1 105378 2.51 17.6 200.51 0.4 17.2 189 7.6 103677 2.47 16.8 200.47 0.4 16.5 192 7.1 102013 2.44 16.3 200.44 0.4 15.9 195 6.6 100360 2.40 15.6 200.40 0.4 15.2 198 6.2 98753 2.37 15.0 200.37 0.4 14.7 201 5.8 97165 2.33 14.3 200.33 0.4 14.0 204 5.4 95631 2.30 13.8 200.30 0.4 13.5 360 0.2 17175 0.49 0.1 198.49 0.1 0.0 720 0.0 17560 0.50 0.1 198.50 0.1 0.0 1080 0.0 14334 0.42 0.1 198.42 0.1 0.0 1440 0.0 11447 0.34 0.1 198.34 0.1 0.0 1800 0.0 8947 0.27 0.1 198.27 0.1 0.0 2160 0.0 6843 0.21 0.1 198.21 0.1 0.0 2520 0.0 5151 0.17 0.1 198.17 0.1 0.0 2880 0.0 3801 0.13 0.0 198.13 0.0 0.0 3240 0.0 2917 0.10 0.0 198.10 0.0 0.0 Results of routing the 100 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 118.7 cfs Peak Stage= 3.59 ft Water Elevation= 201.59 msl Peak Storage = 156828 cf Design Spillway 199.12 msl Length of weir 3.5 ft Emergency Spillway 201.01 msl Length of Weir 58.5 ft 30 Boot emergency spillway plus 32'-3.5' of design spillway = 30'+28.5'= 58.5' 2.0 0.9 0.0 0.0 West Johnston High School -20013-8 Wet Detention Study front of School-100 year 24 hour Size Oudet Pipe for Spillway 100 yr. flow for principal spillway = Effective Length of Emergency spillway for outlet pipe = Water Surface Elevation for 100 year Storm = Top of Emergency Spillway at box = Q=CLH^1.5 = Design flow for 100 year storm for outlet pipe = Slope of outlet pipe = Material of outlet pipe = n= d = 16 (QNS"0.5)"0.375 Use = 40.8 cfs 28.5 ft 201.59 msl 201.01 msl 37.8 cfs 78.5 cfs 0.005 fttft concrete 0.012 42.26 inches 48 inch West Johnston High School -20013-9 J. Inflow outflow hydrograph ....; ......................:............-.......:..............................................,.......................:................... 140 .................................... ....... 120 ............................................................... ' ........................................................................................ 100 ............................................................................................................. €... ............. .................. ................ .............................................................. 80 v 1 LL 60 40 --------------------- <............ ........... ....................... _........ ............... >....................... ........................ ....................... ............. 20 0 0 15 30 45 60 75 90 105 Time (minutes) -+- Inflow Hydrograph - Outflow Hydrograph Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP STORM WATER DETENTION FOR WEST JOHNSTON HIGH SCHOOL BEHIND ATHLETIC FIELDS 2 YR - 24 HOUR NCDENR BMP FIRST V OF RUNOFF 20013 5-25-00 rev 9-13-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 nP-4L N?p%° C' 1 West Johnston High School -20013-1 I l Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Site Conditions Predevelopment Total watershed area Area Impervious C= Area grass or wooded C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channelflow Tc=(L"3M)"0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.7 X 29.00 acres CN= 98 0.00 acres CN= 73 29.00 acres C 1280 feet 51 feet 3.7 inches OVERLAND 2 B Q b 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School -20013-2 13.3 minutes 0.3 4.2 inches per hr 36.6 cfs { Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L^3/H)^0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA Time to peak Tp= Vol/(1.37 Qp) 0.95 0.3 6.7 CN= 98 CN= 73 C. E 9 11 2 132 18 10 203 22 25 246 23 100 302 25 29.00 acres 9.56 acres 19.44 acres C 1280 feet 51 feet 3.7 inches 81.2 2.31 1.89 inches 13.4 minutes 0.51 4.2 inches per hr 62.7 cfs 38.6 minutes West Johnston High School 20013-3 . Storage Required Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface diff. accum. Elevatiop area AL" Storage stoma 179.00 5673 0 1.00 6400 180.00 7127 6400 2.00 18160 182.00 11033 24560 2.00 26047 184.09 15014 50607 2.00 33772 186.00 18758 84379 2.00 42466 188.00 23708 126845 1.50 38900.25 189.50 28159 165745.25 Z C d Stodge L N(sttc, gel LNOtag_e) ompute egg 0 0 ERR ERR 0.00 6,400 1 8.76 0.00 1.24 24,560 3 10.11 1.10 3.00 126,845 9 11.75 2.20 8.81 165,745 10.5 12.02 2.35 10.50 b= 1.5240975 Ks= 4603.0858 1/b Z= (S/K.y)A 36.6 cis 62.7 cfs 60,364 cf Elevation 179 0 180.00 1 182.00 3 184.00 5 186.00 . 7 188.00 9 189.50 10.5 Predicted Water Surface Elevation= 184.41 feet msi To capture the first 1" of runoff volume= DA x 43560 x 1" 112 106270 cf 186.80 feet msl set spillway elevation at this elevation West Johnston High School -20013-4 I V i ? Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Release rate over 48 hours= Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. _ proposed water surface elev. _ available head (h) _ discharge (d) _ coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)"1/2 0.61 cfs pond will drain in greater than 2 days in accordance with NCDENR BMP This will provide removal of 50% TSS with outlet swales TSS removal will be at least 85% 0.5 - SAY 179.00 feet msl 179.30 feet msl 186.80 feet msl 7.50 feet 0.5 cfs 0.6 0.22 feet 3 inches 0.0 Determine Weir length for 2 year 24 hour discharge Q = 36.6 cfs stimate L = 8 ft Q=CwLH"3/2 H = Top of Emergency Spillwc, 1.33 ft 188.12 msl West Johnston High School -20013-5 5 1 ) Mow Fiydm ph Peak Mow = Mme W Peak = 48.26564414 T (dme min) 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCE)ENR BMP 2Ad AdMonal Pow 62.7 38.6 0 0.9 3.7 8.0 13.8 20.6 28.0 35.6 43.0 49.7 55.3 59.5 62.0 62.7 61.5 58.6 54.0 48.9 44.2 39.9 36.1 32.6 29.5 26.7 24.1 21.8 19.7 17.8 16.1 14.5 13.1 11.9 10.7 9.7 8.8 7.9 7.2 6.5 5.9 West Johnston High School 20013-6 0.0 I . Storm Water Detention Study Behind Athletic Fields-2 year 24 hour NCDENR BMP L= 6.5 Stormwater routing 3 Spillway inch 186.80 T (time min) Q (sh) Stomp S#.M Outflow FLevation orifice wl[ 0 0 0 0.00 0.0 179.00 3 0.9 0 0.00 0.0 179.00 0.0 0.0 6 3.7 167 0.11 0.0 179.11 0.0 0.0 9 8.0 826 0.32 0.0 179.32 0.0 0.0 12 13.8 2271 0.63 0.0 179.63 0.0 0.0 15 20.6 4751 1.02 0.2 180.02 0.2 0.0 18 28.0 8423 1.49 0.2 180.49 0.2 0.0 21 35.6 13420 2.02 0.3 181.02 0.3 0.0 24 43.0 19781 2.60 0.3 181.60 0.3 0.0 27 49.7 27459 3.23 0.4 182.23 0.4 0.0 30 55.3 36333 3.88 0.4 182.88 0.4 0.0 33 59.5 46206 4.54 0.5 183.54 0.5 0.0 36 62.0 56824 5.20 0.5 184.20 0.5 0.0 39 62.7 67888 5.85 0.5 184.85 0.5 0.0 42 61.5 79072 6.46 0.6 185.46 0.6 0.0 45 58.6 90044 7.04 0.6 186.04 0.6 0.0 48 54.1 100480 7.56 0.6 186.56 0.6 0.0 51 48.1 110098 8.03 2.9 187.03 0.6 2.2 54 44.2 118247 8.41 10.1 187.41 0.7 9.4 57 39.9 124387 8.70 17.5 187.70 0.7 16.8 60 36.1 128433 8.88 22.7 187.88 0.7 22.0 63 32.6 130843 8.99 26.1 187.99 0.7 25.5 66 29.5 132009 9.04 27.8 188.04 0.7 27.1 69 26.7 132320 9.06 28.4 188.06 0.7 27.7 72 24.1 132003 9.04 27.8 188.04 0.7 27.1 75 21.8 131343 9.01 26.8 188.01 0.7 26.1 78 19.7 130442 8.97 25.5 187.97 0.7 24.8 81 17.8 129394 8.93 24.3 187.93 0.7 23.6 84 16.1 128233 8.87 22.4 187.87 0.7 21.7 87 14.5 127096 8.82 20.9 187.82 0.7 20.2 90 13.1 125951 8.77 19.4 187.77 0.7 18.8 93 11.9 124818 8.72 18.0 187.72 0.7 17.3 96 10.7 123715 8.67 16.6 187.67 0.7 15.9 99 9.7 122656 8.62 15.3 187.62 0.7 14.6 102 8.8 121655 8.57 14.0 187.57 0.7 13.3 105 7.9 120721 8.53 12.9 187.53 0.7 12.3 108 7.2 119819 8.49 12.0 187.49 0.7 11.3 111 6.5 118958 8.45 11.0 187.45 0.7 10.3 114 5.9 118146 8.41 10.1 187.41 0.7 9.4 117 5.3 117391 8.37 9.2 187.37 0.7 8.5 120 4.8 116696 8.34 8.5 187.34 0.7 7.8 123 4.3 116029 8.31 7.9 187.31 0.7 7.2 126 3.9 115393 8.28 7.2 187.28 0.7 6.6 129 3.5 114795 8.25 6.6 187.25 0.7 6.0 132 3.2 114238 8.23 6.2 187.23 0.7 5.6 West Johnston High School -20013-7 1 1 1 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP 135 2.9 113689 8.20 5.7 187.20 0.7 5.0 138 2.6 113188 8.18 5.3 187.18 0.7 4.6 141 2.4 112704 8.15 4.8 187.15 0.7 4.1 144 2.1 112270 8.13 4.4 187.13 0.7 3.8 147 1.9 111858 8.11 4.1 187.11 0.7 3.4 150 1.7 111469 8.09 3.8 187.09 0.7 3.1 153 1.6 111104 8.08 3.6 187.08 0.7 3.0 156 1.4 110738 8.06 3.3 187.06 0.6 2.7 159 1.3 110400 8.04 3.0 187.04 0.6 2.4 162 1.2 110091 8.03 2.9 187.03 0.6 2.2 165 1.1 109785 8.01 2.6 187.01 0.6 1.9 168 1.0 109509 8.00 2.5 187.00 0.6 1.8 171 0.9 109239 7.99 2.3 186.99 0.6 1.7 174 0.8 108977 7.97 2.1 186.97 0.6 1.4 177 0.7 108744 7.96 1.9 186.96 0.6 1.3 180 0.6 108520 7.95 1.8 186.95 0.6 1.2 183 0.6 108305 7.94 1.7 186.94 0.6 1.1 186 0.5 108100 7.93 1.6 186.93 0.6 1.0 189 0.5 107904 7.92 1.5 186.92 0.6 0.9 192 0.4 107719 7.91 1.4 186.91 0.6 0.8 195 0.4 107543 7.91 1.4 186.91 0.6 0.8 198 0.3 107360 7.90 1.3 186.90 0.6 0.7 201 0.3 107189 7.89 1.2 186.89 0.6 0.6 204 0.3 107027 7.88 1.1 186.88 0.6 0.5 360 0.0 99185 7.50 0.6 186.50 0.6 0.0 720 0.0 85717 6.81 0.6 185.81 0.6 0.0 1080 0.0 72899 6.13 0.6 185.13 0.6 0.0 1440 0.0 60792 5.44 0.5 184.44 0.5 0.0 1800 0.0 49450 4.75 0.5 183.75 0.5 0.0 2160 0.0 38931 4.06 0.4 183.06 0.4 0.0 2520 0.0 29303 3.37 0.4 182.37 0.4 0.0 2880 0.0 20659 2.68 0.3 181.68 0.3 0.0 3240 0.0 13125 1.99 0.3 180.99 0.3 0.0 3600 0.0 6896 1.30 0.2 180.30 0.2 0.0 3960 0.0 2332 0.64 0.1 179.64 0.1 0.0 4320 0.0 423 0.21 0.0 179.21 0.0 0.0 4680 0.0 423 0.21 0.0 179.21 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 28.4 cfs Peak Stage= 9.06 ft Water Elevation= 188.06 ms! Peak Storage = 132320 d Design Spillway 186.80 msl Length of weir 6.5 ft West Johnston Nigh School -20013-8 Inflow outflow hydrograph ............:............................................ 70 ........................................... ...._.............................. ...................,........ ................:............ so ................................................................................................................. ................... ................. 50 40 w v LL 30 20 10 0 4 4 4 4 0 15 30 45 60 75 90 105 Time (minutes) +- Inflow Hydrograph Outflow Hydrograph . Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP STORM WATER DETENTION FOR WEST JOHNSTON HIGH SCHOOL BEHIND ATHLETIC FIELDS 100 YR - 24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 NH CAA 23 4.2 ??''r+? aNN OV_`?? %,?FNf JAN ???.. West Johnston High School -20013-1 1 1 . Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Site Conditions Predevelopment Total watershed area Area Impervious C= Anna grass or wooded C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channel flow Tc=(L"3M)"0.385 128 Composite C = Rainfall Intensity Peak Discharge 0.95 0.3 6.7 X CN= 98 CN= 73 OVERLAND 2 8 9 h 1= g/(h+T) 2 132 18 10 203 22 25 246 23 100 302 25 Q=CIA 29.00 acres 0.00 acres 29.00 acres C 1280 feet 51 feet 8.4 inches 13.3 minutes 0.3 7.9 inches per hr 68.5 cfs West Johnston High School -20013-2 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L"3/H)^0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA Time to peak Tp= Vol/(1.37 Qp) 0.95 0.3 CN= CN= C 29.00 acres 98 9.56 acres 73 19.44 acres C 1280 feet 51 feet 8.4 inches 81.2 2.31 6.15 inches 6.7 B 9 h 2 132 18 10 203 22 25 246 23 100 302 25 13.4 minutes 0.51 7.9 inches per hr 117.3 cfs 67.1 minutes West Johnston High School -20013-3 r 4 1 4 Storage Required Storm Water Detention Study Behind Athletic f=ields-100 year 24 hour-NCDENR BMP Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface diff. accum. Elevation area slu stomp storm 179.00 5673 0 1.00 6400 180.00 7127 6400 2.00 18160 182.00 11033 24560 2.00 26047 184.00 15014 50607 2.00 33772 186.00 18758 84379 2.00 42466 188.00 23708 126845 1.50 38900.25 189.50 28159 165745.25 Z C d Storage Rap L Njstor Pagel LN( m) ompute StW 0 0 ERR ERR 0.00 6,400 1 8.76 0.00 1.24 24,560 3 10.11 1.10 3.00 126,845 9 11.75 2.20 8.81 165,745 10.5 12.02 2.35 10.50 b= 1.5240975 Ks= 4603.0858 1/b Z= (5/Ks)^ 68.5 cfs 117.3 cfs 196,465 cf Elevation 179 0 180.00 1 182.00 3 184.00 5 186.00 7 188.00 9 189.50 10.5 Predicted Water Surface Elevation= 190.74 feet msl To capture the first 1" of runoff volume= DA x 43560 x 1" !12 106270 cf 186.80 feet msl set spillway elevation at this elevation West Johnston High School -20013-4 I r 1 f Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP _ _ __ _ Release rate over 48 hours= Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. _ proposed water surface elev. _ available head (h) _ discharge (d) = 0.5 - coefficient of discharge = Determine the orifice diameter Orifice equation 0.61 cfs pond will drain in greater than 2 days in accordance with NCDENR BMP This will provide removal of 50% TSS with outlet swales TSS removal will be at least 85% 179.00 feet msl 179.30 feet msl 186.80 feet msl 7.50 feet 0.0 0.5 cis 0.6 Q = Cd(A)(2gh)"1/2 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 68.5 cfs stimate L = 8 ft Q=CwLH"3/2 H = 2.01 ft Top of Emergency Spiilwc 188.81 msl 5 West Johnston High School -20013-5 I k + • Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Mftw HWmgraph AdditWW Flow 0.0 Peak 1n8ow = 117.3 Time W peak = 67.1 83.92897444 0 0 3 0.6 6 2.3 9 5.1 12 9.0 15 13.8 18 19.6 21 26.1 24 33.2 27 40.9 30 48.9 33 57.0 36 65.2 39 73.3 42 81.1 45 88.5 48 95.2 Si 101.3 54 106.5 57 110.8 60 114.0 63 116.2 66 117.2 69 117.1 72 115.8 75 113.4 78 109.9 81 105.5 84 100.1 87 94.5 90 89.1 93 84.1 96 79.3 99 74.9 102 70.6 105 66.7 108 62.9 111 59.3 114 56.0 West Johnston High School -20013-6 f * 1 0, Stone Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP L= 6.5 55.5 Stormwater routing Emergency 3 Spillway Spillway inch 186.80 187.78 L(time min) Q { ds) Storage Ran Qutfl?c Elevation orifice Wilt WAk 0 0 0 0.00 0.0 179.00 2 0.3 0 0.00 0.0 179.00 0.0 0.0 4 1.0 31 0.04 0.0 179.04 0.0 0.0 6 2.3 154 0.11 0.0 179.11 0.0 0.0 8 4.1 429 0.21 0.0 179.21 0.0 0.0 10 6.3 916 0.35 0.0 179.35 0.0 0.0 12 9.0 1671 0.51 0.0 179.51 0.0 0.0 14 12.1 2751 0.71 0.1 179.71 0.1 0.0 16 15.7 4193 .0.94 0.2 179.94 0.2 0.0 18 19.6 6054 1.20 0.2 180.20 0.2 0.0 20 23.8 8380 1.48 0.2 180.48 0.2 0.0 22 28.4 11212 1.79 0.3 180.79 0.3 0.0 24 33.2 14587 2.13 0.3 181.13 0.3 0.0 0.0 26 38.3 18538 2.49 0.3 181.49 0.3 0.0 0.0 28 43.5 23090 2.88 0.4 181.88 0.4 0.0 0.0 30 48.9 28265 3.29 0.4 182.29 0.4 0.0 0.0 32 54.3 34080 3.72 0.4 182.72 0.4 0.0 0.0 34 59.8 40544 4.17 0.5 183.17 0.5 0.0 0.0 36 65.2 47663 4.64 0.5 183.64 0.5 0.0 0.0 38 70.7 55435 5.12 0.5 184.12 0.5 0.0 0.0 40 76.0 63853 5.62 0.5 184.62 0.5 0.0 0.0 42 81.1 72905 6.13 0.6 185.13 0.6 0.0 0.0 44 86.1 82573 6.65 0.6 185.65 0.6 0.0 0.0 46 90.8 92833 7.18 0.6 186.18 0.6 0.0 0.0 48 95.2 103656 7.72 0.6 186.72 0.6 0.0 0.0 50 99.4 115009 8.26 6.8 187.26 0.7 6.2 0.0 52 103.1 126114 8.78 19.7 187.78 0.7 19.0 0.0 54 106.5 136122 9.23 84.5 188.23 0.7 33.5 50.3 56 109.5 138767 9.34 107.9 188.34 0.7 37.4 69.8 58 112.0 138953 9.35 110.1 188.35 0.7 37.8 71.7 60 114.0 139172 9.36 112.4 188.36 0.7 38.2 73.5 62 115.6 139366 9.37 114.7 188.37 0.7 38.5 75.5 64 116.6 139473 9.38 117.0 188.38 0.7 38.9 77.4 66 117.2 139433 9.37 114.7 188.37 0.7 38.5 75.5 68 117.2 139735 9.39 119.3 188.39 0.7 39.3 79.3 70 116.8 139490 9.38 117.0 188.38 0.7 38.9 77.4 72 115.8 139466 9.38 117.0 188.38 0.7 38.9 77.4 74 114.3 139326 9.37 114.7 188.37 0.7 38.5 75.5 76 112.4 139283 9.37 114.7 188.37 0.7 38.5 75.5 78 109.9 139005 9.36 112.4 188.36 0.7 38.2 73.5 80 107.1 138709 9.34 107.9 188.34 0.7 37.4 69.8 82 103.8 138607 9.34 107.9 188.34 0.7 37.4 69.8 84 100.1 138110 9.32 103.5 188.32 0.7 36.7 66.1 86 96.3 137704 9.30 99.1 188.30 0.7 36.0 62.4 88 92.6 137366 9.28 94.8 188.28 0.7 35.3 58.9 West Johnston High School -20013-7 ? ? • fY Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP 90 89.1 137102 9.27 92.7 188.27 0.7 34.9 92 85.7 136670 9.25 88.6 188.25 0.7 34.2 94 82.5 136331 9.24 86.5 188.24 0.7 33.9 96 79.3 135849 9.22 82.4 188.22 0.7 33.2 98 76.3 135477 9.20 78.5 188.20 0.7 32.5 100 73.4 135220 9.19 76.5 188.19 0.7 32.1 102 70.6 134850 9.17 72.7 188.17 0.7 31.4 104 68.0 134607 9.16 70.8 188.16 0.7 31.1 106 65.4 134268 9.14 31.1 188.14 0.7 30.4 108 62.9 138383 9.33 37.8 188.33 0.7 37.1 110 60.5 141398 9.46 42.6 188.46 0.7 41.9 112 58.2 143549 9.55 46.0 188.55 0.7 45.3 114 56.0 145010 9.62 48.8 188.62 0.7 48.1 116 53.9 145878 _9.66 50.4 188.66 0.7 49.6 118 51.8 146299 9.67 50.8 188.67 0.7 50.0 120 49.9 146427 9.68 51.2 188.68 0.7 50.4 122 48.0 146270 9.67 50.8 188.67 0.7 50.0 124 46.1 145934 9.66 50.4 188.66 0.7 49.6 126 44.4 145428 9.64 49.6 188.64 0.7 48.8 128 42.7 144807 9.61 48.4 188.61 0.7 47.7 130 41.1 144126 9.58 47.2 188.58 0.7 46.5 132 39.5 143392 9.55 46.0 188.55 0.7 45.3 134 38.0 142611 9.51 44.5 188.51 0.7 43.8 136 36.6 141835 9.48 43.3 188.48 0.7 42.6 138 35.2 141023 9.44 0.7 188.44 0.7 0.0 140 33.8 145160 9.63 0.7 188.63 0.7 0.0 142 32.6 149137 9.80 0.7 188.80 0.7 0.0 144 31.3 152958 9.96 0.7 188.96 0.7 0.0 146 30.1 156630 10.12 0.7 189.12 0.7 0.0 148 29.0 160158 10.27 0.7 189.27 0.7 0.0 150 27.9 163549 10.41 0.7 189.41 0.7 0.0 152 26.8 166806 10.54 0.7 189.54 0.7 0.0 154 25.8 169936 10.67 0.8 189.67 0.8 0.0 156 24.8 172943 10.80 0.8 189.80 0.8 0.0 158 23.9 175832 10.92 0.8 189.92 0.8 0.0 Results of routing the 100 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 117.0 cfs Peak Stage= 9.38 ft Water Elevation= 188.38 msl Peak Storage = 139490 cf Design Spillway 186.80 ms! Length of weir 6.5 ft Emergency Spillway 187.78 ms! Length of Weir 55.5 k 57.1 53.6 51.9 48.6 45.3 43.7 40.6 39.0 0.0 West Johnston High School -20013-8 t A. 0 W Inflow outflow hydrograph ......,............................................................................................. 120 ......................................... 100 ' ..............................................`.....................................................................'-.......•••........... ................ 80 ............................................ ....................... ...................... ........ ..............s....................... ................ w U 60 .......................... ....................... ........ ............v............ ..... ............................................................... O tl . 40 ............ .............. ............... ............................... ....................... ..... ................. ...................... ................... 20 0 0 10 20 30 40 50 60 70 Time (minutes) -?- Inflow Hydrograph- Outflow Hydrograph - erosion at inlet and outlet - sediment accumulation/removal - condition of emergency spillway - woody vegetation in the embankment A responsible party is designated in the O&M plan. FORM SWU109 04198 Page 1 of 1 r' - erosion at inlet and outlet - sediment accumulation/removal - condition of emergency spillway - woody vegetation in the embankment A responsible party is designated in the O&M plan. FORM SWU109 04/98 Paae 1 of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATI (please compl to the following information): Project Name Contact Person: Phone Number: For projects with multiple basins, specify which basin this worksheet applies to:. Basid Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume I0_6v ft. l va ft. 199. / ft. , 9 sq. Z 7P.O ac. 11,14- ac. (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) ft. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) ?? Z 28 cu. ft. I ?iD,ly cu. ft. cu. ft. (combined volume of main basin and forebay) (volume detained on top of the permanent pool) SA/DA used 2 •?? Y ?,' /446(surface area to drainage area ratio) Diameter of Orifice in. (draw down orifice diameter) H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. 7/ A submerged and vegetated perimeter shelf at less than 6:1 is provided. f -Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. 7 Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the 0&M plan. A debris check is specified in the 0&M plan to be performed after every storm event. A specific sediment. clean-out benchmark is listed (elevation or depth) in 0&M plan. -A responsible party is designated in the O&M plan. 100 09/97 Page 1 of 1 I/ Project No. DWQ 09 be provided by DWQ) DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review A complete stormwater management plan submittal includes a dry detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : Contact Person: C > Phone Number: / For projects with multiple basins, specify which basin this worksheet applies to:_ 1_ ?r7( ?jp 2 Drainage Area: Zf.,v acres Percent Impervious Area: Ali , ? 7 % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and .Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H.1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or n capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. 