Loading...
HomeMy WebLinkAboutWQ0013116_Residual Annual Report 2019_20200128RECEIVEDINCDEOMR JAN 2 8 2020 Non -Discharge Permitting Unit JAN 2 00 2020 DWR, SmGT;i0N ili�FGR►,i !IO IIPROCESSINGLU.� T Town Of Waynesville WWTP 1150.1 P. Town Of Waynesville WWTP 566 Walnut Trail Waynesville NC 28785 828-452-4685 Ah Annual Sludge Report 2019 Brief Process Description J Period of January 1, 2019 to December 31, 2019 The Town of Waynesville Wastewater Treatment Plant has produced 932.4 metric tons of Class A Biosolids Product that is given away for land application or landfilled. There was 1136.24 metric tons of Class A Biosolids land applied. �f - There was 923.58 wet tons of lime stabilized sludge taken to the landfill. Also, there was 184.28 tons of pressed sludge taken to the landfill. Anaerobic digested sludge is dewatered then blended with quick lime. This mixture is then passed through a pasteurization vessel at a temperature of 1580F or greater for 30 minutes. We had six loads not meet that requirement. Those loads were landfilled. Laboratory results demonstrate that this product exceeds requirements set forth by 40 CFR 503.32 alternative 5 for pathogen reduction and 40CFR 503.33 option 6 for Vector Attraction Reduction. Equipment manufacturer for this process was RDP Technologies Inc. No lime stabilized sludge produced in November & December due to hydrogen sulfide levels in anaerobic digester. Going to convert of aerobic in 2020. Certification Statement 'I certify under penalty of law that the Class A pathogen requirements in 503.32 (a) and the vector attraction reduction requirement in 503.33 (b) (6) have been met. This determination has been made under my direction and supervision in accordance with the system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen requirements and vector attraction reduction requirements have been met. I am aware that there are significant penalties for false certification including the possibility of fine and imprisonment. x Print name x Signature x 1�1; L 5,fy Title ANNUAL RESIDUAL SAMPLING SUMMARY FORM Attach this form to the corresponding Annual Report Please note that your permit may contain additional parameters to be analyzed than those required to be summarized on this form. Permit Number: WQ0013116 Laboratory: 1) Environmental Testing Solutions Facility Name: Town Of Waynesville WWTP 2) Rogers & Callcott NPDES # or NC0025321 3) Environmental Chemists, Inc WQ#: 4) WWTP Name: Town Of Waynesville WWTP 5) Residual Analysis Data Limits Limits Sample or 2/5/19 5/7/19 8/6/19 11/4/19 Low Quality High quality MIN. MAX. AVG. Composite Date Limit mg/kg Limit mg/kg Percent Solids 46 58 63 55 46 63 55.5 Arsenic 7.26 < 4.29 8.8 6.07 75 41 < 4.29 8.8 6.605 Cadmium < 2.14 < 1.72 < 1.5 j< 1.32 85 39 < 1.32 < 2.14 1.67 Chromium 24.6 12.2 21.8 24.4 12.2 24.6 20.75 Copper 121 87.7 136 183 4300 1500 87.7 183 131.925 Lead 13 7.29 15 15.1 840 300 7.29 15.1 12.5975 Mercury 0.63 0.5 0.27 0.59 57 17 0.27 0.63 0.4975 Molybdenum < 5.34 < 4.29 < 3.75 3.65 75 18 < 3.65 5.34 4.2575 rA 1-1 Nickel 18.4 7.55 < 14.2 13.1 420 420 7.55 18.4 13.3125 E CrQ Selenium < 5.34 < 4.29 < 3.75 3.9 100 36 < 3.75 < 5.34 4.32 Zinc 293 184 377 1 490 7500 2800 184 490 336 TKN 14,700 70 5,680 167 69.8 14700 5154.2 Ammonia -Nitrogen 630 280 160 ' 450 160 630 380 Nitrate and Nitrite < 40 16.9 0.25 14 0.25 < 40 17.7875 Total Phosphorus 1 4,180 1 3,050 1 3,050 5,630 3050 5630 3977.5 "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of tines and imprisonment for knowing violations." Signature of Preparer / ' I.L Date Signature Of Permitee - Date `� '� ANNUAL RESIDUAL SAMPLING SUMMARY FORM Attach this form to the corresponding Annual Report Please note that your permit may contain additional parameters to be analyzed than those required to be summarized on this form. Permit Number: WQ0013116 Laboratory: Facility Name: Town Of Waynesville WWTP NPDES # or NCO025321 WQ#: WWTP Name: Town Of Waynesville WWTP Residual Analysis Data 1) Environmental Testing Solutions 2) Rogers & Callcott 3) Environmental Chemists, Inc 4) 5) Sample or Composite Date 2/5/19 5/7/19 8/6/19 11/4/19 MIN. MAX. AVG. Aluminum 10,500 8,380 16,400 125,000 8,380 125,000 40,070 Magnesium 5,510 3,480 7,500 7,280 3,480 7,500 5,943 PAN 3,129 0 1,184 182 0 3,129 1,124 Sodium 510 336 675 442 336 675 491 Calcium 249,000 185,000 228,000 263,000 185,000 263,000 231,250 Potassium 1,700 1,220 2,570 1,680 1,220 2,570 1,793 SAR 4.14 1.5 2 1 1.2 1.2 4.14 2.21 va oa "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Preparer_,, , ti. W�40, Date 1161,gp Signature of Permitee Date 1 `b ,,�D ANNUAL PATHOGEN AND VECTOR ATTRACTION REDUCTION FORM (02T Rules) Facility Name: Town of Waynesville WWTP WQ Permit Number: WQ0013116 WWTP Name: Town of Waynesville WWTP NPDES Number: NCO025321 Monitoring Period: From 1/1/2019 To 12/31/2019 Pathogen Reduction (15A NCAC 02T .1106) - Please indicate level achieved and alternative performed:' Class A: Alt. A (time/temp) ❑ Alt B (Alk Treatment)[]Alt. C (Prior Testing)❑ (N ) 1t.D e A o Prior Test) ❑ Process to u e F rthei Reduce Patho en s ❑ g g If applicable to alternative performed (Class A only) indicate "Process to Further Reduce Pathogens": Compost ❑ Heat Drying ❑ Heat Treatment ❑ Tlherinophilic ❑ Beta Ra Y ® Gamma Ra Y ® Pasteurization ❑ Class B: Alt. (1) Fecal Density ® Alt. (2) Process to Significantly Reduce Pathogens ❑ If applicable to alternative performed (Class B only) indicate "Process to Significantly Reduce Pathogens": Lime Stabilization ❑ Air Drying ❑ Composting ❑ Aerobic Digestion ❑ Anaerobic Digestion If applicable to alternative performed (Class A or Class B) complete the following monitoring data: Parameter Allowable Level in Sludge Pathogen Density g � Number o Excee- dences Frequency of Analysis Sample Type Analytical Tech-nique Minimum Geo. Mean Maximurr Units Fecal Coliform 2 x 10 to the 6th power per gram of total solids MPN CFU 1000 mpn per gram of total solid (dry weight) <79 <115 MPN/g 0 Quarterly grab m-9221-e Salmonella bacteria (in lieu of fecal coliform) I 3 MPN per 4 grams total solid (dry weight) Vector Attraction Reduction (15A NCAC 02T .1107) - Please indicate alternative performed: Alt.l (VS reduction) ❑ Alt. 2 (40-day bench) ❑ Alt. 3 (30-day bench) ❑ Alt. 4 (Spec. 02 uptake) ❑ Alt. 5 (14-Day Aerobic) ® Alt. 6 (Alk. Stabilization 21 Alt 7 (Drying - Stable) ❑ 1 Alt. 8 (Drying - Unstable) ❑ Alt. 9 (Injection) ❑ Alt. 10 (Incorporation) ❑ No vector attraction reduction alternatives were performed ❑ CERTIFICATION STATEMENT (please check the appropriate statement) 21 "I certify, under penalty of law, that the pathogen requirements in 15A NCAC 02T .1106 and the vector attraction reduction requirement in 15A NCAC 02T .1107 have been met." ❑ "I certify, under penalty of law, that the pathogen requirements in 15A NCAC 02T .1106 and the vector attraction reduction requirement in 15A NCAC 02T .1107 have not been met." (Please note if you check this statement attach an explanation why you have not met one or both of the requirements.) "This determination has been made under my direction and supervision in accordance with the system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen and vector attraction reduction requirements have been met. I am aware that there are significant penalties for false certification including fine and imprisonment." Mark Jones ORC Preparer Name and Title (type or print) /a d Signature of Prepa er* Date Land Applier Name and Title (if applicable)(type or print) Signature of Land Applier (if applicable) Date *Preparer is defined in 40 CFR Part 503.9(r) and 15A NCAC 2T .1102 (26) DENR FORM PVRF 02T (12/2006) CLASS A ANNUAL DISTRIBUTION AND MARKETING/ SURFACE DISPOSAL CERTIFICATION AND SUMMARY FORM WQ PERMIT #: WQ0013116 FACILITY NAME: Town of Waynesville WWTP PHONE: (828)4524685 COUNTY: Haywood OPERATOR: Mark Jones FACILITY TYPE (please check one): ❑ Surface Disposal (complete Part A (Source(s) and "Residual In" Volume only) and Part C) ❑ Distribution and Marketing (complete Parts A, B, and C) Was the facility in operation during the past calendar year? Yes 0 No ❑ --► If No skip parts A, B, C and certify form below Part A*: Part B*: Month Sources s ( include NPDES # if applicable) Volume (dry tons) Recipient Information Amendment/ Bulking Agent Residual In Product Out Name(s) Volume (dry tons) Intended use(s) January 46.91 20.29 67.2 Brandon James 131.6 Liming Agent February 24.35 26.05 50.4 Tim Kelley 84 for March 45.28 19.12 64.4 Adrian Presnell 106.4 Hay April 48.41 7.59 56 Doyle Smith 448 & May 43.98 68.02 112 Bart Campbell 2.24 Sillage June 7.0.41 47.19 117.6 Cody Worley 240.8 Fields July 71.92 54.08 126 Johnny James 112 August 70.48 86.32 156.8 James Robinson 11.2 September 55.41 64.99 120.4 October 49.75 11.85 61.6 November 0 0 0 December 0 0 0 Total from om FORM DMSDF su P Y- . Totals:.... d tons): =..r,._,=.� . x ...., ,..:.: 05.5 _ Yused: ::................... .:.: 2" Amendment(s) used: Lime Kiln Dust Bulking Agent(s) * if more space is required, attach additional information sheets (FORM DMSDF (supp)): Total Number of Form DMSDF (Supp)l Part C: Facility was compliant during the past calendar year with all conditions of the land application permit R1 Yes (including but not limited to items 1-3 below) issued by the Division of Water Resources: ❑ No ► If No, Explain in Narritive 1. All monitoring was done in accordance with the permit and reported for the year as required and three (3) copies of certified laboratory results are attached. 2. All operation and maintenance requirements were compiled with or, in the case of a deviation, prior authorization was received from the Division of Water Resources. 3. No contravention of Ground Water Quality Standards occurred at a monitoring well. "I certify, under penalty of law, that the above information is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." MIAL d. Sip,44k Wmittee Date Signature of Prepare * (if different from Permittee) **Preparer is defined in 40 CFR Part 503.9(r) and 15A NCAC 2T .1102 (26) 18 a� Date DENR FORM DMSDF (12/2006) Landfilied Lime Stabilized to Landfill Date Wet Tons % Solids Dry Tons 2/28/2019 89.41 0.56 50.0696 3/1/2019 166.35 0.56 93.156 3/19/2019 65.99 0.56 36.9544 3/20/2019 82.49 0.56 46.1944 3/21/2019 106.47 0.56 59.6232 3/22/2019 90.39 0.56 50.6184 7/25/2019 22.49 0.56 12.5944 7/26/2019 98.54 0.56 55.1824 8/16/2019 15.62 0.56 8.7472 8/22/2019 108.13 0.56 60.5528 8/23/2019 77.7 0.56 43.512 Wet Tons Dry Tons 923.58 1 517.2048 Sludge from Press Date Wet Tons 12/13/2019 44.1 12/14/2019 12.1 12/19/2019 53.6 12/26/2019 42.74 1/8/2020 31.74 Total Wet Sludge 184.28 C Loads to 2019 Farmers Loads Date Who Amount Truck Hauls Tons Number of Loads Total Wet Tons Percent Solids Dry Tons 2/9/2019 Brandon James 5 Tons 1 5 0.56 2.8 2/10/2019 Brandon James 5 Tons 2 10 0.56 5.6 3/20/2019 Tim Kelley 10 Tons 15 150 0.56 84 3/21/2019 Adrian Presnell 10 Tons 10 100 0.56 56 3/22/2019 Doyle Smith 10 Tons, 10 100 0.56 56 3/23/2019 Doyle Smith 10 Tons 15 150 0.56 84 3/23/2019 Adrian Presnell 10 Tons 9 90 0.56 50.4 3/24/2019 Doyle Smith 10 Tons 30 . 300 0.56 168 3/25/2019 Doyle Smith 10 Tons 25 250 0.56 140 3/29/2019 Brandon James 5 Tons 2 10 0.56 5.6 3/30/2019 Brandon James 5 Tons 5 25 0.56 14 4/1/2019 Brandon James 5 Tons 7 35 0.56 19.6 4/1/2019 Cody Worley 10 Tons 1 10 0.56 5.6 4/2/2019 Cody Worley 10 Tons 2 20 0.56 11.2 4/3/2019 Cody Worley 10 Tons 7 70 0.56 39.2 4/3/2019 Brandon James 5 Tons 4 20 0.56 11.2 4/4/2019 Brandon James 5 Tons 3 15 0.56 8.4 4/4/2019 Cody Worley 10 Tons 10 100 0.56 56 4/5/2019 Cody Worley 10 Tons 8 80 0.56 44.8 4/6/2019 Cody Worley 10 Tons 10 100 0.56 56 4/7/2019 Cody Worley 10 Tons 5 50 0.56 28 4/17/2019 Brandon James 5 Tons 4 20 0.56 11.2 4/18/2019 Brandon James 5 Tons 2 10 0.56 5.6 4/25/2019 Brandon James 5 Tons 3 15 0.56 8.4 5/2/2019 Brandon James 5 Tons 3 15 0.56 8.4 5/8/2019 James Robinson 5 Tons 4 20 0.56 11.2 6/27/2019 Brandon James 5 Tons 2 10 0.56 5.6 8/29/2019 Brandon James 5 Tons 2 10 0.56 5.6 8/31/2019 Brandon James 5 Tons 1 5 0.56 2.8 9/21/2019 Johnny James 10 Tons 10 100 0.56 56 9/22/2019 IJohnnyjames 10 Tons 10 100 0.56 56 9/30/2019 Bart Campbell 4 Tons 1 4 0.56 2.24 10/7/2019 Brandon James 5 Tons 3 15 0.56 8.4 Date Who Amount Truck Hauls Number of Loads Total Wet Tons Percent Solids Dry Tons Tons 10/17/2019 Brandon James 5 Tons 3 15 0.56 8.4 Total Wet Tons 2029 Brandon Dry Tons 131.6 Tim Kelley Dry Tons 84 Adrian Presnell Dry Tons 106.4 Doyle Smith Dry Tons 448 Cody Worley Dry Tons 240.8 James Robinson Dry Tons 11.2 Johnny James Dry Tons 112 Bart Campbell Dry Tons 2.24 Total Dry Tons 1136.24 Laboratory " jsAM _ PO Box 7565 iv 011, s �z Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Environmental Testing Solutions, Inc. Certificate of Analysis Project name: Town of Waynesville WWTP Project number: 190121.501 Collection date: 21-Jan-19 Date received: 21-Jan-19 Sample identification: 503 Lime Sludge 41 - Composite Sample number: 165223 Parameter Method Result RL Units Date Analyst Footnotes Analyzed % Total Solid SM 2540 G 44 0.10 % 21-Jan-19 KEK Multiple Tube Fermentation SM 9221-E <79 79 MPN/g 21-Jan-19 KEK Sample identification: 503 Lime Sludge #2 - Composite i Sample number: 165224 Parameter Method Result RL Units • Date Footnotes AnalyzedAnalyst % Total Solid SM 2540 G 46 0.10 % 21-Jan-19 KEK Multiple Tube Fermentation SM 9221-E <83 83 MPN/g 21-Jan-19 KEK Sample identification: 503 Lime Sludge #3 - Composite Sample number: 165225 Parameter Method Result RL Units Date Analyst Footnotes Analyzed % Total Solid SM 2540 G 46 0.10 % 21-.Ian-19 KEK Multiple Tube Fermentation SM 9221-E <83 83 MPN/g 21-.Ian-19 KEK Sample identification: 503 Lime Sludge #4 -Composite Sample number: 165226 Parameter Method Result RL Units Date Analyst Footnotes Analyzed %Total Solid SM 2540 G 48 0.10 % 21-Jan-19 KEI< Multiple Tube Fermentation SM 9221-E <86 86 MPN/e 21-Jan-19 KEK t Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. Date reviewed: Q -a -1 A NC Certification Number: 600 Data reviewed by: Kelley E. Keenan SC Certification Number: 99053 Signature: NC Drinking Water Certification Number: 37786 This report should not be reproduced, e,ept in its entirety, without the written consent of Environmental Testing Solutions, bic. The results in this report relate only to the samples submitted for analysis. c R PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Environmental Testing Solutions, Inc. Certificate of Analysis Project name: Town of Waynesville WWTP Project number: 190128.500 Collection date: 28-Jan-19 Date received: 28-Jan-19 Sample identification: 503 Lime Sludge #5 - Composite Sample number: 165471 Parameter Method Result RL Units Date Analyst Footnotes Analyzed % Total Solid SM 2540 G 62 0.10 % 28-Ja.-19 KEK Multiple "Cube Fermentation SM 9221-E <112 112 MPN/g 28-Jan-19 KEK Sample identification: 503 Lime Sludge #6 - Composite Sample number: ' 165472 Parameter Method Result RL Units Date Analyst Footnotes Analyzed % Total Solid SM 2540 G 64 0.10 % 28-Ja.-19 KEK Multiple Tube Fermentation SM 9221-E <115 115 MPN/g 28-J.- 19 KEK Sample identification: 503 Lime Sludge #7 - Composite Sample number: 165473 Parameter Method Result RL Units DateAnalyzed Analyst Footnotes %Total Solid SM 2540 G 46 0.10 % 28-Jan-19 KEK Multiple Tube Fermentation SM 9221-E <83 83 MPN/g 28-Ja.