Loading...
HomeMy WebLinkAbout20170537 Ver 1_Year 1 Monitoring Report Comments_20200107Strickland, Bev From: Davis, Erin B Sent: Tuesday, January 7, 2020 8:55 AM To: Dailey, Samantha J CIV USARMY CESAW (USA) Subject: RE: [External] RE: Hannah Bridge MY1 Report - DWR Comments Good morning, So... if you haven't sent comments to RES yet, please disregard/delete my first bullet under Requests. Randomly I was going back through the report and did find the maintenance actions within the narrative - my mistake. Thanks! Erin B. Davis, PWS Stream & Wetland Mitigation Specialist 401 & Buffer Permitting Branch Division of Water Resources Department of Environmental Quality 919-707-3684 office erin.davis@ncdenr.gov -----Original Message ----- From: Dailey, Samantha J CIV USARMY CESAW (USA) [mailto:Samantha.J.Dailey@usace.army.mi1] Sent: Thursday, December 19, 2019 8:31 AM To: Davis, Erin B <erin.davis@ncdenr.gov> Subject: [External] RE: Hannah Bridge MY1 Report - DWR Comments CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Thank you for taking a look at this, Erin!! Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil -----Original Message ----- From: Davis, Erin B [mailto:erin.davis@ncdenr.gov] Sent: Wednesday, December 18, 2019 4:35 PM To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> 1 Cc: Haupt, Mac <mac.haupt@ncdenr.gov>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Subject: [Non-DoD Source] Hannah Bridge MY1 Report - DWR Comments Hi Sam, The Hannah Bridge site appears to have a few issues, as Ryan summarizes in the cover letter. We would consider both TH3 with zero flow and wetlands with 1-3% hydroperiods to be "at -risk" areas in need of close monitoring/evaluation next year. Requests: * Include planned maintenance actions noted in the cover letter (supplemental planting and invasive treatment) within the actual monitoring report. * Include stream and vegetation survey dates in Table 2. * Include photo location points on Figure 2. * Include a visual assessment statement regarding easement boundary condition. Ideally, also add photos of crossings. Super nitpicky corrections: * Page 9 second paragraph states 12 automatic pressure transducer gauges, but should be 13. * GW6 graph legend is labelled "GW1". Please let me know if you have any questions. Many thanks, Erin Fil