97The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. -A smali• permanent pool at outlet orifice is provided to reduce clogging. An emergency drain to completely empty the basin is provided. 4-v-Wegetation plan prepared by a licensed professional is specified. Basin'to be stabilized within 14 days of construction is specified. v I9. S' Sediment storage (20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85% TSS removal efficiency is provided. << _ E Access for clean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. i Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation. and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. If used as a temporary basin, plans indicate clean-out prior to final operation. A site specific operation and maintenance plan with the following provisions is provided. - Mow grass at least twice annually -Remove trash and debris upon accumulation and at least twice annually - Inspect for proper operation at least twice annually including: - outlet clogging or too rapid a release - erosion on banks STORM WATER MANAGEMENT PLAN WEST JOHNSTON HIGH SCHOOL JOHNSTON COUNTY, NORTH CAROLINA Proj. No. 20013 June 6, 2000 leiA/. 'T• -a oo oljkV C age" ? F E AD 24 ?IN . V JAND`.``?? prepared by: J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 (252)756-8918 Narrative This site is a proposed high school. It is situated on a 101 acre tract of land off the east side of SR 1330 and south of Beaverdam Branch. The property is not located in the ESOD. The site is classified as commercial in accordance with the classification that Johnston County Director of Infrastructure and Engineering assigned to this school in a joint meeting on April 4, 2000. The impervious limits for commercial areas is 60%. The existing slopes of the land are between 5 and 10 % with drainage in two directions. The proposed drainage plan also manages storm water in the two separate basins. There is a total of 22.70 acres of impervious area on this site which is 22.5% impervious. In the front of the site, a wet detention basin is designed to attenuate the post development peak discharge of the 2 year 24 hour storm to that of the predeveloped flow and to detain the first 1" of runoff and release it between 2 and 5 days. The estimated predevelopment peak rate of runoff is 28.6 cfs. The estimated postdevelopment rate of runoff is 81.9 cfs. The effluent pipe into the basin is a 54"RCP at a flat slope of 0.5% to minimize velocities. The outlet control pipe is a 3" pvc pipe with a small 3.5 ft weir opening to control the 2 year storm The principal spillway is an 8'x8' concrete box. The dam is approximately 15' wide 3:1 front side slopes and 3:1 back side slopes. A 30 foot emergency spillway is cut around the north of the basin to handle the 100 year design storm. The basin is designed to remove 85% TSS prior from the runoff. The downstream impacts are mitigated as a result of the detention basin. In the athletic field site, another detention basin is designed to attenuate the post development peak discharge of the 2 year 24 hour storm to that of the predeveloped flow. The estimated predevelopment peak rate of runoff is 36.6 cfs. The estimated postdevelopment rate of runoff is 62.7 cfs. The effluent pipe into the basin is a 3" pvc pipe to detain the first 1" of runoff and release it over a 2 to 5 day period. This basin is designed as an extended dry detention basin to remove 50 % TSS. It has a level spreader downstream of the outlet to remove another 35% TSS for a total of 85% TSS removal. The outlet control pipe is a 54" RCP with a small , 10 foot wide dam, with 3:1 front side slopes and 3:1 back side slopes. A 30 foot emergency spillway is cut around the west of the basin to handle the 100 year design storm A 6.5 foot weir is formed into an 8'x8' box in order to control the 2 year storm The basin is designed such vegetation will be allowed to grow freely and provide for additional nutrient intake. Maintenance for the facility will include inspections of the dam and control devices. The downstream impacts are mitigated as a result of the detention basin. SOIL EROSION AND SEDIMENTATION CONTROL PLAN NARRATIVE WEST JOHNSTON HIGH SCHOOL JOHNSTON CO , NORTH CAROLINA 20013 J.S. JANOWSKI AND ASSOCIATES 105 C EAST VICTORIA COURT GREENVILLE, NC 27858 252-756-8918 This project includes the construction of approximately 205,630 SF of new buildings for the school on a portion of a 101 acre site. Approximatey 75.5 awes of land will be disturbed . 11. SITE DESCRIPTION The site has slopes averaging 5-10%. Overall, elevations vary from a high point of 242 msl to a low point of less than 176 msl. The site is currently farmed . The soil type is a silty day. The property is bounded on the , south and east by undeveloped property, bounded on the west by Raleigh Rd (SR 1330) and on the North by Beaver Branch. IV. PANNED S'T'ORM WATER MANAGEMENT AND EROSION AND SEDIMENTATION CONTROL MEASURES TEMPORARY GRAVEL CONSTRUCTION ENTRANCE A Temporary Gravel Construction Entrance is to be used at street connection to SR 1330 TEMPORARY SILT FENCE Temporary Silt Fences are to be placed at d'ie toe of fill sites adjacent to the property line to Collect sediment laden runoff. Due to the abundance of fill slopes the silt fence will provide an excellent barrier to protect off-site facilities from sediments. Sediment fence will be installed around all catch basins and drop inlets to prevent sediment from entering the storm drainage system. _ Y \ .. ci-x ..Lt,i7:lYJ Temporary Rods Check Dam will be used in the Construction of new ditches. STORM INLET SEDIMENT TRAP Storm inlet sediment traps will be used at concentrated runoff points associated with drop inlets as shown on plans. GRASS LINED CHANNEL Grass lined channels with temporary straw-net liners will be Constructed in roadside ditches. At the end of time major storm drainage outfall a storm water detention basin including a sediment trap will be installed in order to reduce the peak outflow and to trap sediment that may escape inlet control measures. A rock dam will be placed at the inlet of the outlet pipe for time detention facilities to trap sediment:. 1. OBTAIN PLAN APPROVALS AND ALL APPLICABLE PERMITS. 2. FLAG LIMITS OF ROUGH GRADING FOR BUILDING SITE, PARKING LOTS AND ESTABLISH GRADE LIMITS AS NEEDED. 3. HOLD PRECONSTRUCTION MEETING WITH GRADING CONTRACTOR, EROSION CONROL ADMINISTRATOR, PROJECT ENGINEER AND OWNER. 4. INSTALL SEDIMENT TRAPS AND THE PERIMETER SEDIMENT FENCES AS THE FIRST CONSTRUCTION ACTIVITY. 5. INSTALL STORM DRAINAGE FOR OUTFALL, INSTALL RELATED EROSION CONTROL MEASURES AND END OF DAY MEASURES 6. PREPARE TEMPORARY CONSTRUCTION ENTRANCE, STRIP AREA OF TOP SOIL AND STOCKPILE AS NEEDED FOR FINAL LANDSCAPING. INSTALL SEDIMENT FENCES AROUND PERIMETER OF STOCKPILE AREAS. 7. INSTALL RIP RAP OUTLET PROTECTION OUTLET. 8. BEGIN AND COMPLETE ROUGH GRADING OPERATIONS INCLUDING ENTRY ROADS. 9. INSTALL TEMPORARY SEDIMENT CONTROL MEASURES IN THE ROADSIDE DITCHES. 10. INSTALL STORM DRAINAGE FOR PARIONG AREA, AND BUILDING PERIMETER INSTALL RELATED EROSION CONTROL MEASURES AND END OF DAY MEASURES 11. BRING BUILDING AND PARIMG AREA To WITHIN r OF FINAL SUBGRADE, TEMPORARILY SEED THESE AREAS TO PREVENT EROSION UNTIL SUCH TIME OWNER IS READY TO PROCEED WITH FINAL CONSTRUCTION. 12. BRING LANDSCAPED AREAS TO WITHIN 6' OF FINAL GRADE, REDISTRIBUTE 6" OF TOP SOIL. 13. INSTALL TEMPORARY STAW-NET LINERS IN ROADSIDE SWALES 14. FINE GRADE, PERMANENTLY SEED AND MULCH ALL LANDSCAPED AREAS. 15. STABIIMTION SHALL OCCUR WITHIN 15 DAYS OF COMPLETION OF GRADING OPERATIONS. 16. REMOVE SEDIMENT TRAP AND INSTALL REMAINING STORM DRAINAGE, REGRADE AREA AND SEED AND MULCH. 17. ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES MAY BE REQUIRED BY THE STATE OR OWNER IF DEEMED NECESSARY. 18. AFTER SITE IS STABILIZED, REMOVE ALL TEMPORARY MEASURES, FINE GRADE DISTURBED AREAS, AND INSTALL PERMANENT VEGETATION ON THE DISTURBED AREAS. 19. MAINTAIN PERMANENT VEGETATION BY TOP DRESSING WITH 700 Las PER ACRE OF FERTILIZER EVERY 6 MONTHS UNTIL THE COMPLETION OF THE PR03ECT. 20. REMOVE ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES UPON COMPLETION AND STABILIZATION OF PROJECT. VI. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation following every run-off producing rainfall but in no case less than once every week. Any needed repairs will be made immediately to maintain all practices as designed. 2. Sediment will be removed from behind the silt fence when it becomes 0.5 feet deep. 3. Sediment will be removed from the sediment trap when the storage has been appro)amately 50% filled. Gravel will be cleaned and replaced when the sediment pool no longer drains properly. 4. All seeded areas will be fertilized, re-seeded as necessary, and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. Al. VICINITY PLAN See Erosion Control Plan VIII. VEGETATION PLAN A. PERMANENT SEEDING AFTER APRIL 15 AND BEFORE SEPTEMBER 15 SEEDING MIXTURE COMMON BERMUDAGRASS W (2 LB11000 SF) SOIL AMENDMENTS APPLY 3000 LB(ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB/ACRE 10-10.10 FERTIL)ZER. MULCH USE JUTE, EXCELSIOR MATTING OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGE NOT REQUIRING TEMPORARY LINING, APPLY 4000 LB/ACRE GRAIN STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIAL MUST NOT BE ALLOWED TO BE WASH DOWN SLOPE WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECT AND REPAIR MULCH FREQUENTLY. RE-FERTILIZE THE FOLLOWING APRIL WITH 50 LB/ACRE NITROGEN. B. PERMANENT SEEDING AFTER SEPTEMBER 15 AND BEFORE APRIL 15. SEEDING MIXTURE TALL FESCUE 80 LB(ACRE COMMON BERMUDA GRASS 40 LB/ACRE KOBE LESPEDEZA 40 LB/ACRE SEEDING DATES FROM SEPT. 1- MARCH 1, USE UNSCARIFIED BERMUDA GRASS SEEDING DATES BEST POSSIBLE EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15- APRIL 30 FALL- SEPT I - SEPT. 30 SEPT. 1- OCT. 31 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 5000 LB/ACRE GROUND AGRICULTURAL UMESTONEAND.1000 LB/ACRE 10-10-10 FERTILIZER MULCH APPLY 4000 LB/ACRE GRAIN STRAW ON EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS AN ANCHORING TOOL MAINTENANCE IF GROWTH IS LESS THAN FULL ADEQUATELY RE-FERTILIZE IN THE SECOND YEAR ACCORDING TO THE SOIL TEST OR TOP DRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER AND MOW AS NEEDED. WHEN SERICEA IS OMITTED FROM THE MIXTURE, RE-SEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. C. TEMPORARY SEEDING AFTER SEPTEMBER 15 AND BEFORE APRIL 15: SEEDING MIXTURE RYE GRAIN 120 LB/ACRE KOBE LESPEDEZA 50LBIACRE OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE SEEDING DATES COASTAL PLAIN - DEC. 1- APRIL 15 SOIL AMENDMENTS APPLY UMEAND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURAL LIMESTONEAND 750 LB/ACRE 10-10-10 FERTILIZER MULCH APPLY 4000 LB/ACRE GRAIN STRAW ON EQUIVALENT CO VER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY SR41GHT CAN BE USED AS AN ANCHORING TOOL MAINTENANCE IF GROWTH IS LESS THAN FULL ADEQUATELY RE-FERTILIZE RE-SEED, RE-FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. D. TEMPORARY SEEDING BEFORE SEPTEMBER 15 AND AFTER APRIL 15. SEEDING MIXTURE GERMAN MILLET 40 LB/ACRE SEEDING DATES APRIL 15 -AUGUST 15 I SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER MULCH APPLY 4000 LB/ACRE GRAIN STRAW ON EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY SRAIGHT CAN BE USED AS AN ANCHORING TOOL MAINTENANCE IF GROWTH IS LESS THAN FULL ADEQUATELY RE-FERTILIZE RE-SEED , RE-FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. IX. A. 6.02 ...................... B. 6.06 ...................... C. 6.14 ........................... D. 6.30 .......................... ...................Land Grading ...................Temporary Gravel Construction Entrance ...................Mulching ....................Grass- lined channels E. 6.51 .....................................................Fabric Drop Inlet Protection (Temporary) F. 6.60 ....................................................Temporary Sediment Trap G. 6.62 .....................................................Temporary Sediment Fence H. 6.83 .....................................................Rock Check Dam CULVERT CROSSING DESIGN FOR WEST JOHNSTON HIGH SCHOOL MAIN ENTRY ROAD 100 YR - 24 HOUR 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 %%till 12324 : West Johnston High School -20013-1 Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall 0.95 0.3 CN= CN= C 187.00 acres 98 37.00 acres 73 150.00 acres C 5000 feet 79 feet 8.4 inches Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))"2 / (P+0.8(s)) 77.9 2.83 5.76 inches Time of Concentration channel flow (not overland) Tc=(L"3M)"0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) 27.2 R3 9 h 2 132 18 10 203 22 25 246 23 100 302 25 27.2 minutes 0.43 5.8 inches per hr Peak Discharge Q=CIA 463.7 cfs Time to peak Tp= Vol/(1.37 Qp) 102.5 minutes Based on Analysis of a 2 - 72" culverts the Headwater Elevation = 197.73 Top of the Road = 198.84 Road is designed to not overtop in the 100 year storm Outlet Velocity = 8.8 fps Design Outlet Protection Use Chart pg 8.06.3 for 232 cfs per barrel and 72" dia pipe use La = 30 feet West Johnston High School -20013-2 PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 5, 2000 ------------------ ------------------ PROGRAM INPUT DATA DESCRIPTION VALUE Culvert Diameter (ft) ....................................... FHWA Chart Number ........................................... FHWA Scale Number (Type of Culvert Entrance) ................ Manning's Roughness Coefficient (n-value)..... ' .............. Entrance Loss Coefficient of Culvert Opening ................ Culvert Length (ft) ......................................... Invert Elevation at Downstream end of Culvert (ft).......... Invert Elevation at Upstream end of Culvert (ft)............ Culvert Slope (ft/ft) ....................................... Starting Flow Rate (cfs) .................................... Incremental Flow Rate (cfs) ................................. Ending Flow Rate (cfs) ...................................... Starting Tailwater Depth (ft) ............................... Incremental Tailwater Depth (ft) ............................ Ending Tailwater Depth (ft) ................................. 6.0 1 1 0.012 0.1 55.0 188.0 188.51 0.0093 100.0 50.0 600.0 4-.0 1.0 14.0 ----- --------------- - ------------ COMPUTATION RESULTS ---------- - ---- - - ----- Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth, Outlet Velocity (cfs) (ft) Control Control --- --- (ft) --------- (ft) ---------- (ft) ---------- (fps) --------- ----------- 100.0 ----------- 4.0 ----------- 3.82 -- - 3.99 1.94 2.69 4.0 4.99 150.0 5.0 4.92 5.18 2.41 3.33 5.0 5.96 200.0 6.0 6.0 6.45 2.83 3.87 6.0 7.07 250.0 7.0 7.22 7.99 3.23 4.33 6.0 8.84 300.0 8.0 8.47 9.65 3.63 4.73 6.0 10.61 350.0 9.0 10.09 11.43 4.03 5.07 6.0 12.38 400.0 10.0 11.96 13.33 4.47 5.33 6.0 14.15 450.0 11.0 14.07 15.35 5.03 5.53 6.0 15.92 500.0 12.0 16.44 17.49 6.0 5.67 6.0 17.68 550.0 13.0 19.05 19.75 6.0 5.77 6.0 19.45 600.0 14.0 21.91 22.13 6.0 5.83 6.0 21.22 HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996 Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069 Phone:(281)440-3787, Fax:(281)440-4742, Email:software@dodson-hydro.com All Rights Reserved. .. F1 ? ? `y ? 200 .r _ l % ``\\?• Z,°J i ? 0 r: 1' h Ik' \\ 4 _ Z"? \ I •1 r, imr -S u son I as i ?I / f \ J r') \° J Lam'" ao° ?? 40 Z I eo III , ) 1 -% ? ?(^ % I \ \\ -rte 25 250 I 14 % __ dI \222 200 -?? `Coat ' :Ce ?i ?:. r ?- r III ii - \F!? 1 ac0 i •p\\ \. F TT OSSIY78 ??' III C? \ \ ? _/ \( ) ,? -? - \ \` ?? / - ???'"-7 \ \ `\\ ? n- , 252 ?? .? . 2 1i?• ? ? I I ???; ' i\ ? \ ? la ? n 2410 It- i I - \ .owes ??. "? \ I Bei:ea ? 'IL ?. / •n 0 •II ?.'"- \ ?. "- "? ° \ -C j ?; 25 II \ ?. a I1 a II ?-, Ce '. .7 , ?n ) \ ???• ---? 250 ' ???`?FT" • t?•ii I \\? ?1 i 223' r 1\i o •- ????? ,\ i `?O ?\;ll j :.?II• ? r beth 0 15- (,G/?\ I? I''?• .r ;L -???? `?? \? s --- - Off. ss?-7j W J? \\ 2 3 St a \/ ;l ?? ?Q. 2U'j. 250 i ,4v? C1\.. , ?/' ? ,?-? \-? -?,,?• r_ -.,?,, Y 722 32'30" ?24?'" E • INTERIOR-GEOLOGICAL SURVEY, RESTON, VIRGINIA-199: FOUR OAKS 6 M/.y 1 MILE ROAD CLASSIFICATION 000 5000 6000 7000 FEET Medium-duty_ Light-duty 1 KILOMETRE Unimproved dirt 0 FEET O State Route )ATUM OF 1929 i ' a West Johnston High School 8-04-00 Calculations for level spreader Wet De tention in the front of the Sghool Q = 27.7 cis outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH^1.5 Weir equation C = 3 constant H = ?ft to be computed H = (013.OL)°0.66 H = 0.18 ft V = Q/A A = LH = 22.08 sf V = 1.25 fps OK less than 3 fps Detenti on Behind the Athl etic Fields Q = 27.2 cis outflow from 2year 24 hr storm L = 120 It length of level spreader on plans Q = CLH"1.5 Weir equation C = 3 constant H = ?ft to be computed H = (Q/3.OL)"0.66 H = 0.18 It V = Q/A A = LH = 21.82 sf V = 1.25 fps OK less than 3 fps k j... _.. - SLOPE yi?•! ' ?. .•::: - - - - - TRANSMON TO O'GRAOf S AP_= .. -- ZIIS-Ilparl ---------- --- --- OUTL-' ..... --••.. /..` ................. Design Flow (cfs) Entrance Width Depth End Width Length 0-'C SV 0.? _T '? ? 190 LEVEL SPREADER SCALE: NONE jo,5 - LJ JH 5 r Wet Detention Study front of School-2 year 24 hour WET DETENTION FOR WEST JOHNSTON HIGH SCHOOL FRONT OF THE BUILDING 2 YR - 24 HOUR NCDENR BMP FIRST V OF RUNOFF 20013 6-6-00 rev 9-13-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 ` ,` 4 ?t ?A?' ` . ? /NEE 4 . . r ' *?? ?. ? ?• F .? N JANE %??