-19 KEK k Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only Date reviewed: OIL01 -Lq NC Certification Number: 600 Data reviewed by: Kelley E. Keenan SC Certification Number: 99053 Signature: ,A- NC Drinking Water Certification Number: 37786 This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc The results in this report relate only to the samples submitted for analysis. Environmental Testing Solutions, Inc. Certificate 0f Analysis Project name: Town of Waynesville WWTP Collection date: 5-Feb-19 Date received: 5-Feb-19 Sample identification: 503 Lime Sludge - Composite PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Project number: 190205.522 Sample number: 165680 Parameter Method Result RL Units Date Analyzed Analyst Footnotes Arsenic 6010 C 7.26 5.34 mg/kg 13-Feb-19 MLR 1 Cadmium 6010 C <2.14 2.14 mg/kg 13-Feb-19 MLR 1 Copper 6010 C 121 2.14 mg/kg 13-Feb-19 MLR 1 Chromium 6010 C 24.6 5.34 mg/kg 13-Feb-19 MLR 1 Lead 6010 C 13.0 5.34 mg/kg 13-Feb-19 MLR 1 Molybdenum 6010 C <5.34 5.34 mg/kg 13-Feb-19 MLR 1 Nickel 6010 C .18.4 2.14 mg/kg 13-Feb-19 MLR 1 Selenium 6010 C <5.34 5.34 mg/kg 13-Feb-19 MLR I Zinc 6010 C 293 5.34 mg/kg 13-Feb-19 MLR 1 Aluminium 6010 C 10500 534 mg/kg 15-Feb-19 MLR 1 Calcium 6010 C 249000 2720 mg/kg 19-Mar-19 MLR 1 Magnesium 6010 C 5510 267 mg/kg 13-Feb-19 MLR 1 Potassium 6010 C 1700 10.7 mg/kg 13-Feb-19 MLR I Sodium 6010 C 510 .10.7 mg/kg 13-Feb-19 MLR 1 Mercury 7471 B 0.63 0.043 mg/kg 1 l-Mar-19 TLT 1 Total Kjeldahl Nitrogen 351.2 14700 692 mg/kg 1-Mar-l9 LEW 1 Nitrate + Nitrate 300.0 <40.0 40.0 mg/kg 14-Feb-19 JMM 1 Total Nitrogen Calculation 14700 692 mg/kg 1-Mar-19 LEW 1 Total Phosphorus 200.7 4180 267 mg/kg 13-Feb-19 MLR 1 Total Solids SM2540 G 45.5 0.10 % 8-Feb-19 MLR 1 pH in Soil SW 846 9045D 12.2 0.10 S.U. 6-Feb-19 MS 2 % Total Solid SM 2540 G 46 0.10 % 6-Feb-19 KEK Ammonia Nitrogen EPA 350.3 630 8.7 mg/kg 7-Feb-19 KEK Sodium Absorption Ration CALC 4.14 mg/kg 19-Mar-19 KEK Plant Avaliable Nitrogen CALC 3129 mg/kg l9-Mar-19 KEK R Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. 1. Sample analyzed by Rogers & Callcott Environmental. '. 2. Sample analyzed outside holding time. Date reviewed: Data reviewed by: Signature: O5-H-6 Kelley E. Keenan LA - NC Certification Number: 600 SC Certification Number: 99053 NC Drinking Water Certification Number: 37786 This report should not be reproduced, exert in its entirety, without the written consent of Environmental Testing Solutions, Inc. The results in this report relate only to the samples submitted for analysis. gC�,"_.^.�:ws';_z,.„'J, • Environmental Testing Solutions, Inc. Certificate of Analysis Project name: Town of Waynesville WWTP Collection date: 6-May-19 Date received: 6-May-19 PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828)350-9368 Project number: 190506.503 Sample identification: 503 Lime Sludge - Composite Sample number: 168081 Parameter Method Result RL Units Date Analyst Footnotes Analyzed % Total Solid SM 2540 G 54 0.10 % 6-May-19 KEK Multiple Tube Fermentation SM 9221-E <97 97 M'PN/g 6-May-19 KEK "o Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. i Date reviewed: ,t q .19 NC Certification Number: 600 Data reviewed by: Kelley E. Keenan SC Certification Number: 99053 Signature: �A— NC Drinking Water Certification Number: 37786 This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc. The results in this report relate only to the samples submitted for analysis. tR a --_� Environmental Testing Solutions, Inc. Certificate ®f Analysis PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Project name: Town of Waynesville WWTP Project number: 190507.532 Collection date: 7-May-19 Date received: 7-May-19 Sample identification: 503 Lime Sludge - Composite Sample number: 168192 Parameter Method Result RL Units Date Analyst Footnotes Analyzed Arsenic 6010 C <4.29 4.29 mg/kg IS-May-19 LMC 1 Cadmium 6010 C <1.72 1.72 mg/kg 15-May-19 LMC 1 Copper 6010 C 87.7 1.72 mg/kg 15-May-19 LMC 1 Chromium 6010 C 12.2 4.29 mg/kg is-May-19 LMC 1 Lead 6010 C 7.29 4.29 mg/kg 15-May-l9 LMC 1 Molybdenum 6010 C <4.29 4.29 mg/kg 15-May-19 LMC 1 Nickel 6010 C 7.55 1.72 mg/kg 15-May-19 LMC 1 Selenium 6010 C <4.29 4.29 mg/kg 15-May-19 LMC 1 Zinc 6010 C 184 4.29 mg/kg 15-May-19 LMC 1 Aluminium 6010 C 8380 42.9 mg/kg 15-May-19 LMC 1 Calcium 6010 C 185000 8580 mg/kg 14-May-19 LMC 1 Magnesium 6010 C 3480 42.9 mg/kg 15-May-19 LMC 1 Potassium 6010 C 1220 8.58 mg/kg 15-May-19 LMC 1 Sodium 6010 C 336 8.58 mg/kg 15-May-19 LMC 1 Mercury 7471B 0.50 0.035 mg/kg lo-May-19 TLT 1 Total Kjeldahl Nitrogen 351.2 mg/kg 3 Nitrate + Nitrate 300.0 mg/kg 3 Total Nitrogen Calculation mg/kg 3 Total Phosphorus 200.7 3050 42.9 mg/kg 15-May-19 LMC 1 Total Solids SM2540 G 56.7 0.10 % lo-May-19 LBW 1 pH in Soil SW 846 9045D 12.2 0.10- S.U. 7-May-19 MS 2 % Total Solid SM 2540 G 58 0.10 % 7-May-19 MS Ammonia Nitrogen EPA 350.3 280 6.9 mg/kg 9-May-19 KEK Sodium Absorption Ration CALC 1.5 mg/kg 29-May-19 KEK Plant Avaliable Nitrogen CALC ..,_,1 mg/kg KEK 3, Multiple Tube Fermentation SM 9221-E <97 97 MPN/g 6-May-19 KEK Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. 1. Sample analyzed by Rogers & Cailcott Environmental. 2. Sample analyzed outside holding time. Duplicate result was 12.3 S.U. 3. Cancelled due to sample method. Client is recollecting. Date reviewed: 05IAC,,tq Data reviewed by: Kelley E. Keenan Signature: (./k- NC Certification Number: 600 SC Certification Number: 99053 NC Drinking Water Certification Number: 37786 This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc. The results in this report relate only to the samples submitted for analysis. In _ ...,� Y�Yu�IZA ",� 2 a� r Environmental Testing Solutions, Inc. Certificate of Analysis Project name: Town of Waynesville WWTP Collection date: 10-Jun-19 Date received: 11-Jun-19 Sample identification: 503 Lime Sludge - Composite PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828)350-9368 Project number: 190611.514 Sample number: 169372 Parameter Method Result RL Units Date Analyst Footnotes Analyzed Total Kjeldahl Nitrogen 351.2 69.8 mg/kg 20-Jun-19 ECHEM I Nitrate +Nitrate Nitrogen 353.2 16.9 mg/kg 24-Jun-19 ECHEM I Total Nitrogen Calculation 86.7 mg/kg 25-Jun-19 ECHEM I ti Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. 1. Sample analyzed by Enviro Chemists, Inc. Date reviewed: CO.Z 0 NC Certification Number: 600 Data reviewed by: Kelley E. Keenan SC Certification Number: 99053 Signature:NC Drinking Water Certification Number: 37786 This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc The results in this report relate only to the samples submitted for analysis. Ah .� f�,�)� '�'`�k"-• ^s,. 4.i.:.:t_'-�x.i� s'F^cv`;:t"' dirk y9. ki-.�du;'M Environmental Testing Solutions, Inc. Certificate of Analysis Project name: Town of Waynesville WWTP Collection date: 6-Aug-19 Date received: 6-Aug-19 Sample identification: 503 Lime Sludge - Composite PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Project number: 190806.532 Sample number: 170235 Parameter Method Result RL Units Bate Analyst Footnotes Analyzed Arsenic 6010 D 8.80 3.75 mg/kg 13-Aug-19 LMC 1 Cadmium 6010 D <1.50 1.50 mg/kg 13-Aug-19 LMC 1 Copper 6010 D 136.0 1.50 mg/kg 16-Aug-l9 LMC I Chromium 6010 D 21.8 3.75 mg/kg 13-Aug-19 LMC I Lead 6010 D 15.0 3.75 mg/kg 13-Aug-19 LMC 1 Molybdenum 6010 D <3.75 3.75 mg/kg 13-Aug-19 LMC 1 Nickel 6010 D 14.2 1.50 mg/kg 13-Aug-19 LMC 1 Selenium 6010 D <3.75 3.75 mg/kg 13-Aug-19 LMC 1 Zinc 6010 D 377 3.75 . mg/kg 13-Aug-19 LMC I Aluminium 6010 D 16400 375.0 mg/kg 13-Aug-19 LMC I Calcium 6010 D 228000 3750 mg/kg 16-Aug-19 LMC 1 Magnesium 6010 D 7500 375.0 mg/kg 13-Aug-19 LMC 1 Potassium 6010 D 2570 74.9 mg/kg 13-Aug-19 LMC 1 Sodium 6010 D 675 74.9 mg/kg 13-Aug-19 LMC 1 Mercury 7471B 0.27 0.039 mg/kg 22-Aug-19 TLT 1 Total Kjeldahl Nitrogen SM 4500 ORG B 5680 mg/kg 7-Aug-19 ECHEM 3 Nitrate + Nitrate 353.2 0.25 mg/kg 20-Aug-19 ECHEM 3 Total Nitrogen Calculation 5680 mg/kg 227Aug-19 ECHEM 3 Total Phosphorus 200.7 3050 42.9 mg/kg 15-May-19 LMC 1 Total Solids SM2540 G 50.3 0.10 % 7-Aug-19 MLR 1 pH in Soil SW 846 9045D 12.2 0.10 S.U. 7-Aug-19 MS 2 % Total Solid SM 2540 G 63 0.10 % 8-Aug-19 KEK Ammonia Nitrogen EPA 350.3 160 6.3 mg/kg 8-Aug-19 KEK Sodium Absorption Ration CALC 2.0 mg/kg 29-Aug-19 KEK Plant Avaliable Nitrogen CALC 1184 mg/kg 29-Aug-19 KEK Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. 1. Sample analyzed by Rogers & Callcott Environmental. 2. Sample analyzed outside holding time. Duplicate result was 12.3 S.U. 3. Sample analzyed by Enviro Chemists, Inc. Date reviewed: 00,,2 q- Data reviewed by: Kelley E. Keenan Signature: NC Certification Number: 600 SC Certification Number: 99053 NC Drinking Water Certification Number: 37786 This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc. The results in this report relate only to the samples submitted for analysis. Ift M i Environmental Testing Solutions, Inc. . Certificate of Analysis Project name: Town of Waynesville WWTP Collection date: 8-Aug-19 Date received: 8-Aug-19 PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Project number: 190808.500 Sample identification: 503 Lime Sludge - Composite Sample number: 171422 Parameter Method Result RL Units Date Analyst Footnotes Analyzed % Total Solid SM 2540 G 63 0.10 % 8-Aug-19 KEK Multiple Tube Fermentation SM 9221-E <113 113 MPN/g s-Aug-19 KEK c Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. Date reviewed: Mj (?j\9- NC Certification Number: 600 Data reviewed by: Kelley E. Keenan SC Certification Number: 99053 NC Drinking Water Certification Number: 37786 Signature: V�' This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc The results in this report relate only to the samples submitted for analysis. Ah y.,: .3w;.;:�,tu_x;-,,�- NG:� a Environmental Testing Solutions, Inc. Certificate Of Altlaly515 Project name: Town of Waynesville WWTP Collection date: Date received: 4-Nov-19 4-Nov-19 Sample identification: 503 Lime Sludge - Composite PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Project number: 191104.509 Sample number: 193805 Parameter Method Result RL Units Date Analyst Footnotes Analyzed Arsenic 6010 D 6.07 3.31 mg/kg 12-Nov-19 LMC 1 Cadmium 6010 D <1.32 1.32 mg/kg 12-Nov-19 LMC I Copper 6010 D 183 1.32 mg/kg 12-Nov-19 LMC 1 Chromium 6010 D 24.4 3.31 mg/kg 12-Nov-19 LMC I Lead 6010 D 15.1 3.31 mg/kg 12-Nov-19 LMC 1 Molybdenum 6010 D 3.65 3.31 mg/kg 12-Nov-19 LMC 1 Nickel 6010 D 13.1 1.32 mg/kg 12-Nov-19 LMC I Selenium 6010 D 3.9 3.31 mg/kg 12-Nov-19 LMC 1 Zinc 6010 D 490 33.1 , mg/kg 12-Nov-19 LMC 1 Aluminium 6010 D 12500 331 mg/kg 12-Nov-19 LMC 1 Calcium 6010 D 263600 6610 mg/kg 12-Nov-19 LMC I Magnesium 6010 D 7280 331.0 mg/kg 12-Nov-19 LMC I Potassium 6010 D 1680 66.1 mg/kg 12-Nov-19 LMC 1 Sodium 6010 D 442 66.1 mg/kg 12-Nov-19 LMC 1 Mercury 7471B 0.59 0.068 mg/kg 18-Nov-19 TLT 1 Total Kjeldahl Nitrogen SM 4500 oRG B 167 mg/kg 28-Nov-19 ECHEM 3 Nitrate + Nitrate 353.2 14.0 mg/kg 18-Nov-19 ECHEM 3 Total Nitrogen Calculation 181 mg/kg 29-Nov-19 ECHEM 3 Total Phosphorus 200.7. 5630 331.0 mg/kg 12-Nov-19 LMC 1 Total Solids SM2540 G 57.2 0.10 % 6-Nov-19 JND I pH in Soil SW 846 9045D 12.0 0.10 S.U. 4-Nov-19 MS 2 % Total Solid SM 2540 G 55 0.10 % 4-Nov-19 MS Ammonia Nitrogen EPA 350.3 450 7.3 mg/kg 7-Nov-19 KEK Sodium Absorption Ration CALC 1.2 mg/kg 21-Nov-19 KEK Plant Avaliable Nitrogen CALC 182.4 mg/kg 2-Dec-19 KEK Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. 1. Sample analyzed by Rogers & Calleott Environmental. 2. Sample analyzed outside holding time. Duplicate result was 12.3 S.U. 3. Sample analzyed by Enviro Chemists, Inc. Date reviewed: I9 -Q 2- I q NC Certification Number: 600 Data reviewed by: Kelley E. Keenan SC Certification Number: 99053 NC Drinking Water Certification Number: 37786 Signature: This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions; Inc The results in this report relate only to the samples submitted for analysis. Load & Temperature Mor a YEAR MONTH Jan PASTEURIZATION PASTEURIZATION OPERATOR DATF LOADS |NTEMP. »F OUT TEMP. ^F INITIAL co Ll J)� LA n c- 0- c roc L-c- KEEP SEPERATED FROM MAN DISTRIBUTION PILE ANY -OAOGTHAT OONOT REACH 0,NDMAINTAIN 158`F. TTAKES A MINIMUM OF 3UMINUTES TOGOFROM zAGTER|ZA[|ON IN TO zASTER|ZAT|ONOUT. t- As~° 2q -`~�-~-~' revised: 2/7-25/05 LUAL) I tflflrtKA I UK= LUU YEAR MONTH PASTEURIZATION PASTEURIZATION OPERATOR nATF 4E I OAns IN TEMP. OF OUT TEMP. OF INITIAL J-71 me cj 2o3 I- c 3-14 a- 19 1 1,9'7 �) 1 t� uo rn C- LQ- I cl L) 193 Lc. SW )J4 L c- -)3-- a05 L-- KEEP SEPERATED FROM MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH AND MAINTAIN 158 OF. IT TAKES A MINIMUM OF 30 MINUTES TO GO FROM PASTERIZATION IN TO PASTERIZATION OUT. LOJ� 11 1 f revised: 2/7-25/05 ft YEAR �� {�(�/ x � MONTH PASTEURIZATION PASTEURIZATION OPERATOR nATF #|n4nR iNTEMP. "F OUT TEMP. »F INITIAL 1-d. (o m al pon 7V KEEP SEPERATEDFROM MAIN DISTRIBUTION PILE ANY LOADS THAT OONOT REACH ANDMAINTAIN 15OOF. |TTAKES AMINIMUM OF 3OMINUTES TOGOFROM PASTER|2AT|ON|NTO PA8TER|Z/Q'|ONOUT. ) Loa� � � ° �° ~� ~�� ^ revised: 2/7-25/05 dh YEAR MONTH PASTEURIZATION PASTEURIZATION OPERATOR DATE #LOADS |NTEMP. "F OUT TEMP. «F INITIAL em LC Q3n I a L p\ 190 07 "_4-7'fn� rn c.. KEEP SEPERA7EDFROM MAIN DISTRIBUTION PILE ANY LOADS THAT DONOT REACH AND K8/\|NTA|N 158"F. |TTAKES AMINIMUM OF 3OMINUTES TOG[]FROM PAGTEFl|ZATI[)YJ|NTO PAGTER|Z\T|(]NOUT. revised: 2/7-250 YEAR MONTH PASTEURIZATION PASTEURIZATION OPERATOR DATE # LOADS * IN TEMP. OF OUT TEMP. OF INITIAL Ad V cl tn c (2 6- 3 k rn go 1 1 ly) 0 of J, L 2, 13 MC_ ob, KEEP SEPERATED FROM MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH AND MAINTAIN 158F. IT TAKES A MINIMUM OF 30 MINUTES TO GO FROM PASTERIZATION IN TO PASTERIZATION OUT. revised: 2/7-25/05 MONTH J »/ PA8TEUR|ZAJ|ONPA8TEUR|Z\TON OPERATOR nATF :a I OAn.q IN TEMP- OF OUT TEMP. OF INITIAL os 19 KEEPSEPERATEDFRDK8 MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH ANO MAINTAIN 158~F. F[TAKES AMINIMUM OF 3OMINUTES TO GO FROM PA8TER|ZglDNINTO PAGTER|ZAT|ONOUT �m^ � �00��� °�� revised: 2/7-25/05 L-Wr%Lj I "IWIF L—"m a %JF%L— L-w%j YEAR MONTH PASTEURIZATION PASTEURIZATION OPERATOR r)ATF 9 LOADS IN TEMP. OF OUT TEMP. OF INITIAL c Or CIAI k M C Prn 7-7-19 >,C— )77 Lc 7- to- (�3 7 q I r 1,c- lc 7- 1.3-- f 9 I 1 Lc 1), �L ('3 3 m Pirl T) r-n c CiC ir I Va ao-13 igin L C7L5� o 61 5 0) on c 0C) rn c- fZr a, 16'3 C/I L Izfr KEEP SEPERATED FROM MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH AND MAINTAIN 158 OF. IT TAKES A MINIMUM OF 30 MINUTES TO GO FROM PASTERIZATION IN TO PASTERIZATION OUT. to,J.5 - q.5- revised: 2/7-25/05 u YEAR MONTH PASTEURIZATION PASTEURIZATION OPERATOR DATE #LOADS IN TEMP. OF OUT TEMP. OF INITIAL mc, R111A L C,- j. kc Rm I L C_ kc-- Rm 7LI 2 C29 cu> - i "q a 5143 1 -lq 910 3 3 cl /3 1 q tad 3 V] 1 �46lq 1309 L-c yn a\ I L)(o 09 --Lc- Lc. rn c- Lo) i a n6 c pa--N mc �01\ \(3 KEEP SEPERATED FROM MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH AND MAINTAIN 158 OF. IT TAKES A MINIMUM OF 30 MINUTES TO GO FROM PASTERIZATION IN TO PASTERIZATION OUT. revised: 2/7-25/05 �-30-lcj 3V3 113 .2 101 t-Y)b a YEAR I MONTH ��Cm✓�� PASTEURIZATION PASTEURIZATION OPERATOR naTP :a i nan.q IN TEMP_ OF OUT TEMP. OF INITIAL i v� L c dh 67 --. 