Loading...
HomeMy WebLinkAbout20200066 Ver 1_More Info Received_20200128Strickland, Bev From: Thomas, Kevin <kthomas@cecinc.com> Sent: Tuesday, January 28, 2020 3:19 PM To: Johnson, Alan Subject: [External] RE: Redwood Development DWR 20-0066 Attachments: Kannapolis - Stream Impact Maps Option 3 (updated 1.28.2020)- 200128.pdf • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Mr. Johnson, Based on your previous comments/ recommendations and our phone call yesterday, please see attached revised Option 3 exhibit for the above referenced development. The revised exhibit shows a steeper adjacent street running slope, a 2.5' wall, and increased fill slope into the stream to a maximum of 2:1. Stream impacts are now at 112 L.F. Please let me know if there is any question or further comments. Thank you, Kevin Thomas, PWS & LSS (NC, SC & FL) / Senior Project Manager Civil & Environmental Consultants, Inc. 3701 Arco Corporate Drive • Suite 400 • Charlotte, NC 28273 Toll -Free: 855-859-9932 • Direct: 980-260-2035 • Fax: 980-237-0372 Mobile: 410-259-4745 • http://www.cecinc.com Senior Leadership - Integrated Services - Personal Business Relationships This electronic communication and any attachments are intended solely for the use of the person or entity to which it is addressed, and may contain information that is confidential, privileged and exempt from disclosure under applicable law, including copyright law. If you are not the intended recipient of this message, you are prohibited from disclosing, reproducing, distributing, disseminating or otherwise using this transmission. Please promptly notes the sender by reply electronic communication and immediately delete this message from your system. From: Johnson, Alan <alan.johnson@ncdenr.gov> Sent: Monday, January 27, 2020 2:23 PM To: Thomas, Kevin <kthomas@cecinc.com> Subject: RE: Redwood Development DWR 20-0066 I saw the other plans. It was difficult to tell the difference in the plan layout overall since it was a blow up of the area in question, but I did see the reduction in impact. However, even the current plan is a lot of just fill. Is it not possible to pull the fill line back to the 715 elevation line as shown below. I must admit I get confused as I move over to the bmp. The red line is a potential wall. Not sure if you mention, but the filled stream regardless of length should have a French drain to discharge the day lighted section of stream. Thanks, Alan l a •aaF From: Johnson, Alan Sent: Thursday, January 23, 2020 1:18 PM To: 'kthomas@cecinc.com' <kthomas@cecinc.com> Cc: Janiczak, Catherine M CIV USARMY CESAW (US) <Catherine.M.Janiczak@usace.army.mil> Subject: Redwood Development DWR 20-0066 Reviewing the plan, it would appear that the stream impact can be avoided with the removal of the single unit. If safety is a concern a fence should be utilized. If construction is still preferred, then changing the builing design/location/layout and/or utilizing retaining wall should be utilized. Plus pushing the SW BMP away from the stream. Given the amount of grading proposed, if SW volume is a concern then digging, rather creating a berm on terra firma could be accomplished. Or additional bmp. Essentially, fill slopes are impacting the channel. Thanks Alan DWR bh+51on of Water RC-%0UFCc5 4 Alan D Johnson — Senior Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2200 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 1 1 -1- -7 - � ,,,((( \//� \ [ 10,E/-dIr \ \ \ � `. `� \ \ \ 1 1 i .