•. West Johnston High School 20013-1 Site Conditions Predevelopment Wet Detention Study front of School-2 year 24 hour Total watershed area Area Impervious C= Area grass or woods C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channel flow Tc=(L"3/H)"0.385 128 Composite C = 37 Rainfall Intensity = 1= g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.9 X 13.9 minutes 0.3 4.1 inches per hr 23.00 acres CN= 98 0.00 acres CN= 73 23.00 acres C 1220 feet 40 feet 3.7 inches OVERLAND 2 S 9 h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School -20013-2 28.6 cfs Y 1 Storage Required Wet Detention Study front of School-2 year 24 hour Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface diff. Elevation am sky 198.00 37924 2.00 200.00 43925 2.00 202.00 51021 28.6 cis 81.9 cfs 94,699 cf accum. stomp StOEM Elevation egg 0 198 0 198.00 =water surface 81849 81849 200.00 2 94946 176795 202.00 4 Z Stodge LN(stamv) LNStM) 0 0 ERR ERR 0.00 81,849 2 11.31 0.69 2.00 176,795 4 12.08 1.39 4.00 b= 1.1110408 Ks= 37892.807 i/b Z= (g/Ks)A Predicted Water Surface Elevation for 2 year 24 hour storm= 200.28 feet msi Predicted Surface Area= elev = 198.00 37924 sf To capture the first 1" of runoff Drainage Area = 23 ac % imperv area = 57.00% West Johnston High School -20013.4 Wet Detention Study front of School-2 year 24 hour Average pool depth = 3 ft SAIDA-- 2.30% Required Surface Area= Surface Area Provide= Volume to be controlled by 1" storm = 1"(Rv=0.05 + 0.009(I))(DA) _ Temporary Water Quality Pool Elevation = Discharge of volume in 48 hours = Size Outlet Device for Control Structure invert elevation - estimated orifice center elev. proposed water surface elev. available head (h) _ discharge (d) _ coefficient of discharge = 0.3 - 0.0 23023 sf 37924.0 sf 47005 of 199.12 0.3 cfs 198.00 feet msl 198.10 feet ms] 200.28 feet msl 2.18 feet 0.3 cfs 0.6 Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)^1/2 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 28.6 cfs L = 8 ft Q=CwLH^312 H = 1.12 ft Top of Emergency Spiilvir 1.12 msi 5 West Johnston High School -20013-5 Inflow Hydroyrob Peak Inflow = Time to Peak = Wet Detention Study front of School-2 year 24 hour Additlwial Flow 81.9 29.6 37.0368384 I [ymm min) 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 0 C(s) 0 2.1 8.0 17.2 28.9 41.7 54.5 65.8 74.7 80.3 81.8 79.3 72.9 64.2 56.3 49.3 43.2 37.9 33.2 29.1 25.5 22.4 19.6 17.2 15.1 13.2 11.6 10.2 8.9 7.8 6.8 6.0 5.3 4.6 4.0 3.5 3.1 2.7 2.4 0.0 West Johnston High School -20013-6 Wet Detention Study front of School-2 year 24 hour L= 3.5 Stormwater routing 3 Spillway inch 199.12 T (time min) o r Ohl Stone S O utflow Elevation orifice tic 0 0 0 0.00 0.0 198.00 3 2.1 0 0.00 0.0 198.00 0.0 0.0 6 8.0 369 0.02 0.0 198.02 0.0 0.0 9 17.2 1809 0.06 0.0 198.06 0.0 0.0 12 28.9 4913 0.16 0.0 198.16 0.0 0.0 15 41.7 10110 0.30 0.0 198.30 0.0 0.0 18 54.5 17616 0.50 0.0 198.50 0.0 0.0 21 65.8 27417 0.75 0.2 198.75 0.2 0.0 24 74.7 39236 1.03 0.2 199.03 0.2 0.0 27 80.3 52650 1.34 1.3 199.34 0.3 1.1 30 81.8 66855 1.67 4.6 199.67 0.3 4.3 33 79.3 80760 1.98 8.7 199.98 0.3 8.4 36 72.9 93468 2.25 13.0 200.25 0.3 12.6 39 64.2 104261 2.49 17.2 200.49 0.4 16.8 42 56.3 112717 2.67 20.6 200.67 0.4 20.3 45 49.3 119130 2.80 23.3 200.80 0.4 22.9 48 43.2 123823 2.90 25.3 200.90 0.4 24.9 51 37.9 127048 2.97 26.8 200.97 0.4 26.4 54 33.2 129044 3.01 27.7 201.01 0.4 27.3 57 29.1 130043 3.03 28.1 201.03 0.4 27.7 60 25.5 130226 3.04 28.3 201.04 0.4 27.9 63 22.4 129722 3.03 28.1 201.03 0.4 27.7 66 19.6 128691 3.01 27.7 201.01 0.4 27.3 69 17.2 127242 2.98 27.0 200.98 0.4 26.6 72 15.1 125473 2.94 26.2 200.94 0.4 25.8 75 13.2 123477 2.90 25.3 200.90 0.4 24.9 78 11.6 121298 2.85 24.3 200.85 0.4 23.9 81 10.2 119014 2.80 23.3 200.80 0.4 22.9 84 8.9 116659 2.75 22.2 200.75 0.4 21.9 87 7.8 114261 2.70 21.2 200.70 0.4 20.9 90 6.8 111845 2.65 20.2 200.65 0.4 19.9 93 6.0 109433 2.60 19.3 200.60 0.4 18.9 96 5.3 107044 2.55 18.3 200.55 0.4 18.0 99 4.6 104693 2.50 17.4 200.50 0.4 17.0 102 4.0 102394 2.45 16.5 200.45 0.4 16.1 105 3.5 100159 2.40 15.6 200.40 0.4 15.2 108 3.1 97996 2.35 14.7 200.35 0.4 14.3 111 2.7 95914 2.31 14.0 200.31 0.3 13.6 114 2.4 93888 2.26 13.1 200.26 0.3 12.8 117 2.1 91955 2.22 12.5 200.22 0.3 12.1 120 1.8 90090 2.18 11.8 200.18 0:3 11.5 123 1.6 88297 2.14 11.2 200.14 0.3 10.8 126 1.4 86580 2.10 10.5 200.10 0.3 10.2 129 1.2 84940 2.07 10.1 200.07 0.3 9.7 132 1.1 83353 2.03 9.4 200.03 0.3 9.1 West Johnston High School -20013-7 Wet Detention Study front of School-2 year 24 hour 135 1.0 81849 2.00 9.0 200.00 0.3 8.7 138 0.8 80402 1.97 8.5 199.97 0.3 8.2 141 0.7 79013 1.94 8.1 199.94 0.3 7.8 144 0.6 77684 1.91 7.7 199.91 0.3 7.4 147 0.6 76415 1.88 7.3 199.88 0.3 7.0 150 0.5 75208 1.85 6.9 199.85 0.3 6.5 153 0.4 74061 1.83 6.6 199.83 0.3 6.3 156 0.4 72953 1.80 6.2 199.80 0.3 5.9 159 0.3 71906 1.78 5.9 199.78 0.3 5.6 162 0.3 70898 1.76 5.7 199.76 0.3 5.4 165 0.3 69928 1.74 5.4 199.74 0.3 5.1 168 0.2 68997 1.71 5.1 199.71 0.3 4.8 171 0.2 68127 1.70 4.9 199.70 0.3 4.6 174 0.2 67274 1.68 4.7 199.68 0.3 4.4 177 0.2 66460 1.66 4.5 199.66 0.3 4.2 180 0.1 65684 1.64 4.2 199.64 0.3 3.9 183 0.1 64947 1.62 4.0 199.62 0.3 3.7 186 0.1 64247 1.61 3.9 199.61 0.3 3.6 189 0.1 63565 1.59 3.7 199.59 0.3 3.4 192 0.1 62921 1.58 3.6 199.58 0.3 3.3 195 0.1 62294 1.56 3.3 199.56 0.3 3.1 198 0.1 61704 1.55 3.2 199.55 0.3 3.0 201 0.1 61131 1.54 3.1 199.54 0.3 2.9 204 0.0 60575 1.53 3.0 199.53 0.3 2.8 360 0.0 32579 0.87 0.2 198.87 0.2 0.0 720 0.0 28161 0.77 0.2 198.77 0.2 0.0 1080 0.0 24047 0.66 0.2 198.66 0.2 0.0 1440 0.0 20298 0.57 0.2 198.57 0.2 0.0 1800 0.0 16875 0.48 0.1 198.48 0.1 0.0 2160 0.0 13813 0.40 0.1 198.40 0.1 0.0 2520 0.0 11113 0.33 0.1 198.33 0.1 0.0 2880 0.0 8775 0.27 0.1 198.27 0.1 0.0 3240 0.0 6798 0.21 0.1 198.21 0.1 0.0 3600 0.0 5268 0.17 0.1 198.17 0.1 0.0 3960 0.0 4127 0.14 0.0 198.14 0.0 0.0 4320 0.0 3405 0.11 ERR 198.11 ERR 0.0 4680 0.0 ERR ERR ERR ERR ERR 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 28.3 cfs Peak Stage= 3.04 ft Water Elevation= 201.04 msl Peak Storage = 130226 cf Design Spillway 199.12 msl length of weir 30 ft West Johnston High School -20013-8 Inflow outflow hydrograph ......:.................._ 90 ........................................... ....:......................................... ......._ .......................:.......................................... 80 ..................................................................................................................................... ................... ................. 70 ................................................................................................................... 60 .... ............ v.......................................................---.................................................---.......................... 50 ............................................-----...------..................------...............---......---......----.............--- - ................. U 12 v O LL 40 ............................................................................................€.................................................................... _ ................. 30 ........... € ....................... ............................................. ................. 20 10 0 0 15 30 45 60 75 90 105 Time (minutes) -+- Inflow Hydrograph -- Outflow Hydrograph A Wet Detention Study front of School-100 year 24 hour WET DETENTION FOR WEST JOHNSTON HIGH SCHOOL FRONT OF THE BUILDING 100 YR - 24 HOUR NCDENR BMP FIRST V OF RUNOFF 20013 5-25-00 rev 9-13-00 Prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 ...trot "'rN J ?brUtt? West Johnston High School -20013-1 i e Site Conditions Predevelopment Total watershed area Area Impervious Area grass or woods SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channelflow Tc=(L"3M)"0.385 128 Composite C = Rainfall Intensity = 1= g/(h+T) Peak Discharge Q=CIA Wet Detention Study front of School-100 year 24 hour C= 0.95 C= 0.3 6.9 X 23.00 acres CN= 98 0.00 acres CN= 73 23.00 acres C 1220 feet 40 feet 8.4 inches OVERLAND 2 8 a h 2 132 18 10 203 22 25 246 23 100 302 25 13.9 minutes 0.3 7.8 inches per hr 53.6 cfs West Johnston High School -20013-2 Wet Detention Study front of School-100 year 24 hour Storage Required Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface diff. Elevat*o n am a" stoma 198.00 37924 2.00 81849 200.00 43925 2.00 94946 202.00 51021 accum. storm 0 81849 176795 Z Storage Uap LN oma) LN(St_t__ angel 0 0 ERR ERR 0.00 81,849 2 11.31 0.69 2.00 176,795 4 12.08 1.39 4.00 b= 1.1110408 Ks= 37892.807 1/b Z= (S/Ks) A Predicted Water Surface Elevation for 100 year 24 hour storm= To capture the first 1" of runoff Drainage Area = 23 ac % imperv area = 57.00% 53.6 cfs 120.2 cfs 231,990 cf Elevation Ran 198 0 198.00 =water surface 200.00 2 202.00 4 203.11 feet ms] West Johnston High School -20013-4 1 1 Wet Detention Study front of School-100 year 24 hour Average pool depth = 3 ft SA/DA= 2.30% Required Surface Area= Surface Area Provide= Volume to be controlled by 1" storm =1"(Rv=0.05 + 0.009(I))(DA) _ Temporary Water Quality Pool Elevation = Discharge of volume in 48 hours = Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. _ proposed water surface elev. _ available head (h) _ discharge (d) _ coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)^1/2 0.3 - 0.0 23023 sf 37924.0 sf 47005 cf 199.12 0.3 cfs 198.00 feet msl 198.10 feet msl 203.11 feet msl 5.01 feet 0.3 cfs 0.6 0.18 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 53.6 cfs L = 8 ft Q=CwLH^3/2 H = 1.71 ft Top of Emergency Spillwc, 1.71 msl West Johnston High School -20013-5 Wet Detention Study front of School-100 year 24 hour 135 25.4 131061 3.06 30.7 201.06 0.4 28,4 138 23.8 130104 3.04 29.3 201.04 0.4 27.9 141 22.2 129118 3.01 27.7 201.01 0.4 27.3 144 20.8 128136 2.99 27.3 200.99 0.4 26.9 147 19.4 126972 2.97 26.8 200.97 0.4 26.4 150 18.2 125642 2.94 26.2 200.94 0.4 25.8 153 17.0 124201 2.91 25.5 200.91 0.4 25.1 156 15.9 122662 2.88 24.9 200.88 0.4 24.5 159 14.9 121039 2.84 24.1 200.84 0.4 23.7 162 13.9 119379 2.81 23.5 200.81 0.4 23.1 165 13.0 117658 2.77 22.6 200.77 0.4 22.3 168 12.1 115921 2.74 22.0 200.74 0.4 21.7 171 11.4 114141 2.70 21.2 200.70 0.4 20.9 174 10.6 112364 2.66 20.4 200.66 0.4 20.1 177 9.9 110596 2.62 19.7 200.62 0.4 19.3 180 9,3 108844 2.58 18.9 200.58 0.4 18.5 183 8.7 107114 2.55 18.3 200.55 0.4 18.0 186 8.1 105378 2.51 17.6 200.51 0.4 17.2 189 7.6 103677 2.47 16.8 200.47 0.4 16.5 192 7.1 102013 2.44 16.3 200.44 0.4 15.9 195 6.6 100360 2.40 15.6 200.40 0.4 15.2 198 6.2 98753 2.37 15.0 200.37 0.4 14.7 201 5.8 97165 2.33 14.3 200.33 0.4 14.0 204 5.4 95631 2.30 13.8 200.30 0.4 13.5 360 0.2 17175 0.49 0.1 198.49 0.1 0.0 720 0.0 17560 0.50 0.1 198.50 0.1 0.0 1080 0.0 14334 0.42 0.1 198.42 0.1 0.0 1440 0.0 11447 0.34 0.1 198.34 0.1 0.0 1800 0.0 8947 0.27 0.1 198.27 0.1 0.0 2160 0.0 6843 0.21 0.1 198.21 0.1 0.0 2520 0.0 5151 0.17 0.1 198.17 0.1 0.0 2880 0.0 3801 0.13 0.0 198.13 0.0 0.0 3240 0.0 2917 0.10 0.0 198.10 0.0 0.0 Results of routing the 100 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 118.7 cfs Peak Stage= 3.59 ft Water Elevation= 201.59 msl Peak Storage = 156828 cf Design Spillway 199.12 msl Length of weir 3.5 ft Emergency Spillway 201.01 msl Length of Weir 58.5 ft 30 foot emergency spillway plus 32'-3.5' of design spillway = 30'+28.5'= 58.5' West Johnston High School -20013-8 2.0 0.9 0.0 0.0 Wet Detention Study front of School-100 year 24 hour Size Outlet Pipe for Spillway 100 yr. flow for prindpal spillway = 40.8 cfs Effective Length of Emergency spillway for outlet pipe = 28.5 ft Water Surface Elevation for 100 year Storm = 201.59 msl Top of Emergency Spillway at box = 201.01 msl Q=CLH^1.5 = 37.8 cfs Design flow for 100 year storm for outlet pipe = 78.5 cfs Slope of outlet pipe = 0.005 ft/ft Material of outlet pipe = concrete n = 0.012 d = 16 (Qn/S^0.5)"0.375 42.26 inches Use = 48 inch West Johnston High School -20013-9 A Inflow outflow hydrograph 140 ............................................................................................................................................................................................ 120 .................................................................................... ...................... ....................... ............................................ 100 80 . v 0 LL 60 40 --------------------- ............ .......... ...................... .......... ....... :.................-----.'s...............................................i...........-. 20 0 4 4 r 'r 'r T 'r 0 15 30 45 60 75 90 105 Time (minutes) -+- Inflow Hydrograph --*- Outflow Hydrograph 0 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP STORM WATER DETENTION FOR WEST JOHNSTON HIGH SCHOOL BEHIND ATHLETIC FIELDS 2YR-24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 5-25-00 rev 9-13-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 ;it?.tdctsj>;; West Johnston High School -20013-1 I . Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Site Conditions Predevelopment Total watershed area Area Impervious C= Area grass or wooded C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channelflow Tc=(L^3/H)`0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.7 X CN= 98 CN= 73 OVERLAND 2 R 9 h 2 132 18 10 203 22 25 246 23 100 302 25 29.00 acres 0.00 acres 29.00 acres C 1280 feet 51 feet 3.7 inches 13.3 minutes 0.3 4.2 inches per hr 36.6 cfs West Johnston High School -20013-2 4 i Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L"3/H)^0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA Time to peak Tp= Vol/(1.37 Qp) 0.95 0.3 6.7 CN= 98 CN= 73 C. R 9 h 2 132 18 10 203 22 25 246 23 100 302 25 29.00 acres 9.56 acres 19.44 acres C 1280 feet 51 feet 3.7 inches 81.2 2.31 1.89 inches 13.4 minutes 0.51 4.2 inches per hr 62.7 cfs 38.6 minutes West Johnston High School 20013-3 r i Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Storage Required Allowable release at impoundment = 36.6 cfs Peak rate of inflow at impoundment = 62.7 cis Sr = (Qi - Qo)Tp 60,364 cf STAGE STORAGE DATA surface diff. accum. Elevation area glgY storage Storm Elevation stm 179.00 5673 0 179 0 1.00 6400 180.00 7127 6400 180.00 1 2.00 18160 182.00 11033 24560 182.00 3 2.00 26047 184.00 15014 50607 184.00 5 2.00 33772 186.00 18758 84379 186.00 7 2.00 42466 188.00 23708 126845 188.00 9 1.50 38900.25 189.50 28159 165745.25 189.50 10.5 Z C d Storage Rao LN(st_ orage) LNMM) ompute UM 0 0 ERR ERR 0.00 6,400 1 8.76 0.00 1.24 24,560 3 10.11 1.10 3.00 126,845 9 11.75 2.20 8.81 165,745 10.5 12.02 2.35 10.50 b= 1.5240975 Ks= 4603.0858 1/b Z= (S/Ks)^ Predicted Water Surface Elevation= 184.41 feet ms] To capture the first 1" of runoff volume= DA x 43560 x V 112 105270 of 186.80 feet msl set spillway elevation at this elevation West Johnston High School -20013-4 r , Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Release rate over 48 hours= Size Outlet Device for Control Structure invert elevation estimated orifice center elev. _ proposed water surface elev. _ available head (h) _ discharge (d) = 0.5 - coefficient of discharge = Determine the orifice diameter orifice equation 0.61 cfs pond will drain in greater than 2 days in accordance with NCDENR BMP This will provide removal of 50% TSS with outlet swales TSS removal will be at least 85% 179.00 feet msl 179.30 feet msl 186.80 feet msl 7.50 feet 0.0 0.5 cfs 0.6 Q = Cd(A)(2gh)^1/2 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 36.6 cfs Omate L = 8 ft Q=CwLH"3/2 H = 1.33 ft Top of Emergency Spillwc- 188.12 msl 5 West Johnston High School -20013-5 Peak Ldtow Time W Peak = Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP AddMortal Flow 62.7 38.6 48.26564414 T jdme mini 0 3 6 9 12 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 0 0.9 3.7 8.0 13.8 20.6 28.0 35.6 43.0 49.7 55.3 59.5 62.0 62.7 61.5 58.6 54.0 48.9 44.2 39.9 36.1 32.6 29.5 26.7 24.1 21.8 19.7 17.8 16.1 14.5 13.1 11.9 10.7 9.7 8.8 7.9 7.2 6.5 5.9 0.0 West Johnston High School -20013-6 . 1 i i Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR SMP L= 6.5 Stormwater routing 3 Spillway inch 186.80 T (time min) Qf cW Storage W O utflow F evation orifice W& 0 0 0 0.00 0.0 179.00 3 0.9 0 0.00 0.0 179.00 0.0 0.0 6 3.7 167 0.11 0.0 179.11 0.0 0.0 9 8.0 826 0.32 0.0 179.32 0.0 0.0 12 13.8 2271 0.63 0.0 179.63 0.0 0.0 15 20.6 4751 1.02 0.2 180.02 0.2 0.0 18 28.0 8423 1.49 0.2 180.49 0.2 0.0 21 35.6 13420 2.02 0.3 181.02 0.3 0.0 24 43.0 19781 2.60 0.3 181.60 0.3 0.0 27 49.7 27459 3.23 0.4 182.23 0.4 0.0 30 55.3 36333 3.88 0.4 182.88 0.4 0.0 33 59.5 46206 4.54 0.5 183.54 0.5 0.0 36 62.0 56824 5.20 0.5 184.20 0.5 0.0 39 62.7 67888 5.85 0.5 184.85 0.5 0.0 42 61.5 79072 6.46 0.6 185.46 0.6 0.0 45 58.6 90044 7.04 0.6 186.04 0.6 0.0 48 54.1 100480 7.56 0.6 186.56 0.6 0.0 51 48.1 110098 8.03 2.9 187.03 0.6 2.2 54 44.2 118247 8.41 10.1 187.41 0.7 9.4 57 39.9 124387 8.70 17.5 187.70 0.7 16.8 60 36.1 128433 8.88 22.7 187.88 0.7 22.0 63 32.6 130843 8.99 26.1 187.99 0.7 25.5 66 29.5 132009 9.04 27.8 188.04 0.7 27.1 69 26.7 132320 9.06 28.4 188.06 0.7 27.7 72 24.1 132003 9.04 27.8 188.04 0.7 27.1 75 21.8 131343 9.01 26.8 188.01 0.7 26.1 78 19.7 130442 8.97 25.5 187.97 0.7 24.8 81 17.8 129394 8.93 24.3 187.93 0.7 23.6 84 16.1 128233 8.87 22.4 187.87 0.7 21.7 87 14.5 127096 8.82 20.9 187.82 0.7 20.2 90 13.1 125951 8.77 19.4 187.77 0.7 18.8 93 11.9 124818 8.72 18.0 187.72 0.7 17.3 96 10.7 123715 8.67 16.6 187.67 0.7 15.9 99 9.7 122656 8.62 15.3 187.62 0.7 14.6 102 8.8 121655 8.57 14.0 187.57 0.7 13.3 105 7.9 120721 8.53 12.9 187.53 0.7 12.3 108 7.2 119819 8.49 12.0 187.49 0.7 11.3 111 6.5 118958 8.45 11.0 187.45 0.7 10.3 114 5.9 118146 8.41 10.1 187.41 0.7 9.4 117 5.3 117391 8.37 9.2 187.37 0.7 8.5 120 4.8 116696 8.34 8.5 187.34 0.7 7.8 123 4.3 116029 8.31 7.9 187.31 0.7 7.2 126 3.9 115393 8.28 7.2 187.28 0.7 6.6 129 3.5 114795 8.25 6.6 187.25 0.7 6.0 132 3.2 114238 8.23 6.2 187.23 0.7 5.6 West Johnston High School -20013-7 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP _ _ 135 2.9 113689 8.20 5.7 187.20 0.7 5.0 138 2.6 113188 8.18 5.3 187.18 0.7 4.6 141 2.4 112704 8.15 4.8 187.15 0.7 4.1 144 2.1 112270 8.13 4.4 187.13 0.7 3.8 147 1.9 111858 8.11 4.1 187.11 0.7 3.4 150 1.7 111469 8.09 3.8 187.09 0.7 3.1 153 1.6 111104 8.08 3.6 187.08 0.7 3.0 156 1.4 110738 8.06 3.3 187.06 0.6 2.7 159 1.3 110400 8.04 3.0 187.04 0.6 2.4 162 1.2 110091 8.03 2.9 187.03 0.6 2.2 165 1.1 109785 8.01 2.6 187.01 0.6 1.9 168 1.0 109509 8.00 2.5 187.00 0.6 1.8 171 0.9 109239 7.99 2.3 186.99 0.6 1.7 174 0.8 108977 7.97 2.1 186.97 0.6 1.4 177 0.7 108744 7.96 1.9 186.96 0.6 1.3 180 0.6 108520 7.95 1.8 186.95 0.6 1.2 183 0.6 108305 7.94 1.7 186.94 0.6 1.1 186 0.5 108100 7.93 1.6 186.93 0.6 1.0 189 0.5 107904 7.92 1.5 186.92 0.6 0.9 192 0.4 107719 7.91 1.4 186.91 0.6 0.8 195 0.4 107543 7.91 1.4 186.91 0.6 0.8 198 0.3 107360 7.90 1.3 186.90 0.6 0.7 201 0.3 107189 7.89 1.2 186.89 0.6 0.6 204 0.3 107027 7.88 1.1 186.88 0.6 0.5 360 0.0 99185 7.50 0.6 186.50 0.6 0.0 720 0.0 85717 6.81 0.6 185.81 0.6 0.0 1080 0.0 72899 6.13 0.6 185.13 0.6 0.0 1440 0.0 60792 5.44 0.5 184.44 0.5 0.0 1800 0.0 49450 4.75 0.5 183.75 0.5 0.0 2160 0.0 38931 4.06 0.4 183.06 0.4 0.0 2520 0.0 29303 3.37 0.4 182.37 0.4 0.0 2880 0.0 20659 2.68 0.3 181.68 0.3 0.0 3240 0.0 13125 1.99 0.3 180.99 0.3 0.0 3600 0.0 6896 1.30 0.2 180.30 0.2 0.0 3960 0.0 2332 0.64 0.1 179.64 0.1 0.0 4320 0.0 423 0.21 0.0 179.21 0.0 0.0 4680 0.0 423 0.21 OA 179.21 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 28.4 cfs Peak Stage= 9.06 ft Water Elevation= 188.06 msl Peak Storage = 132320 cf Design Spillway 186.80 msl Length of weir 6.5 ft West Johnston Nigh School -20013-8 1 1 1 y Inflow outflow hydrograph 70 ........................................... .. .................. 60 ............................................ ...................................................................................................................................... 50 .................. .. .......... .................. 40 w LL 30 20 ................................................... --------- ...................... f.