3. i ) c.2 �' °� r' 1 1. r c --7 Lc t �1 "- u 3 c rn r 1'<"jy AIL L-c'1�. Cj•- �- �Cg� FF 73 1-( 12 in � i If I o KEEP SEPERATED FROM MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH AND MAINTAIN 158 OF. IT TAKES A MINIMUM OF 30 MINUTES TO GO FROM PASTERIZATION IN TO PASTERIZATION OUT. L,, ,A s - y3 revised: 2/7-25/05 a L-%JP%UP I A—IWo V L l v I w A %6 "V � a YEAR MONTH 6c.t PASTEURIZATION PASTEURIZATION OPERATOR nATF # I ()An.q IN TEMP- OF OUT TEMP. OF INITIAL --- �3 C- ci c- 66 to -6 qq ) � -��3 A-11 i o L4 (2 i c/ c- tyl n c p, 6 L) L c1c KEEP SEPERATED FROM MAIN DISTRIBUTION PILE ANY LOADS THAT DO NOT REACH AND MAINTAIN 158 OF. IT TAKES AMINIMUM OF 30 MINUTES TO GO FROM PASTERIZATION IN TO PASTERIZATION OUT. 1-a"15-2.2 revised: 2/7-25/05 a TCLP ift 2 �v;SF'i1 Environmental Testing Solutions, Inc. Certificate Of Analysis Project name: Town of Waynesville WWTP Collection date: 7-May-19 Date received: 7-May-19 Sample identification: 503 Lime Sludge - Composite PO Box 7565 Asheville, NC 28802 Phone: (828) 350-9364 Fax: (828) 350-9368 Project number: 190507.531 Sample number: 168191 Parameter Method Result RL Units Date Analyst Footnotes Analyzed Reactive Cyanide 335.4 0.338 mg/kg 23-May-19 ECHEM 2 Reactive Sulfide SM 4500 S D 9.63 mg/kg 24-May-19 ECHEM 2 Ignitability SW 846 1030 <0.8 0.8 mm/sec 23-May-19 ECHEM 2 pH in Soil 9045 C 12.2 S.U. 7-May-19 MS 3 Arsenic - TCLP 6010 C <0.25 0.25 mg/L 17-May-19 LMC 1 Barium - TCLP 6010 C <2.50 2.50 mg/L 17-May-19 LMC 1 Cadmium -TCLP 6010 C <0.05 0.05 mg/L 17-May-t9 LMC 1 Chromium - TCLP 6010 C <0.10 0.10 mg/L 17-May-19 LMC 1 Lead - TCLP 6010 C <0.25 0.25 mg/L 17-May-19 LMC 1 Selenium - TCLP 6010 C <0.25 0.25 mg/L 17-May-19 LMC 1 Silver - TCLP 6010 C <0.10 0.10 mg/L 17-May-19 LMC 1 Mercury - TCLP 7470A <0.0020 0.0020 mg/L 22-May-19 TLT 1 Full Scan TCLP Organics See attached sheets 1,2 Footnotes: RL = Reporting Limit. Values are reported down to the Reporting Limit only. 1. Sample analyzed by Rogers & Callcott Environmental. 2. Sample analzyed by Enviro Chemists, Inc. 3. Sample analzyed outside holding time. Duplicate result was 12.3 S.U. Date reviewed: a-30 Data reviewed by: Kelley E. K, epenan A NC Certification Number: 600 SC Certification Number: 99053 NC Drinking Water Certification Number: 37786 Signature: This report should not be reproduced, exept in its entirety, without the written consent of Environmental Testing Solutions, Inc. in '? f-n-I � ENVIRONMENTAL ENVIRONMEN A off/ an_ Laboratory Report Client Environmental Testing Solutions Project: Kelley E. Keenan Work Order: 351 Depot St. Received: Asheville, NC 28801-4310 Dear Client: Laboratory Services Waynesville WWTP 9050445 05/08/2019 09:30 Rogers and Callcott appreciates the opportunity to be of service to you. The attached laboratory services report includes analytical results and chain of custody for samples that were received on May 08, 2019. Rogers and Callcott maintains a formal QA/QC program. Unless otherwise noted, all analyses performed under NELAP certification have complied with all the requirements for the TNI standard The analyses met the QA/QC confidence interval for each test method unless otherwise qualified. Estimated uncertainty is available upon request. Privileged / Confidential information may be contained in this report and is intended only for the use of the addressee. If you are not the addressee, or the person responsible for delivering to the person addressed, you may not copy or deliver this message to anyone else. If you receive this message by mistake, please notify Rogers and Callcott immediately. We strive to provide excellent service to our clients. Please contact Amy Ashley, your Project Manager, at amy.ashley@rogersandcallcott.com or (864)-335-4962 if you have any questions about this report. Report Approved By: t/In 4 Amy Ashley Project Manager This report may not be reproduced, except in full, without written permission from Rogers & Callcott, Inc. PO Box 5655 1 Greenville, SC 29606 1 426 Fairforest Way i Greenville, SC 29607 i main 864.232.1556 1 fax 864.232.6140 rogersandcalleott.eom - --�- -- -- — — an employee -owned company Page 1 of 21 n Certificate of Analysis Client Environmental Testing Solutions Kelley E. Keenan 351 Depot St. Asheville, NC 28801-4310 Sample Number Sample Description 9050445-01 Waynesville W WTP 503 Lime Sludge - Comp South Carolina Greenville Laboratory Identification 23105 South Carolina Columbia Laboratory Identification 40572 North Carolina Laboratory Certification Number 27 North Carolina Drinking Water Lab Number 45710 NELAP Utah Certificate Number SC000042014-1 Georgia Drinking Water Lab ID 880 Project: Waynesville WWTP Work Order: 9050445 Received: 05/08/2019 09:30 Matrix Sampled Type Sludge 05/07/19 07:41 Composite PO Box 5655 1 Greenville, SC 29606 426 hirforest Way i Greenville, SC 2-9607 �! main 864.232.1556 ' fax 864.232.6140 rogersandcallcott.Com — _- -g - - an employee -owned company 0512812019 16:30 This report may not be reproduced, except in full, without written permission froin Rogers & Callcott, Inc. Page 2 Of 21 f Rogersn! ENVIRONMENTAL kl NAM K � 1 E35 vironmental Testing Solutions Project: Waynesville WWTP 1 Depot St. Work Order: 9050445 heville, NC 28801-4310 Reported: 05/28/19 16:30 Sample Data Sample Number Sample Description Parameter 9050445-01 Waynesville WWTP 503 Lime Sludge - Comp collected on 05/07/19 07:41 Reporting Result Limit Units DF Analyzed Method Flag Analyst Batch TCLP Metals Mercury ND 0.0020 mg/L 10.0 05/22/19 11:57 EPA7470A TLT B9E0976 Arsenic ND 0.25 mg/L 5.00 05/17/19 00:48 EPA 60101) LMC B9E0681 Barium ND 2.50 mg/L 5.00 05/17/19 00:48 FPA6010D LMC B9E0681 Cadmium ND 0.05 mg/L 5.00 05/17/19 00:48 EPA 601OD LMC B9E0681 Chromium ND 0.10 mg/L 5.00 05/17/19 00:48 EPA 60101) LMC B9E0681 Lead ND 0.25 mg/L 5.00 05/17/19 00:48 EPA 60101) LMC B9E0681 Selenium ND 0.25 mg/L 5.00 05/17/19 00:48 EPA 6010D LMC B9E0681 Silver ND 0.10 mg/L 5.00 05/17/19 00:48 EPA 601OD LMC B9E0681 TCLP Volatile Organics Benzene ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 2-Butanone(MEK) ND 0.200 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9EI134 Carbon tetrachloride ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 Chlorobenzene ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9EI134 Chloroform ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 1,2-Dichloroethane ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 1,4-Dichlorobenzene ND 0.100. mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 1,1-Dichloroethene- ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 Tetrachloroethene ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 Trichloroethene ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 Vinyl chloride ND 0.100 mg/L 50.0 05/21/19 17:44 EPA 8260B LDM B9E1134 Surrogates %REC % REC Limits Flag 1,2-Dichloroethane-D4 94 70-130 Toluene-D8 122 70-130 4-Bromofhrorobenzene 109 70-130 TCLP Semi -Volatile Organics 2-Methylphenol (o-Cresol) ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 3/4-Methylphenol(m,p-Cresol) ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 total Cresol ND 0.200 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 2,4-Dinitrotoluene ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 Hexachlorobenzene ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 Hexachlorobutadiene ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 Hexachloroethane ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 Nitrobenzene ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 PO Box 5655 1 Greenville, SC 29606 ! 426 Riirforesc Way 1 Greenville, SC 29607 ': main 864.232.1556 1 f,,x 864.232.614o rogersandcallcott.com an employee -owned company 0512812019 16:30 This report may not he reproduced, except in frill, without written permission from Rogers & Callcott, Inc. Page 3 of 21 ENVIRONMENTALRogers &Cakott Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 Sample Number 9050445-01 Sample Description Waynesville WWTP 503 Lime Sludge - Comp collected on 05/07/19 07:41 Reporting Parameter Result Limit Units DF Analyzed Method Flag Analyst Batch TCLP Semi -Volatile Organics Pentachlorophenol ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 Pyridine ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 2,4,5-Trichlorophenol ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 2,4,6-Trichlorophenol ND 0.100 mg/L 50.0 05/15/19 15:21 EPA 8270D RJM B9E0691 Surrogates %REC %REC Limits Flag Nitrobenzene-D5 81 15-314 2-Fluorobiphenyl 68 32-118 2-Fluorophenol 67 20-110 Phenol-D5 55 8-424 2,4,6-7ribromophenol 110 39-130 Teiphenyl-D14 106 26-173 TCLP Pesticides Gamma-BHC(Lindane) ND 0.00050 mg/L 10.0 05/24/19 06:16 EPA8081B Chlordane ND 0.0050 mg/L 10.0 05/24/19 06:16 EPA8081B Endrin ND 0.00050 mg/L 10.0 05/24/19 06:16 EPA8081B Heptachlor ND 0:00050 mg/L 10.0 05/24/19 06:16 EPA 8081B Heptachlor epoxide ND 0.00050 ing/L 10.0 05/24/19 06:16 EPA8081B Toxaphene ND 0.0050 mg/L 10.0 05/24/19 06:16 EPA8081B Methoxychlor ND 0.00050 mg/L 10.0 05/24/19 06:16 EPA8081B Surrogates %REC %REC Limits 2,4,5,6-Tetrachloro-m xylene 89 60-130 Decachlorobiphenyl 56 30-150 Flag RKH 139E0848 RKH B9E0848 RKH . B9E0848 RKH B9E0848 RKH 139E0848 RKH 139E0848 RKH 139E0848 PCB Box 5655 1 Greenville, SC 29606 1 426 FairEorest Way !'Greenville, SC 29607 1 main 864,232.1556 1 fax 864.232.6140 rogersandcallcott.com an employee -owned company 0512812019 16:30 This report may not be reproduced, except in fdl, without written permission from Rogers & Callcott, Inc. Page 4 Of 21 n Rogers k ott ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Metals Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result % REC Limits RPD Limit , Flags Batch B9E0681 - EPA 3005A Blank (B9E0681-BLK1) Arsenic ND 0.05 mg/L Barium ND 0.50 mg/L Cadmium ND 0.01 mg/L Chromium ND 0.02 mg/L Lead ND 0.05 mg/L Selenium ND 0.05 mg/L Silver ND 0.02 mg/L Blank (B9E0681-BLK2) Arsenic ND 0.25 mg/L Barium ND 2.50 mg/L Cadmium ND 0.05 mg/L Chromium ND 0.10 mg/L Lead ND 0.25 mg/L Selenium ND 0.25 mg/L Silver ND 0.10 mg/L Blank (B9E0681-BLK3) Arsenic ND 0.25 mg/L Barium ND 2.50 mg/L Cadmium ND 0.05 mg/L Chromium ND 0.10 mg/L Lead ND 0.25 mg/L Selenium ND 0.25 mg/L Silver ND 0.10 mg/L LCS (B9E0681-BS1) Arsenic 0.47 0.05 mg/L 0.500 94 80-120 Barium ND 0.50 mg/L 0.500 96 80-120 Cadmium 0.47 0.01 mg/L 0.500 94 80-120 Chromium 0.49 0.02 mg/L 0.500 98 80-120 Lead 0.49 0.05 mg/L 0.500 98 80-120 Selenium 0.47 0.05 mg/L 0.500 94 80-120 Silver 0.47 0.02 mg/L 0.500 94 80-120 PO Box 5655 I Greenville, SC 29606 1426 Fairforest Way I Greenville, SC 29607 ' main 864.232.1556 '; fax 864.232.6f4o rogerSandcallcott.COm - -,m.._ �. ®,--- an employee -owned company 0512812019 16:30 This report may not be reproduced, except in fell, without written permission from Rogers & Callcott, Inc. Page 5 Of 2� Ah ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Metals Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0681 - EPA 3005A LCS (B9E0681-BS2) Arsenic 2.23 0.05 mg/L 2.50 89 80-120 Barium 2.25 0.50 mg/L 2.50 90 80-120 Cadmium 2.14 0.01 mg/L 2.50 86 80-120 Chromium 2.28 0.02 mg/L 2.50 91 80-120 Lead 2.28 0.05 mg/L 2.50 91 80-120 Selenium 2.22 0.05 mg/L 2.50 89 80-120 Silver 2.18 0.02 mg/L 2.50 87 80-120 Matrix Spike (B9E0681-MS5) Source: 9050445-01 Arsenic Barium Cadmium Chromium Lead Selenium Silver Batch E9E0976 - EPA 7470A Blank (B9E0976-BLKl) Mercury Blank (B9E0976-BLK2) 2.41 0.25 mg/L 2.50 ND 96 75-125 3.58 2.50 mg/L 2.50 ND 87 75-125 2.34 0.05 mg/L 2.50 ND 94 75-125 2.30 0.10 mg/L 2.50 ND 92 75-125 2.22 0.25 mg/L 2.50 ND 89 75-125 2.38 0.25 mg/L 2.50 ND 95 75-125 2.49 0.10 mg/L 2.50 ND 99 75-125 ND 0.0002 mg/L Mercury ND 0.0020 mg/L Blank (B9E0976-BLK3) Mercury Blank (B9E0976-BLK4) ND 0.0020 mg/L Mercury ND 0.0020 mg/L LCS (B9E0976-BS1) Mercury 0.0052 0.0002 mg/L 0.00500 103 85-115 PO Box 5655 (Greenville, SC 2960b = 426 Fairforest Way 1 Greenville; SC 29607 i main 864.232.1556 ; fax 864.232.6140 rogersandcal(Cott.com an employee -owned company 0512812019 16:30 This report may not be reproduced, except infill, without written permission from Rogers & Callcott, Inc. Page 6 Ot Z1 t� Rogers &Cakot ENVIRONMEN A Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Metals Quality Control Summary Reporting Spike Source %.REC RPD Parameter Result Limit Units Level Result % REC Limits RPD Limit Flags Batch B9E0976 - EPA 7470A LCS (B9E0976-BS2) Mercury 0.0507 0.0020 mg/L 0.0500 101 85-115 Matrix Spike (B9E0976-MS5) Source: 9050445-01 Mercury 0.0391 0.0020 mg/L 0.0500 ND 78 75-125 Post Spike(B9E0976-PS5) Source:9050445-01 Mercury 3.93 ug/L 4.00 0.0415 97 80-120 PO Box 5655 ; Greenville, SC 29606 ; 426 hirforest Way ; Greenville, SC 29607 € main 864.232.1556 i fax 864.232.6140 rogersandcallcott.Com an employee -owned company 0512812019 16:30 This report may not be reproduced, except infill, without written permission from Rogers & Callcott, Inc. Page 7 Of Z 1 Ah Rogers &Cakott 'Wri_a_l..l.-l..r: ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Volatile Organics Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E1134 - EPA 5030 Blank (B9E1134-BLKI) Benzene ND 0.00200 mg/L 2-Butanone (MEK) ND 0.00400 mg/L Carbon tetrachloride ND 0.00200 mg/L Chlorobenzene ND 0.00200 mg/L Chloroform ND 0.00200 mg/L 1,2-Dichloroethane ND 0.00200 mg/L 1,4-Dichlorobenzene ND 0.00200 mg/L l,l-Dichloroethene ND 0.00200 mg/L Tetrachloroethene ND 0.00200 mg/L Trichooroethene ND 0.00200 mg/L Vinyl chloride ND 0.00200 mg/L Surrogate:1,2-Dichloroethane-D4 103 70-130 Surrogate: Toluene-D8 127 70-130 Surrogate:4-Bromofuorobenzene 117 70-130 Blank (B9E1134-BLK2) Benzene ND 0.100 mg/L 2-Butanone (MEK) ND 0.200 mg/L Carbon tetrachloride ND 0.100 mg/L Chlorobenzene ND 0.100 mg/L Chloroform ND 0.100 mg/L 1,2-Dichloroethane ND 0.100 mg/L 1,4-Dichlorobenzene ND 0.100 mg/L 1, 1 -Dichloroethene ND 0.100 mg/L Tctrachloroethene ND 0.100 mg/L Trichlorocthene ND 0.100 mg/L Vinyl chloride ND 0.100 mg/L Surrogate: 1,2-Dichloroethane-D4 89 70-130 Surrogate: Toluene-D8 117 70-130 Surrogate: 4-Bromofuorobenzene 105 70-130 LCS (B9E1134-BSI) Benzene 0.0203 0.00200 mg/L 0.0200 101 70-130 2-Butanone (MEK) 0.0195 0.00400 mg/L 0.0200 98 60-140 Carbon tetrachloride 0.0187 0.00200 mg/L 0.0200 94 70-130 Chlorobenzene 0.0183 0.00200 mg/L 0.0200 92 70-130 PO Box 5655 I Greenville, SC 29606 '. 