Loading...
HomeMy WebLinkAbout20091235 Ver 1_Application_20091117.. FAi[p? ?e STATE OF NORTH CAROLINA N& ? .l ? Zo09 O a/JD DEPARTMENT OF TRANSPORTATION 41411y BEVERLY EAVES PERDUE GOVERNOR November 10, 2009 Mr. Brian Wrenn Division of Water Quality 401/Transportation Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 EUGENE A. CONPI, JR. SECRETARY X91235 SUBJECT: Pipe Replacement on Highway 27 East, Lincoln County Dear Mr. Wrenn: The North Carolina Department of Transportation requests authorization to replace three existing pipes in conjunction with a widening project on Highway 27 from east of Hwy 150 to SR 1354 (Asbury Church Road) in Lincoln County. At Site 1 (St. 28+00), NCDOT proposes to replace the existing 48-foot long 4'x 6' RCBC with an 120-foot long, 96" RCP on a different alignment. The new pipe alignment will result in 50 feet loss of the old upstream channel; however, 25 feet of upstream channel will be relocated to reconnect the stream to the new pipe. Therefore, the total loss of the upstream channel will be 25 feet. The relocated channel will be reconstruced based upon a reference cross-section surveyed -145 feet upstream of the existing pipe. The new pipe alignment will also result in a loss of 70 feet of downstream channel. A 130 foot section of the downstream channel will be relocated to an 85-foot step/pool channel to provide a better culvert/stream alignment and also to reconnect the outlet invert to the downstream channel elevation. The downstream relocation will result in 35 feet of stream loss. The outlet invert of the new culvert will not be buried per regulation due to the construction of the step/pool channel downstream of the outlet. The work at Site #1 will result in a total loss of 130 feet of stream channel. At Site 2 (St. 30+80), NCDOT proposes to replace a 44-foot long, 4' x 6' RCP with one 104-foot long, 66" RCP. The new pipe will result in a loss of 40 feet of downstream channel (the upstream channel is non jurisdictional). Due to proposed slope of the new pipe (-5.2%), the pipe will not be buried per regulation and will be placed at existing streambed grade. A 20- foot armored scourhole will be constructed for energy dissipation. The work at Site #2 results in a loss of 60 feet of stream channel. At Site 3 (St. 39+00), NCDOT proposes to replace a 39- foot 3' x 4' RCP with a 36-foot long, 60" RCP. An 8-foot x 8-foot long dropbox will be constructed at the outlet of the 36-foot long, 60" RCP and a 24-foot long, 66" RCP extended from the dropbox and the invert placed on the existing streambed gradient (i.e. the pipe will not be buried per regulation). The work at Site #3 results in a loss of 32 feet of stream channel. temporary cofferdam system will be graded and restored back to pre-project conditions. The scope of the work at the three permit sites will result in 222 feet of permanent impacts to Hoyle Creek and two unnamed tributaries to Hoyle Creek, which is classified as a WS-V watershed by the Division of Water Quality. Temporary cofferdam pumping systems will be used to divert the stream flow around the construction sites, as needed. Area affected by Post Office Box 47 Shelby, North Carolina 2 8 1 5 1-0047 Hwy 27 Widening Page 