--........................................s........................................... 10 0 0 15 30 45 60 75 90 105 Time (minutes) +- Inflow Hydrograph -- Outflow Hydrograph 1 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP STORM WATER DETENTION FOR WEST JOHNSTON HIGH SCHOOL BEHIND ATHLETIC FIELDS 100 YR - 24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 , 1 ryt H C,a c Z AZ J0 West Johnston High School -20013-1 1 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Site Conditions Pnedevelopment Total watershed area Area Impervious Area grass or wooded SCS Sal Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channel flow Tc=(L"3/H)`0.385 128 Composite C = Rainfall Intensity Peak Discharge C= 0.95 C= 0.3 6.7 X CN= 98 CN= 73 OVERLAND 2 B 9 h 1 = g/(h+T) 2 132 18 10 203 22 25 246 23 100 302 25 Q=CIA 29.00 acres 0.00 acres 29.00 acres C 1280 feet 51 feet 8.4 inches 13.3 minutes 0.3 7.9 inches per hr 68.5 cfs West Johnston High School -20013-2 Stone Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Site Conditions postdevelopment Total watershed area 29.00 acres Area Impervious C= 0.95 CN= 98 9.56 acres Area grass C= 0.3 CN= 73 19.44 acres SCS Soil Group (Craven) C. C Hydraulic Length 1280 feet Vertical Relief 51 feet 24-hr, 2 yr rainfall 8.4 inches Design Hydrograph Formulation Composite CN 81.2 S=1000/CN -10 2.31 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L"3/H)^0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA Time to peak Tp= Vol/(1.37 Qp) 6.7 E S h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School -20013-3 6.15 inches 13.4 minutes 0.51 7.9 inches per hr 117.3 cfs 67.1 minutes l P , Storage Required Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface dill. accum. Elevation Wea 21" stoma stoma 179.00 5673 0 1.00 6400 180.00 7127 6400 2.00 18160 182.00 11033 24560 2.00 26047 184.00 15014 50607 2.00 33772 186.00 18758 84379 2.00 42466 188.00 23708 126845 1.50 38900.25 189.50 28159 165745.25 Z d Storage Ltgp L N(gorM) S(NUM) Compute 0 0 ERR ERR 0.00 6,400 1 8.76 0.00 1.24 24,560 3 10.11 1.10 3.00 126,845 9 11.75 2.20 8.81 165,745 10.5 12.02 2.35 10.50 b= 1.5240975 Ks= 4603.0858 1/b Z= (S/Ks)^ 68.5 cfs 117.3 cfs 196,465 cf Elevation 179 0 180.00 1 182.00 3 184.00 5 186.00 7 188.00 9 189.50 10.5 Predicted Water Surface Elevation= 190.74 feet msl To capture the first 1" of runoff volume= DA x 43660 x 1" 112 105270 cf 186.80 feet msl set spillway elevation at this elevation West Johnston High School -20013-4 ( 0 ), Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Release rate over 48 hours= Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. _ proposed water surface elev. _ available head (h) _ discharge (d) = 0.5 - coefficient of discharge = Determine the orifice diameter Orifice equation 0.61 de pond will drain in greater than 2 days in accordance with NCDENR BMP This will provide removal of 50% TSS with outlet swales TSS removal will be at least 85% 179.00 feet msl 179.30 feet msl 186.80 feet msl 7.50 feet 0.0 0.5 cfs 0.6 Q = Cd(A)(2gh)"1/2 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 68.5 cfs stimate L = 8 ft Q=CwLH"3/2 H = 2.01 ft Top of Emergency Spillwe 188.81 ms! 5 West Johnston High School 20013-5 Peak Inflow = Time W Peak = Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP _ AdMonal Flow ' 1173 67.1 83.92897444 T (Nmm min) 0 3 6 9 12 Y5 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 0 (cfsl 0 0.6 2.3 5.1 9.0 13.8 19.6 26.1 33.2 40.9 48.9 57.0 65.2 73.3 81.1 88.5 95.2 101.3 106.5 110.8 114.0 116.2 117.2 117.1 115.8 113.4 109.9 105.5 100.1 94.5 89.1 84.1 79.3 74.9 70.6 66.7 62.9 59.3 56.0 0.0 West Johnston High School -20013-6 M J ? f Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP L= 6.5 55.5 Stormwater routing Emergency 3 Spillway Spillway inch 186.80 187.78 T (time min) Q-(sh) Storms g Outfl ?C Elevation orifice w1k We![ 0 0 0 0.00 0.0 179.00 2 0.3 0 0.00 0.0 179.00 0.0 0.0 4 1.0 31 0.04 0.0 179.04 0.0 0.0 6 2.3 154 0.11 0.0 179.11 0.0 0.0 8 4.1 429 0.21 0.0 179.21 0.0 0.0 10 6.3 916 0.35 0.0 179.35 0.0 0.0 12 9.0 1671 0.51 0.0 179.51 0.0 0.0 14 12.1 2751 0.71 0.1 179.71 0.1 0.0 16 15.7 4193 .0.94 0.2 179.94 0.2 0.0 18 19.6 6054 1.20 0.2 180.20 0.2 0.0 20 23.8 8380 1.48 0.2 180.48 0.2 0.0 22 28.4 11212 1.79 0.3 180.79 0.3 0.0 24 33.2 14587 2.13 0.3 181.13 0.3 0.0 0.0 26 38.3 18538 2.49 0.3 181.49 0.3 0.0 0.0 28 43.5 23090 2.88 0.4 181.88: 0.4 0.0 0.0 30 48.9 28265 3.29 0.4 182.29 0.4 0.0 0.0 32 54.3 34080 3.72 0.4 182.72 0.4 0.0 0.0 34 59.8 40544 4.17 0.5 183.17 0.5 0.0 0.0 36 65.2 47663 4.64 0.5 183.64 0.5 0.0 0.0 38 70.7 55435 5.12 0.5 184.12 0.5 0.0 0.0 40 76.0 63853 5.62 0.5 184.62 0.5 0.0 0.0 42 81.1 72905 6.13 0.6 185.13 0.6 0.0 0.0 44 86.1 82573 6.65 0.6 185.65 0.6 0.0 0.0 46 90.8 92833 7.18 0.6 186.18 0.6 0.0 0.0 48 95.2 103656 7.72 0.6 186.72 0.6 0.0 0.0 50 99.4 115009 8.26 6.8 187.26 0.7 6.2 0.0 52 103.1 126114 8.78 19.7 187.78 0.7 19.0 0.0 54 106.5 136122 9.23 84.5 188.23 0.7 33.5 50.3 56 109.5 138767 9.34 107.9 188.34 0.7 37.4 69.8 58 112.0 138953 9.35 110.1 188.35 0.7 37.8 71.7 60 114.0 139172 9.36 112.4 188.36 0.7 38.2 73.5 62 115.6 139366 9.37 114.7 188.37 0.7 38.5 75.5 64 116.6 139473 9.38 117.0 188.38 0.7 38.9 77.4 66 117.2 139433 9.37 114.7 188.37 0.7 38.5 75.5 68 117:2 139735 9.39 119.3 188.39 0.7 39.3 79.3 70 116.8 139490 9.38 117.0 188.38 0.7 38.9 77.4 72 115.8 139466 9.38 117.0 188.38 0.7 38.9 77.4 74 114.3 139326 9.37 114.7 188.37 0.7 38.5 75.5 76 112.4 139283 9.37 114.7 188.37 0.7 38.5 75.5 78 109.9 139005 9.36 112.4 188.36 0.7 38.2 73.5 80 107.1 138709 9.34 107.9 188.34 0.7 37.4 69.8 82 103.8 138607 9.34 107.9 188.34 0.7 37.4 69.8 84 100.1 138110 9.32 103.5 188.32 0.7 36.7 66.1 86 96.3 137704 9.30 99.1 188.30 0.7 36.0 62.4 88 92.6 137366 9.28 94.8 188.28 0.7 35.3 58.9 West Johnston High School -20013-7 ? JS A • Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP 90 89.1 137102 9.27 92.7 188.27 0.7 34.9 57.1 92 85.7 136670 9.25 88.6 188.25 0.7 34.2 53.6 94 82.5 136331 9.24 86.5 188.24 0.7 33.9 51.9 96 79.3 135849 9.22 82.4 188.22 0.7 33.2 48.6 98 76.3 135477 9.20 78.5 188.20 0.7 32.5 45.3 100 73.4 135220 9.19 76.5 188.19 0.7 32.1 43.7 102 70.6 134850 9.17 72.7 188.17 0.7 31.4 40.6 104 68.0 134607 9.16 70.8 188.16 0.7 31.1 39.0 106 65.4 134268 9.14 31.1 188.14 0.7 30.4 0.0 108 62.9 138383 9.33 37.8 188.33 0.7 37.1 110 60.5 141398 9.46 42.6 188.46 0.7 41.9 112 58.2 143549 9.55 46.0 188.55 0.7 45.3 114 56.0 145010 9.62 48.8 188.62 0.7 48.1 116 53.9 145878 .9.66 50.4 188.66 0.7 49.6 118 51.8 146299 9.67 50.8 188.67 0.7 50.0 120 49.9 146427 9.68 51.2 188.68 0.7 50.4 122 48.0 146270 9.67 50.8 188.67 0.7 50.0 124 46.1 145934 9.66 50.4 188.66 0.7 49.6 126 44.4 145428 9.64 49.6 188.64 0.7 48.8 128 42.7 144807 9.61 48.4 188.61 0.7 47.7 130 41.1 144126 9.58 47.2 188.58 0.7 46.5 132 39.5 143392 9.55 46.0 188.55 0.7 45.3 134 38.0 142611 9.51 44.5 188.51 0.7 43.8 136 36.6 141835 9.48 43.3 188.48 0.7 42.6 138 35.2 141023 9.44 0.7 188.44 0.7 0.0 140 33.8 145160 9.63 0.7 188.63 0.7 0.0 142 32.6 149137 9.80 0.7 188.80 0.7 0.0 144 31.3 152958 9.96 0.7 188.96 0.7 0.0 146 30.1 156630 10.12 0.7 189.12 0.7 0.0 148 29.0 160158 10.27 0.7 189.27 0.7 0.0 150 27.9 163549 10.41 0.7 189.41 0.7 0.0 152 26.8 166806 10.54 0.7 189.54 0.7 0.0 154 25.8 169936 10.67 0.8 189.67 0.8 0.0 156 24.8 172943 10.80 0.8 189.80 0.8 0.0 158 23.9 175832 10.92 0.8 189.92 0.8 0.0 Results of routing the 100 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 117.0 cfs Peak Stage= 9.38 ft Water Elevation= 188.38 msl Peak Storage = 139490 d Design Spillway 186.80 msl Length of weir 6.5 ft Emergency Spillway 187.78 msl Length of Weir 55.5 It West Johnston High School -20013-8 Inflow outflow hydrograph ..:.......................:................... 120 ............................................. .; ...............................................; .......................:..................... 100 ................................................................................................................ .... ...... .............. 80 ........................................................................................... ...................... ........ .............. .......................................... w ....................... ......... 60 ..............................................................................._......... ....... 0 LL 40 ............ ............. =............... ...... ........................ ............................. ............... .................. ................ 20 0 0 10 20 30 40 50 60 70 Time (minutes) -?- Inflow Hydrograph -*- Outflow Hydrograph hereby acknowtedgg that I am the financially responsible party for maintenance and inspection of this detention pond. I will perform the maintenance as outlined above, to comply with the Johnston County Stormwater Management Ordinance and the Stormwater Management permit received for this project Furthermore, I attest that this inspection and Maintenance Agreement is on file with the Register of Deeds. '? Signature A4 AA I "f Y/ . J I, IUYA" he __, a Notary Pubfic for state of Co of do reby certify that personally Weared before me th is day of 19,A0 and acl n a the due execution of the foregoing instrument Witness my hand and official seat, ,. •.......... My commission ,O,OTA1,j a ems, CA °° ?CN COU Hite associates ARCHITECTURE / BrGNEEW6 / PLANNN6 LETTER of TRANSMITTAL TO: NCDENR - Division of Water Quality 4401 Reedy Creek Road Raleigh, NC 27607 DATE: October 5, 2000, tf r q 9 2000 ATTN: Mr. Todd St. John, PE RE: West Johnston. High 80=1 We are sending via UPS the following plans: r,nPiFS mr. DATF DESCRIPTION NOTES: 2sets Site Plans/Grading and Erosion Control/Details 2 Extended D Detention Basin work sheet 2 Operation and Maintenance manuals 2 Storm water management plans This information is transmitted for approval unless noted otherwise. REMARKS: Drawings: 0001-Overall Site Key Plan 0002-Site Phasing Plan C201-Site Grading and Erosion Control - South C202-Site Grading and Erosion Control - North C203-Site Grading and Erosion Control - Entrance C204-Site Grading and Erosion Control C401-Site Details: Storm Sewer/ Sanitary Sewer C402-Site Details: General Notes / Erosion Control C403-Site Details: Storm Water Detention Boxes C404-Site Details: Wet Detention / Storm Water Detention C405-Site Details: Curb and Gutter / Asphalt & base / Parking C406-Site Details: Athletic Field Improvements C407-Site Details: Athletic Field Improvements I Misc. NED C G NTodd Smith copy: Steve Janowski, P.E. Ms. Ann Williams, Johnston County Schools Mr. Ray Debruhl, TPFG 3 C408-Site Details: Dugouts C409-Site Details: Water Services C410-Site Details: Concrete Steps C501-Road Widening 2600 Meridian Drive / Greenville, NC 27834 / tel 252.757.0333 / fax 252.757.1330 / e-mail. tsmith@hiteassoc.com :a- OPERATION AND MAINTENANCE MANUAL AND AGREEMENT for West Johnston High School Wet Detention Basin No. 1 and Dry Detention Basin No. 2 , 7No INS proj no 20013 prepared by J.S. Janowski, PE 105 C East Victoria Court Greenville, NC 27856 252-756-8918 West Johnston High School - 1 14 Wet Detention Basin Checklist and Schedule Monthly Inspection 1. T Remove debris from primary and emergency spillways 2. _ Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. _ Check draw down pipe for blockage 4. _ Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. _ Check pipes for undercutting. Replace rip rap and repair broken pipes 3. _ Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment, and the emergency spillway. 6 Month Inspection 1. _ Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool =194.00 fore bay = 192.00 outlet of pond =193.00 2. _ Check emergency spillway for erosion. General Maintenance 1. Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of the grass 2. _ Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. _ Check bar grating to make sure it is secure and locked down. 5. _ Turn gate valve. to make sure it is operable 6. _ Remove any woody trees growing in the embankment. West Johnston High School - 2 Dry Detention, Basin Checklist and Schedule Monthly Inspection 1. _ Remove debris from primary and emergency spillways 2. _ Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. Check draw down pipe for blockage 4. - Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. _ Check pipes for undercutting. Replace rip rap and repair broken pipes 3. _ Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment. 6 Month Inspection 1. _ Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool =178.00 fore bay =178.00 outlet of pond =177.00 General Maintenance 1. - Mow the side slopes for the embankment and the ponded area (not including the shel) according to the growing season of the grass 2. _ Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. _ Check bar grating to make sure it is secure and locked down. 5. _ Turn gate valve to make sure it is operable West Johnston High School - 3 hereby acknowledge that I am the financially responsible party for maintenance and ispection of this detention pond. I will perform the maintenance as outlined above, to comply with the Johnston County Stormwater Management Ordinance and the Stormwater Management permit received for this project Furthermore, I attest that this Inspection and Maintenance Agreement is on file with the Register of Deeds. Signature I, a Notary PubC?c for state of ? ' p?e of, do reby certify that sonally befofte is da y of YL'Ig ,1c9 ldG, and ackno a the due execution of the foregoing instrument Wiliness my hand and official seal, ?. .......... My commission c t\.OTA,g ec*42 - CA o AVS?IG "N t' •.,._ COU OPERATION AND MAINTENANCE MANUAL AND AGREEMENT for West Johnston High School Wet Detention Basin No.1 and Dry Detention Basin No. 2 proj no 20013 prepared by J.S. Janowski, PE 105 C East Victoria Court Greenville, NC 27856 252-756-8918 West Johnston High School - 1 Dry Detention Basin Checklist and Schedule Monthly Inspection 1. _ Remove debris from primary and emergency spillways 2. - Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. _ Check draw down pipe for blockage 4. _ Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. _ Check pipes for undercutting. Replace rip rap and repair broken pipes 3. - Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment. 6 Month Inspection 1. Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool =178.00 fore bay =178.00 outlet of pond = 177.00 General Maintenance 1. _ Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of the grass 2. - Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. - Check bar grating to make sure it is secure and locked down. 5. _ Turn gate valve to make sure it is operable West Johnston High School - 3 OPERATION AND MAINTENANCE MANUAL AND AGREEMENT for West Johnston High School Wet Detention Basin No.1 and Dry Detention Basin No. 2 %'rN JA' ii1+A proj no 20013 prepared by J.S. Janowski, PE 105 C East Victoria Court Greenville, NC 27856 252-756-8918 West Johnston High School - 1 14 Wet Detention Basin Checklist and Schedule Monthly Inspection 1. T Remove debris from primary and emergency spillways 2. _ Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. _ Check draw down pipe for blockage 4. _ Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. T Check pipes for undercutting. Replace rip rap and repair broken pipes 3. _ Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment, and the emergency spillway. 6 Month Inspection 1. _ Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool = 194.00 fore bay = 192.00 outlet of pond = 193.00 2. _ Check emergency spillway for erosion. General Maintenance 1. Mow the side slopes for the embankment and the ponded area (not including the shel fl according to the growing season of the grass 2. _ Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. _ Check bar grating to make sure it is secure and locked down. 5. Turn gate valve to make sure it is operable 6. _ Remove any woody trees growing in the embankment. West Johnston High School - 2 Dry Detention. Basin Checklist and Schedule Monthly Inspection 1. - Remove debris from primary and emergency spillways 2. _ Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. _ Check draw down pipe for blockage 4. _ Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. _ Check pipes for undercutting. Replace rip rap and repair broken pipes 3. _ Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment. 6 Month Inspection 1. Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool =178.00 fore bay =178.00 outlet of pond = 177.00 General Maintenance 1. _ Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of the grass 2. _ Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. _ Check bar grating to make sure it is secure and locked down. 5. - Turn gate valve to make sure it is operable West Johnston High School - 3 hereby acknowledge that I am the financ*k* responsible party for maintenance and inspection of this detention pond. I will perform the maintenance as outlined above, to comply with the Johnston County Stormwater Management Ordinance and the Stormwater Management permit received for this project Furthermore, I attest that this Inspection and Maintenance Agreement is on file with the Register of Deeds. Signature 1.1?lr111 Gy Adp'AM le f, . a Notary Public for state of Cou of , do reby certify that personalty *before me th is day of ,1c9, and ac(mo Nlete the due execution of the foregoing instrument. Witness my hand and official seal, My commission W. c 40 TAq AUSLIG '''+unnm??a r OPERATION AND MAINTENANCE MANUAL AND AGREEMENT for West Johnston High School Wet Detention Basin No. I and Dry Detention Basin No. 2 proj no 20013 prepared by J.S. Janowski, PE 105 C East Victoria Court Greenville, NC 27856 252-756-8918 West Johnston High School - 1 Wet Detention Basin Checklist and Schedule Monthly Inspection 1. , Remove debris from primary and emergency spillways 2. Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. - Check draw down pipe for blockage 4. - Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. _ Check pipes for undercutting. Replace rip rap and repair broken pipes 3. Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment, and the emergency spillway. 6 Month Inspection 1. _ Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool =194.00 fore bay = 192.00 outlet of pond = 193.00 2. _ Check emergency spillway for erosion. General Maintenance 1. Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of the grass 2. _ Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. _ Check bar grating to make sure it is secure and locked down. 5. - Turn gate valve to make sure it is operable 6. _ Remove any woody trees growing in the embankment. West Johnston High School - 2 Dom' Detention Basin Checklist and Schedule Monthly Inspection 1. - Remove debris from primary and emergency spillways 2. - Check groundcover for signs of erosion or failure 1. on embankment 2. in pond 3. _ Check draw down pipe for blockage 4. _ Inspect the embankment, primary spillway and undeerdrain fro signs of seepage or erosion. 1. If seepage is found, note approximate flow rate, color of discharge, location of slumps, wetness on slope, etc. 2. Draw a map of the structure noting any erosion, wetness, slumps, etc. Quarterly Inspection 1. _ Remove debris 2. _ Check pipes for undercutting. Replace rip rap and repair broken pipes 3. _ Reseed grass swales, the area between the forebay and permanent pool, and the pond embankment. 6 Month Inspection 1. Remove accumulated sediment from the permanent pool, the fore bay and the outlet of the pond. Note: the following are the benchmark elevations for the sediment pools. permanent pool = 178.00 fore bay ° 178.00 outlet of pond =177.00 General Maintenance 1. _ Mow the side slopes for the embankment and the ponded area (not including the shelf) according to the growing season of the grass 2. _ Keep the cattails from clogging the pond and spillways. 3. _ Check debris at the inlet after each storm event. 4. - Check bar grating to make sure it is secure and locked down. 5. , Turn gate valve to make sure it is operable West Johnston High School - 3 .; j? .ems _ IE,^C7A _O _.- •? - '. : • .. - : STAB'LZED ' •?- SLOF? TRANSMON '0 . r r '- T TRADE %...-" S 7A 6L OUTLE- ......_.. ....... Design Flow (cfs) Entrance Width Depth End idth Length 20 2C-3. ?1 2 I.0 3' 20 LEVEL SPREADER 1 SCALE: NONE Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP 135 2.9 114550 7.97 5.9 186.97 0.6 5.3 138 2.6 114002 7.94 5.4 186.94 0.6 4.7 141 2.4 113504 7.92 5.0 186.92 0.6 4.4 144 2.1 113026 7.90 4.7 186.90 0.6 4.0 147 1.9 112571 7.88 4.3 186.88 0.6 3.7 150 1.7 112140 7.86 4.0 186.86 0.6 3.4 153 1.6 111735 7.84 3.7 186.84 0.6 3.0 156 1.4 111359 7.83 3.5 186.83 0.6 2.9 159 1.3 110982 7.81 3.2 186.81 0.6 2.6 162 1.2 110636 7.79 2.9 186.79 0.6 2.3 165 1.1 110321 7.78 2.8 186.78 0.6 2.1 168 1.0 110011 7.77 2.6 186.77 0.6 2.0 171 0.9 109708 7.75 2.4 186.75 0.6 1.7 174 0.8 109436 -7.74 2.2 186.74 0.6 1.6 177 0.7 109173 7.73 2.1 186.73 0.6 1.5 180 0.6 108919 7.72 2.0 186.72 0.6 1.4 183 0.6 108675 7.71 1,9 186.71 0.6 1.2 186 0.5 108442 7.69 1.6 186.69 0.6 1.0 189 0.5 108239 7.69 1.6 186.69 0.6 1.0 192 0.4 108028 7.68 1.5 186.68. 0.6 0.9 195 0.4 107827 7.67 1.4 186.67 0.6 0.8 19& 0.3 107638 7.66 1.3 186.66 0.6 0.7 201 0.3 107460 7.65 1.2 186.65 0.6 0.6 204 0.3 107294 7.64 1.1 186.64 0.6 0.5 360 0.0 99184 7.27 0.6 186.27 0.6 0.0 720 0.0 85939 6.64 0.6 185.64 0.6 0.0 1080 0.0 73295 6.00 0.6 185.00 0.6 0.0 1440 0.0 61328 5.36 0.5 184.36 0.5 0.0 1800 0.0 50079 4.71 0.5 183.71 0.5 0.0 2160 0.0 39610 4.06 0.4 183.06 0.4 0.0 2520 0.0 29982 3.40 0.4 182.40 0.4 0.0 2880 0.0 21292 2.74 0.4 181.74 0.4 0.0 3240 0.0 13655 2.06 0.3 181.06 0.3 0.0 3600 0.0 7282 1.38 0.2 180.38 ti . . 0.2 0.0 3960 0.0 2495 0.70 0.1 , 179.70 0.1 0.0 4320 0.0 213 0.15 0.0 179.15 0.0 0.0 4680 0.0 213 0.15 0.0 179.15 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 271 cfs Peak Stage= 8.78 k Water Elevation= 187.78 msl Peak Storage = 133491 d Design Spillway 186.55 msl Length of weir 6.S ft West Johnston High School -20013-8 West Johnston High School 8-04-00 Calculations for level spreader Wet Detention in the front of the School 0 = 27.7 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans 0 = CLHw1.5 Weir equation C = 3 constant H = ?ft to be computed H = (013.OL)A0.66 H = 0.18 ft V = Q/A A = LH = 22.08 sf V = 1.25 fps OK less than 3 fps Detention Behind the Athleljc Fields 0 = 27.2 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans 0 = CLH°1.5 Weir equation C = 3 constant H = ?ft to be computed H = (0/3.OL)AO.66 H = 0.18 ft V = 0/A A = LH = 21.82 sf V = 1.25 fps OK less than 3 fps,,. West Johnston High School 8-04-00 Calculations for level spreader Wet Detention in the front of the School Q = 27.7 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLH111.5 Weir equation C = 3 constant H = ?ft to be computed H = (0/3.OL)"0.66 H = 0.18 ft V = Q/A A = LH = 22.08 sf V = 1.25 fps OK less than 3 fps nd the Athletic Fiel Q = 27.2 cfs outflow from 2year 24 hr storm L = 120 ft length of level spreader on plans Q = CLHw1.5 Weir equation C = 3 constant H = ?ft to be computed H = (Q/3.OL)"0.66 H = 0.18 ft V = Q/A A = LH = 21.82 sf V = 1.25 fps OK less than 3 fps,. .... %ESE A ,u - :! . Oil/ 3EZI SLOPE . - .. -..... ... • • • • ' TRANSMON TO O'GRADE S AELE .. /?..._....... ... - _. ' OUTLE- ?.. j'.. ---•••• .. 