Loading...
HomeMy WebLinkAbout20140090 Ver 7_U 2579B Corps emails_20200129 Wanucha, Dave From:Dagnino, Carla S Sent:Wednesday, January 29, 2020 9:12 AM To:Braspennickx, Nicholle M CIV USARMY CESAW (US) Cc:Wanucha, Dave; Euliss, Amy; Barrett, William A Subject:RE: \[External\] RE: U 2579B - WSNB from US 158 to I-40B/US 421 - impact tally Hi Nicholle, I will se sending the permit modification letter and drawings soon this morning. Then I will update the paragraphs you have sent. Thanks. Carla -----Original Message----- From: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil> Sent: Wednesday, January 29, 2020 9:05 AM To: Dagnino, Carla S <cdagnino@ncdot.gov> Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Euliss, Amy <aeuliss@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: \[External\] RE: U 2579B - WSNB from US 158 to I-40B/US 421 - impact tally CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Here's a paragraph from the cover letter... some of the same numbers...checking on the totals.... for the U- 2579B project... Thank you ! Nicholle B. These stream relocation changes bring the U-2579B project impact totals to: 12,492 linear feet of permanent stream channel impacts, 1,570 linear feet of temporary stream impacts, and the draining, excavating and filling of 7.82 acres of aquaculture ponds (permanent impact). There are no changes to the permitted permanent wetland impact(s) of 1.96 acres. Bank stabilization would increase 12 additional feet from 2,309 to 2,321 linear feet. -----Original Message----- From: Braspennickx, Nicholle M CIV USARMY CESAW (US) Sent: Wednesday, January 29, 2020 8:47 AM To: Dagnino, Carla S <cdagnino@ncdot.gov> 1 Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Euliss, Amy <aeuliss@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov> Subject: U 2579B - WSNB from US 158 to I-40B/US 421 - impact tally Hello Carla, Here are the place holders I currently have in my memorandum... could you please check that these are accurate and fill in the totals where necessary? I want to get this over to Monte for his review this morning if possible? If not - I hope to by this afternoon? The newly relocated Smith Creek will measure 2,127 linear feet and the newly relocated unnamed tributary will measure 384 linear feet. With the current Smith Creek and unnamed tributary to Smith Creek stream relocation plan (using natural stream design), the temporary stream impacts to both streams has been reduced by 218 linear feet. Bank stabilization has been increased 12 linear feet for a total of xxxx . Based on the applicant's 90% plans, received 27 January 2020, these stream relocation changes bring the U-2579B project impact totals to: 12,492 linear feet of permanent stream channel impacts, 1,570 linear feet of temporary stream impacts, and the draining, excavating and filling of 7.82 acres of aquaculture ponds (permanent impact). There are no changes to the permitted permanent wetland impact(s) of 1.96 acres. Bank stabilization has been increased 12 linear feet from 2,309 to 2,321 linear feet. Checking -- Is that 2,321 linear feet correct? (for the addition of 12 linear feet bank stabilization... Is that what goes in the xxxx in the previous paragraph?). Please make sure the rest of the numbers are accurate. Thank you ! Sincerely, Nicholle Braspennickx U.S. Army Corps of Engineers Regulatory Project Manager Charlotte Regulatory Office Desk: 704-510-0162 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2