Loading...
HomeMy WebLinkAboutNCC200350_NOI Application_20200130Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/27/2020 5:24:25 PM (NCG01 NOI Submission) Approve by McCoy, Suzanne 1/28/2020 8:05:36 AM (Review- Construction NOI 21197) • The task was assigned to McCoy, Suzanne by round robin distribution 1/27/2020 5:24 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 29, 2020 5:00 PM 1/27/2020 5:24 PM Submit by McCoy, Suzanne 1/30/2020 7:13:22 AM (Payment Verification for NCC200350) * Charles Yomll • McCoy, Suzanne assigned the task to McCoy, Suzanne 1/30/2020 7:12 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 10, 2020 5:00 PM 1 /28/2020 8:05 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Titanium 2. County* Orange 3. Highway or Street 6801 Industrial Drive Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Mebane 5. State * NC 6. Zip Code * 27307 7. Latitude * Enter the latitude in decirral degrees 36.0803 8. Longitude* Enter the longitude in decinal degrees (M. ST be negative) -79.2368 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/03/2020 Estimated Construction Project Start Date 10. Date to End* 03/31/2021 Estimated Construction Project End Cute 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Developrrent 12. Acres to be 5.34 disturbed* (including off -site borrow and waste areas) 13. Total site area 101.75 (acres) * 14. Post- 26.73 construction (Estimated) impervious area (acres) * NCC Project NCC-ORANG-2020-Titanium Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Haw Creek Waterbody* Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 16-20-(1) Index No.* NCWaterbody Index Nirrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Geis Construction Name * 2. First Name* Bill IF Corporation, enter Fbgistered Agent First Barre 3. Last Name * Carney If Corporation, enter FZegistered Agent Last %rre 3b. Title Site Superintendent 4. Permitee E-mail billc@geisco.net Address * 5. Permittee 330-571-9120 Telephone No.* 6. Permittee Mailing Street Address Address* 10020 Aurora Hudson Road Address Line 2 city Streetsboro Fbstal / Zip Code 44241-1621 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 10020 Aurora Hudson Road Address Line 2 city Streetsboro Fbstal / Zip Code 44241-1621 State / Frovince / Faegion OH Country us State / Frovince / Fbgion OH Country US C. Site Contact Information Part C. Roject Site Contact Inforrration _..................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Charlie Contact - First Name * 3. Primary Site Yowell Contact - Last Name * 4. Title Associate 5. Site Contact E- cyowell@bohlereng.com mail Address* 6. Site Contact 919-578-9000 Telephone No.* 7.Organization Bohler Name 8. Site Contact Street Address Mailing Address* 4130 Parklake Avenue Address Line 2 Suite 130 aty Raleigh Fbstal / Zip Code 27612 9. Consultant Name (Optional) Paul Asche First and Last narre 10. Consultant E- pasche@bohlereng.com mail This person will be copied on all correspondence. 11.Consultant 919-578-9000 Telephone No. State / Rovince / Fbgion NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/27/2020 Approved * 2. E&SC Plan Project LDP19-0077 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Orange County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan 200127 - Phase III Approval.pdf 106.78KB Approval Wst be FDFfornat letter/documentation Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Orange County E&S Approval for the Phase III improvements to Titanium which consist of a permanent parking lot, driveway, wet pond, & associated infrastructure. 6. NOI Certification Notice of Intent.pdf 710.77KB Form Mast be FDFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent IT Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Bill Carney Title Site Superintendent Organization Geis Construction Date * 01 /27/2020 F. Tracking and COC Info NOI Tracking No. 21197 NC Reference No. NCG01-2020-0350 Uses 'count number' variable (incremrented by SP) Certificate of NCC200350 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 350 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)