426 hirforest Way ; Greenville, SC 2960" ' main 864,232.1556 ! fax 864.232.6140 rogersandcallcot:t.com employee-o:vned company 0512812019 16:30 This report may not be reproduced, except in full, without written permission from Rogers & Callcolt, Inc. Page $ Ot 21 Rogers &Cakot A � hi* - ENVIRONMENT Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Volatile Organics Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E1134 - EPA 5030 LCS (B9E1134-BS1) Chloroform 0.0198 0.00200 mg/L 0.0200 99 70-130 1,2-Dichloroethane 0.0181 0.00200 mg/L 0.0200 90 70-130 1,4-Dichlorobenzene 0.0186 0.00200 mg/L 0.0200 93 70-130 I,1-Dichloroethene 0.0197 0.00200 mg/L 0.0200 99 70-130 Tetrachlorocthene 0.0182 0.00200 mg/L 0.0200 91 70-I30 Trichloroethene 0.0198 0.00200 mg/L 0.0200 99 70-130 Vinyl chloride 0.0227 0.00200 mg/L 0.0200 114 60-140 Sur•rogate:l,2-Dichloroethane-D4 93 70-130 Surrogate: Toluene-D8 104 70-130 Surrogate: 4-Bromo luorobenzene 105 70-130 Matrix Spike (B9E1134-MSl) Source: 9050445-01 .Benzene 1.09 0.100 mg/L 1.00 ND 109 70-130 2-Butanone (MEK) 1.05 0.200 mg/L 1.00 ND 105 60-140 Carbon tetrachloride 1.25 0.100 mg/L 1.00 ND 125 70-130 Chlorobenzene 0.973 0.100 mg/L 1.00 ND 97 70-130 Chloroform 1.09 0.100 mg/L 1.00 ND 109 70-130 1,2-Dichloroethane 0.924 0.100 mg/L 1.00 ND 92 70-130 1,4-Dichlorobenzene 0.972 0.100 mg/L 1.00 ND 97 70-130 I,1-Dichloroethene 1.21 0.100 mg/L 1.00 ND 121 70-130 Tetrachloroethene 1.13 0.100 mg/L 1.00 ND 113 70-130 Trichloroethene 1.05 0.100 mg/L 1.00 ND 105 70-130 Vinyl chloride 1.28 0.100 mg/L 1.00 ND 127 60-140 Surrogate:l,2-Dichlorroethane-D4 96 70-130 Surrogate: Toluene-D8 119 70-130 Surrogate: 4-Bromofluorobenzene 106 70-130 Matrix Spike Dup (B9E1134-MSD1) Source: 9050445-01 Benzene 1.10 0.100 mg/L 1.00 ND 110 70-130 1 20 2-Butanone (MEK) 0.971 0.200 mg/L 1.00 ND 97 60-140 8 20 Carbon tetrachloride 1.23 0.100 mg/L 1.00 ND 123 70-130 2 20 Chlorobenzene 0.986 0.100 mg/L 1.00 ND 99 70-130 l 20 Chloroform 1.10 0.100 mg/L 1.00 ND 110 70-130 1 20 1,2-Dichloroethane 0.924 0.100 mg/L 1.00 ND 92 70-130 0.05 20 1,4-Dichlorobenzene 1.01 0.100 mg/L 1.00 ND 101 70-130 4 20 l,l-Dichloroethene 1.16 0.100 mg/L 1.00 ND 116 70-130 5 20 PO Box 5655 1 Greenville, SC 29606 ' 426 Fairtorest Way 1 Greenville, SC 29607 main 864.232.1556 % fax 864,232.6140 rogersandcallcotc.com an employee -owned Cornpany 0512812019 16:30 This report may not be reproduced, except in full, without written permission from Rogers & Callcott, Inc. Page 9 Of Z 1 da Rogers t ENViRONMENT Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Volatile Organics Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch 139E1134 - EPA 5030 Matrix Spike Dup (B9E1134-MSDI) Source: 9050445-01 Tetrachlorocthenc 1.12 0.100 mg/L 1.00 ND 112 70-130 0.9 20 Trichloroethene 1.06 0.100 mg/L 1.00 ND 106 70-130 0.9 20 Vinyl chloride 1.29 0.100 mg/L 1.00 ND 127 60-140 0.2 20 Surrogate: 1,2-Dichloroethane-D4 Surrogate: Toluene-D8 Surrogate: 4-Bromofluorobenzene 97 70-130 118 70-130 110 70-130 PO Box 5655 1 Greenville, SC 29606 1 426 hirforest Way I Greenville, SC 29607 main 864.232.1556 1 fax 864.232.6140 rogersandcallcott.com an employee -owned company 0512812019 16:30 This report may not be reproduced, except infill, without written permission from Rogers & Callcott, Inc. Page 10 of 21 Rogers s ot MC Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Semi -Volatile Organics Quality Control Summary Reporting Spike Source % REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0691 - EPA 3510C - GCMS Blank (B9E0691-BLK1) 2-Methylphenol (o-Cresol) ND 0.0100 mg/L 3/4-Methylphenol (m,p-Cresol) ND 0.0100 mg/L total Cresol ND 0.0200 mg/L 2,4-Dinitrotoluene ND 0.0100 mg/L Hexachlorobenzene ND 0.0100 mg/L Hexachlorobutadiene ND 0.0100 mg/L Hexachloroethane ND 0.0100 mg/L Nitrobenzene ND 0.0100 mg/L Pentachlorophenol ND 0.0100 mg/L Pyridine ND 0.0100 mg/L 2,4,5-Trichlorophenol ND 0.0100 mg/L 2,4,6-Trichlorophenol ND 0.0100 mg/L Surrogate: Nitrobenzene-D5 .84 15-314 Surrogate: 2-Fluorobiphenyl 78 32-118 Surrogate: 2-Fluoropheno/ 66 20-110 Surrogate: Phenol-D5 62 8-424 Surrogate: 2,4,6-7ribromophenol 77 39-130 Surrogate: Terphenyl-DM 119 26-173 Blank (B9E0691-BLK2) 2-Methylphenol (o-Cresol) ND 0.100 mg/L 3/4-Methylphenol (m,p-Cresol) ND 0.100 mg/L total Cresol ND 0.200 mg/L 2,4-Dinitrotoluene ND 0.100 mg/L Hexachlorobenzene ND 0.100 mg/L Hexachlorobutadiene ND 0.100 mg/L Hexachloroethane ND 0.100 mg/L Nitrobenzene ND 0.100 mg/L Pentachlorophenol ND 0.100 mg/L Pyridine ND 0.100 mg/L 2,4,5-Trichlorophenol ND 0.100 mg/L 2,4,6-Trichlorophenol ND 0.100 mg/L Surrogate: Nitrobenzene-D5 74 15-314 Surrogate: 2-Fluorobiphenyl 65 32-118 Surrogate: 2-Fhrorophenol 47 20-110 Surrogate: Phenol-D5 47 8-424 PO Box 5655 1 Greenville, SC 29606 i 426 Fairforest Way ! Greenville, SC 29607 main 864.232.1556 ; fax 864.232.6140 rogersandcallcott.com - -- - - - �- �-- -_ an employee -owned company 0512812019 16:30 This report may not be reproduced, except in full, without written permission from Rogers & Callcott, Inc. Page 11 Of Z1 Rogers &Cakott ENVIRONMENTAL. i�r�-1•.r�rl-r�'� Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Semi -Volatile Organics Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0691 - EPA 3510C - GCMS Blank (B9E0691-BLK2) Surrogate: 2,4.6-Tribromophenol 63 39-130 Surrogate: Terphenyl-D14 123 26-173 Blank (B9E0691-BLK3) 2-Methylphenol (o-Cresol) ND 0.100 mg/L 3/4-Methylphenol (m,p-Cresol) ND 0.100 mg/L total Cresol ND 0.200 mg/L 2,4-Dinitrotoluene ND 0.100 mg/L Hexachlorobenzene ND 0.100 mg/L Hexachlorobutadiene ND 0.100 mg/L Hexachlorocthane ND 0.100 mg/L Nitrobenzene ND 0.100 mg/L Pentachlorophenol ND 0.100 mg/L Pyridine ND 0.100 mg/L 2,4,5-Trichlorophenol ND 0.100 mg/L 2,4,6-Trichlorophenol ND 0.100 mg/L Surrogate: Nitrobenzene-D5 68 15-314 Surrogate:2-Fluorobiphenyl 57 32-118'" ' Surrogate: 2-Fluorophenol 53 20-110 Surrogate: Phenol-D5 44 8-424 Surrogate: 2,4.6-7ribromophenol 76 39-130 Surrogate: Terphenyl-D14 119 26-173 LCS (B9E0691-BSl) 2-Methylphenol (o-Cresol) 0.659 0.100 mg/L 0.800 82 40-110 3/4-Methylphenol (m,p-Cresol) 1.21 0.100 mg/L 1.60 76 40-1 l0 2,4-Dinitrotoluene 0.595 0.100 mg/L 0.800 74 52-I10 Hexachlorobenzene 0.742 0.100 mg/L 0.800 93 52-121 Hexachlorobutadiene 0.460 0.100 mg/L 0.800 57 30-110 Hexachlorocthane 0.605 0.100 mg/L 0.800 76 24-I10 Nitrobenzene 0.778 0.100 mg/L 0.800 97 36-I10 Pentachlorophenol 0.592 0.100 mg/L 0.800 74 43-125 Pyridine 0.578 0.100 mg/L 0.800 72 24-110 2,4,5-Trichlorophenol 0.652 0.100 mg/L 0.800 82 53-115 2,4,6-Trichlorophenol 0.644 0.100 mg/L 0,800 80 53-I10 Surrogate: Nitrobenzene-D5 86 15-314 PO Box 5655 1 Greenville, SC 29606 1 426 Fairforest Way I Greenville, SC 29607 1 main 864.232.1556 ; fax 664.232.6140 rogersandcalleott.com - - - -- - - - - -- --- - - - an employee -owned company 0512812019 16:30 This report may not be reproduced, except in fidl, without written permission fr-arn Rogers & Callcott, Inc. Page 12 of 21 Ah Rogers &Cakott r, ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Semi -Volatile Organics Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0691 - EPA 3510C - GCMS LCS (B9E0691-BS1) Surrogate:2-Fluorobiphenyl 81 32-118 Surrogate:2-Fluorophenol 70 20-110 Surrogate: Phenol-D5 57 8-424 Surrogate. 2.4,6-Tribromophenol 72 39-130 Surrogate: Terphenyl-D14 97 26-173 LCS (B9E0691-BS2) 2-Methylphenol (o-Cresol) 0.630 0.100 mg/L 0.800 79 40-110 3/4-Mcthylphenol (m,p-Cresol) 1.30 0.100 mg/L 1.60 81 40-110 2,4-Dinitrotoluene 0.506 0.100 mg/L 0.800 63 52-110 Hexachlorobenzene 0.774 0.100 mg/L 0.800 97 52-121 Hexachlorobutadiene 0.558 0.100 mg/L 0.800 70 30-110 Hexachloroethane 0.621 0.100 mg/L 0.800 78 24-110 Nitrobenzcne 0.878 0.100 mg/L 0.800 Ito 36-110 Pentachlorophenol 0.516 0.100 mg/L 0.800 65 43-125 Pyridine 0.642 0.100 mg/L 0.800 80 24-110 .2,4,5-Trichlorophenol 0.512 0.100 mg/L 0.800 64 53-115 2,4,6-Trichlorophenol 0.490 0.100 mg/L 0.800 61 53-1I0 Surrogate: Nitrobenzene-D5 83 15-314 Surrogate: 2-Fluorobiphenyl 62 32-118 Surrogate: 2-Fluorophenol 68 20-110 Surrogate: Phenol-D5 60 8-424 Surrogate: 2,4,6-Tribromophenol 82 39-130 Surrogate: Terphenyl-D14 98 26-173 LCS (B9E0691-BS3) 2-Methylphenol(o-Cresol) 0.0516 0.0100 mg/L 0.0800 64 40-110 3/4-Methylphenol(m,p-Cresol) 0.124 0.0100 mg/L 0.160 77 40-110 2,4-Dinitrotoluene 0.0549 0.0100 mg/L 0.0800 69 52-I10 Hexachlorobenzene 0.0660 0.0100 mg/L 0.0800 82 52-121 Hexachlorobutadiene 0.0431 0.0100 mg/L 0.0800 54 30-I10 Hexachloroethane 0.0469 0.0100 mg/L 0.0800 59 24-I10 Nitrobenzene 0.0697 0.0100 mg/L 0.0800 87 36-I10 Pentachlorophenol 0.0693 0.0100 mg/L 0.0800 87 43-125 Pyridine 0.0504 0.0100 mg/L 0.0800 63 24-110 2,4,5-Trichlorophenol 0.0662 0.0100 mg/L 0.0800 83 53-115 2,4,6-Trichlorophenol 0.0600 0.0100 mg/L 0.0800 75 53-110 ' PO Box 5655 j Greenville, SC 29606 ! 426 Fairforest Way Greenville, SC 29607 I main 864.232.1556 ! fax 864.232.6140 rogersandealleott.eom -_ -�- -�---------------- --------- ®- an employee -owned company 0512812019 16:30 This report may not be reproduced, except in full, without written permission from Rogers & Callcott, Inc. Page 13 Of 21 Rogers &Cakott -..1_ ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28 801-43 10 Reported: 05/28/19 16:30 TCLP Semi -Volatile Organics Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0691 - EPA 3510C - GCMS LCS (B9E0691-BS3) Surrogate: Nhrobenzene-D5 68 15-314 Surrogate: 2-Fluorobiphenyl 62 32-118 Surrogate: 2-Fhrorophenol 61 20-110 Surrogate: Phenol-D5 49 8-424 Surrogate:2,4,6-Tribromophenol 76 39-130 Surrogate: Terphenyl-D14 115 26-173 Matrix Spike (139E0691-MS2) Source: 9050445-01 2-Methylphenol (o-Cresol) 0.498 0.100 mg/L 0.800 ND 62 30-110 3/4-Methylphenol (m,p-Cresol) 1.10 0.100 mg/L 1.60 ND 69 26-110 2,4-Dinitrotoluene 0.646 0.100 mg/L 0.800 ND 81 43-120 Hexachlorobcnzene 0.857 0.100 mg/L 0.800 ND 107 45-120 Hexachlorobutadiene 0.625 0.100 mg/L 0.800 ND 78 12-110 Hexachlorocthane 0.505 0.100 mg/L 0.800 ND 63 15-110 Nitrobenzene 0.714 0.100 mg/L 0.800 ND 89 25-112 Pentachlorophcnol 0.788 0.100 mg/L 0.800 ND 99 30-140 Pyridine 0.502 0.100 mg/L 0.800 ND 63 17-110 2,4,5-Trichlorophcnol 0.696 0.100 mg/L 0.800 ND 87 46-125 2,4,6-Trichlorophcnol 0.652 0.100 mg/L 0.800 ND 82 43-120 Surrogate: Nitrobenzene-D5 65 15-314 Surrogate: 2-Fluorobiphenyl 78 32-118 Surrogate:2-Fhrorophenol 57 20-110 Surrogate: Phenol-D5 46 8-424 Surrogate. 2,4,6-Tribromophenol 100 39-130 Surrogate: Terphenyl-DM 105 26-173 PO Box 5655 1 Greenville, SC 29606 1 426 Fahforest Way i Greenville, SC 29607 ; main 864.232.1556 1 fax 864.232.6140 rogersandcalleott.eom �- - ----� --- -- -�-- an employee -owned company 0512812019 16:30 This report may not be reproduced, except in fidl, without written permission from Rogers & Callcott, Inc. Page 14 of 21 Rogers &Cakott ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28 801-43 10 Reported: 05/28/19 16:30 TCLP Pesticides Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result % REC Limits RPD Limit Flags Batch B9E0848 - EPA 3510C - GC Blank (B9E0848-BLKI) Gamma-BHC (Lindanc) ND 0.000050 mg/L Chlordane ND 0.00050 mg/L Endrin ND 0.000050 mg/L Heptachlor ND 0.000050 mg/L Heptachlor epoxide ND 0.000050 mg/L Toxaphene ND 0.00050 mg/L Methoxychlor ND 0.000050 mg/L Surrogate:2,4,5,6-Tetrachloro-m-xylene 85 60-130 Surrogate: Decachlorobiphenyl 69 30-150 Blank (B9E0848-BLK2) Gamma-BHC (Lindanc) ND 0.00050 mg/L Chlordane ND 0.0050 mg/L Endrin ND 0.00050 mg/L Heptachlor ND 0.00050 mg/L Heptachlor epoxide ND 0.00050 mg/L Toxaphenc ND 0.0050 mg/L Methoxychlor ND 0.00050 mg/L Surrogate: 2,4,5,6-Tetrachloro-in-xylene 86 60-130 Surrogate: Decachlorobiphenyl 86 30-150 Blank (B9E0848-BLK3) Gamma-BHC (Lindanc) ND 0.00050 mg/L Chlordane ND 0.0050 mg/L Endrin ND 0.00050 mg/L Heptachlor ND 0.00050 mg/L Heptachlor epoxide ND 0.00050 mg/L Toxaphenc ND 0.0050 mg/L Methoxychlor ND 0.00050 mg/L Surrogate: 2,4,5,6-Tetrachloro-m-xylene 88 60-130 Surrogate: Decachlorobiphenyl 72 30-150 LCS (B9E0848-BS1) Gamma-BHC (Lindanc) 0.0037 0.00050 mg/L 0.00400 91 70-130 Endrin 0.0038 0.00050 mg/L 0.00400 96 70-130 Heptachlor 0.0034 0.00050 mg/L 0.00400 85 70-130 PO Box 5655 1 Greenville, SC 29606 ' 426 Fair.`orest Way 1 Greenville, SC 29607 i main 864.232.1556 1 fax 864.232.6140 rogersandcallcott.com ---�-� -- -- --�-- - — -�-�-- - - an employee -owned company 0512812019 16:30 This report nray not be reproduced, except in fdl, without written permission from Rogers & Callcott, Inc. Page 15 Of 21 pw r k ott - �''%°3 ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28 801-43 10 Reported: 05/28/19 16:30 TCLP Pesticides Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0848 - EPA 3510C - GC LCS (B9E0848-BS1) Heptachlor epoxide 0.0037 0.00050 mg/L 0.00400 94 70-130 Methoxychlor 0.0041 0.00050 mg/L 0.00400 103 70-130 Surrogate: 2, 4,5, 6-Tetrachloro-nz-xylene 81 60-130 Surrogate: Decachlorobiphenyl 86 30-150 LCS (B9E0848-BS2) Gamma-BHC (Lindane) 0.0037 0.00050 mg/L 0.00400 93 70-130 Endrin • 0.0039 0.00050 mg/L 0.00400 97 70-130 Heptachlor 0.0035 0.00050 mg/L 0.00400 88 70-130 Heptachlor epoxide 0.0038 0.00050 mg/L 0.00400 95 70-130 Methoxychlor 0.0042 0.00050 mg/L 0.00400 105 70-130 Ste rogate: 2,4,5,6-Tetrachloro-m-xylene 81 60-130 Surrogate: Decachlorobiphenyl 77 30-150 " Matrix Spike (B9E0848-MS2) Source: 9050445-01 Gamma-BHC (Lindane) 0.0039 0.00050 mg/L 0.00400 ND 98 60-140 Endrin 0.0040 0.00050 mg/L 0.00400 ND 99 60-140 Heptachlor 0.0034 0.00050 mg/L 0.00400 ND 85 60-140 Heptachlor epoxide 0.0038 0.00050 mg/L 0.00400 ND 94 60-140 Methoxychlor 0.0040 0.00050 mg/L 0.00400 ND 100 60-I40 Surrogate: 2,4,5,6-Tetrachloro-m-xylene 86 60-130 Surrogate: Decachlorobiphenyl 67 30-150 PO Box 5655 1 Greenville, SC 29606 ' 426 Fait -forest Way 1 Greenville, SC 29607 ; main 864.232.1556 ; fax 864.232.6140 rogersandca(Icottxom ------ an employee -owned corn pany 0512812019 16:30 This report may not be reproduced, except in fill, without written permission j-om Rogers & Callcott, Inc. Page 16 Of Z1 i Rogersk `srritr{ ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP Bottle Extraction Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result %REC Limits RPD Limit Flags Batch B9E0586 - EPA 1311 Blank (B9E0586-BLKI) TCLP Bottle Extraction Complete Blank (B9E0586-BLK2) TCLP Bottle Extraction Complete PO Box 5655 1 Greenville, SC 29606 ' 426 Fair;nrest Way i Greenville, SC 29607 1 main 864.232.1556 1 fix 864.232.6140 rogersandealkott.eom an employee -owned company 0512812019 16:30 This report may not be reproduced, except in fill, without written permission from Rogers & Callcon, Inc. Page 17 Of Z 1 go � ,,{_ Rogers &Cakott ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 TCLP ZHE Extraction Quality Control Summary Reporting Spike Source %REC RPD Parameter Result Limit Units Level Result % REC Limits RPD Limit Flags Batch B9E0944 - EPA 1311 - ZHE Blank (B9E0944-BLKI) TCLP ZHE Extraction Complete Sample Preparation Data Parameter Batch Sample ID Prepared Analyst EPA 3005A ICP Digestion EPA3005A 139E0681 9050445-01 05/14/2019 08:47 LMC EPA 3510 Extraction EPA 3510C - GC 139E0848 9050445-01 05/16/2019 08:15 DBB EPA 3510 Extraction EPA 3510C - GCMS 139E0691 9050445-01 05/14/2019 09:30 DBB EPA 7470A Mercury Digestion EPA7470A 139E0976 9050445-01 05/21/2019 14:06 TLT TCLP Extraction Data Parameter 'Batch Sample ID Extraction Initial Started Finished Fluid # pH Final pH EPA 1311 - TCLP Extraction EPA 1311 B9E0586 9050445-01 5/8/2019 at 1635 5/9/2019 at 1040 2 11.86 12.01 EPA 1311- TCLP ZHE EPA 1311 - ZHE 139E0944 9050445-01 5/16/2019 at 1714 5/17/2019 at 1038 1 N/A N/A PO Box 5655 1 Greenville, SC 29606 1 426 Fairforest Way 1 Greenville, SC 29607 ' main 864.232.1556 '. fax 864.232.6140 rogersandeallcott.eom — -- - _ _- --_ -- an employee -owned company 0512812019 16:30 This report may not be reproduced, except in full, without written permission fionr Rogers & Callcott, Inc. Page 18 of 21 t♦ „q 4 I t�tRogers &Cakott -; ENVIRONMENTAL Environmental Testing Solutions Project: Waynesville WWTP 351 Depot St. Work Order: 9050445 Asheville, NC 28801-4310 Reported: 05/28/19 16:30 Data Qualifiers and Definitions ND Analyte NOT DETECTED at or above the reporting limit NR Not reported RPD Relative Percent Difference PO Box 5655 1 Greenville, SC 29606 1426 Fairforest Way I Greenville, SC 29607 i main 864.232.1556 1 fax 864.232.6140 rogersandcallcott.com — - -------�— �-- - - an employee -owned company 0512812019 16:30 This report may not be reproduced, except in fill!, without written permission from Rogers & Callcott, Inc. Page 19 of 21 fi CHAIN OF CUSTODY RECORD WORK ORDER Rnoprq �050"� Girt tt -` FNVIRONMFINITAL Filtered Cooled (—es _o) Mailing PO Box 5655 Shipping 426 Fa(rforest Way 2158 Stoneridge Drive Container Type (Plasti lass) Address: Greenville, SC 29606 Address: Greenville, SC 29607 Columbia, SC 29210 Phone (864) 232-1556 Fax (864) 232-6140 Phone (803) 509-8999 Client Name Container Volume (ml-) j (, Sample Type (Grab/Cg posite) Address Report To: Email Address 7ele phone P PO # Project # c u o �' ' ro ° Sample Source (WW, R, DW, S , S, ther) Preservation Codes) A — None E — HCI I — Zn Acetate B — HNOa F — Na2S20a 1— H3p04 C—H2SO4 G--Boric Acid K-MCAA D—NaOH H—Ascorbic Acid L- , WORK _ YDATE TIME SAMPLE DESCRIPTION COMMENTS Or 1 �e� t,X SAMPLER — R-LINQUIS ED BY: DATE/TIME: RECEIVED BY: 2. .�,�, DATE/TIME: 1 9 Composite Start Date: Composite Start Time: Time or Flow (Circle one) Initials: _ RELIN EDBY: 3. W')4 DATEMME: 0 jq RECE BY: 4. DATE/TIME: 5 -'V tq NU RELINQUISHED BY: DATE/TIME: RECEIVED,BY:. DATE/`I'IME: S. S• Temperature of blank or representative sample At time of collection _---��• °C � RELINQUISHED BY: DATE/TIME: _ RECEIVED BY: DATE/TIME: 7. 8. At tirne of lab receipt , �SlA .