016 ................. .....• Oesign Flow (cfs) Entrance Width Oepth End Width Length Z^ 2? V. 3 'l1 2 ?, 0 3' 2v' LEVEL SPREADER ` SCALE: NONE rln.?_ r.)t l u? Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP 135 2.9 114550 7.97 5.9 186.97 0.6 5.3 138 2.6 114002 7.94 5.4 186.94 0.6 4.7 141 2.4 113504 7.92 5.0 186.92 0.6 4.4 144 2.1 113026 7.90 4.7 186.90 0.6 4.0 147 1.9 112571 7.88 4.3 186.88 0.6 3.7 150 1.7 112140 7.86 4.0 186.86 0.6 3.4 153 1.6 111735 7.84 3.7 186.84 0.6 3.0 156 1.4 111359 7.83 3.5 186.83 0.6 2.9 159 1.3 110982 7.81 3.2 186.81 0.6 2.6 162 1.2 110636 7.79 2.9 186.79 0.6 2.3 165 1.1 110321 7.78 2.8 186.78 0.6 2.1 168 1.0 110011 7.77 2.6 186.77 0.6 2.0 171 0.9 109708 7.75 2.4 186.75 0.6 1.7 174 0.8 109436 ..7.74 2.2 186.74 0.6 1.6 177 0.7 109173 7.73 2.1 186.73 0.6 1.5 180 0.6 108919 7.72 2.0 186.72 0.6 1.4 183 0.6 108675 7.71 1.9 186.71 0.6 1.2 186 0.5 108442 7.69 1.6 186.69 0.6 1.0 189 0.5 108239 7.69 1.6 186.69 0.6 1.0 192 0.4 108028 7.68 1.5 186.68 0.6 0.9 195 0.4 107827 7.67 1.4 186.67 0.6 0.8 19$ 0.3 107638 7.66 13 186.66 0.6 0.7 201 0.3 107460 7.65 1.2 186.65 0.6 0.6 204 0.3 107294 7.64 1.1 186.64 0.6 0.5 360 0.0 99184 7.27 0.6 186.27 0.6 0.0 720 0.0 85939 6.64 0.6 185.64 0.6 0.0 1080 0.0 73295 6.00 0.6 185.00 0.6 0.0 1440 0.0 61328 5.36 0.5 184.36 0.5 0.0 1800 0.0 50079 4.71 0.5 183.71 0.5 0.0 2160 0.0 39610 4.06 0.4 183.06 0.4 0.0 2520 0.0 29982 3.40 0.4 182.40 0.4 0.0 2880 0.0 21292 2.74 0.4 181.74 0.4 0.0 3240 OA 13655 2.06 0.3 181.06 0.3 0.0 3600 0.0 7282 1.38 0.2 180.38 0.2 0.0 3960 0.0 2495 0.70 0.1 179.70 0.1 0.0 4320 0.0 213 0.15 0.0 179.15 0.0 0.0 4680 0.0 213 0.15 0.0 179.15 0.0 0.0 Results of routing the Z year 24 hour storm Use orifice = 3.0 inches Peak outflow = 271 cfs Peak Stage= 8.78 ft Water Elevation= 187.78 msl Peak Storage = 133491 cf Design Spillway 186.55 msl Length of weir 6.5 ft West Johnston High School -20013-8 Wet Detention Study front of School-2 year 24 hour 135 1.0 84006 2.00 9.0 200.00 0.3 8.7 138 0.8 82559 1.97 8.5 199.97 0.3 8.2 141 0.7 81170 1.94 8.1 199.94 0.3 7.8 144 0.6 79841 1.91 7.7 199.91 0.3 7.4 147 0.6 78572 1.88 7.3 199.88 0.3 7.0 150 0.5 77364 1.86 7.0 199.86 0.3 6.7 153 0.4 76194 1.83 6.6 199.83 0.3 6.3 156 0.4 75085 1.81 6.3 199.81 0.3 6.0 159 0.3 74015 1.78 5.9 199.78 0.3 5.6 162 0.3 73006 1.76 5.7 199.76 0.3 5.4 165 0.3 72037 1.74 5.4 199.74 0.3 5.1 168 0.2 71106 1.72 5.2 199.72 0.3 4.9 171 0.2 70214 1.70 4.9 199.70 0.3 4.6 174 0.2 69361 -1.68 4.7 199.68 0.3 4.4 177 0.2 68546 1.66 4.5 199.66 0.3 4.2 180 0.1 67771 1.65 4.3 199.65 0.3 4:1 183 0.1 67013 1.63 4.1 199.63 0.3 3.8 186 0.1 66293 1.61 3.9 199.61 0.3 3.6 189 0.1 65611 1.60 3.8 199.60 0.3 3.5 192 0.1 64947 1.58 3.6 199.58. 0.3 3.3 195 0.1 64320 1.57 3.5 199.57 0.3 3.2 198 0.1 63710 1.56 3.3 199.56 0.3 3.1 201 0.1 63119 1.54 3.1 199.54 0.3 2.9 204 0.0 62563 1.53 3.0 199.53 0.3 2.8 360 0.0 34567 0.89 0.2 198.89 0.2 0.0 720 0.0 30091 0.79 0.2 198.79 0.2 0.0 1080 0.0 25914 0.69 0.2 198.69 0.2 0.0 1440 0.0 22062 0.59 0.2 198.59 0.2 0.0 1800 0.0 18563 0.51 0.1 198.51 0.1 0.0 2160 0.0 15377 0.43 0.1 198.43 0.1 0.0 2520 0.0 12536 0.35 0.1 198.35 0.1 0.0 2880 0.0 10088 0.29 0.1 198.29 0.1 0.0 3240 0.0 7985 0.24 0.1 198.24 0.1 0.0 3600 0.0 6217 0.19 0.1 198.19. 0.1 0.0 3960 0.0 4867 0.15 0.0 198.15 0.0 0.0 4320 0.0 3983 0.12 0.0 198.12 0.0 0.0 4680 0.0 3983 0.12 0.0 198.12 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 27.7 cfs Peak Stage= 3.01 ft Water Elevation= 201.01 msl ` Peak Storage = 131446 d Design Spillway 199.12 msl Length of weir 30 ft West Johnston High School -20013-8 ??- . . 9E OE TA, SLOPE ?:':._ . "- " • ::: .. • TRANSITION TO - •'- :::.' 0' GRADE S AB-= . OUTLET -•--._-.. -..-•--.. - / :. ................ .•- :.... .••:.:. ...... ------------- --- ........... _ i ... ............... ...... ._ Oesign Flow (cfs) Entrance Width Oepth End %dth Length C t0 0.? 0 24 ?1 2 1.0 3 LEVEL SPREADER SCALE: NONE ,in.<_ ?.1(iu< Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP 135 2.9 114550 7.97 5.9 186.97 138 2.6 114002 7.94 5.4 186.94 141 2.4 113504 7.92 5.0 186.92 144 2.1 113026 7.90 4.7 186.90 147 1.9 112571 7.88 4.3 186.88 150 1.7 112140 7.86 4.0 186.86 153 1.6 111735 7.84 3.7 186.84 156 1.4 111359 7.83 3.5 186.83 159 1.3 110982 7.81 3.2 186.81 162 1.2 110636 7.79 2.9 186.79 165 1.1 110321 7.78 2.8 186.78 168 1.0 110011 7.77 2.6 186.77 171 0.9 109708 7.75 2.4 186.75 174 0.8 109436 .7.74 2.2 186.74 177 0.7 109173 7.73 2.1 186.73 180 0.6 108919 7.72 2.0 186.72 183 0.6 108675 7.71 1.9 186.71 186 0.5 108442 7.69 1.6 186.69 189 0.5 108239 7.69 1.6 186.69 192 0.4 108028 7.68 1.5 186.68 195 0.4 107827 7.67 1.4 186.67 198 0.3 107638 7.66 13 186.66 201 0.3 107460 7.65 1.2 186.65 204 0.3 107294 7.64 1.1 186.64 360 0.0 99184 7.27 0.6 186.27 720 0.0 85939 6.64 0.6 185.64 1080 0.0 73295 6.00 0.6 185.00 1440 0.0 61328 5.36 0.5 184.36 1800 0.0 50079 4.71 0.5 183.71 2160 0.0 39610 4.06 0.4 183.06 2520 0.0 29982 3.40 0.4 182.40 2880 0.0 21292 2.74 0.4 181.74 3240 0.0 13655 2.06 0.3 181.06 3600 0.0 7282 1.38 0.2 180.38 3960 0.0 2495 0.70 0.1 179.70 4320 0.0 213 0.15 0.0 179.15 4680 0.0 213 0.15 0.0 179.15 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 271 cfs Peak Stage= 8.78 R Water Elevation= 187.78 msl Peak Storage = 133491 d Design Spillway 186.SS msi Length of weir 6.S k 0.6 5.3 0.6 4.7 0.6 4.4 0.6 4.0 0.6 3.7 0.6 3.4 0.6 3.0 0.6 2.9 0.6 2.6 0.6 2.3 0.6 2.1 0.6 2.0 0.6 1.7 0.6 1.6 0.6 1.5 0.6 1.4 0.6 1.2 0.6 1.0 0.6 1.0 0.6 0.9 0.6 0.8 0.6 0.7 0.6 0.6 0.6 0.5 0.6 0.0 0.6 0.0 0.6 0.0 0.5 0.0 0.5 0.0 0.4 0.0 0.4 0.0 0.4 0.0 0.3 0.0 0.2 0.0 0.1 0.0 0.0 0.0 0.0 0.0 West Johnston High School -20013-8 Wet Detention Study front of School-2 year 24 hour 135 1.0 84006 2.00 9.0 200.00 0.3 8.7 138 0.8 82559 1.97 8.5 199.97 0.3 8.2 141 0.7 81170 1.94 8.1 199.94 0.3 7.8 144 0.6 79841 1.91 7.7 199.91 0.3 7.4 147 0.6 78572 1.88 7.3 199.88 0.3 7.0 150 0.5 77364 1.86 7.0 199.86 0.3 6.7 153 0.4 76194 1.83 6.6 199.83 0.3 6.3 156 0.4 75085 1.81 6.3 199.81 0.3 6.0 159 0.3 74015 1.78 5.9 199.78 0.3 5.6 162 0.3 73006 1.76 5.7 199.76 0.3 5.4 165 0.3 72037 1.74 5.4 199.74 0.3 5.1 168 0.2 71106 1.72 5.2 199.72 0.3 4.9 171 0.2 70214 1.70 4.9 199.70 0.3 4.6 174 0.2 69361 _1.68 4.7 199.68 0.3 4.4 177 0.2 68546 1.66 4.5 199.66 0.3 4.2 180 0.1 67771 1.65 4.3 199.65 0.3 4.1 183 0.1 67013 1.63 4.1 199.63 0.3 3.8 186 0.1 66293 1.61 3.9 199.61 0.3 3.6 189 0.1 65611 1.60 3.8 199.60 0.3 3.5 192 0.1 64947 1.58 3.6 199.5a 0.3 3.3 195 0.1 64320 1.57 3.5 199.57 0.3 3.2 198 0.1 63710 1.56 3.3 199.56 0.3 3.1 201 0.1 63119 1.54 3.1 199.54 0.3 2.9 204 0.0 62563 1.53 3.0 199.53 0.3 2.8 360 0.0 34567 0.89 0.2 198.89 0.2 0.0 720 0.0 30091 0.79 0.2 198.79 0.2 0.0 1080 0.0 25914 0.69 0.2 198.69 0.2 0.0 1440 0.0 22062 0.59 0.2 198.59 0.2 0.0 1800 0.0 18563 0.51 0.1 198.51 0.1 0.0 2160 0.0 15377 0.43 0.1 198.43 0.1 0.0 2520 0.0 12536 0.35 0.1 198.35 0.1 0.0 2880 0.0 10088 0.29 0.1 198.29 0.1 0.0 3240 0.0 7985 0.24 0.1 198.24 0.1 0.0 3600 0.0 6217 0.19 0.1 198.19 ?; . 0.1 0.0 3960 0.0 4867 0.15 0.0 198.15 " 0.0 0.0 4320 0.0 3983 0.12 0.0 198.12 0.0 0.0 4680 0.0 3983 0.12 0.0 198.12 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 27.7 cfs Peak Stage= 3.01 ft Water ©evatlon= 201.01 msl ` Peak Storage = 131446 d Design Spillway 199.12 msl Length of weir 30 It West Johnston High School -20013-8 n Lm U, A 9nn0 STORM WATER MANAGEMENT PLAN WEST JOHNSTON HIGH SCHOOL JOHNSTON COUNTY, NORTH CAROLINA Proj. No. 20013 June 6, 2000 ...1,... J? prepared by: J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 (252)756-8918 Narrative This site is a proposed high school. It is situated on a 101 acre tract of land off the east side of SR 1330 and south of Beaverdam Branch. The property is not located in the ESOD. The site is classified as commercial in accordance with the classification that Johnston County Director of Infrastructure and Engineering assigned to this school in a joint meeting on April 4, 2000. The impervious limits for commercial areas is 60%. The existing slopes of the land are between 5 and 10 % with drainage in two directions. The proposed drainage plan also manages storm water in the two separate basins. There is a total of 22.70 acres of impervious area on this site which is 22.5% impervious. In the front of the site, a wet detention basin is designed to attenuate the post development peak discharge of the 2 year 24 hour storm to that of the predeveloped flow and to detain the first 1" of runoff and release it between 2 and 5 days. The estimated predevelopment peak rate of runoff is 28.6 cfs. The estimated postdevelopment rate of runoff is 81.9 cfs. The effluent pipe into the basin is a 54"RCP at a flat slope of 0.5% to minimize velocities. The outlet control pipe is a 3" pvc pipe with a small 3.5 ft weir opening to control the 2 year storm. The principal spillway is an 8'x8' concrete box. The dam is approximately 15' wide 3:1 front side slopes and 3:1 back side slopes. A 30 foot emergency spillway is cut around the north of the basin to handle the 100 year design storm The basin is designed to remove 85% TSS prior from the runoff. The downstream impacts are mitigated as a result of the detention basin. In the athletic field site, another detention basin is designed to attenuate the post development peak discharge of the 2 year 24 hour storm to that of the predeveloped flow. The estimated predevelopment peak rate of runoff is 36.6 cfs. The estimated postdevelopment rate of runoff is 62.7 cfs. The effluent pipe into the basin is a 3" pvc pipe to detain the first 1" of runoff and release it over a 2 to 5 day period. This basin is designed as an extended dry detention basin to remove 50 % TSS. It has a level spreader downstream of the outlet to remove another 35% TSS for a total of 85% TSS removal. The outlet control pipe is a 54" RCP with a small , 10 foot wide dam, with 3:1 front side slopes and 3:1 back side slopes. A 30 foot emergency spillway is cut around the west of the basin to handle the 100 year design storm A 6.5 foot weir is formed into an 8'x8' box in order to control the 2 year storm The basin is designed such vegetation will be allowed to grow freely and provide for additional nutrient intake. Maintenance for the facility will include inspections of the dam and control devices. The downstream impacts are mitigated as a result of the detention basin. CULVERT CROSSING DESIGN FOR WEST JOHNSTON HIGH SCHOOL MAIN ENTRY ROAD 100 YR - 24 HOUR 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 111111 12924 z s _ INES'S`• 5 West Johnston High School 20013-1 r a Site Conditions postdevelopment Total watershed area Area Impervious C= 0.95 Area grass C= 0.3 SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall 187.00 acres CN= 98 37.00 acres CN= 73 150.00 acres C C 5000 feet 79 feet 8.4 inches Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))"2 / (P+0.8(s)) Time of Concentration channel flow (not overland) 27.2 Tc=(L"3M)^0.385 128 Composite C = B Rainfall Intensity = I = g/(h+T) 2 10 25 100 9 h 132 18 203 22 246 23 302 25 77.9 2.83 5.76 inches 27.2 minutes 0.43 5.8 inches per hr Peak Discharge Q=CIA 463.7 cfs Time to peak Tp= Vol/(1.37 Qp) 102.5 minutes Based on Analysis of a 2 - 72" culverts the Headwater Elevation = 197.73 Top of the Road = 198.84 Road is designed to not overtop in the 100 year storm Outlet Velocity = 8.8 fps Design Outlet Protection Use Chart pg 8.06.3 for 232 cfs per barrel and 72" dia pipe use La = 30 feet West Johnston High School -20013-2 PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 5, 2000 PROGRAM INPUT DATA DESCRIPTION Culvert Diameter (ft) ....................................... FHWA Chart Number ........................................... FHWA Scale Number (Type of Culvert Entrance) ................ Manning's Roughness Coefficient (n-value) ................... Entrance Loss Coefficient of Culvert Opening ................ Culvert Length (ft) ......................................... Invert Elevation at Downstream end of Culvert (ft).......... Invert Elevation at Upstream end of Culvert (ft)............ Culvert Slope (ft/ft) ....................................... Starting Flow Rate (cfs) .................................... Incremental Flow Rate (cfs) ................................. Ending Flow Rate (cfs) ...................................... Starting Tailwater Depth (ft) ............................... Incremental Tailwater Depth (ft) ............................ Ending Tailwater Depth (ft) ................................. VALUE 6.0 1 1 0.012 0.1 55.0 188.0 188.51 0.0093 100.0 50.0 600.0 4-.0 1.0 14.0 COMPUTATION RESULTS Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control - Control --------- (ft) --------- (ft) ---------- (ft) ---------- (fps) --------- ----------- 100.0 ----------- 4.0 ---------- 3.82 3.99 1.94 2.69 4.0 4.99 150.0 5.0 4.92 5.18 2.41 3.33 5.0 5.96 200.0 6.0 6.0 6.45 2.83 3.87 6.0 7.07 250.0 7.0 7.22 7.99 3.23 4.33 6.0 8.84 300.0 8.0 8.47 9.65 3.63 4.73 6.0 10.61 350.0 9.0 10.09 _ 11.43 4.03 5.07 6.0 12.38 400.0 10.0 11.96 13.33 4.47 5.33 6.0 14.15 450.0 11.0 14.07 15.35 5.03 5.53 6.0 15.92 500.0 12.0 16.44 17.49 6.0 5.67 6.0 17.68 550.0 13.0 19.05 19.75 6.0 5.77 6.0 19.45 600.0 14.0 21.91 22.13 6.0 5.83 6.0 21.22 HYDROCALC Hydraulics for Windows, Version 1.2a Copyright (c) 1996 Dodson & Associates, Inc., 5629 FM 1960 West, Suite 314, Houston, TX 77069 Phone:(281)440-3787, Fax:(281)440-4742, Email:software@dodson-hydro.com All Rights Reserved. ?- 700 .785X. ?• ???wa¢.?? '? 1 ?a=c==c=O\I % ;'``??4,?; , ?i \ - It 5° i -? Ply oar \ 1 ?I .? `; 200"'x\ im -S son \ /fry/ ?' , It'v I_ ?? ° \J ` 5 25 `223 200 it. cat :Ce cem 250 J?i II e7,A •A- 1. ossloa (,07 i- 252 / ?d•\ ? - ai' `? • / AIBM ?.' N i \ \` \ /i;?'? o\ yam/ \' /?.?. - •'?? a`- !•- ?'?.\! II . - 246 i Z(.L- 1 a \ i Beres 250 ?\ ??/^ ) ?J _ --? i ? 250 ` ?,•`? et_s • ?? ?` • i ? D ' ?I"-'??` \Y 127 `` o .• ; _,: ` '' 1 I ?\ r! -- \ r.' 77 0 -7 2663 SKaIWE 250 00 7? 32'30" 724 "'-E • INTERIOR--GEOLOGICAL SURVEY, RESTON. VIRGINIA-1*1 FOUR OAKS 6 Ml."*, 1 MILE ROAD CLASSIFICATION \ Mo 5000 6000 7000 FEET Medium-duty- Light-duty -, 1 KILOMETRE Unimproved dirt ====a=:=. T• ?1 n._._ n_.-•_ Wet Detention Study front of School-2 year 24 hour WET DETENTION FOR WEST JOHNSTON HIGH SCHOOL FRONT OF THE BUILDING 2 YR - 24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 6-6-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 324 West Johnston High School -20013-1 Site Conditions Predevelopment Wet Detention Study front of School-2 year 24 hour Total watershed area Area Impervious C= Area grass or woods C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channel flow Tc=(L"3/H)"0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.9 X CN= 98 CN= 73 OVERLAND 2 S 9 h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School -20013-2 23.00 acres 0.00 acres 23.00 acres C 1220 feet 40 feet 3.7 inches 13.9 minutes 0.3 4.1 inches per hr 28.6 cfs Site Conditions postdevelopment Wet Detention Study front of School-2 year 24 hour Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))"2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(LA3M)"0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) 0.95 0.3 CN= CN= C 23.00 acres 98 13.14 acres 73 9.86 acres C 1220 feet 40 feet 3.7 inches 87.3 1.46 2.39 inches 6.9 R S h 2 132 18 10 203 22 25 246 23 100 302 25 6.9 minutes 0.67 5.3 inches per hr Peak Discharge Q=CIA 81.9 cfs Time to peak Tp= Vol/(1.37 Qp) 29.6 minutes West Johnston High School -20013-3 Wet Detention Study front of School-2 year 24 hour Storage Required Allowable release at impoundment = Peak rate of inflow at impoundment = Sr = (Qi - Qo)Tp STAGE STORAGE DATA surface dill. Elevation area A" stoma 198.00 38922 2.00 83904 200.00 44982 2.00 95795 202.00 50813 accurm storms 0 83904 179699 Z Storms Ran LN(stoorrw) LN(kno RAP 0 0 ERR ERR 0.00 83,904 2 11.34 0.69 2.00 179,699 4 12.10 1.39 4.00 b= 1.0987709 Ks= 39175.962 1/b Z= (S/KS)n Predicted Water Surface Elevation for 2 year 24 hour storm= Predicted Surface Area= To capture the first 1" of runoff Drainage Area = 23 ac % imperv area = 57.00% 28.6 cfs 81.9 cfs 94,699 cf Elevation Ran 198 0 198.00 =water surface 200.00 2 202.00 4 200.23 feet ms] =35607 sf West Johnston High School -20013-4 A ? Wet Detention Study front of School-2 year 24 hour Average pool depth = 3 ft SA/DA= 2.30% Required Surface Area= Surface Area Provide= Volume to be controlled by 1" storm =1"(Rv=0.05 + 0.009(I))(DA) _ Temporary Water Quality Pool Elevation = Discharge of volume in 48 hours = Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. proposed water surface elev. _ available head (h) _ discharge (d) = coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)"1/2 0.3 - 0.0 23023 sf 35607.0 sf 47005 cf 199.12 0.3 cfs 198.00 feet msl 198.10 feet msl 200.23 feet msl 2.13 feet 0.3 cis 0.6 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 28.6 cfs L = 8 It Q=CwLH^3/2 H = 1.12 ft Top of Emergency Spillwc- 1.12 msl 5 West Johnston High School 20013-5 K Wow Hydmgraph Peak MOW = Time to Peak L(time mW 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 7S 78 81 84 87 90 93 96 99 102 105 108 111 114 Wet Detention Study front of School-2 year 24 hour 37.0368384 Ud Additlorwi Flow 81.9 29.6 0 2.1 8.0 17.2 28.9 41.7 54.5 65.8 74.7 80.3 81.8 793 72.9 64.2 563 493 43.2 37.9 33.2 29.1 25.5 22.4 19.6 17.2 15.1 13.2 11.6 10.2 8.9 7.8 6.8 6.0 53 4.6 4.0 3.5 3.1 2.7 2.4 West Johnston High School -20013-6 0.0 Wet Detention Study front of School-2 year 24 hour Stormwater routing j (time min) Q-(-Q 0 0 3 2.1 6 8.0 9 17.2 12 28.9 15 41.7 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 117 120 123 126 129 132 54.5 65.8 74.7 80.3 81.8 79.3 72.9 64.2 56.3 49.3 43.2 37.9 33.2 29.1 25.5 22.4 19.6 17.2 15.1 13.2 11.6 10.2 8.9 7.8 6.8 6.0 5.3 4.6 4.0 3.5 3.1 2.7 2.4 2.1 1.8 1.6 1.4 1.2 1.1 Storage 0 0 369 1809 4913 10110 17616 27417 39237 52652 66896 80884 93722 104635 113224 119777 124581 127918 130030 131146 131446 131061 130147 128814 127162 125242 123139 120892 118574 116212 113832 111455 109101 106784 104518 102316 100153 98071 96045 94112 92247 90454 88736 87097 85510 RM 0.00 0.00 0.01 0.06 0.15 0.29 0.48 0.72 1.00 1.31 1.63 1.93 2.21 2.45 2.63 2.77 2.87 2.94 2.98 3.00 3.01 3.00 2.98 2.95 2.92 2.88 2.84 2.79 2.74 2.69 2.64 2.59 2.54 2.49 2.44 2.40 2.35 2.31 2.26 2.22 2.18 2.14 2.10 2.07 2.03 Outflow 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 1.1 4.1 8.0 12.3 16.5 19.9 22.6 24.7 26.2 27.0 27.5 27.7 27.5 27.0 26.4 25.8 24.9 24.1 23.0 22.0 21.0 20.1 19.1 18.1 17.2 16.3 15.6 14.7 14.0 13.1 12.5 11.8 11.2 10.5 10.1 9.4 Elevation 198.00 198.00 198.01 198.06 198.15 198.29 198.48 198.72 199.00 199.31 199.63 199.93 200.21 200.45 200.63 200.77 200.87 200.94 200.98 201.00 201.01 201.00 200.98 200.95 200.92 200.88 200.84 200.79 200.74 200.69 200.64 200.59 200.54 200.49 200.44 200.40 200.35 200.31 200.26 200.22 200.18 200.14 200.10 200.07 200.03 L= 3.5 3 Spillway inch 199.12 orifice WAk 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 3.8 7.7 11.9 16.1 19.5 22.3 24.3 25.8 26.6 27.1 27.3 27.1 26.6 26.0 25.4 24.5 23.7 22.7 21.7 20.7 19.7 18.7 17.8 16.8 15.9 15.2 14.3 13.6 12.8 . 12.1 11.5 10.8 10.2 9.7 9.1 West Johnston High School -20013-7 Wet Detention Study front of School-2 year 24 hour 135 1.0 84006 2.00 9.0 200.00 0.3 8.7 138 0.8 82559 1.97 8.5 199.97 0.3 8.2 141 0.7 81170 1.94 8.1 199.94 0.3 7.8 144 0.6 79841 1.91 7.7 199.91 0.3 7.4 147 0.6 78572 1.88 7.3 199.88 0.3 7.0 150 0.5 77364 1.86 7.0 199.86 0.3 6.7 153 0.4 76194 1.83 6.6 199.83 0.3 6.3 156 0.4 75085 1.81 6.3 199.81 0.3 6.0 159 0.3 74015 1.78 5.9 199.78 0.3 5.6 162 0.3 73006 1.76 5.7 199.76 0.3 5.4 165 0.3 72037 1.74 5.4 199.74 0.3 5.1 168 0.2 71106 1.72 5.2 199.72 0.3 4.9 171 0.2 70214 1.70 4.9 199.70 0.3 4.6 174 0.2 69361 1.68 4.7 199.68 0.3 4.4 177 0.2 68546 1.66 4.5 199.66 0.3 4.2 180 0.1 67771 1.65 4.3 199.65 0.3 4.1 183 0.1 67013 1.63 4.1 199.63 0.3 3.8 186 0.1 66293 1.61 3.9 199.61 0.3 3.6 189 0.1 65611 1.60 3.8 199.60 0.3 3.5 192 0.1 64947 1.58 3.6 199.58 0.3 3.3 195 0.1 64320 1.57 3.5 199.57 0.3 3.2 198 0.1 63710 1.56 3.3 199.56 0.3 3.1 201 0.1 63119 1.54 3.1 199.54 0.3 2.9 204 0.0 62563 1.53 3.0 199.53 0.3 2.8 360 0.0 .34567 0.89 0.2 198.89 0.2 0.0 720 0.0 30091 0.79 0.2 198.79 0.2 0.0 1080 0.0 25914 0.69 0.2 198.69 0.2 0.0 1440 0.0 22062 0.59 0.2 198.59 0.2 0.0 1800 0.0 18563 0.51 0.1 198.51 0.1 0.0 2160 0.0 15377 0.43 0.1 198.43 0.1 0.0 2520 0.0 12536 0.35 0.1 198.35 0.1 0.0 2880 0.0 10088 0.29 0.1 198.29 0.1 0.0 3240 0.0 7985 0.24 0.1 198.24 0.1 0.0 3600 0.0 6217 0.19 0.1 198.19 0.1 0.0 3960 0.0 4867 0.15 0.0 198.15 0.0 0.0 4320 0.0 3983 0.12 0.0 198.12 0.0 0.0 4680 0.0 3983 0.12 0.0 198.12 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 27.7 cfs Peak Stage= 3.01 ft Water Elevation= 201.01 msl Peak Storage = 131446 cf Design Spillway 199.12 msl Length of weir 30 ft West Johnston High School -20013-8 M I Inflow outflow hydrograph .. 