2 November 10, 2009 This office has conducted a GIS and field survey for the project for historical sites and threatened/endangered species sites. No sites listed on the National Register of Historic Places are located in the vicinity of the project nor did there appear to be any eligible structures. The federally listed species for Lincoln County (USFWS listed date January 3l, 2008) include Michaux's sumac (Rhus michauxii) and the dwarf flowered heartleaf (Hexastylis nanii lora). National Heritage Program records document the nearest Michaux's Sumac location approximately 16.6 miles southeast (in Mecklenburg county) of the proposed project area. There are no known sites of Michaux's sumac in Lincoln County. The sumac is typically found in sandy or rocky, open woods and appears to survive best in areas with some disturbance, such as artificially or naturally maintained clearings. There is no suitable habitat within the proposed project area and no species were observed. National Heritage Program records document the nearest dwarf-flowered heartleaf location approximately 3.5 miles southwest of the proposed project area. The heartleaf is usually found on dry to moist ravine slopes (usually north facing and of the oak-hickory-pine forest type) and in boggy areas near springheads. There is no suitable habitat within the proposed project area and no species were observed. The proposed project will have a finding of "no effect" on the dwarf flowered heartleaf (Hexastylis naniora) or Michaux's sumac (Rhus michauxii). Highway 27 is a rural arterial; however, the project area is not located within Yz mile of any critical watershed area. Therefore, hazardous spill basins are not required. Enclosed is the hazardous spill basin checklist. I have enclosed a pre-construction notification for a NW#14 (WQC#3704), sketches of planned activities and location maps relative to the project. Project information for the 401 Automated Payment Procedure is as follows: 0 Work order number: 150470-55120005-37734.3.1-2170 • TIP#: W-4712 • Project Category: $240.00 Fee If you have any questions or concerns please feel free to contact me at (704) 480-9044. Thank you for your time and consideration on this matter. Respectfully yours, M.L. Holder, P.E. Division Engineer Twelfth Division BY: J Trish Simon Division 12 Environmental Supervisor Enclosures cc Polly Lespinasse, Division of Water Quality, Mooresville Regional Office O?O? W A7Fq,9 ? O Nli? Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ® Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No 2. Project Information 2a. Name of project: NC Highway 27 East 2b. County: Lincoln 2c. Nearest municipality / town: Boger City 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: W-4712 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Right of Way 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form -Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is ? Agent ? Other, specify: 4b. Name: Mike Holder 4c. Business name (if applicable): N.C. Department of Transportation, Division 12 4d. Street address: 1710 East Marion Street 4e. City, state, zip: Shelby, NC 28151 4f. Telephone no.: 704-480-9020 4g. Fax no.: 704-480-5401 4h. Email