-C Possible Hazards associated with samples: a Non -Hazard "Flammable "Skin Irritant "Poison nknawn "ether Form Revised July, 2011 Page Page 20 of 21 - - - - - - - - - - - - - - - - - r, �Wtt MENTAL Sample Receipt Verification Date Work Client: e'Ts Received: Order: 66LA5 Carrier Name: Client FedEx UPS US Mail Courier Field Set -vices Other: Tracking Number: Receipt Criteria Y e N N Comments s o A Shipping container / cooler intact'! Damaged Leaking Other: Custody seals intact? COC included with samples? COC signed when relinquished and received? Sample bottles intact? Damaged Leaking Other: Sample ID on COC agree with label on bottle(s)? Date I time on COC agree with label on bottle(s)? Number of bottles on COC agrees with number of bottles received? Samples received within holding time? Sample volume sufficient for analysis? VOA vials free of headspace (<6mm bubble)? Temp at receipt recorded on COC Samples cooled? Temp measured with IR thermometer - SN: 97050067 TC Cold Packs Dry Ice. None Samples requiring pH preservation at proper pH? Note: Samples for metals analysis may be preserved d upon receipt in the lab. Note: SampleE for O&G and VOA analysis — preservation checked at bench. Samples dechlorinated for parameters requiring chlorine removal at the time of sample collection? Note: Chlorine checked at bench for samples requiring Bacteria], VOA, and RAA anatsis. If in-house preservation used — record Lot # RCL H3PO4 H2SO4 NaOH i4NO, Other Comments: Were non-conformance issues noted at sample receipt? Yes or No Non -Conformance issue other than noted above: Revised February 2018 Completed by: Cu Page 21 of 21 n ANALYTICAL & CONSULTING CHEMISTS 6602 Windmill Way, Wilmington, NC 28405 - 910.392.0223 Lab u 910.392.4424 Fax 710 Bowsertown Road, Manteo, NC 27954 - 252.473.5702 Lab/Fax 255-A Wilmington Highway, Jacksonville, NC 28540 � 910.347.5843 Lab/Fax info@environmentalchemists.com Environmental Testing Solutions, Inc. Date of Report: May 29, 2019 Post Office Box 7565 Customer PO #: Asheville NC 28802 Customer ID: 08100055 Attention: Kelley Keenan (ETS) Report #: 2019-07469 Project ID: Waynesville WWTP Lab ID Sample ID: Waynesville WWTP Collect Date/Time Matrix Sampled by 19-18917 Site: 503 Lime Sludge 5/7/2019 7:41 AM Solid/Sludge Client Test Method . Results Date Analyzed 2,4,5-TP (TCLP) SW846 Method 8151A <0.003 mg/L 05/16/2019 2,4-D (TCLP) SW846 Method 8151A <0.003 mg/L 05/16/2019 RCI Ignitability EPA 1030 <0.8 mm/sec 05/23/2019 Cyanide EPA 335A 0.338 mg/kg 05/23/2019 Sulfide SM 4500 S D 9.63 mg/kg 05/24/2019 Comment: Reviewed by: Koj, .o Report #:: 2019-07469 Page 1 of 1 All ANALYTICAL & CONSULTING CHEMISTS LCS Environmental Chemists, Inc. 6602 Windmill Way, Wilmington, NC 28405 3 910.392.0223 Lab 0 910-392.4424 Fax 710 Bowsertown Road, Manteo, NC 27954 1, 252.473.5702 Lab/Fax 255-A Wilmington Highway; Jacksonville, NC 28540 v 910.347.5843 Lab/Fax info@eiiviroiimentalchemists.com QC ETS- 2019-07469 Parameter True Value ing1L Result mig/L % True Galue Limits % Ignitability N/A N/A N/A N/A Cyanide 0.125 0.121 97 90-110 Sulfide 0.50 0.53 106 90-110 MS/MSD True Recovery % Recovery % Limits % Limits % Parameter Value mg/L mg/L Difference Recovery Difference Ignitability N/A N/A N/A N/A N/A N/A Cyanide 0.125 0.126/0.125 101/100 1 80-120 <20 Sulfide N/A N/A N/A N/A N/A N/A DUPLICATE SAMPLES Parameter Results mg1L %Difference Limits % Ignitability N/A N/A N/A N/A Cyanide N/A N/A N/A N/A Sulfide <0.01 <0.01 0 <_ 10 BLANKS Parameter Results mg/L Limit mg/L Ignitability N/A N/A Cyanide <0.0025 0.0025 Sulfide <0.005 0.005 dh ANALYTICAL & CONSULTING CHEMISTS Column 1 LCS 6602 Windmill Way, Wilmington, NC 28405 m 910.392.0223 Lab , 910.392.4424 Fax 710 Borvsertown Road, Manteo, NC 27954 o 252.473.5702 Lab/Fax 255-A Wilmington Highway, Jacksonville, NC 28540 0 910.347.5843 Lab/Fax info@environmentalchemists. corn Environmental Chemists Inc. 8151 LCS Recovery Summary Batch 19-155 LCSD %RPD Compound Spk Amt. (ug/L) Calc. Amt. (ug/L) % REC. QC Limits * Calc. Amt. (ug/L) % REC. QC Limits * 40% ** 2,4-D 0.10 0.1108 111 70 - 130 0.0946 95 70 - 130 16 2,4,5-TP 0.10 0.1113 111 70 - 130 0.0986 99 70 130 12 Column-2 LCS LCSD %RPD Compound Spk Amt. (ug/L) Calc. Amt. (ug/L) % REC. QC Limits * Calc. Amt. (ug/L) % REC. QC Limits * 40% ** 2,4-D 0.10 0.1143 114 70 - 130 0.0999 100' 70 130 13 2,4,5-TP 0.10 0.1046 105 70 - 130 0.0932 93 70 130 12 n ANALYTICAL & CONSULTING CHEMISTS 6602 Windmill Way, Wilmington, NC 28405 - 910-392.0223 Lab L 910.392.4424 Fax 710 Bowsertown Road, Manteo, NC 27954 , 252.473.5702 Lab/Fax 255-A Wilmington Highway, Jacksonville, NC 28540 9 910.347.5843 Lab/Fax info@enviromnentalchemists.coin Environmental Chemists Inc. 8151 Herbicide Surrogate (DCAA) Recovery Batch 19-155 Column 1 Column 2 Samole ue/L %R ue/L %R MB 0.2295 114.8 0.1994 99.7 LCS 0.2319 116.0 0.2012 100.6 LCSD 0.2162 108.1 0.1876 93.8 19-18917 0.2084 104.2 0.2246 112.3 Control Charts Used for control limits. Est 02272019 DCAA C1 65.36% - 144.37% DCAA C2 63.44% - 132.14% r 4 CHAIN -OF -CUSTODY Analytical Request 41PRI I . . . . . . . . . . . . . Client Name: Address: Environmental Testing Solutions, Inc. Report to: 110 Box 7565, Asheville, NC 28802 Phone: Fax: Phone: (828) 350-9364, Fax: (828) 350-9368 PO Number: Project Name: Re( tiested AnaMes Project Number Ii Chccknd Upon Receipt Preservatives Sample Identification Field 7- Telilt). co on, Comments Temperature ()C) ,IFF I Received on fee: Y / N Scaled Cooler: Y N Samples Intact: Y N Additional Comments: O"Sampler Name and Signature Date ampjt:Ny, �Signature ol'Sanipler: CHAIN -OF -CUSTODY / Analytical Request Environmental Testing Solutions, Inc. PO Box 7565, Asheville, NC 28802 Phone: (828) 350-9364, Fax: (828) 350-9368 Project Name: Project Number: l Client Name: A)�:11 Address: J (;z,%ix v► u { j ix (c� lIC,, /06 28786 Report to: Phone: yjj -q� Fax: [9-;V5) PO Number: nested pH Checked Cie < 0.2 mg/1 A Sample Identification d a L L Preservatives b;- E '6 61 x a O O v �j J Field n w A H x x zpz x x Z z i Temp. (°C) Comments �� rr %lyt 11oe 191 1 I►k 5�� Temperature (°C) 2i� ,(p '�.� �{� Received on Ice: Y / N �'OSU�'Ia L-� �b5�1°l 1 D`i$ Sealed Cooler: YYN l Samples Intact: /D/ N Additional Comments: ,t ,'CSampler Name and S ignature Printe�I�jame of Sampler: (:+_I- 1 .1. . . e- - I. L�• Signature a/mpler: - - - - - - - - - - - - - - - - - - - � - /�Nr - - - - - - - EEE C I Vector Attraction pH Values SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 -�4 ID: NC01119 Certification #: 194 .strument ID: ORION DualStar pH/ISE Benchtop 3/N: E08421 -n Lab quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date-JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial 480410124 Cal Due Date:10/2/2023 DATE qTIMEEFF. OPE CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH-110.0SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIALIA.;�/I i r� �.J.i' /�l2a �,.ro F r)! 7od l°� �1 •. b =oM1.J :OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC 121,e 1,'�Lf 7'.�v �?• 9�I ORRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL —`tRECTED PH SU: _] Z- U - &- 1 5 r I Z- 14-1 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL /"� 4( RS. -JRRECTED PH SU: Post Calibratinn VPrificatinn TIME INITIAL Ph 10 SU Temp. °C 10a LG .Jf- i0 C; 1`T ! �c readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. a initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. off of this second reading has to be above a pH of 12. PH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21/16 Ah SW-846-9040C -own of Waynesville WWTP -66 Walnut Trail Vaynesville, NC 28785 :PA ID: NC01119 Certification #: 194 -istrument ID: ORION DualStar pH/ISE Benchtop JN: E08421 i Lab Lquipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot* Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:UO3EO21 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME E/FF. PH 7.0 SU PH 10.0 SU BUFFER® PH 13.0 SU BUFFER INITIAL C% 'L} yBUFFER -OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C �\ i /� � i � � � ^'� y,� 4w� ..l � . J' , �;�'. 3 •� .6 f r'Y'1 ".•' 1 .J "ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL _ iRRECTED PH SU: ; '_.< (,?. 24 HR SU 24 HR TEMP. °C ANALYST INITIAL %PH n) / ^ . i' p �c e )RRECTED PH SU: �'�a��a - 63 i /J.0, 9 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. a pH of this initial reading has to be above a pH of 12. a second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. ---cumeht changes in lot #'s. revised: 12/21/16 Ah SW-846-9040C _ ___-.._._...�......� -own of Waynesville WWTP -66 Walnut Trail /aynesville, NC 28785 :PA ID: NC01119 Certification #: 194 ..istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 I Lab -quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot* Exp. Date: pH 13.00 Lot #:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL -OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME INITIAL SU TEy/MP. °C/ ' �L'-J,I E.`%1� pDAT/Erb I'�I ' ^TIME 4V .'bl ^ Y� (PH tl •: �� i II C/ 4,1. -'DRRECTED PH SU: 1J. s 2 HR 2 HR ANALYST PH SU TEMP. oC INITIAL .RRECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL , S . )RRECTED PH SU: !•..)- > - e)—: q / .),(.' Post Calihration VPrifirntinn Ph Temp. TIME INITIAL 10 SU °C 'I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --- culation may be used to correct the pH reading to the standard temperature of 25 centigrade. - irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. --e pH of this initial reading has to be above a pH of 12. —a second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. -current changes in lot #'s. revised: 12/21/16 Am SW-846-9040C .own of Waynesville WWTP ^66 Walnut Trail Jaynesville, NC 28785 PA ID: NC01119 Certification #: 194 ..istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 I Lab -quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot*:UO3E021 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10!2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL dc ,•OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C "7RRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL 17) �,1RECTED PH SU: %? _ _ t ` / 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL /5, . )RRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ---culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -'ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. ,_,? second pH reading is taken 2 hours after the initial reading. H of this second reading has to be above a pH of 12. PH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21 /16 SW-846-9040C .own of Waynesville WWTP •)66 Walnut Trail Vaynesville, NC 28785 =PA ID: NC01119 Certification #: 194 ..istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 i Lab :quipment Maintenance: a PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:UO3EO21 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL jid jjy 100 7,6; (� f 7 `/ " . I G G f � �: 4 C. I � ; c�G, 1.7 ,•OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C 41 0 If C'i 13 n' C. "ORRECTED PH SU: q 2 H R 2 H R ANALYST PH SU TEMP. °C INITIAL jRRECTED PH SU: : J q 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL )RRECTED PH SU: %, .. ` - - Post Calibration Verification I Ph Temp. TIME INITIAL 10 SU °C KIC - I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --culation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units'` (Temp. Measured -- 25 Centigrade). -tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. T' e pH of this initial reading has to be above a pH of 12. ,1e second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. —current changes in lot #'s. revised: 12/21/16 Ah SW-846-9040C -own of Waynesville WWTP j66 Walnut Trail Vaynesville, NC 28785 ID: NCO1119 .,ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 'n Lab �quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:UO3E021 Exp. Date:OCT. 2020 PH 13.00 Lot*: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL fDATE OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ORRECTED PH SU: / 17- q I - 63 , '� ; J1,1 __� 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL t� r _)RRECTED PH SU: :i J1,',jLj 7 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL - )RRECTED PH SU: Ll, 5- - D 9`_-; .- i 1, 3 ' Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C �, cr3 e .1. �, -..� readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -,-.:ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. -second pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12. -' pH of the final reading (24 hours latter) has to be above a pH of 11.5. —cument changes in lot #'s. revised: 12/21 /16 i SW-846-9040C ,own of Waynesville WWTP --366 Walnut Trail Vaynesville, NC 28785 'PA ID: NC01119 Certification * 194 istrument ID: ORION DualStar pH/ISE Benchtop JN: E08421 'n Lab _quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 pH13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL I pyf p ( j/'i( 1.% i"%...._ _OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C •DRRECTED PH SU: 1;? '3 6 IS 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL JRRECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C' INITIAL )RRECTED PH SU:. - v ' i =) �•�a°i Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C LID I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion �.culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units " (Temp. Measured - 25 Centigrade). - -tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. --a pH of this initial reading has to be above a pH of 12. _a second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above- a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. --cument changes in lot Vs. revised: 12/21/16 Ah r 11 IVIL I LAX vie-KuIxm I wro f VR OVJ LIIVIG101-uu r- SW-846-9040C !own of Waynesville WWTP `56 Walnut Trail /aynesville, NC 28785 PAID: NC01119 Certification #: 194 —strument ID: ORION DualStar pH/ISE Benchtop fN: E08421 Lab r--juipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot*: Exp. Date: PH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL XLECT COLLECT ANALYSIS ANALYSIS ANALYST .INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC - -)RRECTED PH SU: t'� - �'� - 5.. 15 = I � . r) �r 2 H R 2 HR ANALYST PH SU TEMP. oC INITIAL �-)RRECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL ►RRECTED PH SU: Post Calibration Verifiratinn Ph Temp. TIME INITIAL 10 SU °C c 1q . 7 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion - ;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF), = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. PH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. W revised: 12/21/16 r-n Mr-1 CM WALIO w l IUIV t-UK OUS LIMt/SLUIJUt SW-846-9040C own of Waynesville WWTP -36 Walnut Trail .Jaynesville, NC 28785 PA ID: NC01119 Certification #: 194 —strument ID: ORION DualStar pH/ISE Benchtop (N: E08421 Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL PC JLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C P, T, `'� �x �' _7r? )RRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ( 7 v- i �• i �1W • )RRECTED PH SU: ! Z.�;a - o 4,� 12,. ?- 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL I'�zi J ! 7,"_ �C. 1�'i'.- )RRECTED PH SU: +) } ` °�• = 1:?; :r, Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --',,ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. -q second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 19. pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21 /16 n rn 1VIC 1 r-M lr/AL DMA I IVIV rvm DUJ L11dIt/JLUU1jt - SW-846-9040C `gown of Waynesville WWTP -566 Walnut Trail ,:Vaynesville, NC 28785 ID: NCO1119 certification #: 194 -.,.istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 Lab ",',quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER. PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL v. OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C %�i1 �a°�L' 8/8.71'9i `'.