90 ........................................... 80 .......................................... ............ .................. .................. .................. ................... ................. 70 .................. ......................... ....................... ....................... ....................... ................... 60 ..................... ...... ................. ................. ...... 50 ...................... ........................ ........................ ........................ ....................... _ ................... v v L 40 ........ ................ €....................... ......................... ....................... ................... 30 ............................................................................................................... ...........•----............................. ................ 20 .......... ... ............. .................. .. ................. .............. ................... 10 .... ........ ................... ......................................... .................. ... ...... 0 0 15 30 45 60 75 90 105 Time (minutes) -+- Inflow Hydrograph- Outflow Hydrograph K Wet Detention Study front of School-100 year 24 hour WET DETENTION FOR WEST JOHNSTON HIGH SCHOOL FRONT OF THE BUILDING 100 YR - 24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 .u 24 = jilk 110111111160, West Johnston High School -20013-1 Site Conditions Predevelopment Wet Detention Study front of School-100 year 24 hour Total watershed area Area Impervious C= Area grass or woods C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channelflow Tc=(L"3M)"0.385 128 Composite C = Rainfall Intdnsity = I = g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.9 X 23.00 acres CN= 98 0.00 acres CN= 73 23.00 acres C 1220 feet 40 feet 8.4 inches OVERLAND 2 B 9 h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School 20013-2 13.9 minutes 0.3 7.8 inches per hr 53.6 cfs Wet Detention Study front of School-100 year 24 hour Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall 0.95 0.3 CN= CN= C 23.00 acres 98 13.14 acres 73 9.86 acres C 1220 feet 40 feet 8.4 inches Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L"3/H)"0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) 87.3 1.46 6.87 inches 6.9 X2 S 9 h 2 132 18 10 203 22 25 246 23 100 302 25 13.8 minutes 0.67 7.8 inches per hr Peak Discharge Q=CIA 120.2 cfs Time to peak Tp= Vol/(1.37 Qp) 58.1 minutes West Johnston High School -20013-3 4 Storage Required Wet Detention Study front of School-100 year 24 hour Allowable release at impoundment = 53.6 cfs Peak rate of inflow at impoundment = 120.2 cfs Sr = (Qi - Qo)Tp 231,990 cf STAGE STORAGE DATA surface dill. accum. Elevation area ALLY storage stoma Elevation 198.00 38922 0 198 0 198.00 =water surface 2.00 83904 200.00 44982 83904 200.00 2 2.00 95795 202.00 50813 179699 202.00 4 Z C d Storage Stage L oma) L N(StM) ompute Rage 0 0 ERR ERR 0.00 83,904 2 11.34 0.69 2.00 179,699 4 12.10 1.39 4.00 b= 1.0987709 Ks= 39175.962 1/b Z= (S/KS)A Predicted Water Surface Elevation for 100 year 24 hour storm= 203.05 feet msl To capture the first 1" of runoff Drainage Area = 23 ac % imperv area = 57.00% West Johnston High School -20013-4 t , Wet Detention Study front of School-100 year 24 hour Average pool depth = 3 ft SA/DA= 2.30% Required Surface Area= 23023 sf Surface Area Provide= 35607.0 sf Volume to be controlled by 1" storm =1"(Rv=0.05 + 0.009(I))(DA) = 47005 cf Temporary Water Quality Pool Elevation = 199.12 Discharge of volume in 48 hours = 0.3 cfs Size Outlet Device for Control Structure invert elevation = 198.00 feet msl estimated orifice center elev. = 198.10 feet msl proposed water surface elev. = 203.05 feet msl available head (h) = 4.95 feet discharge (d) = 0.3 - 0.0 0.3 cfs coefficient of discharge = 0.6 Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)^1/2 0.18 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 53.6 cfs L = 8 ft Q=CwLH^3/2 H = 1.71 ft Top of Emergency Spillwc- 1.71 msl West Johnston High School -20013-5 4 Wet Detention Study front of School-100 year 24 hour Dftw HWYOWaph AddRkmel Flow Peak Inflow = 120.2 Time to Peak = 58.1 72.6105069 L(time min) 0 ! e6) 0 0 3 0.8 6 3.1 9 7.0 12 12.2 35 18.7 18 26.3 21 34.7 24 43.9 27 53.4 30 63.1 33 72.8 36 82.1 39 90.9 42 98.8 45 105.7 48 111.4 51 115.8 54 118.7 57 120.1 60 119.9 63 118.1 66 114.8 69 110.1 72 104.0 75 97.4 78 91.0 81 85.1 84 79.6 87 74.4 90 69.6 93 65.1 96 60.9 99 56.9 102 53.2 105 49.8 108 46.5 ill 43.5 114 40.7 0.0 West Johnston High School -20013-6 Wet Detention study front of School-100 year 24 hour Stormwater routing I (time min) 24- Storage egg Outflow Elevation 0 0 0 0.00 0.0 198.00 3 0.8 0 0.00 0.0 198.00 6 3.1 142 0.01 0.0 198.01 9 7.0 706 0.03 0.0 198.03 12 12.2 1961 0.07 0.0 198.07 15 18.7 4158 0.13 0.0 198.13 18 26.3 7516 0.22 0.1 198.22 21 34.7 12230 0.35 0.1 198.35 24 43.9 18461 0.50 0.1 198.50 27 53.4 26329 0.70 0.2 198.70 30 63.1 35912 0.92 0.2 198.92 33 72.8 47240 1.19 0.4 199.19 36 82.1 60264 1.48 2.5 199.48 39 90.9 74586 1.80 6.2 199.80 42 98.8 89824 2.13 11.0 200.13 45 105.7 105627 2.47 16.8 200.47 48 111.4 121623 2.80 23.3 200.80 51 115.8 137493 3.14 38.8 201.14 54 118.7 151354 3.42 83.1 201.42 57 120.1 157757 3.55 109.9 201.55 60 119.9 159597 3.59 118.7 20139 63 118.1 159804 3.59 118.7 201.59 66 114.8 159693 3.59 118.7 201.59 69 110.1 158990 3.58 116.5 201.58 72 104.0 157839 3.55 109.9 201.55 75 97.4 156793 3.53 105.5 201.53 78 91.0 155323 3.50 99.2 201.50 81 85.1 153857 147 93.0 201.47 84 79.6 152437 3.44 87.0 201.44 87 74.4 151101 3.42 83.1 201.42 90 69.6 149536 3.38 75.6 201.38 93 65.1 148455 3.36 72.0 201.36 96 60.9 147215 3.34 68.4 201.34 99 56.9 145852 3.31 63.3 201.31 102 53.2 144702 3.28 58.4 201.28 105 49.8 143771 3.27 56.8 201.27 108 46.5 142505 3.24 52.2 201.24 111 43.5 141485 3.22 49.3 201.22 114 40.7 140448 3.20 46.4 201.20 117 38.0 139409 3.17 42.5 201.17 120 35.6 138611 3.16 41.2 201.16 123 33.3 137596 3.14 38.8 201.14 126 31.1 136601 3.12 36.5 201.12 129 29.1 135626 3.10 34.4 201.10 132 27.2 134668 3.08 32.5 201.08 L= 3.5 58.5 Emergency 3 Spillway Spillway inch 199.12 201.01 orifice New 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 2.3 0.0 5.9 0.0 10.7 0.0 16.5 0.0 22.9 0.0 30.1 8.2 36.6 46.1 39.8 69.6 40.8 77.5 40.8 77.5 40.8 77.5 40.5 75.5 39.8 69.6 39.3 65.8 38.6 60.2 37.8 54.8 37.1 49.5 36.6 46.1 35.7 39.5 35.2 36.3 34.7 33.3 34.0 28.8 33.3 24.6 33.1 23.3 32.4 19.4 32.0 16.9 31.5 14.5 30.8 11.2 30.6 10.2 30.1 8.2 29.7 6.4 29.3 4.7 28.8 3.3 West Johnston High School -20013-7 Wet Detention Study front of School-100 year 24 hour 135 25.4 133717 3.06 30.7 201.06 0.4 28.4 138 23.8 132760 3.04 29.3 201.04 0.4 27.9 141 22.2 131774 3.02 28.1 201.02 0.4 27.5 144 20.8 130721 2.99 27.3 200.99 0.4 26.9 147 19.4 129556 2.97 26.8 200.97 0.4 26.4 150 18.2 128227 2.94 26.2 200.94 0.4 25.8 153 17.0 126786 2.91 25.5 200.91 0.4 25.1 156 15.9 125247 2.88 24.9 200.88 0.4 24.5 159 14.9 123624 2.85 24.3 200.85 0.4 23.9 162 13.9 121927 2.81 23.5 200.81 0.4 23.1 165 13.0 120205 2.77 22.6 200.77 0.4 22.3 168 12.1 118468 2.74 22.0 200.74 0.4 21.7 171 11.4 116689 2.70 21.2 200.70 0.4 20.9 174 10.6 114911 2.66 20.4 200.66 0.4 20.1 177 9.9 113143 2.63 19.9 200.63 0.4 19.5 180 9.3 111356 2.59 19.1 200.59 0.4 18.7 183 8.7 109592 2.55 18.3 200.55 0.4 18.0 186 8.1 107857 2.51 17.6 200.51 0.4 17.2 189 7.6 106155 2.48 17.0 200.48 0.4 16.7 192 7.1 104458 2.44 16.3 200.44 0.4 15.9 195 6.6 102805 2.41 15.7 200.41 0.4 15.4 198 6.2 101166 2.37 15.0 200.37 0.4 14.7 201 5.8 99578 2.34 14.5 200.34 0.4 14.1 204 5.4 98012 2.30 13.8 200.30 0.4 13.5 360 0.2 19556 0.53 0.2 198.53 0.2 0.0 720 0.0 19782 0.54 0.2 198.54 0.2 0.0 1080 0.0 16398 0.45. 0.1 198.45 0.1 0.0 1440 0.0 13379 0.38 0.1 198.38 0.1 0.0 1800 0.0 10679 0.31 0.1 198.31 0.1 0.0 2160 0.0 8341 0.24 0.1 198.24 0.1 0.0 2520 0.0 6432 0.19 0.1 198.19 0.1 0.0 2880 0.0 4901 0.15 0.1 198.15 0.1 0.0 3240 0.0 3760 0.12 0.0 198.12 0.0 0.0 Results of routing the 100 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 118.7 cfs Peak Stage= 3.59 ft Water Elevation= 201.59 ms1 Peak Storage = 159804 cf Design Spillway 199.12 msl Length of weir 3.5 ft Emergency Spillway 201.01 msl Length of Weir 58.5 ft 30 foot emergency spillway plus 32'-3.5' of design spillway = 30'+28.5'= 58.5' 2.0 0.9 0.2 0.0 West Johnston High School -20013-8 Wet Detention Study front of School-100 year 24 hour Size Outlet Pipe for Spillway 100 yr. flow for principal spillway = 40.8 cfs Effective Length of Emergency spillway for outlet pipe = 28.5 ft Water Surface Elevation for 100 year Storm = 201.59 msl Top of Emergency Spillway at box = 201.01 msl Q=CLH"1.5 = 37.8 cfs Design flow for 100 year storm for outlet pipe = 78.5 cfs Slope of outlet pipe = 0.005 ftfft Material of outlet pipe = concrete n = 0.012 d = 16 (QNS^0.5)"0.375 42.26 inches Use = 48 inch West Johnston High School -20013-9 Worksheet Worksheet for Circular Channel Project Description Worksheet Circular Channel - 2- Outlet Pipe for Wet Detention 100yr Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.012 Slope 0.005000 ft/ft Diameter 48 In Discharge 78.50 cis Results Depth 2.50 ft Flow Area 8.3 ft= Wetted Perimeter 7.29 It Top Width 3.87 ft Critical Depth 2.68 It Percent Full 62.4 % Critical Slope 0.004070 f tft Velocity 9.51 ft/s Velocity Head 1.41 ft Specific Energy 3.90 It Froude Number 1.15 Maramum Discharc 118.36 cis Discharge Full 110.03 dfs Slope Full 0.002545 tuft Flow Type Supercritical Project Engineer. Canon INNOVA MEDIA User c:1..Istonn drainage for west johnston hs.fm2 J.S. Janowski and Associates FlowMaster %e.0 ]614e] 06/08/00 07:47:00 AM m Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 Inflow outflow hydrograph 140 ........................................................................................................................................................................................... 120 .................................................................................... .........................................--- ....................... ;................... 100 ........................................................................................ 80 .................. .................. .. ......... ........ .... .................. ....... .................. .......------•-- U O LL 60 40 ............ ........ ..........................i......... .... .................................. ............................................................ 20 ............... ................ .................. ................ 0 0 15 30 45 60 75 90 105 Time (minutes) -+- Inflow Hydrograph -*- Outflow Hydrograph Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP STORM WATER DETENTION FOR WEST JOHNSTON HIGH SCHOOL BEHIND ATHLETIC FIELDS 2 YR - 24 HOUR NCDENR BMP FIRST 1" OF RUNOFF 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 _ 324 .,??>FA GI Nt.?ryy? yFNt .' 0 %% 1111, West Johnston High School -20013-1 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Site Conditions Predevelopment Total watershed area Area Impervious C= Area grass or wooded C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channel flow Tc=(L"3/H)^0.385 128 Composite C = Rainfall Intensity = 1= g/(h+T) Peak Discharge Q=CIA 0.95 0.3 6.7 X 29.00 acres CN= 98 0.00 acres CN= 73 29.00 acres C 1280 feet 51 feet 3.7 inches OVERLAND 2 E 9 h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School 20013-2 13.3 minutes 0.3 4.2 inches per hr 36.6 cfs R Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall 0.95 0.3 CN= CN= C 29.00 acres 98 9.56 acres 73 19.44 acres C 1280 feet 51 feet 3.7 inches Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))"2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L^3M)"0.385 128 Composite C = Rainfall Intensity = I = g!(h+T) Peak Discharge Q=CIA Time to peak Tp= VoV(1.37 Qp) 81.2 2.31 1.89 inches 6.7 13.4 minutes 8 9 h 2 132 18 10 203 22 25 246 23 100 302 25 0.51 4.2 inches per hr 62.7 cfs 38.6 minutes West Johnston High School 20013-3 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Storage Required Allowable release at impoundment = 36.6 cfs Peak rate of inflow at impoundment = 62.7 cfs Sr = (Qi - Qo)Tp 60,364 cf STAGE STORAGE DATA surface diff. accum. Elevation area flu Storm storage Elevation 179.00 0 0 179 0 1.00 4362 180.00 8724 4362 180.00 1 2.00 20960 182.00 12236 25322 182.00 3 2.00 28541 184.00 16305 53863 184.00 5 2.00 37500 186.00 21195 91363 186.00 7 2.00 47429 188.00 26234 138792 188.00 9 Z C d Stowage S LNG o omporte 0 0 ERR ERR 0.00 4,362 1 8.38 0.00 1.00 25,322 3 10.14 1.10 3.06 138,792 9 11.84 2.20 9.00 b= 1.5747347 Ks= 4362 1/b Z= (S/Ks)^ Predicted Water Surface Elevation= 184.30 feet msl To capture the first V of runoff volume= DA x 43560 x 1" 112 106270 cf 186.55 feet msl set spillway elevation at this elevation West Johnston High School 20013-4 } f Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP Release rate over 48 hours= Size Outlet Device for Control Structure invert elevation estimated orifice Center elev. proposed water surface elev. _ available head (h) _ discharge (d) _ coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)"1/2 0.61 afs pond will drain in greater than 2 days in accordance with NCDENR BMP This will provide removal of 50% TSS with outlet swales TSS removal will be at least 85% 0.5 - 0.0 179.00 feet msl 179.30 feet ms] 186.55 feet msl 7.25 feet 0.5 cfs 0.6 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 36.6 cfs stimate L = 8 ft Q=CwLH^3/2 H = 1.33 ft Top of Emergency Spiltwc 187.88 msl 5 West Johnston High School 20013-5 T i Inflow Hydmgraph Peak Mow - Tiom to Peak - Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP AddMonal Flow 0.0 62.7 38.6 48.26564414 7 ftim mint 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 2-UM 0 0.9 3.7 8.0 13.8 20.6 28.0 35.6 43.0 49.7 55.3 59.5 62.0 62.7 61.5 58.6 54.0 48.9 44.2 39.9 36.1 32.6 29S 26.7 24.1 21.8 19.7 17.8 16.1 14.5 13.1 11.9 10.7 9.7 8.8 7.9 7.2 6S 5.9 West Johnston High School -20013-6 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP L= 6.5 Stormwater routing 3 Spillway inch 186.55 L(time min) Q-(-Q Storage 2M Outflow Elevation orifice Wak 0 0 0 0.00 0.0 179.00 3 0.9 0 0.00 0.0 179.00 0.0 0.0 6 3.7 167 0.13 0.0 179.13 0.0 0.0 9 8.0 826 0.35 0.0 179.35 0.0 0.0 12 13.8 2271 0.66 0.1 179.66 0.1 0.0 15 20.6 4734 1.05 0.2 180.05 0.2 0.0 18 28.0 8405 1.52 0.2 180.52 0.2 0.0 21 35.6 13402 2.04 0.3 181.04 0.3 0.0 24 43.0 19762 2.61 0.3 181.61 0.3 0.0 27 49.7 27440 3.22 0.4 182.22 0.4 0.0 30 55.3 36314 3.84 0.4 182.84 0.4 0.0 33 59.5 46187 4.48 0.5 183.48, 0.5 0.0 36 62.0 56806 5.10 0.5 184.10 0.5 0.0 39 62.7 67871 5.71 0.5 184.71 0.5 0.0 42 61.5 79057 6.30 0.6 185.30 0.6 0.0 45 58.6 90029 6.84 0.6 185.84 0.6 0.0 48 54.1 100468 7.33 0.6 186.33 0.6 0.0 51 48.1 110088 7.77 2.6 186.77 0.6 2.0 54 44.2 118277 8.13 9.2 187.13 0.7 8.6 57 39.9 124564 8.40 15.9 187.40 0.7 15.3 60 36.1 128886 8.59 21.3 187.59 0.7 20.7 63 32.6 131544 8.70 24.7 187.70 0.7 24.0 66 29.5 132971 8.76 26.6 187.76 0.7 25.9 69 26.7 133491 8.78 27.2 187.78 0.7 26.6 72 24.1 133385 8.78 27.2 187.78 0.7 26.6 75 21.8 132817 8.75 26.3 187.75 0.7 25.6 78 19.7 132007 8.72 25.3 187.72 0.7 24.6 81 17.8 130993 8.68 24.1 187.68 0.7 23.4 84 16.1 129864 8.63 22.5 187.63 0.7 21.9 87 14.5 128704 8.58 21.0 187.58 0.7 20.4 90 13.1 127537 8.53 19.6 187.53 0.7 18.9 93 11.9 126382 8.48 18.1 187.48 0.7 17.5 96 10.7 125257 8.43 16.7 187.43 0.7 16.1 99 9.7 124178 8.39 15.7 187.39 0.7 15.0 102 8.8 123109 8.34 14.3 187.34 0.7 13.7 105 7.9 122109 8.30 13.3 187.30 0.7 12.6 108 7.2 121143 8.26 12.3 187.26 0.7 11.6 111 65 120219 8.22 11.3 187.22 0.7 10.7 114 5.9 119347 8.18 10.4 187.18 0.7 9.7 117 5.3 118533 8.14 9.5 187.14 0.7 8.8 120 4.8 117782 8.11 8.8 187.11 0.7 8.2 123 4.3 117059 8.08 8.2 187.08 0.7 7.5 126 3.9 116370 8.05 7.5 187.05 0.6 6.9 129 3.5 115720 8.02 6.9 187.02 0.6 6.3 132 3.2 115112 7.99 6.3 186.99 0.6 5.7 West Johnston High School 20013-7 Storm Water Detention Study Behind Athletic Fields-2 year 24 hour-NCDENR BMP 135 2.9 114550 7.97 5.9 186.97 0.6 5.3 138 2.6 114002 7.94 5.4 186.94 0.6 4.7 141 2.4 113504 7.92 5.0 186.92 0.6 4.4 144 2.1 113026 7.90 4.7 186.90 0.6 4.0 147 1.9 112571 7.88 4.3 186.88 0.6 3.7 150 1.7 112140 7.86 4.0 186.86 0.6 3.4 153 1.6 111735 7.84 3.7 186.84 0.6 3.0 156 1.4 111359 7.83 3.5 186.83 0.6 2.9 159 1.3 110982 7.81 3.2 186.81 0.6 2.6 162 1.2 110636 7.79 2.9 186.79 0.6 2.3 165 1.1 110321 7.78 2.8 186.78 0.6 2.1 168 1.0 110011 7.77 2.6 186.77 0.6 2.0 171 0.9 109708 7.75 2.4 186.75 0.6 1.7 174 0.8 109436 7.74 2.2 186.74 0.6 1.6 177 0.7 109173 7.73 2.1 186.73 0.6 1.5 180 0.6 108919 7.72 2.0 186.72 0.6 1.4 183 0.6 108675 7.71 1.9 186.71 0.6 1.2 186 0.5 108442 7.69 1.6 186.69 0.6 1.0 189 0.5 108239 7.69 1.6 186.69 0.6 1.0 192 0.4- 108028 7.68 1.5 186.68 0.6 0.9 195 0.4 107827 7.67 1.4 186.67 0.6 0.8 198 0.3 107638 7.66 1.3 186.66 0.6 0.7 201 0.3 107460 7.65 1.2 186.65 0.6 0.6 204 0.3 107294 7.64 1.1 186.64 0.6 0.5 360 0.0 99184 7.27 0.6 186.27 0.6 0.0 720 0.0 85939 6.64 0.6 185.64 0.6 0.0 1080 0.0 73295 6.00 0.6 185.00 0.6 0.0 1440 0.0 61328 5.36 0.5 184.36 0.5 0.0 1800 0.0 50079 4.71 0.5 183.71 0.5 0.0 2160 0.0 39610 4.06 0.4 183.06 0.4 0.0 2520 0.0 29982 3.40 0.4 182.40 0.4 0.0 2880 0.0 21292 2.74 0.4 181.74 0.4 0.0 3240 0.0 13655 2.06 0.3 181.06 0.3 0.0 3600 0.0 7282 1.38 0.2 180.38 0.2 0.0 3960 0.0 2495 0.70 0.1 179.70 0.1 0.0 4320 0.0 213 0.15 0.0 179.15 0.0 0.0 4680 0.0 213 0.15 0.0 179.15 0.0 0.0 Results of routing the 2 year 24 hour storm Use orifice = 3.0 inches Peak outflow = 273 cfs Peak Stage= 8.78 ft Water Elevation= 187.78 msl Peak Storage = 133491 cf Design Spillway 186.SS msl Length of weir 6.S ft West Johnston High School -20013-8 i Inflow outflow hydrograph . 70 ............................................ so ......................... .................................................. ................... ................. 50 ................• ..------•---- - •-------....----.. .. ......... .................. ...-----.......... ................... ..............._ 40 .................. ...... ...... ................• •---.....-- .................. .................. ...---•-----....... ........_....... o? L 30 .................. ---.......... .................. .................. . ---..... .----.-•--------- .........---.----- ................. .................... 20 ------------------ ........................... ........................ .................. ........................ ...:.................... ........................ 10 ................... <........... ... .................. ................ ........ ... 0 0 15 30 45 60 75 90 105 Time (minutes) ?