address: mholder@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Trish Simon 5b. Business name (if applicable): N.C. Department of Transportation, Division 12 5c. Street address: 1710 East Marion Street 5d. City, state, zip: Shelby, NC 28151 5e. Telephone no.: 704-480-9044 5f. Fax no. 704-480-5401 5g. Email address: tsimon@ncdot.gov Page 2 of 12 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): NA Latitude: 35.474004 Longitude: - 1b. Site coordinates (in decimal degrees): 81.181068 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 6.5 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Hoyle Creek proposed project: WS-V (From source to a point 0.5 mile upstream of 2b. Water Quality Classification of nearest receiving water: Lincoln County SR 1321) 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site 1: Existing 48-foot long 4'x 6' RCBC; Site 2: Existing 44-foot long 4'x 6' RCP; Site 3: Existing 39-foot Y x 4' RCP. Landuse is residental. Pipes are on paved primary road. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 400 3d. Explain the purpose of the proposed project: The purpose of the proposed work is to upgrade and lengthen culverts associated with the widening of Hwy 27 east. 3e. Describe the overall project in detail, including the type of equipment to be used: Site 1: NCDOT proposes to replace the existing 48-foot long 4'x 6' RCBC with one 120-foot long, 96" RCP on a different alignment. The new pipe alignment will result in 50 feet loss of the old upstream channel, however, 25 feet of upstream channel will be relocated following natural channel design principles to reconnect the stream to the new pipe. Therefore, the total loss of the upstream channel will be 25 feet. The new pipe alignment will also result in a loss of 70 feet of downstream channel. A 130 foot section of the downstream channel will be relocated to an 85-foot step/pool complex, which will result in 35 feet of stream loss. The scope of work at this site results in a loss of 130 feet of stream channel. Site 2: NCDOT proposes to replace a 44-foot long, 4'x 6' RCP with one 104-foot long, 66" RCP. The new pipe will result in a loss of 40 feet of downstream channel (the upstream channel is non-jurisdictional). A 20-foot armored scourhole will be constructed due to the new pipe slope of 5.2%. The scope of work at this site results in a loss of 60 feet of stream channel. Site 3: NCDOT proposes to replace a 39-foot X x 4' RCP with a 36-foot long, 60" RCP. An 8-foot x 8-foot long dropbox will be constructed at the outlet of the 36-foot long, 60" RCP and a 24-foot long, 66" RCP extended from the dropbox. The scope of work at this site results in a loss of 32 feet of stream channel. A temporary cofferdam pumping system will be used to divert the stream flow around the construction sites as needed. Area affected by temporary cofferdam system will be graded and restored back to pre-project conditions. All Best Management Practice's will be utilized during the course of the project. The Project will be constructed using typical heavy equipment (trackhoe, backhoe, etc.). Page 3 of 12 PCN Form - Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ? No ? Unknown Comments: Jurisdictional stream determinations made by the Division of Water Quality 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Division of Water Quality, 6/30/09 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 12 PCN Form - Version 1.3 December 10, 2008 Version C. 