�..J <sl, *,ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL 7�i _ - DRRECTED PH SU: 1 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL a ) ' j °" '"�, is "C' 4Li , •. � , - )RRECTED PH SU: .a - o Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --'culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. .econd pH reading is taken 2 hours after the initial reading. .,H of this second reading has to be above a pH of 12. PH of the final reading (24 hours latter) has to be above a pH of 11.5. current changes in lot #'s. Ah revised: 12/21 /16 rn IYIC1 CIS Vf1L1�I�MI IVIY rUr[ VUJ LI1V1r-10LUUUr- SW-846-9040C' 'own of Waynesville WWTP '766 Walnut Trail Vaynesville, NC 28785 PA ID: NC01119 Certification #: 194 �.istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 I Lab —quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot *UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial•#:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL CIG' 3 1 3;0 OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC 1L 7 r Jr la l� '1 s C- ,DRRECTED PH SU: 2 H R PH SU 2 HR TEMP. °C ANALYST INITIAL C •-ORRECTED PH SU: 0, T- 6, 6 -- 1:2:.3,;� 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL q. )RRECTED PH SU: a. C� Post Calihratinn Vprifirntinn TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --culation may be used to correct the pH reading to the standard temperature of 25 centigrade. - rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. ~e second pH reading is taken 2 hours after the initial reading. ; pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. cument changes in lot #'s. revised: 12/21/16 Ah r l 1 191C 1 L-1\ vr%L-1W %r%J Iv111 VMFW. 7V4 LIItlIG/JLUUUC SW-846-9040C ;Fown of Waynesville WWTP `66 Walnut Trail .Vaynesville, NC 28785 4, ID: NC01119 Certification #: 194 ;,nstrument ID: ORION DualStar pH/ISE Benchtop -'/N: E08421 `.i Lab f equipment Maintenance: 4 PH 7.00 Lot #:A8165 , Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. QC OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL }} 010 11G, I' COLLECT DATE COLLECT TIME ANALYSIS ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C DATE ORRECTED PH SU: i"')"sr-- �' a ( j ) a 9 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL Q. G /7w7`', -=. ,.ORRECTED PH SU: 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL i�?, s` ;(0.0:, uf- S. ORRECTED PH SU: j). S = 0. �q 7 " /a • -�3 Post Calibration VPrifinntinn TIME INITIAL Ph 10 SU Temp. °C 10:IL/ Pry", iol 1*7 q, i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --lculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 i re1 Mr. A 1=1t % A"9L19;0FN i A IWIM run Oula L11N1r_1QL_ W%a[= SW-846-9040C own of Waynesville WWTP -66 Walnut Trail vaynesville, NC 28785 ,PLC ID: NC01119 ,ertification #: 194 -nstrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 I Lab `quipment Maintenance:clilcvt-'­�d fi; ft^"If�iO1.-, pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU D1 EFF. PH 7.0 SU B PH10.0SU BUFFER PH 13.0 SU BUFFER INITIAL I Vel?C -yTIME l'ti) I 1�d i.. ��• C3L� yUFFER F �r9 J� iG 0 i Oc OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL TIME DATE TIME INITIAL PH SU TEMP. °C dDATE /�;j �t CAI � �CS�� •�� �• �- d tY � CY N�' :� 4 : A�� r�� /6 ORRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL <RECTED PH SU: 24 H R PH SU 24 H R TEMP. °Q ANALYST INITIAL DRRECTED PH SU: / 1 3 " 0- � / " 1,9: a 9 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other -than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Drrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. T'a,second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21/16 Ah rrl IVIC 1 CK t.ALIDMA 1 IUN 1-UK 5U.9 LWJr-1JL000r- SW-846-9040C ,;'own of Waynesville WWTP -66 Walnut Trail Waynesville, NC 28785 _.. ?PA ID: NC01119 ertification #: 194 -,.ristrument ID: ORION DualStar pH/ISE Benchtop --=/N: E08421 I)I Lab equipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7:00 Lot #: Exp. Date: pH 10.01 Lot *A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot* Exp. Date: pH 13.00 Lot #:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: . Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER P.H 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU 'DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL I OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C C ORRECTED PH SU: 12• 2 H R PH SU 2 H R TEMP. oC ANALYST INITIAL ....RECTED PH SU: 24 HR PH SU . 24 HR TEMP. °C ANALYST INITIAL a DRRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C Sr . L I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. ie second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. Icument changes in lot #'s. Ah revised: 12/21 /16 M MC I M UALItSKA I IUN [-UK 5UJ LIMt/SLUDGE SW-846-9040C gown of Waynesville WWTP .66 Walnut Trail Waynesville, NC 28785 PA ID: NC01119 artification #: 194 'n5Lrument ID: ORION DualStar pH/ISE Benchtop -_`./N: E08421 Lab equipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot* Exp. Date: pH 13.00 Lot#:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp: Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER 'PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH.13.0 SU BUFFER INITIAL . t/ �! 9 1 `) - `') ; 5)" i; 1 a) , Co `q, -� C( 10,61 1 1 7 L n' O".) 1 r5-11oC f. �_. OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL TIME DATE TIME INITIAL PH SU TEMP. oC %DATE 1.&Ij � I(0 `J.,I@ f S, /d. C, i6,<-`'C 'ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ..RECTED PH SU: 'Z _ c, 3 3 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL JRRECTED PH SU: 1 . 0,1. 7 :: /). T � Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 16`.0) 1 V QV). ( i1S_. VC I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. je initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. ie second pH reading is taken 2 hours after the initial reading. _1H of this second reading has to be above a pH of 12. C pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. Alk revised: 12/21 /16 rre IdIG I r-7[ IiF:LIDMAI IVIM P'l3I' OUJ LIRfIC/3LlIUUt SW-846-9040C 'own of Waynesville WWTP '66 Walnut Trail Jaynesville, NC 28785 -pA ID: NCO1119 ertification #: 194 -Istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 i Lab `.quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot#:UO3EO21 Exp. Date:OCT. 2020 PH 13.00 Lot*: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 4. cc 'OLLECT DATTE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °Cta,7"'a 2 7, A d'h— To? P 5-e Jd- 'I Xxv-)( ORRECTED PH SU: ., i - . C, ` /P, vd-� q •-..RECTED PH SU 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ,11-"s JRRECTED PH SU: ,C1 G-- Q,j q " 0.- 6 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. T`e.second pH reading is taken 2 hours after the initial reading. .)H of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. Icument changes in lot #'s. revised: 12/21/16 n r I I IVIL I L ['% VAL.ILJP'Un 11W1V rvlR UVJ LJ1V1r-/JLUlJ%7C SW-846-9040C "own of Waynesville WWTP �66 Walnut Trail •.Vaynesville, NC 28785 :PAID: NCO1119 ertification #: 194 ��istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 i Lab ~quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot*: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU TIME EFF. PH 7.0 SU BUFFER PH SU BUFFER PH 3.0 SU BUFFER INITIAL '}DAT®fE1 % h"- '�r�i 4 J r'�,�' p10.0 11 • 9 •�i / r,�� s''(1p 1 "co ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PyH SU INITIAL TEMP. °C 2141110, y ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL l2. i pp Up•.�Il P 5 . A-XRECTED PH SU: •- 0.P?-- k2.- 24 HR PH SU 24 HR ° TEMP. °C ANALYST INITIAL 17. ORRECTED PH SU: /� 15 t";, :21 9.10 115 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion �Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection.factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. -'ie second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21 /16 Ah n.nl 1-%JR 0U.7 LI1V1r_170_UUhC, SW-846-9040C own of Waynesville WWTP 566 Walnut Trail .Vaynesville, NC 28785 :PkID: NC01119 ertification #: 194 .istrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 i Lab ;quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date. - pH 13.00 Lot#:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF . CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU TIME E'fFF. PH 7.0 SU BUFFER PH SU BUFFER PH 13.0 SU BUFFER INITIAL iDATE f 7.L��3 / .a�JC *10.0 �l�e l O i 7 OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ORRECTED PH SU: -:z­ 0,= d' - 'a :3 °)- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL [g., ;% ,:RECTED PH SU 1 24 H R PH SU 24 ,H R TEMP. °C ANALYST INITIAL a `f n,o t jo y, ,DRRECTED PH SU: /I �_ 0 1 - /.) - 1 11 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C S_ 0.1 IO I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. T` a second pH reading is taken 2 hours after the initial reading. :H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot Vs. revised: 12/21/16 r1 rn 1Y1G 1 GIX Vf1L1LJ1\M 1 lull Fur% Dula W1V1r_106iJul7C SW-846-9040C ,'own of Waynesville WWTP --66 Walnut Trail ^Vaynesville, NC 28785 P-3,ID: NC01119 ertification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop /N: E08421 i Lab `equipment Maintenance: c ��✓�L�1 �,l�y �,�� L� pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot*: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot*: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU' DATE TIME EFF. PH 7:0 SU BUFFER PH 10.0 SU J BUFFER PH 13.0 SU BUFFER INITIAL Tdo OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C DRRECTED PH SU: �.,l • a S" %/d O� 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 9 lq wi 4C. = —, RECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 1,2- x lei. 4 ec P l .-DRRECTED PH SU Post Calibration Verification =/)' TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _ -)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. ...e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. .esecond pH reading is taken 2 hours after the initial reading. . )H of this second reading has to be above a pH of 12. -,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot Vs. revised: 12/21 /16 I-rl IVIC 1 CM WALIDMA I IVIV rum 5U3 LIIVIC/bLUVUL SW-846-9040C rown of Waynesville WWTP -566 Walnut Trail ';'Naynesville, NC 28785 NCO1119 .,ertification #: 194 'nstrument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab :quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Dafe:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot* Exp. Date: pH 13.00 Lot #:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL -URRECTED PH SU: a. . i r�- c? , k -- _ n- ;� 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL z ORRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. _le initial pH reading is taken after the lime is mixed with the 503 sludge. le pH of this initial reading has to be above a pH of 12. .-^ second pH reading is taken 2 hours after the initial reading. jH of this second reading has to be above a pH of 12. le pH of the final reading (24 hours latter) has to be above a pH of 11.5. >cument changes in lot Vs. revised: 12/21 /16 M "n %0P%"U1XM J wry r%Jm OW LIIVIC/SLUUCat SW-846-9040C 'own of Waynesville WWTP 766 Walnut Trail --;Waynesville, NC 28785 ID: NC01'119 .;ertification #: 194 —istrument ID: ORION DualStar pH/ISE Benchtop ,/N: E09596 I Lab —quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot*: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot*: Exp. Date: PH 13.00 Lot#:3E021 U0 Exp. Date:OCT. 2020 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 10/212023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ORRECTED PH SU: N, 3 ` L, • ! " /.j. t s- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL JRRECTED PH SU: Qj /'3.. u° ;-' �2. 61 :l 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL /)-`� I(T,') �'( _) . )RRECTED PH SU: A),t % cj Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion lculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 M [VIC I tK UAL10KA I IUN I -UK 5Us LIMt/tiLUDGE SW-846-9040C -own of Waynesville WWTP 66 Walnut Trail ••Vaynesville, NC 28785 ID: NC01119 Jertification #: 194 '7strument ID: ORION DualStar pH/ISE Benchtop _/N: E09596 i Lab - �quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL J;4" . -C' y �dc CI I /�.� I OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE/ TIME INITIAL PH SU TEMP. oC �i I 7 2' �� • 5� 1�'i`� `� JRRECTED PH SU: i' % .S ' ea f r = /'9 A5~ 2 H R PH SU 2HR TEMP. °C ANALYST INITIAL "ORRECTED PH SU: �•.�_ —9. 1 24 H R 24 H R ANALYST PH SU TEMP. °C INITIAL _DRRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C I readil:gs must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _ Irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,tual pH = Measured pH +/- the correction Factor. —e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21/16 Ah PH It it I t:K L;ALIBKA I IONI FOR 503 LIME/SLUDGE SW-846-9040C "own of Waynesville WWTP 66 Walnut Trail -Vaynesville, NC 28785 -',ID: NCO1119 certification #: 194 ' Istrument ID: ORION DualStar pH/ISE Benchtop -/N: E09596 I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 20.19 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 7,60 f �-,7VC OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL JRRECTED PH SU: /1-3 - 0 - sC Y 9.9• a 5" 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL `' -JRREC" ED PH SU: .� , } `� ' jb�, 7t, Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Vorrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. •e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. . ,.e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C .-own of Waynesville WWTP ,66 Walnut Trail '.Maynesville, NC 28785 ID: NC01119 -ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop --�/N: E09596 1 Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp: Date: pH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL TI-NA 1 /&/0(- 1 P-'S� ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DAT/E TIME INITIAL PH SU TEMP. oC )110i /fq . 6' �2 2 ORRECTED PH SU: /), 3 42, 12 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ORRECTED PH SU: 0, q - t"a1 1)- I °a 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL t ,).'9. v 7. C "l f- 5 . --DRRECTED PH SU: !). - 0 • I fl, YI Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to -25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. 'orrection factor (CF) = 0.03 pH units " (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. le initial pH reading is taken after the lime is mixed with the 503 sludge. le pH of this initial reading has to be above a pH of 12. — second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ..le pH of the final reading (24 hours latter) has to be above -a pH of 11.5. )current changes in lot #'s. revised: 12/21 /16 rrl Mt I tK UALUSKA I IUN t-UK 503 LIME/SLUDGE SW-846-9040C 'own of Waynesville WWTP 66 Walnut Trail -- laynesville, NC 28785 ID: NCO1119 .;ertification #: 194 Istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 i Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 0 i) •� yl �L' °3 . 