- Inflow Hydrograph -A- Outflow Hydrograph Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP STORM WATER DETENTION FOR WEST JOHNSTON HIGH SCHOOL BEHIND ATHLETIC FIELDS 100 YR - 24 HOUR NCDENR BMP FIRST T' OF RUNOFF 20013 5-25-00 prepared by J.S. Janowski and Associates 105 C East Victoria Court Greenville, NC 27858 1-252-756-8918 West Johnston High School 20013-1 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Site Conditions Predevelopment Total watershed area Area Impervious C= Area grass or wooded C= SCS Soil Group Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Time of Concentration channelflow Tc=(L"3/H)"0.385 128 Composite C = Rainfall Intensity = I = gt(h+T) Peak Discharge Q--CIA 0.95 0.3 6.7 X 29.00 acres CN= 98 0.00 acres CN= 73 29.00 acres C 1280 feet 51 feet 8.4 inches OVERLAND 2 13 9 h 2 132 18 10 203 22 25 246 23 100 302 25 West Johnston High School -20013-2 13.3 minutes 0.3 7.9 inches per hr 68.5 cfs Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Site Conditions postdevelopment Total watershed area Area Impervious C= Area grass C= SCS Soil Group (Craven) Hydraulic Length Vertical Relief 24-hr, 2 yr rainfall Design Hydrograph Formulation Composite CN S=1000/CN -10 Runoff RO=(P-0.2(S))^2 / (P+0.8(s)) Time of Concentration channel flow (not overland) Tc=(L"3/H)^0.385 128 Composite C = Rainfall Intensity = I = g/(h+T) Peak Discharge Q=CIA Time to peak Tp= Vol/(1.37 Qp) 0.95 0.3 6.7 CN= 98 CN= 73 C B 9 h 2 132 18 10 203 22 25 246 23 100 302 25 29.00 acres 9.56 acres 19.44 acres C 1280 feet 51 feet 8.4 inches 81.2 2.31 6.15 inches 13.4 minutes 0.51 7.9 inches per hr 117.3 cfs 67.1 minutes West Johnston High School -20013-3 Storage Required Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Allowable release at impoundment = 68.5 cis Peak rate of inflow at impoundment = 117.3 cis Sr = (Qi - Qo)Tp 196,465 cf STAGE STORAGE DATA surface diff. accum. Elevation am 21a stomp, storage Elevation 179.00 0 0 179 0 1.00 4362 180.00 8724 4362 180.00 1 2.00 20960 182.00 12236 25322 182.00 3 2.00 28541 184.00 16305 53863 184.00 5 2.00 37500 186.00 21195 91363 186.00 7 2.00 47429 188.00 26234 138792 188.00 9 Z d Storage Stage LN(stomy) L N(S ) Compute SUp 0 0 ERR ERR 0.00 4,362 1 8.38 0.00 1.00 25,322 3 10.14 1.10 3.06 138,792 9 11.84 2.20 9.00 b= 1.5747347 Ks= 4362 1/b Z= (S/Ks)^ Predicted Water Surface Elevation= 190.22 feet msl To capture the first 1" of runoff volume= DA x 43560 x 1" !12 105270 cf 186.55 feet msi set spillway elevation at this elevation West Johnston High School -20013-4 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Release rate over 48 hours= Size Outlet Device for Control Structure invert elevation = estimated orifice center elev. proposed water surface elev. _ available head (h) _ discharge (d) _ coefficient of discharge = Determine the orifice diameter Orifice equation Q = Cd(A)(2gh)"1/2 0.61 cfs pond will drain in greater than 2 days in accordance with NCDENR BMP This will provide removal of 50% TSS with outlet swales TSS removal will be at least 85% 0.5 - 0.0 179.00 feet msl 179.30 feet msl 186.55 feet msl 7.25 feet 0.5 cfs 0.6 0.22 feet SAY 3 inches Determine Weir length for 2 year 24 hour discharge Q = 68.5 cfs stimate L = 8 ft Q=CwLH"3/2 H = 2.01 ft Top of Emergency Spillwc 188.56 msi 5 West Johnston High School -20013-5 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Peak Inflow lime to Peak = Adddonal Flow 1173 67.1 83.92897444 T Mme oriel 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 102 105 108 111 114 RI AI 0 0.6 2.3 5.1 9.0 13.8 19.6 26.1 33.2 40.9 48.9 57.0 65.2 733 81.1 88.5 95.2 101.3 1065 110.8 114.0 116.2 117.2 117.1 115.8 113.4 109.9 105.5 100.1 94.5 89.1 84.1 793 74.9 70.6 66.7 62.9 59.3 56.0 0.0 West Johnston High School 20013-6 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP L= 6.5 55.5 Stormwater routing Emergency 3 Spillway Spillway inch 18635 187.78 T (time min) QJ.cK Storms, O utflow Elevation orifice wlr W-Ift 0 0 0 0.00 0.0 179.00 3 0.6 0 0.00 0.0 179.00 0.0 0.0 6 2.3 104 0.09 0.0 179.09 0.0 0.0 9 5.1 517 0.26 0.0 179.26 0.0 0.0 12 9.0 1438 0.49 0.0 179.49 0.0 0.0 15 13.8 3057 0.80 0.1 179.80 0.1 0.0 18 19.6 5526 1.16 0.2 180.16 0.2 0.0 21 26.1 9016 1.59 0.2 180.59 0.2 0.0 24 33.2 13666 2.07 0.3 181.07 0.3 0.0 27 40.9 19593 2.60 0.3 181.60 0.3 0.0 30 48.9 26886 3.17 0.4 182.17 0.4 0.0 33 57.0 35609 3.79 0.4 182.79 0.4 0.0 36 65.2 45798 4.45 0.5 183.45 0.5 0.0 0.0 39 73.3 57458 5.14 0.5 184.14 0.5 0.0 0.0 42 81.1 70565 5.86 0.5 184.86 0.5 0.0 0.0 45 88.5 85070 6.60 0.6 185.60 0.6 0.0 0.0 48 95.2 100891 7.35 0.6 186.35 0.6 0.0 0.0 51 101.3 117924 8.12 9.0 187.12 0.7 8.4 0.0 54 106.5 134533 8.82 40.0 187.82 0.7 27.9 11.4 57 110.8 146511 9.31 110.4 188.31 0.7 45.5 64.2 60 114.0 146571 9.32 112.7 188.32 047 45.9 66.1 63 116.2 146817 9.33 114.9 188.33 0.7 46.3 67.9 66 117.2 147049 9.34 117.1 188.34 0.7 46.7 69.8 69 117.1 147061 9.34 117.1 188.34 0.7 46.7 69.8 72 115.8 147050 9.34 117.1 188.34 0.7 46.7 69.8 75 113.4 146810 9.33 114.9 188.33 0.7 46.3 67.9 78 109.9 146544 9.32 112.7 188.32 0.7 45.9 66.1 81 105.5 146056 9.30 108.2 188.30 0.7 45.1 62.4 84 100.1 145555 9.28 103.9 188.28 0.7 44.3 58.9 87 94.5 144871 9.25 97.5 188.25 0.7 43.2 53.6 90 89.1 144316 9.23 93.41 188.23 0.7 42.4 50.3 93 84.1 143548 9.19 85.3 188.19 0.7 40.9 43.7 96 79.3 143326 9.19 85.3 188.19 0.7 40.9 43.7 99 74.9 142250 9.14 75.7 188.14 0.7 39.1 36.0 102 70.6 142097 9.14 75.7 188.14 0.7 39.1 36.0 105 66.7 141183 9.10 68.4 188.10 0.7 37.6 30.1 108 62.9 140865 9.09 66.7 188.09 0.7 37.2 28.7 111 59.3 140187 9.06 61.5 188.06 0.7 36.1 24.7 114 56.0 139798 9.04 58.2 188.04 0.7 35.4 22.1 117 52.8 139402 9.03 56.6 188.03 0.7 35.1 20.8 120 49.9 138729 9.00 51.9 188.00 0.7 34.0 17.2 123 47.0 138364 8.98 48.9 187.98 = 0.7 33.3 14.9 126 44.4 138031 8.97 47.4 187.97 0.7 33.0 13.8 129 41.9 137482 8.95 44.6 187.95 0.7 32.3 11.7 132 39.5 136988 8.93 41.9 187.93 0.7 31.6 9.7 West Johnston High School -20013-7 Storm Water Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP 135 3 37 136553 8.91 39.4 187.91 0.7 30.9 7.8 138 . 2 35 136176 8.89 37.0 187.89 0.7 30.2 6.1 141 . 2 33 135854 8.88 35.8 187.88 0.7 29.9 5.3 144 . 31 3 135381 8.86 33.7 187.86 0.7 29.2 3.8 147 . 6 29 134962 8.84 31.7 187.84 0.7 28.5 2.4 150 . 27.9 134582 8.83 30.8 187.83 0.7 28.2 1.9 153 26.3 134067 8.80 28.4 187.80 0.7 27.2 0.5 156 24.8 133697 8.79 27.7 187.79 0.7 26.9 0.2 159 23.4 133173 8.77 26.9 187.77 0.7 26.2 0.0 162 22.1 132544 8.74 26.0 187.74 0.7 25.3 165 20.9 131851 8.71 25.0 187.71 0.7 24.3 168 19.7 131104 8.68 24.1 187.68 0.7 23.4 171 18.6 130314 8.65 23.1 187.65 0.7 22.5 174 17.5 129492 8.61 21.9 187.61 0.7 21.3 177 16.5 128700 8.58 21.0 187.58 0.7 20.4 180 15.6 127$91 8.54 19.9 187.54 0.7 19.2 183 14.7 127127 8.51 19.0 187.51 0.7 18.3 186 13.9 126360 8.48 18.1 187.48 0.7 17.5 189 13.1 125597 8.45 17.3 187.45 0.7 16.6 192 12.4 124844 8.41 16.2 187.41 0.7 15.5 195 11.7 124156 8.39 15.7 187.39 0.7 15.0 198 11.0 123440 8.35 14.6 187.35 0.7 13.9 201 10.4 122795 8.33 14.1 187.33 0.7 13.4 204 9.8 122133 8.30 13.3 187.30 0.7 12.6 360 0.5 89395 6.81 0.6 185.81 0.6 0.0 720 0.0 86908 6.69 0.6 185.69 0.6 0.0 1080 0.0 74222 6.05 0.6 185.05 0.6 0.0 1440 0.0 62201 5.41 0.5 184.41 0.5 0.0 1800 0.0 50894 4.76 0.5 183.76 0.5 0.0 2160 0.0 40362 4.11 0.4 183.11 0.4 0.0 2520 0.0 30667 3.45 0.4 182.45 0.4 0.0 2880 0.0 21903 2.79 0.4 181.79 0.4 0.0 3240 0.0 14181 2.11 0.3 181.11 0.3 0.0 3600 0.0 7707 1.44 0.2 180.44 0.2 0.0 3960 0.0 2760 0.75 0.1 179.75 0.1 0.0 Results of routing the Use orifice = Peak outflow = Peak Stage= Water Elevation= Peak Storage = Design Spillway Length of weir Emergency Spillway Length of Weir 100 year 24 hour storm 3.0 Inches 117.1 cfs 9.34 ft 188.34 msl 147061 cf 186.55 msl 6.5 ft 187.78 msl 55.5 ft West Johnston High School -20013-8 i Sto?vvater Detention Study Behind Athletic Fields-100 year 24 hour-NCDENR BMP Size Outlet Pipe for Spillway 100 yr. flow for principal spillway = Effective Length of Emergency spillway for outlet pipe = Water Surface Elevation for 100 year Storm = Top of Emergency Spillway at box = Q=CLH^1.5 = Design flow for 100 year storm for outlet pipe = Slope of outlet pipe = Material of outlet pipe = n= d = 16 (QNS"0.5)^0.375 Use = 46.7 cfs 25.5 ft 188.34 msl 187.78 msl 32.1 cfs 78.7 cfs 0.005 ft/ft concrete 0.012 42.30 inches 48 inch West Johnston High School 20013-9 t Worksheet Worksheet for Circular Channel Project Description Worksheet Circular Channel - 3- Outlet Pipe for Extended Dry Detention 100 yr Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.012 Slope 0.005000 ft/ft Diameter 48 in Discharge 78.70 cis Results Depth 2.50 ft Flow Area 8.3 ft2 Wetted Perimeter 7.30 ft Top Width 3.87 ft Critical Depth 2.69 ft Percent Full 62.5 % Critical Slope 0.004076 ft/ft Velocity 9.52 ft/s Velocity Head 1.41 ft Specific Energy 3.91 ft Froude Number 1.15 Mabmum Discharc 118.36 cis Discharge Full 110.03 cfs Slope Full 0.002558 ft/ft Flow Type Supercritical Project Engineer: Canon INNOVA MEDIA User cA ..1stonn drainage for west johnston hs.fm2 J.S. Janowski and Associates FlowMaster v6.0 (614e] 06/08/00 08:03:00 AM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 t 4 1 1 Inflow outflow hydrograph ....................:. . ........ 120 ................................................ .......................;............. 100 ` ................:............................................................... ................... ................. ------............ .. ..... ............ .................. ............................................... 80 60 € ........ .................................................................. ... ........ ................ 40- ....................... 20 .................. ....... .................. 0 105 0 15 30 45 60 75 90 Time (minutes) -+- Inflow Hydrograph -- Outflow Hydrograph Talg® ? Ana. /L? JOB NO SH/ . s?. CLIENT ?r. DATE L?4S0C1 OF x CONSULTING ENGINEERS SUBJECT S DES. - ;f..: Yr fiYr - 41 ;S .. - i y!. i ? v t # a -777 10 .. 1zJ 7. fl -1151,-1 L i C y o s - 302 Sycamore Branches Close • Winterviile, NC 28590 • 919-756-8918 v y 1 r Worksheet Worksheet for Trapezoidal Channel Project Description Worksheet Trapezoidal Channel -1-Main Entry Road Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Slope 0.025000 fttft Left Side Slope 3.00 H : V Right Side Slope 3.00 H : V Bottom Width 1.00 ft Discharge 1.10 cfs Results Depth 0.26 It Flow Area 0.5 ft2 Wetted Perimeter 2.62 ft Top Width 2.54 It Critical Depth 0.26 ft Critical Slope 0.024268 ftfft Velocity 2.43 ftts Velocity Head 0.09 ft Spec Energy 0.35 It Froude Number 1.01 Flow Type Supercritical Project Engineer. Canon INNOVA MEDIA User c:\..lztorm drainage for west johnston hs.fm2 J.S. Janowski and Associates FlowMaster v6.0 [614e] 06107100 03:33:50 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 Worksheet Worksheet for Trapezoidal Channel Project Description Worksheet Trapezoidal Channel - 2- Swales by pump station Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Slope 0.050000 fttft Left Side Slope 3.00 H : V Right Side Slope 3.00 H : V Bottom Width 1.00 ft Discharge 1.00 cis Results Depth 0.20 ft Flow Area 0.3 ftz Wetted Perimeter 2.29 ft Top Width 2.22 ft Critical Depth 0.24 ft Critical Slope 0.024596 fttft Velocity 3.04 I'tts Velocity Head 0.14 ft Specific Energy 0.35 ft Froude Number 1.39 Flow Type Supercritical Project Engineer. Canon INNOVA MEDIA User c:\..\storm drainage for west johnston hs.fm2 J.S. Janowski and Associates FlowMaster %6.0 [614e] 06108/00 07:14:44 AM ®Haestad Methods, inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 JOB NO J.. jari6wski -JOB . 1ak eS ASS CLIENTS' ` BATE OC ,?? SUBJECT DES BY CONSULTING ENGINEERS n r 302 Sycamore Branches Close • Winterville, NC 28590 • 919-156-8918 ?4. Worksheet Worksheet for Circular Channel Project Description Worksheet Circular Channel -1- Slope Drain Calculation Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.012 Slope 0.005000 ft/ft Diameter 12 in Discharge 2.30 cis Results Depth 0.70 ft Flow Area 0.6 ft2 Wetted Perimeter 1.99 ft Top Width 0.91 ft Critical Depth 0.65 It Percent Full 70.4 % Critical Slope 0.006235 ft/ft Velocity 3.90 ft/s Velocity Head 0.24 ft Specific Energy 0.94 ft Froude Number 0.85 Maximum DischaN 2.94 cis Discharge Full 2.73 cis Slope Full 0.003551 fttft Flow Type Subcritical Project Engineer: Canon INNOVA MEDIA User c:G..'.storm drainage for west johnston hs.fm2 J.S. Janowski and Associates FlowMaster v6.0 [614e] 06/08100 07:18:01 AM Q Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 302 Sycamore Branches Close • Winterville, NC 28590 • 919-756.8918 1`ri Project No. DWQ Project Name: West Johnston High Pond #2 SUBMITTED DESIGN: REQUIRED DESIGN: elevations status Bottom of Basin (ft) 0 Permanent Pool (ft) 179 179 ft. depth check depth Temporary Pool (ft) 186.55 7.55 ft. depth ok areas Permanent Pool SA (sq ft) 0 #DIV/0! sq. ft. #DIV10! Drainage Area (ac) 38.56 Impervious Area (ac) 9.56 24.8% - volumes Permanent Pool (cu ft) 0 Temporary Pool (cu ft) 105270 38231 cu. ft. ok Forebay (cu ft) 0 #DIV/0! % #DIV10! other parameters SA/DA 0 #DIV/0! - Orifice Diameter (in) 3 0.46 cfs drawdown - Design Rainfall (in) 1 2.7 day drawdown ok Linear Interpolation of Correct SAIDA*** 179 ft. Permanent Pool Depth % Impervious SA/DA from Table Next Lowest 1 01 Project Impervious 24.8 #DIV/0! Next Highest 1 r r oq? err? DP /,i? Hits associates ARCHITECTURE i ENGINEERING / PLANNING TO: NCDENR - Division of VI 1621 Mail Service Center Raleigh, NC 27699-1621 ATTN: Mr. John Dorney We are sending via UPS the following plans: LETTER of TRANSMITTAL FE: June 9, 2000 { r, JUN 14 2000 GROUP -MAWS 'West Johnston SECTION 'OPIES _DWG DATE DESCRIPTION NOTE 3sets Storm Water Management Calcs 3sets Site Plans listed below This information is transmitted forapproval unless noted otherwise. REMARKS: Drawings: 0001-Overall Site Key Plan 0002-Site Phasing Plan C201-Site Grading and Erosion Control - South C202-Site Grading and Erosion Control - North C203-Site Grading and Erosion Control - Entrance C401-Site Details: Storm Sewer/ Sanitary Sewer C402-Site Details: General Notes / Erosion Control / Silt fence / End-of-day measures C403-Site Details: Storm Water Detention Boxes C404-Site Details: Wet Detention / Storm Water Detention Ponds C405-Site Details: Curb and Gutter / Asphalt & base / Parking C406-Site Details: Athletic Field Improvements C407-Site Details: Athletic Field Improvements / Misc. SIGNED(D??* : Todd Smith copy: Steve Janowski, P.E. Mr. Tom Davis, Johnston County Schools Mr. Ray Debruhl, TPFG file 1530 East Fourteenth Street / Greenville, NC 27858 / tel 252.757.0333 / fax 252.757.1330 / e-mail: tsmith@hiteassoc.com Project No. DWQ Project Name: West Johnston High Pond #1 SUBMITTED DESIGN..- REQUIRED DESIGN. elevations status Bottom of Basin (ft) 194 Permanent Pool (ft) 198 4 ft. depth ok Temporary Pool (ft) 199.12 1.12 ft. depth ok areas Permanent Pool SA (sq ft) 35607 19436 sq. ft. ok Drainage Area (ac) 23 Impervious Area (ac) 13.11 57.0% - volumes Permanent Pool (cu ft) 0 Temporary Pool (cu ft) 47005 47005 cu. ft. ok Forebay (cu ft) 0 #DIV/O! % #DIY/0! other parameters SA/DA 0 1.94 - Orifice Diameter (in) 3 0.18 cfs drawdown - Design Rainfall (in) 1 3.1 day drawdown ok Linear Interpolation of Correct SAIDA * * * K Impervious Next Lowest 50 Project Impervious 57.0 Next Highest 60 4 ft. Permanent Pool Depth SA/DA from Table 1.73 1.94 2.03 ,71 State of North Carolina .. Department of Environme :. lr4 Natural resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Tom Davis NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES May 8, 2000 Johnston County DWQ Project #: 000404 APPROVAL OF 401Quality Certification and ADDITIONAL CONDITIONS and Neuse River Buffer Rules Johnston County Board of Education Post Office Box 1336 Smithfield, NC 27577 :Dear Mr. Davis: You have our approval, in accordance with the attached conditions and those listed below, to impact 0.40 acres of wetlands. 95 linear feet of stream for the purpose of constructing a road crossing for the new West Johnson High School at SRI 330 near SR1382 as you described ir your revised application dated May 4, 2000. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3102. This certification allows you to use Nationwide Permit Number 14 when the Corps of Engineers issues it. This approval is also valid for the Neuse River buffer rules (15A NCAC 2B .033). In addition, you shouid get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application.. If the property is sold, the new owner must bc giv.r a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or.as otherwise provided in the General Certification. I-or this approval to be valid, you musi follow the conditions listed in the attached certification and any additional conditions listed below. 1. Deed notifications or similar mechanisms shall be placed on all remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later,. ?. Stormwater shall be directed to flow at non-erosive velocities across the entire protected stream buffers. 3. An additional condition is that a final, written stormwater management plan shall be approved by this Office before the impacts specified in this Certification occur. The stormwater management plan must include plans and specifications for stormwater management facilities designed to remove 85% TSS according to the most recent version of the NC DENR,Stormwater Best Managectent Practices Manual. Also, before any permanent building is occupied at the subject site, the facilities, as approved by this Office, shall be constructed and operational, and the stormwater management plan, as approved by this Office, shall be implemented If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. T} is letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-9646. ; , inc„ e y,l Steven Attachment cc: Carps of Engineers Raleig, a Fic;ld Office— J Ra?cigh DWQ Re;?oval Office Raleigh Division of Land Resources' Merle Hall; Southwind Surveying & engineering File copy Central Files Todd .*St. John Divisicr. ^of Water C;uality o Non-Discharge Branch 162, Mail Seivice.Center Raleigh NC 27669-1621 Telephone 919-733-1786 An Equal Opportunity Affirmative Action Employer 50%a recycled/10%a post consumer paper FAX # 733-9959 SOUTHWIND SURVEYING AND ENGINEERING 201 Glen Road Garner, North Carolina 27529 Phone: (919) 773-0183 L. Fax: (919) 773-0148 TO j;2m 4c- I%1Vt j n"d0I;FrU ATEr44 t''M 4%4vt F;E95r* Ce61G.?. %::?% 6-C Fw--M, K4C- 74 77 LIEUTEM orF TRUSEDUML DATE ATTENTIO WE ARE SENDING YOU ached Of ,vte cover via ? Shop drawings ? Prints ? Plans ? Copy of letter ? Change order ? the following items: ? Samples ? Specifications COPIES DATE NO. Figoem> DESCRIPTION .z " W THESE ARE TRANSMITTED as checked below: or approval ? Approved as submitted ? Resubmit copies for approval ? For your use ? Approved as noted ? Submit copies for distribution ? As requested ? Returned for corrections ? Return corrected prints ? For review and comment ? ? FOR BIDS DUE 19 -El PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO 1-1LC7 SIGNED: If enclosures are not as noted, kindly notify us at once. 4c, ss ? l? ,S"q4mL,jjQ-,-- ud-eA sek 4?? AQ? y-4& /C AI /J A 1 l 40 11 t,"S C DtiVQ ID: CORPS ACTION ID: NATIONWIDE PER;tifIT REQUESTED (PROVIDE NATIONWIDE PERyIIT #) PRE-CONSTRUCTION NOTIFICATION APPLICATION , FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFCATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENG21EERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES MUST BE SENT TO THE NC DIVISION OF WATER QUALITY, ATTN: JOHN DORNEY, 4401 REEDY CREEK ROAD, RALEIGH NC 27607. PLEASE PRINT OR TYPE. 1. OWNER'S NAME: JC L,5-,C eJ C,,A9 i?ZZ 7 CIE ic1?TT?.?-4 2. MAILING ADDRESS: F0 i gnY- F?- SUBDIVISION NAME CITY: Svc rTliFl STATE: t1l• G, ZIP CODE: Z7 V?5'?7 PROTECT LOCATION ADDRESS, INCLUDING SUBDIVISION NANIE (IF DIFFERENT FROM MAILING ADDRESS ABOVE): ?t`l it C S i?? n?Xtv?nA`iELy 4Z?- 3. TELEPHONE NUMBER: (HOivfE) (WORK)gL '?c03 4. IF.APPLICABLE: AGEN"T"S N.?N(E OR RESPONSIBLE CORPORATE OFFICIAL. ADDRESS. PHONE NZLN IBER: --- E" 1 ?? ?? Pal C (t s'-tt ?1(- 2-7j5-7`7 C J lam) 'E-1:3 1- -CL651 5 LOC.AT(ON OF WORK (PROVIDE .A .MAP. PREFERABLY .-\ COP%' OF USGS TOPOGRAPHIC M.- P OR AERIAL PHOTOGRAPHY ?VITH SCALE): COUNTY V<5fr4E nt-A - NE.kREST TO?VN l l l? ?? .1 SPECIFIC LOCATION (INCLUDE ROAD NUMBERS. LANDNIARKS. ECT.) ?c?? ?? ?T? tr?t?'?-sc?'T[cr.! ?=? 1-1-,G• S.P, . t?-??-? ? rl-.C..S. o`?, f ?8?' 6. IMPACTED OR NEAREST STREAM RIVER: 1??1E 1?15?^'t ': ?OG.64 RIVER BASIN: KIE;u,Se? 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER, (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURSE WATERS (ORW), WATER SUPPLY (WS-I OR WS-In? YES ( ) NO (tj IF YES, EXPLAIN: 7b. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIROMENTAL CONCERN (AEC)? YES ( ) NO (? ) 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES). WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROJECT? YES ( ) NO ( ) IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES ( ) NO ( ) IF YES. DESCRIBE ANTICIPATED WORK: 9a. ESTIMATED TOTAL. NUNiBERS OF ACRES IN TRACT OF LAND: i © l , 9b. ESTIMATED TOTAL. NLti(BER OF ACRES OF WETLA.vDS LOCATED ON PROJECT SITE: I Zl (p, 10a. NUN(BER OF ACRES OF WETL kNDS IL(PACTEE,DD BY THE PROPOSED PROJECT BY: 0' -M' FILLING: _ n ©v? FLOODING: DRAINAGE : EXCAVATION: OTHER: TOTAL ACRES TO BE IMPACTED: 10b. (1) STREAM CHANNEL TO BE IN PACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION: LENGTH BEFORE: -1 ?