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream'impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Site 1: Upstream- 25 Stream loss due to fill Upstream- Stream relocation to 25 reconnect channel to new pipe S1 ®P ? T D Hoyle Creek ® PER ? INT ® Corps ® DWQ 4.5 ownstream- 70 Stream loss due to due to fill Downstream- 35 Stream loss due to stream relocation (130 feet relocated to 85 foot step/pool complex S2 ? P ®T Site 1: Cofferdam Hoyle Creek ® PER - ® Corps 4.5 40 I bypass pumping [ I INT ® DWQ Site 2 : Stream ? PER ® Corps 40 S3 ®P ? T loss to increase in UT to Hoyle Creek ®INT ®DWQ 1 pipe length Page 6 of 12 PCN Form - Version 1.3 December 10, 2008 Version Site 2:Stream loss due to armored scourhole 20 S4 ? P ® T Site 2:Cofferdam Ut to Hoyle Creek ? PER ® corps 1 20 bypass pumping ® INT ® DWQ Site 3:Stream loss S5 ®P ? T due to dropbox Ut to Hoyle Creek ? PER ® Corps 1 32 and increase in ® INT ® DWQ pipe length S6 ? P ®T Site 3: Cofferdam Ut to Hoyle Creek ? PER ® corps 1 20 bypass pumping ® INT ® DWQ 3h. Total stream and tributary impacts 327 3i. Comments: REFER TO PAGE 3, SECTION 3E. FOR PROJECT IMPACT DESCRIPTION. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 417. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 7 of 12 PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ?P?T ?Yes [_1 No B2 ?P?T ?Yes E] No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. At Site 1, a step pool system was designed for downstream stream relocation to dissipate energy and to connect the new pipe outlet to the downstream channel. This measure was designed to minimize impacts by removing the 90 degree meander bend which is located at the existing pipe outlet. At Site 2 outlet, an armored scourhole is designed to minimize erosion potential due to the necessary slope of the new pipe. At Site 3 outlet, a dropbox is designed to minimize erosion potential. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Minimization of impacts by installing appropriate erosion control measures. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in-lieu fee program project'? pro ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 8 of 12 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. i 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zo ne 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 9 of 12 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 90% 2b. Does this project require a Stormwater Management Plan? ? Yes ®No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Com plies with NCDOT's individual NPDES permit NCS000250. Existing impervious is 4 acres, widening of roadway will result in a 2 acre increase of impervious surface. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? NA ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HOW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 41b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 10 of 12 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation.(DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The project is classified as a categorical exclusion project which has low potential for cumulative/indirect impacts and will not result in additional development which could impact water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 11 of 12 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a . Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b . Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? E] Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program database. 6. Essential Fish Habitat (Corps Requirement) 6a . Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b . What data sources did you use to determine whether your site would impact Essential Fish Habitat? No salt marshes, oyster reefs, or seagrass beds in the vicinity of the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 71b . What data sources did you use to determine whether your site would impact historic or archeological resources? The project has been reviewed by and approved by NCDOT Cultural Resources Specialist. No further survey is required. 8. Flood Zone Designation (Corps Requirement) 8a . Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ®No 81b . If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM panel number: 3710364300J M L. NWder- 11-/D-Dol Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 PCN Form - Version 1.3 December 10, 2008 Version Elevation, ft A VO1 (0 0) OD O N W - A 0) V co O N - w A 0) y v d .w dp G x N O N N N W N A N N m N V N OD N 0 W O W W N W W W A W W 0) W V co 0 0 (O O Q O O O) O_ C v rz? I N W N N O) w W c CN a) a) C C_ (D d 1 (p S ? I I 111 0 A W N N x ."S C7 0 N N (D O O I F tU (D to N O (D C_ G N V X A W 3 CD 0 1 N W fA fD 0 7 .a A M C O N D) 3 0 N 3 N M Highway 27 Widening Lincoln County Site 2 Outlet Downstream C D CO 00 CDL-0 C9 - oC_oLO00000 M --r ?, m CID 0iv?mCxO C) H Q m a v N ?n O W N ? A s ^ $ m X cn* _ ° cb (b W N A C 9p? O ? II ? I I ? 8 0 cb w \ O Q = 99 rn O 9 ? 9? L X9 ? 8 r O 9j ?C r O ;6 CO QD 2 -I C D CD OD LID L.9 C9 C9 C9 r n n , ? C9C.000OOO ° ? N C N ? mco0N ?0) 0D n N Z n ? N Fr) ~ o ? ? - z c? ?, m o ? n y s 0 ti IV o w rn rn cn cn N N N Al ' Ol Ul v io ,p W Ul v co W O n r ?-o(-oco(-oL-oLoc9c9Lo(-OQO JJ?-o --?6? co N)NfvIVN)LJ O ON-L, 6)ooO l-, (-J rv-r?, ,I m o C) m J166 6 1 I g? O ? I I 1 1 ODD 9 r o ' s? 3 9 O O lp m C b 8o p o (n WOW O ? ?L ?` m to D \ N? O ? Q c ? Z o O II rn ? n [A II 1 4 ? a ? 2 Q a ? y m r m II O N O O ? C o I rn z Z ? ? o -? o z o n n rn ? z ? n m N wz ? a CD o O y z c? n y 0 s ? s tn ?^+ N N N N Q b, ° o ' ? y y y y I y y y y y n c? n c) O n n n c? ? m m rn rn rn m m m m 2 z a z a z z z z n y ?I y y y y y y y r NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division: I? County: I inroln Project ID: W-4712 River Basin: Catawba Bridge No: NA Route: Highway 27 East Stream: Hoyle Creek and two unnamed tributaries to Hoyle Creek Water Quality Criteria: Yes No Stream Crossing Blue Line On USGS r r ORW r r WSI r r WS 11,111 OR IV, Crossing Within 0.5mi of W.S. Critical Area ? r Roadway Criteria: Route Designation- Yes No Arterial Urban r r Arterial Rural R- U Additional Site Information: Yes No Is a Hazardous Spill Basin Required? r r Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997). no 27 lincolnton\plcnsheets\w-4712-rdy_tsh.dgn (CONTRACT ------------ TIP PROJECT. W-4112 J 0 9 N T O P O o Z 0 O N < O O O A U c X X 41 = t a g I ?