Loading...
HomeMy WebLinkAboutNCC200385_NOI Application_20200131Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/29/2020 3:20:07 PM (NCG01 NOI Submission) Approve by McCoy, Suzanne 1/30/2020 8:57:41 AM (Review- Construction NOI 21297) • The task was assigned to McCoy, Suzanne by round robin distribution 1/29/2020 3:20 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 31, 2020 5:00 PM 1/29/2020 3:20 PM Submit by McCoy, Suzanne 1/31/2020 6:54:53 AM (Payment Verification for NCC200385) * Laura Meadows • McCoy, Suzanne assigned the task to McCoy, Suzanne 1/31/2020 6:54 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 12, 2020 5:00 PM 1 /30/2020 8:57 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Suffolk-Swamp-Winfall 230 kV Rebuild, Section 2 2. County* Gates 3. Highway or Street North of US Rt. 158 Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Sunbury 5. State * NC 6. Zip Code * 27979 7. Latitude * Enter the latitude in decimal degrees 36.4423 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -76.5756 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/01/2020 Estimated Construction Project Start Date 10. Date to End* 08/31/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Other (0000) Standard Industrial aassification for Ceveloprrent 12. Acres to be 27.14 disturbed* (including off -site borrow and waste areas) 13. Total site area 91.51 (acres) * 14. Post- 0.08 construction (Estimated) impervious area (acres) * NCC Project NCC-GATES-2020-Suffolk-Swamp-Winfall 230 kV Rebuild, Section Tracking ID 2 Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Folly Swamp Waterbody * %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 30-3-2-1-2 Index No.* NCWaterbody Index Nunber Stormwater r No discharges will flow Pf Yes to additional wate rs * 15c. Additional Taylor Swamp Receiving Waterbody narre Waterbody 15d. Waterbody 30-3-2-1-1-1 Index No. NCWaterbody Index Nunber 15e. Additional Waterbody narre Receiving Waterbody 15f. Waterbody NCWaterbody Index Nunber Index No. 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Dominion Energy North Carolina Name * 2. First Name* Mark IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Allen If Corporation, enter F3egistered Agent Last %rre 3b. Title Director, Electric Transmission Lines Project Development & Execution 4. Permitee E-mail Mark.Allen@dominionenergy.com Address* 5. Permittee 804-257-4711 Telephone No.* 6. Permittee Mailing Street Address Address* 10900 Nuckols Road Address Line 2 4th Floor Cty Glen Allen Fbstal / Zip Code 23060 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 10900 Nuckols Road Address Line 2 4th Floor city Glen Allen F ostal / Zip Code 23060 State / Frovince / Plegion VA Country us State / Frovince / Region VA Country us C. Site Contact Information Part C. Roject Site Contact Inforrration ............................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site James Eric Contact - First Name * 3. Primary Site Clay Contact - Last Name * 4. Title Electric Transmission Construction Consultant 5. Site Contact E- James.E.Clay@dominionenergy.com mail Address* 6. Site Contact 804-335-9534 Telephone No. 7. Organization Dominion Energy North Carolina Name 8. Site Contact Street Address Mailing Address* 10900 Nuckols Road Address Line 2 4th Floor city Glen Allen Fbstal / Zip Code 23060 9. Consultant Name (Optional) First and Last nacre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Region VA Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/17/2020 Approved * 2. E&SC Plan Project Gates-2020-003 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Washington (WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Gates-2020-003 Suffolk-Swamp-Winfall 230 kV Approval 1.16MB Rebuild -Section 2 - 011720.... pdf letter/documentation Mast be R7Fforrrat Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. 6. NOI Certification enoi.pdf 441.84KB Form Mast be R7Ffon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Mark Allen Title Director, Electric Transmission Lines Project Development and Execution Organization Dominion Energy North Carolina Date * 01 /29/2020 F. Tracking and COC Info NOI Tracking No. 21297 NC Reference No. NCG01-2020-0385 Uses 'count number' variable (incremrented by SP) Certificate of NCC200385 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 385 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)