` - - _ ♦ \ \ 1 , \ \ i i V \ �U\ `�'-"'' ``'` ` • \ \ \\\\ ``` \\\\` \ \` \ \` `I `i�'v \ `\ \` I �, ; ; ; O ` `. ` ` \`♦ `. ` \``♦```.`♦`♦\` ,` ; 1 , 1 ---------------- \ , i I i i i \`. �`. `♦ `♦ `\ `, �� ------------------ 1-- IN. j`J{p'p'y/� 730 --- - - - - -------- \` \ ``• CD ------------- ------------- a mu It IN ``\ \` '\ ``\ N ``\/V/Y�`- '\ '`-------- \\ _ _ / - \ \ \, \ \ ♦ � ♦ ... . 10- `----------- -- __- _- 11 III ♦.♦ \♦♦\♦ , ♦ ♦ ! , 1 1` / / . \ `\ -------------------- ---------------- - p ♦♦\3`.,, ♦ ♦ ♦ I 1 1 1 / , / \ ♦ ` ♦ , \, I I 1 ; I 1 I 1 I I '�- '-__ � � -_ '' _ �__ '/'/ I fop ``�♦`�♦;;�♦; ♦ `♦ ♦` \ � 1 1 , I / ' ,/ / / j i \ `, `♦ I' I'1IIII III I, -�. \\\ - - - _ // \♦ ♦ 1 1 1 , ✓ / / , / PROPOSED 112 L.F. FRENCH — _ �_ __ i' �`���♦ `�:``� ♦ ♦. 1 i 1 1 , // : / i i % I DRAIN SYSTEM ALONG IMPACTED AREA r I �s ------------------ ----------------------------- N --------------------- / E /D PERM. IMPACT -__ __-/ / j � I I,11 11'_ ` III 111, II, I I --- . , . I, I1, - _-_ -, ,, , , .,/ / / N: 631608.6993 ------- i- - - _ ;_ . ::: " ,BEGIN PERM. IMPACT �____- / I I ---- //------------------ ------ - . �. / . / 1 - , = . E:1501389.4055 ,-- ' 4705- - _ // _/; / . / /, / // 1 N: 631579.9521 E: 1501304.2031 _�. , / . I -------- --_- ` \ `----- PROPOSED STREAM / / / , ♦ It ♦ /IMPACT: 112 L.F. _ ' 700- it EXISTING STREAM / I 1 \ `, '` , / , , _ , / ; /' / ; , , , 1�,�• , / ; / ; / h ;------------------ - II '� -- ' --------- It -__ .STREAM TOP OF BANK - '' ' '/ % % i / / / � 7 / ' / '1 ` ` ' I � 1�� \ ♦� ` i DIANNE 6. JAMES & ' NORRIS ✓. JAMES, SR. 4' BARBED WIRE FENCE PARCEL lD.• 56031037160000 LEGEND PROPERTY LINE DB 5808, PG 293 _ > ZONING: AG STREAM CENTERLINE REDWOOD - KANNAPOLIS KANNAPOLIS PKWY KANNAPOLIS, NC 28081 - OPTION 3 11� SCALE: All_ A^1 DATE: ^^_j CAD ID' ROJECTNUMBER: BOHLIER ENGINEERING NC, PLLC NCBELS P-1132 1927 S. TRYON STREET, SUITE 310 CHARLOTTE NC 28203 PHONE: (980) 272-3400 FAX (980) 272-3d01 0 20 40 1 "= 40' \\\` BQLDIN `\ \ �Y• `, \ �� \UNITS ` \ '� ' \�`\�`♦ / �`I `\ ` �` �` \�`\ �\�`.\♦`. \�`♦ `\` 1 — 730- - - -- --- LLDING E \ \ w lo 720 ♦`, ♦`♦ \\\, ` , �� ��i I J,O � `` -_____ ____ _ __ '''- �- "-" I �I'I�\`\`\;`♦ ` j\`` `\\ `` Js \,1 1 �t 111 1 1� '' � -, / ,, ` ,\\ `\` `\``. `\ ,\ I � ; , \ --- - -- _ _ - % III �\\O ` O • . I � � PROPOSED 112 L.F. FRENCH- ` PROP. WET POND ___, DRAIN SYSTIMP EM ALONG ACTED AREA ♦` I ; I ; � >oo I --- BUILDI G --- - --'" \';'i I I I ' ' - , ' ,'' ; , ' � UN TS , IMPACT _ N: 631608.6993 I 1501389.4055 705- E: 1501304.2031 I _ ��;ROPOSEDSTREAM'/,-'� : / / ---- --- ' 1 ,I 10 ' : ,�' - `--`----_--' ��J, / ,�, ,/ /� �� • �,: MPACT: 112L.F. EXISTING STREAM �' ,'/ , / / / / 1�0' / / / / h / ------ �� --- -"-_-__ _ 1 I S ` , ------------ TREAM TOP OF BANK \ / LEGEND STREAM IMPACT TABLE \ `\`\ \`\ `\ - \ •r / I ' /� / i / ' i /' %� \�` i/ —"—"— STREAM CENTERLINE TOTAL IMPACT 112 LINEAR FEET STREAM DISTURBANCE 4' BARBED WIRE FENCE PROPERTY LINE REDWOOD - KANNAPOLIS � BOHLIER KANNAPOLIS PKWY 0 20 40 KANNAPOLIS, NC 28081 ENGINEERING NC, PLLC NCBELS P-1132 1 "= 40' STREAM IMPACT MAP - OPTION 3 �'� 1927 S. TRYON STREET, SUITE 310 CHARLOTTE NC 28203 SCALE: DATE: CAD ID' ROJECT NUMBER: PHONE: (980) 272-3400 FAX: HAR OTTE 01 PROPOSED CONDITIONS 1"=40' 1/28/2020 FXO NCC192091 \USERS\TZOOKV\PPDATA\LOCAL\TEMPV\CPUBLISH_8496\KANNAPOLIS - STREAM IMPACT MAPS OPTION 3.DWG PRINTED BY: TZOOK 1.28.20 @ 3:03 PM LAST SAVED BY: TZOOK