+ 5 S ? c 3 22 k a K ti z rA g g b N N l2J 0 O (n II II x A N a O 0 0 b 0 b b C) 1 1 F Y ? n ?x O O xx K N p? b ? ? F A Y y 4 O n ? b m b ? O b N D! b i O Y 'b F b y a 0 Ya` r J J n Q\ IO 1 71 1 m W Z 1 i -J? A Ld lr ?? N. m s _ Ol `h/??K A IV C u : mlm in m•1 ?JOF 0 A m O m i m Y0 m ? S Ip N W O V m m / I'T1 A m m 3 m mm N ? m IV m ? V A m m m ,O m / ply' A O ? V O IA N ,O N Im \ IWO? /?/ IO m b m xa O O •1 Q 8 N ?. e ? eCn n N m F ?i b m O 0 N at3 am v •. no • I bb z ?> I a R • ? ? D W I ? 93 ?2?`P' n01 yn ® ®? w ? a ay ® ?? Cx ? n w .Rf x ? ?9 b ? ti C aI C? l' a I--ii-- a ? S a 7 a N a a 1? -TI r i O TT? nc 27 )mcolncon\planshoots\.-47)2_rdy_psh <.dgn s? Lk 8 w a S Irva.T ns.sr bO RexI ? ?4a }p„ O RRyy?A "ggF ) i.W .5•. na5r A N O X. xIar ad d? .F 5 OVb.y V O ?Y a ! N ' 4 at p?ac? SLIM s nasty q ni.T ar 88 F AR ?x OO ~Ye I: 8 R J' k Y o s 55Y'S0'? ? - - uor x ?-=n- 9S..' rcaR. ORUN STREET _s5??? xi5r ig £ jS"?7YmT tt [ F 3 a as Ga`? Co I ? r. To 7?'a'?Seg4 an le w?T???RI III?R??S? - I I ? AEI lal?l S 1J--JHS 3N1IHJIVR z nc 27 Lncclncan\plansheeu\.-4712_rey-psh-5.egn O N Sy-0'YL [ P¢N [ ]I.ILIO N N 11 vN Y.t q A olV I ? L I ? [ ?v ,O.K R? I GIm ? ? I i ? ? p P ! ?N 3 Y \ i ? • F 6 I ? s oo%'ss•+ f o ? S 466' Y IIi.YY I®^C,p e I ? u tivSY Y•? a 3?T? N '" y C N m & Ly Y S8 u1 ?O s 2S? ' RR oxg n s:W •.F • ?m 4 R?Y?4 O:10 r i O r rn rn Ul) 03 I I I= eG wl I a??oDp I Y Y n u nIn $w yo / d 1 iNE[ 1 m5 gY? O y F^ RAF fl ? Aj9. a e YY ?a } °s iy? AE ' Cb A 8885 wag RRR$ N ?s3 g r Q $A F? 'a 3 ?EEl4 / 3 a S AM'W'Y ? 5 AM'00'[ g N $Ary [\ A e \ 8?7 x?F O a f 23 Ell ?0. nnn o? g?a ? 6 7 ? i 5 2 y II? 6 ? m n N 0$%'I J'[ SilA' ?-fr ODU [ [ Y Y 6I/1 0 ?vw Ul l?' ?[bmQe?Y _ y 11 JJ 8yyy\\\ r 30 ? ogles - [ q[y}[0 N gSa u?? N RRr O F Er ? Oa w NAD 83 2001 n$6 _ a nc 27 lincolnton\plonaheetn\.-4712-rdy-psh 6.dgn a • agN? ?? d gR O 35 '8 A m JI a z? m 1 ???zes[-oo-r r 1 O?.N ?[ rlNOp' 1 p m ? mie ? \ Iq - i?QQ ,?mnv 8 C I I F?? mo. e N Sm E O ,?y s 3 ? a 8?y \8619+9f Ld -7- r,lliirr V . f g t r?X? Soo JE ?? O O?QQI + ly 5 'A- 3 7 VE \S° O J A 1 G ° ti F h. g d a €? [p cgs I u t/ I I g r ?' fl i,?5 I I g I ' 3?Qi W I ?F. I m N ?Y g€.. J= o i o s IA I g+ l a O s- v I' N M8 I mNl ?I 3 y ?"q I 0900+11 lUd -0- -TI ^I 1 0 ?TT rn i a? f a ^ 4 - 00'[6+16 $A N g ?F S O T le V13 a y.ar??a 8 8 i 8 ka 8T~ ieTr ? "Y'?Na ?J Y e ? yo iY O e,?e 'yy y Otll? al Ail Q Xa Di MAI CHLIN 9 a i. _ i or 8 -- mT'fe--[-----qm g ? ?Ig 40 I 8p ?I8 dF' Nry W I. ?N ? I I v? or r.c s alb wp 3 1 Cam" 8 R.e'° 02 I f 6 ?> $W e N 45\ "Is ? sP ? p ?[ W ??? 8 fl O ;a [ _ _ _ _ rn Zrov'c _ RIVE g v 2t O 8 m 3 ° y? Z 0 a o K.[6' x Lrv33• E_ O nc 27 Itncolnvon\ploraxeev\.-4]12-rdy-pen_].Ggn SH ,1 I ARRs 0 I i = e9[srtts tud -r `? N O u F `O s,.•u+rY ? ICJ S? a ? o a YI- a I ? sa O^ Ji MC4 ?~ o I 1L`?A T s '^4 T • 59J.6Y V .. 50 ? T oa v ' I fi .. ? L Q n O ? sp O Rk ga°a _ F C?? x w, ee• -- - n+a 9? I A-I r•oD? uu nn uv_, a tNii?y ?? ?Nm i u` F a a OT a I r y I ?C Yo r esy rn "br " \ ' asrys. w, rn o rn ? rn I-TI F a a a s a a? O 8 s ?