Loading...
HomeMy WebLinkAboutNCC200209_ESC Approval Submitted_20200131Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: November 14, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Jim Stevens Cardinal FG Company 342 Mooresville Blvd. Mooresville, NC 28115 RE: Project Name: Cardinal Float Glass Addition & Laydown Area Acres Approved with Modifications: 6.91 Project ID: MVLLE-2020-032 Project Location: PIN 4669904788.000 Submitted By: Bowman -Bunn, P.C. Date Received: November 1, 2019 Plan Type: New Dear Mr. Stevens: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Section 9.6.6 of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Section 9.6.9 of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Section 14.2.2 of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Letter of Approval with Modifications Cardinal Float Glass Addition & Laydown Area November 14, 2019 Page 2 of 3 inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and County water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govINCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Randall Moore, CESSWI, CFM Erosion Control Inspector II Enclosures: Modifications Fact Sheet on the New NCG01 Permit Fact Sheet on the New NCG01 Permit DE � April 2019 ,Ma The NC Construction General Permit (also known as "NCG01") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below, Most notably, there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucasPncdenr.goy or (919) 707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion & Sedimentation Control construction activity requirements; a-NOI: Notice of Intent, application form for the NCG01 permit • Is clearly organized by topic; and a -NOT: Notice of Termination, form for closing out the NCG01 permit o Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 Technical Updates The new permit: Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the _.. construction sequence, plans, calculations, etc. (p. 2-4); - - • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); - - • Puts all timeframes for inspections, record -keeping and reporting in The NCG01 Process "calendar days" for clarity and The new NCG01 applies to permits approved on or after April 1, 2019. consistency (p. 11-14);2 • Changes the inspection frequency Permittees will no longer receive a copy of the NCG01 permit in the mail with their E&SC Plan approvals and be considered as covered under the (during business hours) to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 0.5 inch);' and _ Under the new NCG01 process, construction sites will continue to • Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCG01 by place (p. 23). completing an a-N01 (available at deg.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. ' This list is based on website guidance by the DEMLR Sediment Program. Initially, there will be no charge associated with applying for an NCG01 z The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required per §143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an s The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at DEMLR. Q&A about the New NCG01 Permit Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific COC to every construction site that disturbs one acre or more. DEMLR is working to create a form that combines the E&SC plan approval and e-NOI processes, but that will take more time. For now, DEMLR has created an efficient e-NOI process. If an E&SC Plan is approver! before April 1, which permit applies? Projects with already approved E&SC Plans will automatically follow the new NCGO1 permit, but will not need to fill out an e-N01 or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deg.nc.gov/NCG01 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. Hove will the new a-NC}i submittal and COC process work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before. The E&SC approval letter will instruct the permittee to visit deq.nc.gov/NCG01 to submit an e-NOI form to DEMLR. The permittee may begin the construction activity after receipt of the COC (within three days*). The permittee must print and retain a copy of the permit and the COC on site. Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an e-NOi form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV.B.6 of the NCG01 permit. Additional signatory options are set forth in IV.13.6 of the permit. It is possible for consultant to prepare the e-N01, save it as a draft, and email it to the responsible entity for signature & submittal. What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit deg.nc.gov/NCGO1 to submit an e-NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&SC Plan approval letters and list servs. If a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an e-N01 after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment low does the new NCG01 affect the ieiegated local E&SC Programs? _ocal programs will continue to review ind approve E&SC plans. However, :hey will no longer send copies of the 4CGO1 with E&SC Plan approvals. )EMLR will provide sample language to ise in local E&SC Plan approvals to advise permittees that they must Submit an e-NOI to DEMLR. Local programs are not required to check if permittees have submitted e- NOls to DEMLR. However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for them to view a list of construction projects that have submitted e-NOIs. When local programs close out an E&SC Plan, the close-out letter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&SC plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCGO1 requirements. However, their permittees will be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCG01 permit. Or 24 business hours for a project opproved under the DEMLR Express review program. Letter of Approval with Modifications Cardinal Float Glass Addition & Laydown Area November 14, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Cardinal Float Glass Addition & Laydown Area Project ID: MVLLE-2020-032 County: Iredell Reviewed by: Randall Moore Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan, 1. Skimmer Orifice should be closer to 1.75" to dewater the required volume in as close to 3 days' time as possible. —RC 2. In the Construction Sequence, after #9, call for an inspection by Iredell County staff prior to mass grading beginning onsite. —RC IREDELL COUNTY t PO Box 788 IREDELL 349 North Center St. COUNTY • N C Statesville, NC 28677 Permit Type: EROSION CONTROL - PLAN REVIEW APPLICATION NUMBER 302307 Issue Date: Parcel Number Street Address Jurisdiction 4669904788.000 342 MOORESVILLE BLVD Owner Information Applicant Information Contractor Information Name: CARDINAL GLASS Name. CARDINAL FG COMPANY Name: INDUSTRIES INC Address: 775 PRAIRIE CENTER DR Address: 342 MOORESVILLE BLVD Address: STE 200 EDEN PRAIRIE, MN 55344 MOORESVILLE, NC 28115 Phone: Phone: (704)660-0900 Phone: Project Description Cardinal Float Glass Addition & Laydown Area EC Plan Conditions Permit Details Fees PLAN REVIEW Amount: $1,225.00 I hereby certify that all information in this application is correct and all work will comply with the state code and all other applicable state and local laws, ordinances and regulations. The respective department will be notified of any changes in the approved plans, a change of contractor, and/or specifications for the project permitted herein. This application becomes a permit only when validated and approved. Date: 11 /14/2019 Signature of Owner/Contractor This permit shall expire three (3) years following the date of approval if no land -disturbing activity has been undertaken. Permit Number 300426 1 TOTAL FEES: $1,225.00 IREDELL COUNTY -NC Cash Register Receipt Iredell County Receipt Number [ 11*4 PermitTRAK $1.,225.00 EC-300426 Address: 342 MOORESVILLE BLVD APN: 4669904788.000 $1,225.00 EROSION CONTROL $1,225.00 PLAN REVIEW 104563-460003 7 $1,225.00 Date Paid: Friday, November 01, 2019 Paid By: BOWMAN-BUNN PC Cashier: CCS Pay Method: CHECK 1624 NA Printed: Friday, November 1, 2019 3:30 PM 1 of 1 SUPERION