9 �1 �r 3,/ii3 0 �. �. OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C JRRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL )RRECTED PH SU: 6-`( — 0-1k : 0_ f 24 HR PH SU 24 HR TEMP. ANALYST ' INITIAL /j°C = DRRECTED PH SU: I) s - L9 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C m C- I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _-irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the.final reading (24 hours [after) has to be above a pH of 11.5. icument changes in lot Vs. revised: 12/21/16 rn IVIC 1 CK UALIMMA I IUM I -UK 5U3 LIME/SLUDGE SW-846-9040C -own of Waynesville WWTP 66 Walnut Trail -•Uaynesville, NC 28785 ,RA,ID: NCO1119 ertification #: 194 'nstrument ID: ORION DualStar pH/ISE Benchtop _/N: E09596 I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot*: Exp. Date: pH 13.00 Lot#:UO3E021 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF DATE TIME SLOPE EFF. BUFFER PH 7.0 SU PH 7.0 SU BUFFER BUFFER PH 10.0 SU PH 10.0 SU BUFFER BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C I._ g) 6 ORRECTED PH SU: / :).) -- o' , ( �- � 0, e 2 HR 2HR ANALYST PH SU TEMP. °C INITIAL, ,AcRECTED PH SU: /'I )- -C)" tT '-::1 1 ` , L, A 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL )RRECTED PH SU: i'l I 0, 18 YBa Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. . rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. H of this second reading has to be above a pH of 12. s pH of the final reading (24 hours latter) has to be above a pH of 11.5. cument changes in lot #'s. 6 revised: 12/21/16 SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Naynesville, NC 28785 FRAA ID: NC01119 ertification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 'n Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date.JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot#:UO3EO21 Exp. Date:OCT. 2020 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ' r_ ( lL'���'1 :1•.�Jp lC: l..� ldn �J 3a'l 1010 �'J1��'�- i'• 0'o %�e�'� 7• . COLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE . TIME DATE TIME INITIAL PH SU TEMP. °C `,ORRECTED PH SU: 0-q` 2 H R PH SU 2 HR TEMP. °C ANALYST INITIAL _,,,,<RECTED PH SU: I. -ta -- 0-1 0, 9A 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL Q,Lf I7.(; �'( �.S. ORRECTED PH SU: g')- q •- 0. gt `l t, l of Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C -I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Drrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ^tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. -)e pH of this initial reading has to be above a pH of 12. te-second pH reading is taken 2 hours after the initial reading. H of this second reading has to be above a pH of 12. le pH of the final reading (24 hours latter) has to be above a pH of 11.5. -,)current changes in lot#'s. revised: 12/21/16 1JH Mt i tK GAL1t5111A @UN FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 56 Walnut Trail • /aynesville, NC 28785 1-4,I1): NC01119 . ertification #: 194 strument ID: ORION DualStar pH/ISE Benchtop —IN: E09596 Lab —quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:UO3EO21 Exp. Date:OCT. 2020 PH 13.00 Lot #: Y 97 C 01 L Exp. Date: ca, �. Vic; R t Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 90,0 '7 /� %f1 t7 d. ,� � 4 v �� �P•�, XLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ec. DRRECTED PH SU: ,�G— 0-Bq r /2— qJ a 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL .1 ] �� to 'C f, 5 . ,RRECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ,; �( _JRRECTED PH SU: d2-6" fl.�1 = 0"30k Post Calibration Verification TIME INITIAL Ph 10 SU Temp. l y B°C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. „- initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. PH of the final reading (24 hours latter) has to be above a pH of 11.5. current changes in lot Vs. revised: 12/21/16 Town of Waynesville WWTP -366 Walnut Trail Naynesville, NC 28785 -QA ID: NC01119 :ertification #: 194 -- - -_ • - vvv --IVLVVVG SW-846-9040C -.1strument ID: ORION DualStar pH/ISE Benchtop JN: E09596 i Lab quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: PH 13.00 Lot *Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL a �c. ��.. �� i""�� ..3 `� _ � � �• � �� ilia ,: L� ,� �'., �° °�. � ' .ca�:� � �-�.�� �` OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC JRRECTED PH SU: lY�- (0 -- f d = (J'q 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL n tfl,vt- fj - ,ar<RECTED PH SU: a7— Puy- � • 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL )RRECTED PH SU: /). ( Q—) I 0 .3 9 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C •.1-Y Y .. S. d AiVt� I I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. .-..e initial pH reading is taken after the lime is mixed with the'503 sludge. e pH of this initial reading has to be above a pH of 12. Q-second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 • PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C `own of Waynesville WWTP 66 Walnut Trail ' Vaynesville, NC 28785 .-�--A.ID: NC01119 *ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 i Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot*: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF ' SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU. DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C I v ORRECTED PH SU: /J- C-1 - / I - a C) 2 H R PH SU 2 H R TEMP. °C ANALYST INITIAL 1-:1? a �'3 "C fly. uRRECTED PH SU: /;)--7 - , )Lf /) 1� G 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL • •ORRECTED PH SU: / " " 0, •�% /0 • S Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C Wreadings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. :-le initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ,ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot Vs. revised: 12/21 /16 PH METER CALI6RATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 36 Walnut Trail '-laynesville, NC 28785 -ID: NCO1119 artification #: 194 strument ID: ORION DualStar pH/ISE Benchtop -,1N: E09596 Lab juipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date-OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL / l L'` t7 OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ORRECTED PH SU: /') •' _ D, a 1 = i,; .,�c( 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL )RRECTED PH SU: � � �, � lti;�� T 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL IQi-( 17,7JL PS. _JRRECTED PH SU: " � J'_ �? I .- _�-2- 9 11 Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C \� to I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. —second pH reading is taken 2 hours after the initial reading. ,)H of this second reading has to be above a pH of 12. ...e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot Vs. revised: 12/21 /16 Ah PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 56 Walnut Trail "Jaynesville, NC 28785 ter' lD: NCO1119 artification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 ,'I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot* Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C DRRECTED PH SU: o. b - Q, ,1'� /,),.q j 2 HR PH SU 2 HR TEMP. '°C ANALYST INITIAL � 21 I " ��- .).rtRECTED PH SU: 121 01 T.' 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL _'JRRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C r_ I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. Fie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. —second pH reading is taken 2 hours after the initial reading. jH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. �cument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C awn of Waynesville WWTP 36 Walnut Trail "laynesville, NC 28785 1"`, ID: NCO1119 ;ertification #: 194 strument ID: ORION DualStar pH/ISE Benchtop -,%N: E09596 'Lab luipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE, TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL =�, �, C>� S e% �,,t��, �`�. �`��_ �� �_ 13,E Q41 XLECT DATE COLLECT TIME ANALYSIS D ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C )RRECTED PH SU: 2 H R PH SU. 2 HR TEMP. °C ANALYST INITIAL -� )RRECTED PH SU: (9 3-j — cr, , ( 16 12 �'i Z 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL —)RRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C �. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —,rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. -e initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. .,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. �cument changes in lot #'s. revised: 12/21/16 rrl ME 1 CK VHLIOM%l IUIV rUK SUJ Llldlt/JLUUUt SW-846-9040C awn of Waynesville WWTP 36 Walnut Trail —laynesville, NC 28785 P-11D: NC01119 artification #: 194 '-strument ID: ORION DualStar pH/ISE Benchtop 'N: E09596 Lab juipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE.2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ,h/iq 7 ah 1� j 0 '(0 0 (� - C) -e", XLECT DATE, COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C )RRECTED PH SU: 2 H R PH SU 2 H R TEMP. °C ANALYST INITIAL 12:6 (q, c_ 4T- "..,rtRECTED PH SU: 0- tl C- — C", 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL /r5 /15111L ells, _ JRRECTED PH SU: 0-3 "-94f S Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _ _,rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. . ,.e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. jH of this second reading has to be above a pH of 12. ...e pH of -the final reading (24 hours [after) has to be above a pH of 11.5. icument changes in lot Vs. revised: 12/21/16 Ftl I IETER GALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 66 Walnut Trail " Vaynesville, NC 28785 _.rA ID: NC01119 •ertification #: 194 Istrument ID: ORION DualStar pH/ISE Benchtop _/N:E09596 I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL "j�13�f`d OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C GI JRRECTED PH SU: /:� & - j y Pj > /) V,2 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL l afwc _)RRECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL qOc (A —,)RRECTED PH SU: 04 ` 0, 2 ( ' = C ,, 3 i Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction'Factor. ­e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. -second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ...e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 36 Walnut Trail /aynesville, NC 28785 _P�, ID: NC01119 ertification #: 194 strument ID: ORION DualStar pH/ISE Benchtop /N: E09596 Lab juipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLl BUFFER PH 13.0 SU BUFFER INITIAL tl/n T2 1 1 �'o OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC DRRECTED PH SU: 15� 7112, q 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 1 ©a�4 N'T _ jRRECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL - L . —JRRECTED PH SU: 011" ,.. 0, 1 S 7 4, Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C _ 'I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion 'Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. -e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has.to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. .,.e pH of the final reading (24 hours latter) has to be above a pH of 11.5. cument changes in lot #'s. revised: 12/21/16 Ah PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP '36 Walnut Trail ­/aynesville, NC 28785 �(D: NC01119 artification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop _JN: E09596 iLab �quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot#: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #:. Exp. Date: pH 13.00 Lot #:Y27E016' Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF DATE TIME SLOPE EFF. BUFFER PH 7.0 SU PH 7.0 SU BUFFER BUFFER PH 10.0 SU PH 10.0 SU BUFFER BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL C Mee) XLECT DATE COLLECT TIME ANALYSIS ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C DATE )RRECTED PH SU: /1 6 - 2 H R PH SU 2HR TEMP. °C ANALYST INITIAL i,°7 111.61C ��.�_ --)RRECTED PH SU: 12, F7 — 0, K - 12 T z 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL _ jRRECTED PH SU: � �. - 0 9 q Post Calibration Verification TIME INITIAL Ph 1((0 Temp. °C dSU readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion -ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. _ -rection factor (CF) = 0.03 pH units * (Temp. Measured -25 Centigrade). ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with -the 503 sludge. pH of this initial reading has to be above a pH of 12. ;-second pH reading is taken 2 hours after the initial reading. ,jH of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot Vs. go revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C 'own of Waynesville WWTP 66 Walnut Trail ' Vaynesville, NC 28785 NC01119 i artification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 i Lab quipment Maintenance: pH 7.00 Lot *A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ORRECTED PH SU: 1'2: (" " 0.1 e : 1')' 4 d 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 01 - c)rtRECTED PH SU: 24 HR PH SU 24 HR oC ANALYST INITIAL /TEMP. � P 'r —ORRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —arrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. ?—second pH reading is taken 2 hours after the initial reading. ,jH of this second reading has to be above a pH of 12. ..ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. Dcument changes in lot #'s. revised: 12/21 /16 A r1l IVIL I LK CALIBRATION FOR 603 LIME/SLUDGE SW-846-9040C .'own of Waynesville WWTP 66 Walnut Trail -Vaynesville, NC 28785 : �JD: NC01119 artification #: 194 -1strument ID: ORION DualStar pH/ISE Benchtop /N: E09596 i Lab '"quipment Maintenance: pH 7.00 Lot ##:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 1:0.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL OLLECT DATE COLLECT ANALYSIS. DATE ANALYSIS TIME ANALYST INITIAL PHSUTEMP. INITIAL °C ACV(,, TIME 1alr s '7 � / ( ld ,INITIAL DRRECTED PH SU: (2.'-j 1 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL /000 1-41 -..jrZRECTED PH SU: /2,?� — (j?, , �- t = 1191 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 0157 1 � ic, (.. _CRRECTED PH SU: Post Calibration Verification Ph Temp. TIME//.. INITIAL 10 SU °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. a pH of this initial reading has to be above a pH of 12. --second pH reading is taken 2 hours after the initial reading. dH of this second reading has to be above a pH of 12. a pH of the final reading (24 hours latter) has to be above a pH of 11.5. cument changes in lot Vs. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 36 Walnut Trail -/aynesville, NC 28785 ID: NC01119 ertification #: 194 strument ID: ORION.DualStar pH/ISE Benchtop -ft E09596 'Lab juipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot*: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC . TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL Oc )LLECT OAT/fE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C °)RRECTED PH SU: d 2 HR PH SU . 2 HR TEMP. °C ANALYST INITIAL 1- .T iRRECTED PH SU: �' " o : I ,i� 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL � i 4 JRRECTED PH SU: I.2,1 C, 2 1 j2 , 2'I Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C T`73 (/�1 % ��. I � .`ACC readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion :ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. _-,. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot Vs. i revised: 12/21 /16 rN INIC I LK UALII3KATION FOR 503 LIME/SLUDGE SW-846-9040C 'Fown of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 ::PA -ID: NCO1119 k. ertification #: 194 ';nstrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 n Lab 7quipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL' TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATES TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI BUFFER PH 13.0 SU BUFFER INITIAL 16,0 11,9" c C3, C� j,0/ r ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ORRECTED PH SU: I) , IS — C: ( S- f 7 , 5 S 2 HR PH SU 2 HR 'TEMP. oC ANALYST INITIAL Y. .,r<RECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL a. q 17� `�( . 