>'W V vx.? F t? a ?F 06 ycr%??Sp ?I 4:t4t ?r qq .d 1 s $?& 8m o?¢'o? 1 0 g x r s$ ? 777AAA 8F °? g i ? A K_ ?I T K 4l O Rsi g ? `a= Rm 'Q - w qy T ? END C7N - - PoT Tgt9bN <?. 7? ry o K c9' 4 Z A? 8 Ri a c a grn*SS ad -7 n a n 9 a plen,\. -,1712 III I.I, TIP PROJECT W-4712 T Jp 4• T ?H T ? m - m R A 1 p1 ! C tv 3`1 Y 4 bl ^'7 w L yin ?• N ?l C: ?-1 Roos tAw ?z ® P? f ., i d ry y f r , Q py' i te Mhi4.l eµ ? S i f qna X. iy !I m t e e a e x e R e e e y e ? ^3 ? F t_ C F F y Y- i Y .m A i ?_ Y Y t Z m T F F F ?, T 3_ O z?A°2'7o = ;'boo ??? pg w i u x all f a i [ f 6 A }{t if 6 V_ f 1? 6 i f rlU s ? ¢¢F ?E ? Eo ?E? \.-4712 nc 27 hnc oln wn\Pl9naneeta\ec Plena\.-4712-ec-4_c69•d9n $iis OR= d kn o ?y >[a oMC; J 3 G a? s Hp - u? ?A? LIYLI A 1 I ALI 8p b" S Ir.a.r. 9951' r 1 ?} yy?? Q IL y88 ?!t Ay ?? QRR-a = s Irglr. IM R? R ? iO s mmEr. $?o 8F s m5a4r. ssxn' \ `` O r o M,-0 xa7a RRRRRRAig a"^,g"d'8eg'?N s 6131W1 Q fl145' y \ 'M G -L- por /o+c»m 7a V, IN (,VNZ?l U I UN Y? r eli I 95X w T a g -_ s essv. F nLnl- a m - SKADE SpiEEE S S o ¢¢¢ axe GIs a ?, I ? 1' o _ I I s rsv'v'. flEA10 .g ? I = q pfa O a ?i '? ^IRRe Tg m pd .. ?/ al: V rigioiu ?, ? LWML a n ? I g? ?^ 0 ?s n ' t • e w3' • R a =? W. E . « 93 YY GGFEN STKEi' «K•f5'00•E ISLE' O NI ,_n zft p^n a;. FI an 10 15 Z o?A.. go>>m rs ? ?o i z O or 2N zo ?Z 10 4 as A? a? n? Gm g3 ;IVA 20 F 8 0 >zA L? v ?. CA Lu TO n2 O y,y0 Z? o GGGGG E ?T n °m Lnc oln wn\plomhee n\ec plain\.-1]12 _<c-5.c6 g.tlgn nc 27 t F a? i nc 27 lincolmmn\planaheeca\cc pions\.-4712-ec-6.c&q.dgn $ Co?? T^A Z I• N? $8$ tni^o / / - •Y}M nmr?- ^z uz Qn? =0 O Z?C as Ro 'n 0 23A Ao Z ig >9 Z O Z r?i • yC?yC? M? ZO OO 0 n n ,. o? ?c P? z pin 0Z I I I ?I pf I O }_ ? \ I 4 of 12 nc 27 Lncolntan\plenahee to\ec P1-\.-4712,.-7..&,.d,n 8 x W 4 g kx- g3 p ?N o O $? N M'? ] -- O N M'4 1 - ZfIRT T ?i } z gi ? =E n u ii o e H C n,?y nNNl° AOA`, Y 8 a? O a a l bS9 lSa. ? ? S JSS / a omn Z . A y 2 0 FA 00 B ?o .': OF O am s6 8 .s? s? g OnQ n nn [O N n 0 ? n? m ?L lI n? ac 5 31'J951• 590.6Y !!nn Z? 50 >• m ym Sym Nm SymS 4? O R N]]l ? Y S? +F u, uS O R .. IuUF.C. "Slog E R I az >A a r ?r 3 g? l B L S1 bf K? a 1 c?a P + ? Ka $l it 88? ~ a?R w T END CONSr s :rona. NS.II a 1 J ,AQ a3 O O ?i0?1 K ` s1 a O r^ it 12 nc 27 lincolnwn\plemheeie\ec p1ona\„-012-cc-8-fmo1.dgn e 6TJ'. . p r155' 88 w RR ?,?? O I- • ??..u ? w o-o I 8 I 5n.M' - sw,oE STREET Rp N W ?R d ? e'bE?_ 5 ?? F? °? [ E5 O J SI1V0'S5'I C 1" R R O = I ORR?A QR???n lr. dY LIZ 5 O _ 5 R45'S5-- W. a Q tl. mRR?, O N- 511'q'IS- ? I `I ? - YYN Pd ,11J1' I N I a..9 0 a ? SRRS'S'- 4k'?O Qom/ I I I Sg ?P •6 - s a a? III I &'s I I? I I Jlp o 5?-4vQ'. I I all V m Jxxn I I - -O10 5R%1F- t e I I 93AJ' S! > S R &? as•• xrs'orr y 1 pp a[[?_rt[ _ GREEN EEfi N 115-W E • • . f5c ?' .. I I I . - n N- e e!s 98 I ??I Ifl O qp W N (f 1 8????fB?U' $ I 1.? ,?s a•Ii RRR R ?? ?8 T+ \ A ?? 'I$ ?I is g3 20 F ial"al na 27 Lncoln oon?p bnanee c??ec pi.n,\.-4712_--9 _fm.I.d,o > `NJ.l ?t Z l? 44ECN `` f/ \N lli ' mss. < S CIOSW? 90il' wl)q» C N M-1, t / --y M-1, l5fll,- $`a OE n? 8 V ^ T O N£ 0 N N N om_3 ? 3 % to f 30 a pYYO ?? -? •p1pr0 N NAD 83 2001 a? i nc 27 Lncoln,on?plenaneen4c pI.naw4712,.