-) FT AFTER: FT v WIDTH BEFORE (based on normal high water contours): FT AVERAGE DEPTH BEFORE: FT AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CH,,kNNEL: , ? CHANNEL EXCAVATION: COONSTRUCTION OF A DA.M/FLOODl tG: OTHER: 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? POND SURFACE AREA? WHAT IS THE EXPECTED 12. DISCTIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED? (ATTACH PLANS; 81/2 BY 11 DRAWINGS ONLY) ??ytSi"7 G#?c rSSc ?ILF ^T'? ?'+?= 4 E `I? t? [k1-THE ?t'?"(1??? 13. PLJWOSE OF PROPOSED WORK: l4. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS ( INCLUDE ANY :V[EASL,'RES TAKEN TO :?IINI?IIZE WETLAND IN[PACTS) ?C? <,Sr-S 'Tt-tE ?r?t??-?c ?^?C?? ©a-`?'zt?t?? Gi-?s?5t ??C-c--?-?t GP,? tS 15. YOU ARE REQUIRED TO CONTACT THE US FISH AND WILDLIFE SERVICE AND/OR NATIONAL ?iLARI1"IE FISHERIES SERIVE REGARDING THE PRESENCE OF ANY FEDERALY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL. HABITAT IN THE PERMIT AREA THAT ?IAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: _ 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OT THE USE OF PUBLIC (STATE) LAND? YES ( ) NO (&,< (IF NO, GO TO' 16) a. IF YES, DOES THE PROJECT REQUIRE PREPERATION OF AN ENVIRONMENTAL DOCUMENT PURUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONI fENTAL POLICY ACT? YES( ) NO ( ) b. IF YES, HAS THE DOCUMENT BEEN REFIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE YES ( ) NO ( " ) IF ANSWER 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATIONFROM THE STATE CLEARINGHOUSE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OF FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS. LAKES, AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14.18. 21, 26, 29, li-D 38). ALL STREAM (INTER.MITTENT A?NfD PERNkZlIENT) ON THE PROPERTY [UST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 [NCH EQUALS SO FEET OF 1 INCH EQUALS 100 FEET OF THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PRODUCT. r. IF DELINEATION WAS PERFORMED BY A CONSULTANT. INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER ,\(.?.`lAGE?(ENT PLAN IF REQUIRED. e. WHAT IS LAND USE OF SURROUND[NG PROPOERTY' f. IF APPLICABLE. WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? F?cou< ' c?c? +- -p"-BuL ? S. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WTLANDS OR WATERS OF THE US MAY NOT BE IMPACTED PRIOR TO: 1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF WATER QUALITY CERTIFICATION, AND 3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, -0 " X0'3v ??d - OWNER'S/AGENT'S SIGNATURE" DATE (AGENT'S SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED). •r?Willoow;Springs ?\ f.r q1 ao It, u, II _ BR !83 GI 1 ' 1 i o • Nimrod-S??phenson Memorial,?em • ii O ii it Aso `? _ - -? '111 \` ?? ' ? ^•?'I I, ' \ ?\? ?xanch if ,r _ •' cam, - Nl? N x , 200 ? ? - - '1 *223 -•lt., ?- / 1 - ?. -i. \ 0 9 C- pet It Cem i\ I ? it 271. Cos LT Ems. V A - T I 0 r ICJ '? ; ,? 1 Crossroads Q,,r; "? \ • 2 1 - °,` ,\ e 252 0l• •\ I/ii^\?! (.?° -? o:in \01 Radio Towers •? ?` Berea Ch . 56 .u •;? %i Z a. I.- Cem.. I lowers Z. eM •n, 260 . cell!'" ?• 1l / y •.;' / '• ,,?" 263 I R o St Marys Gcpvci„y _ Cem --- - o '22 32'30" '24l E. I. MILE 5000 7000 FEET ?--- I 1 KILOMErRE _ ; ? ,3 ry y 1, I ROAD CLASSIFICATION Medium-duty Light-duty Unimproved dirt = .: k 1 ,f {t /L f INUI`?n TOTAL AREA= 101.46 ACRES TOTAL WETLANDS= 12.18 ACRES AREA IN CROSSING= 0.40 ACRES SCALE, 1'=400' MCROSSING AREA REVISED 5/3/2000 WEST JOHNSTON SOUTHWIND HIGH SCHOOL SURVEYING AND 201 GLEN ROAD ENGINEERING, INC. GARNER, N.C. 27529 OWNER JOHNSTON COUNTY BOARD OF EDUCATION 919-773-0183 919-773-0148 (FAX) PRO.. No, STATE CO. j2URVE"'ANGANGINEERINGAMD PLANNING MARCH 2000 SW980438 NC JOHNSTON ------ ------ / - ----------- . . ? ' y J 1 i ti. L •L' DISTURBED AREA .L, .y. .y , y. v .L 1f +/ JI V L y DISTURBED WETLANDS ?- - -- 1 WETLANDS OUTLET PROTECTION J 1 t NCS`330 WETLAND AREA TO BE DISTURBED= 17,484 S.F.(0.40 AC.) LENGTH OF STREAM TO BE DISTURBED= 95 L.F. SCALES 11=100' *CROSSING AREA REVISED 5/3/2000 WEST JOHNSTON SOUTHWIND HIGH SCHOOL 8 SURVEYING AND 201 GLEN ROAD N ENGINEERING, INC. GARNER, N.C. 27529 OWNER JOHNSTON COUNTY BOARD OF EDUCATION 919-773-0183 PIL MW Mi. SMTWIn . NC M77 919-773-0148 (FAX) DATE Maj. No. STATE Ci7. MARCH 2000 SW9 438 NC JOHNSTON SOUTHWIND SURVEYING AND ENGINEERING 201 Glen Road Garner, North Carolina 27529 Phone: (919) 773-0183 ()00404 Fax: (919) 773-0148 TO C`j F$1? ??t=t(1?Q L? L1 IEU M of URMS EDUML DAT5 E JOB NO. f 1?/ ATTENT ON RE: tttt YZ MAR 2 8 2W the?follol ing items: WE ARE SENDING YOU [&,*ffa`ched ? Under separate cover via 1 if WETUW ? Shop drawings ? Prints ? Plans E1: $am ??ER U ificatidns ? Copy of letter ? Change order ? r COPIES DATE NO. DESCRIPTION G ? - Nl ct,?? PAYMENT RECEIVED THESE ARE TRANSMITTED as checked below: or approval ? Approved as submitted ? For your use ? Approved as noted ? As requested ? Returned for corrections ? For review and comment ? ? FOR BIDS DUE 19 ? Resubmit copies for approval ? Submit copies for distribution ? Return corrected prints ? PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED:( Hw L If enclosures are not as noted, kindly notify us at once. PAYMENT RECEIVED 000404 DWQ ID: CORPS :ACTION ID: NATIONWIDE PERMIT REQUESTED (PROVIDE NATIoi 1411,1 I '""'°- ?EW __, PRE-CONSTRUCTION NOTIFICATIOI`?ILT?01'?7?iµ FOR NATIONWIDE PERMITS THAT REQUIRE: 2 8 2000 1) NOTIFICATION TO THE CORPS OF ENGINEERS --- 2) APPLICATION FOR SECTION 401 CERTIFCATION W TIANDS GROUP ,ATIER Qi)!ILITY^SEUION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF EN024EERS (SEE AGENCY ADDRESSES SHEET). S_ N (7) COPIES MUST BE SENT TO THE NC DIVISION OF WATER QUALITY, ATTN: JOHN DORNEY, 4401 REEDY CREEK ROAD, RALEIGH NC 27607. PLEASE PRINT OR TYPE. 1. OWNER'S NAME: LCN4a??? C',,-nN z'4E.7 CE ELILc1?Tic 2. MAILING ADDRESS: t?0 IF SUBDIVISION NAME CITY:: R Jul Eli FI Elm STATE: KI, G o ZIP CODE: Z2'E 7 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE): QLA Lt, I TELEPHONE NUMBER: (HOME) (WORK) rq 19 ! ??'C73 4. IF APPLICABLE: AGEV?'S Y.-MME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS. PHONE LNUNIBER: 5. LOCATION OF WORK (PROVIDE A NIAP. PPEFER.-kBLY A COPY OF USGS TOPOGRAPHIC OR AER(AL. PHOTOGRAPHY WITH SCALE): COUN, TY: J0F4"'=5ZP'a - :.NEAREST TOW`): SPECIFIC LOCATION (INCLUDE ROAD NUMBERS. LANDtvIARKS. ECT.) ?x Ce o? T t1 'gs i lc-nl e iJ-?G cp r: ?7 r? G S 1382 6. INIPACTED OR NEAREST STREAM(RIVER: RIVER BASIN: i???]Sl 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER, (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURSE WATERS (ORW), WATER SUPPLY (WS-I OR WS-In? YES ( ) NO (?) IF YES, EXPLAIN: 7b. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIROMENTAL CONCERN (AEC)? YES ( ) NO ( ? ) 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROJECT? YES ( ) NO ( ) IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION: 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES ( ) NO ( ) IF YES, DESCRIBE ANTICIPATED WORK: 9a. ESTIMATED TOTAL NUMBERS OF ACRES IN TRACT OF LA,W: I O 1, 4'?& 9b. ESTIMATED TOTAL. NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: 10, IF? 10a. NUMBER OF ACRES OF WETLA.YDS IMPACTED BY THE PROPOSED PROJECT BY: 0, El) I /_1 " (-- ? 6S FILLING: O.BI FLOODING: DRAINAGE : EXCAVATION: OTHER : TOTAL ACRES TO BE IMPACTED: OI 10b. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROTECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION: LENGTH BEFORE: 217-7 FT AFTER: FT WIDTH BEFORE (based on normal high water contours): FT AVERAGE DEPTH BEFORE: FT AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: L,--'_ CHANNEL EXCAVATION: COONSTRUCTION OF A DAM/FLOODING: OTHER: 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DR4INING TO THE POND? WHAT IS THE EXPECTED POND SURFACE AREA? 12. DISCTIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE. OF MECHANICAL EQUIPMENT TO BE USED? (ATTACH PLANS; 81/2 BY 11 DRAWINGS ONLY) ?-t roc ?t? 13. PURPOSE OF PROPOSED WORK: l? l??`?e7 ??`? kkl ?-:z ?L- [4. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS ( INCLUDE ANY iNIFASURES TAKEN TO :MINIMIZE WETLAND IMPACTS) ^1-(-?EG'??S?c??S?s'ThE,E r?'v?--CC-?'???©F`fiE'i??'i"? Cr??St?-?x-?-?F? wN?CN U-C-tA L-y F=CT 13. YOU ARE REQUIRED TO CONTACT THE US FISH AND WILDLIFE SERVICE AND/OR NATIONAL MARINE FISHERIES SERIVE REGARDING THE PRESENCE OF ANY FEDERALY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT L*vfAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OT THE USE OF PUBLIC (STATE) LAND? YES ( ) NO ( t/f (IF NO, GO TO 16) a. IF YES, DOES THE PROJECT REQUIRE PREPERATION OF AN ENVIRONMENTAL DOCUMENT PURUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES( ) NO ( ) b. IF YES, HAS THE DOCUMENT BEEN REFIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE YES ( ) NO ( ) IF ANSWER 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATIONFROM THE STATE CLEARINGHOUSE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT. DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003. TELEPHONE (919) 733-6369. 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OF FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS. STREAMS. LAKES, AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18.21, 26, 29, AN-D 38). ALL STREANN1(INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE Nf..P. MAP SCALES SHOULD BE 1 Il CH EQUALS 50 FEET OF 1 INCH EQUALS 100 FEET OF THEIR EQUIVALENT. b. IF AVAILABLE. REPRESENTATIVE PHOTOGRAPH OF WETLA.WS TO BE IMPACTED BY PRODUCT. c. IF DELINEATION WAS PERFORMED BY A CONSULTANT. INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STOR.viWATER MANAGEMENT PLAN IF REQUIRED. e. WHAT IS LANvD USE OF SURROUNDING PROPOERTY" f. IF APPLICABLE. WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL.'.' g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WTLANDS OR WATERS OF THE US MAY NOT BE IMPACTED PRIOR TO: 1) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DMSION OF WATER QUALITY CERTIFICATION, AND 3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, '7 ?Y- 3 . ®-- OWNER'S/AGENT'S SIGNA URE DATE (AGENT'S SIGNATURE VALID ONLY IF AUTHORIZATION LETTER FROM THE OWNER IS PROVIDED). ` i ?/ '?i?--'' ,., : `"`?• `?\ i ? _ ? 1. ?I ? ?, I• ?? It If \ SR 183 rl 1 '?' \ \ ;• Nimrod-Sphe nson Me'n i.i em ?. O / ?••=? I j / l X50 G3 - I. 'Sy i . C 250 LIN, 222 200 / u it 200 0 N - ^? ,, 271.* Cots .? - E Lg,V A T r' Crossroa3s 11 1 7 252 •\ '° / u. °•I„ „ e z i .r o \ 0 l ° • 246 - "Radio Towers Berea Ch t 56 ?\ % •n ?' Cem°-..\•• II\1 ,1 II r -_- % • Flowers Cem:: BM •ii? 260 • a ??? ? '?1? 11 • ?I .'i -_ ° ?. 1 u J Ce? o _ $egobeth / m Sas / - R o St Marys G¢Dve / %'( ac \ 122 32'30" 724000m.E • a,.,•,,,_•,.•,,: „•.e,.,,t,<<,.,.,,,,,.?., „9 I MILE ROAD CLASSIFICATION 0 6000 7000 FEET Medium-duty Light•duty_ I KILOMETRE Unimproved dirt ::..: F - TOTAL AREA= 101.46 ACRES TOTAL WETLANDS= 12.18 ACRES AREA IN CROSSING= 0.81 ACRES SCALE, 1'=400' WEST JOHNSTON SOUTHWIND HIGH SCHOOL 'A 93 SURVEYING AND 201 GLEN ROAD ENGINEERING, INC. GARNER, N.C. 27529 13WNER JOHNSTON COUNTY BOARD OF EDUCATION 919-773-0183 919-773-0148 (FAX) DATE PROJ. Nm STATE Co. S URVEYING/ENGINEERINGAAND PLANNING MARCH 2000 SW980438 NC JOHNSTON f AA DISTURBED WETLANDS - WETLANDS - OUTLET PROTECTION DISTURBED AREA 1 t . NCS_ R 1330 WETLAND AREA TO BE DISTURBED= 35,648 S.F.(0.81 AC.) LENGTH OF STREAM TO BE DISTURBED= 217 L.F. SCALES 1'=100' WEST JOHNSTON SOUTHWIND HIGH SCHOOL 1 93 SURVEYING AND 201 GLEN ROAD ENGINEERING, INC. GARNER. N.C. 27529 ?wt-" JOHNSTON COUNTY BOARD OF EDUCATION 919-773-0183 pn Em 13;&. OOTHFIEL D NC 919-773-0148 (FAX) JArE PROD No. STATE MARCH 2000 SW980438 NC JOHNSTON PH aowo luuol2Qd omull l!UII IowspurIlom "KaiuoQ ugor :oo MIMI of, IT laauc8 Imuouluonnug d `clot '1S ppo.L b ,ClaiaautS V896-££L (6I6) lu aui iosluoo asuold °loafoid sup ssnosip of o lg plnom ao suopsanb Auu anuq noA 31 •uopsuuojui palsanba.i aip jo ldiam jo Shp Suplaom 01 uigltm mainai Iuoiugoal Isup E alaldiuoo of anuis Ipm puls liun spuspom uoisiniQ •pazumou puu,(usd olgtsuodsoi oql Xq pou2is oq osls lsnui luautaaj2u oouuualuiuui pus uopuiodo aqZ Awd olgisuodsoi u jo uopuuSisaQ . (palsil suopBnala opioads) Isnoutal luaunpas 303 NJLMgouag . Juana u1101S XIDAa JOIJU ?Ioago sugaQ . suopoadsui Iunuuu-maoS . alnpagos BuimouipuauiaSuuuui uopul020A . :nuimolloj aql apnloui usld aousualuisui pus uopsiodo us ioj sluaiuannbai Iuoidx.L •oouuualumw mjnaaa lnopm pauSisop su omodo lou lllm amlorms lonuoo plumuuols y •pa.nnba.i si luouiaaiau aouuualutuui puu uoiluiodo uv luauiaaAd aouuuaiupW pus uoiauiadp suisuq taismuuols u su uoiluluautaldwi of .loud panouta.I oq llim luaunpros palulnuinoou lugs olumpui Al.molo lsnui suuld oql `uoponAsuoo auimp suisuq luowipos su posn oq of posodoid aw suisuq ag13I Iunouia2l luauiipaS •suuld Suuaauiguo aql uo sup Aioods asuald •uoilslaSan anilsu 30 lsisuoo hugs pus (Mug so 1:9) podols Alluas oq llsgs jiags agy •p pnbaa si (I#) puod uopuelap lam a p jo ialauiuad aql punotu JIags anpmoSoA V •L '9 3lagS anpslaSaA Hite associates AOfECf1RE / HCHRE / iMY JAN 2 `L/ 17 January 2001 Mr. John Dorney Wetlands/401 Unit NCDEHNR Division of Water Quality 4401 Reedy Creek Road Raleigh, NC 27607 ?A- RE: West Johnston High School - 99018 DWQ # 000404 Dear Mr. Dorney:Za?l? Thank you for your letter of approval dated December 19, 2000. Regarding to dam regulations, we have confirmed with our Site Engineer that the height of our dam is 8' maximum and does not (as he understands) fall underneath these particular regulations. If this is . not the case, please advise. James G. Hite, AIA, Project Architect Hite Associates, PC JGH:pg xc: Tom Davis Ray DeBruhl, P.E. Steve Janowski, P.E. 2600 Meridian Drive I Greenville, NC 27834 / tel 252.757.0333 / fax 252.7571330 / e-mail.-mail@hfteassoc.com 127 South Third Street /Smithfield, NC 27577 / tel 919.989.7140 / fax 919.989.6746 / e-mail, mjs@hiteassoc.com State of North Carolina Department of Environment and Natural Resources &14 • • Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director NCDENR DIVISION OF WATER QUALITY December 19, 2000 Mr. Tom Davis Johnston County Board of Education PO Box 1336 Smithfield, NC 27577 Subject: Stormwater Management Plans West Johnston High School Johnston County, NC DWQ# 000404 Dear Mr. Davis: This Office is in receipt of the plans dated August 1, 2000 and revised December 18, 2000 for the stormwater management ponds and level spreaders at the subject facility prepared on your behalf by Hite Associates and submitted to the Division on December 18, 2000. Staff from the Wetlands Unit reviewed the plans and found them acceptable. Please note that this approval shall not be construed as an approval of the dam design for Dam Safety purposes. If you have any questions regarding this matter, please contact Mr. Todd St. John at (919) 733-9584. cc: Mr. Todd St. John, Wetlands Raleigh Regional Office File R. DQ ands Unit Sup i or 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1896 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper awn NCDENR DIVISION OF WATER QUALITY December 19, 2000 Memorandum To: John Dorney From: Todd St. Joh 1 0/ Subject: West Johnston High School Johnston County DWQ# 000404 I have reviewed the stormwater management plans for the subject High School. They have proposed using a dry and a wet detention pond each followed by a level spreader that will discharge before it reaches zone 2 of the buffer. The side slopes of the wet pond are 3:1 above the permanent pool and 6:1 below the permanent pool. The level spreaders should be adequate considering the fact that they are each preceded by a detention pond. As such, I recommend that the stormwater management plans be approved. DEC-18-00 12:26 PM J. 5. JanOwoki and 55001ate5 December 18, 2000 Todd St. John, PE Environmental Engineer NCDENR Division of Watcr Quality 4401 Reedy Crock Road Raleigh,, NC 27607 Re: FAX to 919-733-9959 DWQ Proj. No. 000404 West Johnston High School Johnston County Dear Todd- I am faxing the following information per our cony tion this morning and in response to comments in a letter dated October 11, 2000: 1. Plan view of wet detention basin in front o the school. 2. Section of wet detention basin in front of t e school, . 3. Plan view of dry detention basin behind t athletic fields. 4. Section of dry detention basin behind the hletic fields. In response to item 1 of the referenced letter I have clarified the separation of the forebay area from the main detention area. Please note that a revision was made in the wet detention pond in order to pronounce the definition of the Wrm. In response to item no. 2 there are notes on the plan view that have a bubble • ound them establishing the height of the berm for the level spreader. This will provide on level elevation for the storm water to discharge over. Each level spreader is 120 feet long and has a level berm with an elevation of 194.00 for the wet detention pond and 178.2 for t c dry detention pond. The level spreader will be constructed in accordance with sect n 402.6. I hope this additional information satisfies the comin nts from the October 11, 2000 letter. If you need additional information please call. Sincerely; J.S. J Ad and Associates .S. owski, PE 105.C Emot Victorla Ct. • Greenville, NC 2746 @ phone & Fax (252) 756-8918. P.01 / YD EC-19-00 12:27 PM P • 02 Y?/? / uc•.+w. /, ,?? s rR??,\..?? ' 111YR ?L? i .•yy',: , ! ' 1?W?1I.?sw • _ .._??. TP EL.-1sMJ t t y-• M LUTS OF 00 rAl .?w' ?.? -jo Klw guy.. eel 20' 1D` " Tw ?. ` C1ci?5S ' STONE tx 1C' x24- TNK ?. CLASS T",STONE $S TO CREIITH r } Aa , •- _ NOTE: f MPLETIO\"F ALL •, 1 REMOVED TO Bf31'T _'•??' OF SEDIMENT POOL `s cote.ARS ELEVATION. W00 ATlVF +•! SHELF ?_ \. G04 aS AM ROCK _r----- ET D'ETEN0 / ATER SURF rf98 00'! a? d'x0' OYEFiFLOw - SPLL BOX • .?liP-7w.a •''' ' BOTTOM-1fKA0 3. / / ?eP 210- /? 1 ? r 1 .% 31Y WOE wmw_w WAY M .-201.01 '• ••,- lip, _.!"_ or .00 A11% 718-00 12:28 PM 1. T i .l 1000 ool f r do-.. P.03 { y I P ? t ? r 1 a V/-04 0 OP / // 91, - J?l,?,??u?ry DEC-19-00 12:28 PM hW 9!4 Cl td N i rr£ a •? ` 1 31 0 Y 1 OR a a ? 1 1 e n . W 0 0 .? d 1? 1 18? 1'1 ?r. r?k 1 Y11 / I 1 1 (il- - ?o P.04 i 19 viw xN _'t DEC-18-00 12:30 PM State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Todd Smith Hite Associates 1530 Last Courtecnth Street Greenville, NC: 27558 Dear Mr, Smith: Division of Vj October 11, 200 1 Subject: West J?p nwQ The Wetlands Unit staff reviewed the stormwater mana that additional information is necessary to complete the information is as follows: Forebay CDENR Quality nston County High School )ject No. 000404 County plans for the subject project and determined at review process. The required additional The berm for the forebay (whether above or below tBit urface of the pond) should extend across the pond so the forcbay will contain sediment. Please nethe engineering plans to reflect the change. Please refer to page 9 of the NC DENR stormwater Management Practices Manual, April 1999. 2. Level Spreader The level spreaders should be designed to discharge ah ng the length of the berm in order to maximize the length of buffer utilized for stormwnt_r °°Firnilation. The plans do not show this. Please feel free to call me at (919) 733-9584 to discuss ?this matter. Please refer to page 77 of the NC DFNR Swrmwater Best Management Practices Manu: , April 1999, Division wetlands unit staff will strive to complete a final receipt of the requested information. If you have any +W.5 contact me at (919) 733.9584. cc: John Dorney. Wetlands/301 Unit Raleigh Regional Office File Sinc reI Todd t, o7 hn , Environmental 4401 Reedy Creek Road, Raleigh, NC 27607 An Equal Opportunity Affirmative Action Employer heal review within 10 working days of or would like to discuss this project. please I L ineer P.06 r r i TelAphone 919-733.1766 FAX 919-733-9959 5VI recycled/ 10% post-consumer paper -00 12:28 PM h I r ? 1 I P.03 • e ?r f T b ? pry , ??? I f `? DEC-18-00 12:28 PM 8 lZ 1 P. 0044 s Q?- q! ?,SS 91 / ? ? S2 cs r? _ Jfi . Wv i 'r4 a_ J 31 Poll i MW>< 7 I a a ? J 4 1 Tb O h A W r, ! ;J 1 ?r. Q'4 w` e. 4i . ?r 1$1, 41 I. bx a it DEG-19-00 12:29 PM 1 ~ 1 1 E'er ? I r ? t '? I ?kr P.05 G r MAW 61?4ro . - 141-114e4o