-IB-f,-I.d,n \`u 0 x i S dd a r , p C ?a RAF O 3 °B m a LS ,R R F 3 1 `1 ?tesrar! r?ao?p T 11 1I ',.m \ U4)1 `t! A? y? I i 11 C9= a SPS$ n l ( ? ( R I she ??_ e? \n L y A w ?N W004 Z 1 ? 0 z I $ 4 I ?E ii J O $p 3 V ?. O a ? I J- yq ¢o p t y I ; #II7{' 6F I 1 I 40 O $ ? I• ?O R" I a x O N AS,;? ?n I &C w a 2 S P$ ?_ yproypM1 6 I T,.tY M1 ' I $? r ? C NA ? N 45\? P'J Q1 $W s / I ^11 V( a o s M.C " Ll s? 'a Q yey0lq p 888 tx o?& t 72 ?'b W mm ,??jJ +O j/ . M1 ar,. L m? 4 a'm \ OaOo+Z ,g??? \arr+e JF^ Rix R ` ? 8 : o ---_- _ ?? x :r.nr! _ yp Sr [ ?(,E?y o 9 = \\ A Vr O ^ ? t a a? Z N lZY, E- !KK' ? S nc 27 Lncolnwn\°lnnaneaca\ec plans\.-4]12-ec-I1-(mal.dgn :I RRAR y4 it sm ry H' _-- p1fY ? I 6 C? a ? _ Pr ?r2a.? G7 s bss'se 4ay.. \ T Js zr a 0 ? ?4*f / Al " ....a.. ? kaa " , 1 f7 0 $ m s L RO Q Hyew?"-? _ ice' S? O ?r a a. 0 8i a? crli.cc v _ -a lie y a a lfYLS+Ni 1Vd -?- nm O uN ? !1= rsn?. 90.{Y 50 a CJ a s _ A B „ x SE ^ a ? c. ew» a+ g R 71 - ffi_ \g ?n y R r ? i L 06 a4e.n 9 9 °• 9 ss? Rs? a 1 0 0 o N ?oo? ? _ 14 a 0 i Highway 27 Widening Lincoln County Site 3 Outlet Downstream i? ? U O? 0 it 4ik V-r Y OF L/Nco LIVTON ETJ L 11ulTS +a` Wig. / l N CApR)CE pR S I ENHAVEN TR y? v .. N rRCY 1'n (SIl 1814 . tCb TIC- 'r .. 76 _eo .e•• NF Y , 99j NSF GF ?? .. ' 00- ? ?1v,. ST R?..' 3 m ? -n D m 1 ??. _- z? m D r d 7 n G C r, q O C Z O O ?ary??? m M? CC7 io I r ?? 0 T -bc`? o Mme'*r p is ?' 5L 3 4 m ;v Ir z o0 a3 tI s n , v Nan D M 0SbT9? _ 7 ° Z ] err: C _ ..? w irn :o ?»'.mQ° ?rrc 3 u m D ?; o a rc sZ7 3 L n:; 3063 - a m - - - m .. m m 90 °] 3 d ? m n A O ? n z m r W rn A L 3 D o ? n N r y! M v u z o p ? o = L r .. O O O O T y Highway 27 Widening Lincoln County Site 1 Inlet Downstream Outlet U pstrea m J a? c? z m C1 0 N 1 O z C'> c r- 7 (D -n 0 N N_ O (D NE Dv zm 070 m< >5 E?c U) 0 m 0 I s ? ? rn cll I O I z A m r o l m CA p i m l - i i i / L. + m'e? c ° (D 0 1 N (n O CD mm / NUIC' I Ozo r? X r N ?c) r I m I ? D I D o zD I c? 7 ? N` I 3 N ? D m zm °< co < D p Oc N I II m Wr3 Nlr,l t? I in - i / ^ - D >D m? zm- m<o °<mg >OCD N m m -L- PT 28+71.83 I Iln m I\ III I I I I noo O zQl Mr-j ?cZ NM MQr W mom Dc? =Z m o-, n °1c 0 mz? 2 (A n 1 Zm Zc mn r ? zZ I 30 I I? ?I onCn CO-0 Ul -u o(n o?0?nrrln? MFTl CO=(-A zN HIV ?f:: ?:: D= ?JG--i 0 m XS° DXDrTI° rrl° =ODDZm n M>-Fl (n m0 O-film mDDDfTI (nnnDfTl mm fT OZZ(z:ir O nZFZ m- < n?mn? DmZnZX fTIDTOX 0X cli D Z -d=F- m rT10 ?Dr-<Z<zn <-Tlgn FT1n 0 m _ mm 00? mz-um ?D-rT>M> ODFDD 0D ?u(nZF n - 7-<M Z Oro <---j O OOnZOr---iF < ?OD?m C ?r nfTl ZFTl0° SAC M D nfTlmr D D ZmD(n M 0 11 C)=F- (n0 D--I = 0 ? ? ?nzCnD ter- <(n ?-{n ZDZm D Dm m =m-Vz I D Dn---Tl? OOKmfT10Z?=DAD OOOD - DDmmO n (-)CO f- Z C n o m (n Z Z m n o CJD T Fri(-) Od (nK: cnmm? OC7m0 DKCno ? S??I?D D? ?O mz??-?zm°mn ?Grrr O m< >z0n r OS OorZT1 mDM(n----I = U-1 OC/)D D nmOZO (}? CO (n A Z ?u - D (/1 Cnm O z0 U?? =0? ???0 < Z ?mm O m m r -u F- ?J m m? m C-) D0 S?l_ om????Dnz? nn m(Di m? ????? D r-? _u> X10 ?N(nC)ZO? n? -m??0 mZ n< m_{ mz DD=m r -DC -Dm Dm mOD?mCO?-Im D?OZ ??__? F- Z m Z D?0(n-? Zp(n DCD OJ -u m?-r n- -I m r-G7ZDD CDD ? m -gym= m0 Fq 0?rZ=?OzDZ? (A CA O??OF I> D -=> lD DKOm ?° Z =:J N m 0 O r z= D C Z M z z -Ti (n n D Fr-l o r 0 00 z - n C m m n O Z C n O z m D CA z C?