15, _ �RRECTED PH SU: I qa 0 ,,,�/ _ f; ) c.�l Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C n .i I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade; a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrectio.-I factor (CF) = 0.03 pH units "` (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. ...e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. p second pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of.11.5. current changes in lot Vs. revised: 12/21/16 Ah rn Mir= 1 Qr% WALIDMA I IVIV rum OU3 LIIYIC/ILU1J(9t SW-846-9040C . _Jown of Waynesville WWTP 66 Walnut Trail -Vaynesville, NC 28785 pA ID: NC01119 '.ertification #: 194 "Istrument ID: ORION DualStar pH/ISE Benchtop /N:E09596 i Lab quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot* Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot* Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:1012/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C lgd)i 1 -�'j ,)RRECTED PH SU: i'2`'!Z � Q_ —2 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL '-,-<RECTED PH SU: I Z � G � j , I �y� Q /2 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL i)G I7�0, f,5. ORRECTED PH SU: /), L - a')I1 < � 'C1 "h � Post -Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 0 1 . I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. —e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. e second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. ' cument changes in lot #'s. revised: 12/21 /16 A rn fair— 1 CK I.ALILSKA I IUN I -UK 5W LIMO/SLUDGE S W-846-9040C 'own of Waynesville WWTP 66 Walnut Trail "daynesville, NC 28785 k ID: NCO1119 ;ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot* Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial`#:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF. SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL �} '�J —!.ti (V�t�. ���v ��4���. �C�.O IOa r9C- �3(It; bg.8,"C S. OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C JRREC TED PH SU: /.-(Z'-0-I5- l'),i%5- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ilk- I d,e1°C P.5. .RRECTED PH SU: 113 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ds -to r?,i'c Ps. _.JRRECTED PH SU /.,?,�-Lima p11:3(� Post Calibration Verification TIME INITIAL .Ph 10 SU Temp. °C 04 . i . toil I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. ...e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. e second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ...e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21/16 PH Mt I trt UALMSKATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 66 Walnut Trail Waynesville, NC 28785 -_"PA ID: NC01119 :ertification #: 194 Istrument ID: ORION DualStar pH/ISE Benchtop E09596 _ _I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU TIME EFF�. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL DATE OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C -St �?k (:!3 3(-,-1 a. � ��� � a L C DRRECTED PH SU: jj, '" 3 9?S = Ikagj 2 H R PH SU 2HR TEMP. °C ANALYST INITIAL riRECTED'PH SU: 11(" _ 'n' / � 7 1,2, 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL _ORRECTED PH SU: i'Z• 5 0. 21 (2, )-1 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to.the standard temperature of 25 centigrade. —irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. e second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ;.e pH of the final reading (24 hours [after) has to be above a pH of 11.5. cument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 603 LIME/SLUDGE SW-846-9040C town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 ,=P-A ID: NCO1119 :ertification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop -3/N: E09596 . n Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot* Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME , EE5. . PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C 3 /LqjC1- TO 14 'r 12 17, 3C"C. ;ORRECTED PH SU: 09-=Lj2 2 H R PH SU 2HR TEMP. °C ANALYST INITIAL ,jRRECTED PH SU: Ig-(g " C., t� I I q .1 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL /;2. 1'7. it '( P. S . :ORRECTED PH SU: oq�e. Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I/O ��°i �•� � ��,�� \ �04���.�C _H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. he initial pH reading is taken after the lime is mixed with the 503 sludge. he pH of this initial reading has to be above a pH of 12. he second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ne pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot Vs. revised: 12/21/16 rn arav— 1 "m % P%L-io m i IVIV rum OU.S LIMt/,L000E SW-846-9040C own of Waynesville WWTP ,66 Walnut Trail .4aynesville, NC 28785 =L'A ID: NC01119 ertification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop _K E09596 I Lab equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot* Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oG OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL r OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: 1;2- (a — 2 H R PH SU 2 'HR TEMP. °C ANALYST INITIAL f2-7 69=7'(. ?S< .,ERECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 7 4' _ JRRECTED PH SU: J-2 , 6 ® 0,. 2 9 -7--- 1 ) : �- C Post Calibration VPrifiratinn TIME INITIAL Ph 10 SU Temp. °C `I:S` ?.s_ I 10.1 11a.3"( readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. __rrection factor (CF) = 0.03 pH units * (Temp. Measured -.25 Centigrade). tual pH = Measured pH +/- the correction Factor. a initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. cy pH of the final reading (24 hours latter) has to be above a pH of 11.5. 1`,ument changes in lot Vs. revised: 12/21/16 - SVV-846-9040C 'Fown of Waynesville WWTP `i% Walnut Trail l Vaynesville, NC 28785 ;PkID: NC01119 ertification #: 194 - -,isirument ID: ORION DualStar pH/ISE Benchtop /N: E09596 Lab `"�,quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/212023 DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. oC OF PH 13.0 SU BUFFER INITIAL I FI( , C,� i . , aly ( . 17, ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C -ORRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL —. RECTED PH SU: 24 H R 24 H R ANALYST PH SU 'TEMP. °C INITIAL /4 DRRECTED PH SU: 12, = 12, 2 �� Post Calibration Verificatinn TIME INITIAL Ph 10 SU Temp. °C t �4c ,s. � •,i Q �'c I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --lculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. e second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. -)cument changes in lot #'s. revised: 12/21 /16 .....� . �......�.........v.. . VI\ YVJ L.e1n"1.Jwuvc SW-846-9040C ;own of Waynesville WWTP �"36 Walnut Trail :Jaynesville; NC 28785 PAID: NC01119 ertification #: 194 -istrument ID: ORION DualStar pH/ISE Benchtop -_;IN: E09596 i Lab -quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ll .rhAl °�' 'b'7 (Go. ir�` t�s � (°f c� ��.� � ��d� K,� � � �, �4�C 4� j y- lJ� 1 OLLECT DATE COLLECT TIME ANALYSIS ANALYSIS TIME ANALYST INITIAL INITIAL P°H SU INITIAL TEMP. °C DATE )RRECTED PH SU: %� :S': (�l ) 23 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL I'�:) (�a . -6 P S. -,<RECTED PH SU: /21I - 0�11 70.got 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL Q- - [7, l °C ? - S • )RRECTED PH SU: Id, 6-- Jr d"I i�2J6 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade) tual pH = Measured pH +/- the correction Factor. ...e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. ;�'<;esecond pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. `cument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP -, 66 Walnut Trail 'Naynesville, NC 28785 -V-�A ID: NCO 1119 lrtification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop ti/N: E09596 i Lab :quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot* Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME -DATE TIME INITIAL PH SU TEMP. °C 2 0 y�� �� -7 --, I '�- r, 5 . � �• w. i 9, S( Z'( ORRECTED PH SU: / �-(� - t't V �' = 1), q-; 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL /�l•S— ms c Q5. �,-<RECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 9 eL ORRECTED PH SU: a " - 0 -19 ' n 3 a1 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. }°C Wreadings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,tual pH = Measured pH +/- the correction Factor. • -le initial pH reading is taken after the lime is mixed with the 503 sludge. ..ie pH of this initial reading has to be above a pH of 12.. second pH reading is taken 2 hours after the initial reading. jH of this second reading has to be above a pH of 12'. .;lie pH of the final reading (24 hours latter) has to be above a pH of 11.5. .ocument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 '-A ID: NCO1119 ,ertification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 .n Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot* Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIMEgg PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL gqEFF. F 1, C. .��� ��;.�, � (•5• 'OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC CORRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL zv � ;uRRECTED PH SU: /,' : s--0,, 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL "ORRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C ­r-I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _ctual pH = Measured pH +/- the correction Factor. "he initial pH reading is taken after the lime is mixed with the 503 sludge. . he pH of this initial reading has to be above a pH of 12. �--second pH reading is taken 2 hours after the initial reading. ')H of this second reading has to be above a pH of 12. he pH of the final reading (24 hours latter) has to be above a pH of 11.5. _ ocument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 66 Walnut Trail ''Vaynesville, NC 28785 =� ID: NC01119 .ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 i Lab :quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot*: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI BUFFER PH 13.0 SU BUFFER INITIAL I L :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C VIP A I*, ORRECTED PH SU: %tip...: —0, 9S=0 ; 5✓ 2 H R 2 HR ANALYST PH SU TEMP. °C INITIAL 1,�q dla�"� ts. ur<RECTED PH SU: aa 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL Q,)- I r?, t- - • ORRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C w.1 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion 3lculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. -ie initial pH reading is taken after the lime is mixed with the 503 sludge. _ie pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. Dcument changes in lot Vs. revised: 12/21 /16 PH MC I ER CALIBRATION FOR 603 LIME/SLUDGE SW-846-9040C )Town of Waynesville WWTP �566 Walnut Trail ;Waynesville, NC 28785 •'F-PA,ID: NCO1119 1 ertification #: 194 'nstrument ID: ORION DualStar pH/ISE Benchtop ,3/N: E09596 :n Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date.JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP.. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU ' BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL I F(I �;o ' �i:i�i!i,,:„ i.r> fin! G�� p�;��3 6 i<� uc < 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C Te. :ORRECTED PH SU:, 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL "'u�RECTED PH SU: /2' 16 —off jT- 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL —ORRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. oe initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. .)H of this second reading has to be above a pH of 12. .,:ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. s:)cument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 603 LIME/SLUDGE SW-846-9040C ' ,_ .. own of Waynesville WWTP '66 Walnut Trail ,,Vaynesville, NC 28785 �,1A ID: NC01119 :ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 i Lab ',quipment Maintenance: pH 7.00 Lot *A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot* Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER 'PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ot :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C 7vid ��(61 �q j6/I ?1 `��-) r 6 cC I d. ORRECTED PH SU: /2 La-y alb z aq) 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL ,,ERECTED PH SU: 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL �DRRECTED PH SU: 2. S ^ C3v P 12 .2 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C dS —1 j /0 d 1ti, .,. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. —` a initial pH reading is taken after the lime is mixed with the 503 sludge. ,e pH of this initial reading has to be above a pH of 12. �P_second pH reading is taken 2 hours after the initial reading. H of this second reading has to be above a pH of 12. �Ie pH of the final reading (24 hours [after) has to be above a pH of 11.5. )cument changes in lot #'s. revised: 12/21/16 rrl IVIC 1 CK I.ALIMKA I IUN 1-UK OUS LIMt/SLUUIit SW-846-9040C rown of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 :PAID: NC01119 ;ertification #: 194 'nstrument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab -quipment Maintenance: pH 7.00 Lot #:A8165 pH 7.00 Lot #: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2020 Exp. Date: Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF ' SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL l tl1z.10llc ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C V4 1 -7:0 �/(/ t� 12. C C- 1014RECTED PH SU: ,D C, 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL "u.<RECTED PH SU: .' 61. o 24 HR 24 HR ANALYST PH SU TEMP. oC INITIAL -0RRECTED PH SU: Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °Cy Joe I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. _,,ne initial pH reading is taken after the lime is mixed with the 503 sludge. tie pH of this initial reading has to be above a pH of 12. --lsecond pH reading is taken 2 hours after the initial reading. IH of this second reading has to be above a pH of 12. _ile pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot Vs. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C 1.'own of Waynesville WWTP '66 Walnut Trail Vaynesville, NC 28785 .�:P-A ID: NCO1119 ertification #: 194 ,tstrument ID: ORION DualStar pH/ISE Benchtop -�/N: E09596 i Lab equipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal'Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL `AC- OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C (//, Z ei -7 ORRECTED PH SU: 5 4),y 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL %/ Sy .jr<RECTED PH SU: L„ �- (' .-Ct Q, y-1) 24. HR PH SU 24 HR, TEMP. °C ANALYST INITIAL ORRECTED PH SU: 0,43 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C tQ_� °�� P 1011 1 3`' I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 251 centigrade, a conversion llculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. ..je pH of this initial reading has to be above a pH of 12. o-.second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. ,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21 /16 SW-846-9040C '`Town of Waynesville WWTP - '566 Walnut Trail Waynesville, NC 28785 IF-P—q ID: NC01119 1 ;artification #: 194 --Instrument ID: ORION DualStar pH/ISE Benchtop 'S/N: E09596 iln Lab "Equipment Maintenance: i pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 0,711 =S i F 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC :ORRECTED PH SU: O) q- 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL urtRECTED PH SU: 0.15 24 HR PH SLI 24 HR TEMP. ANALYST INITIAL >°C bRRECTED PH SU: /,2, q w Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 101os� e.,', N't )0.111( A readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. .le initial pH reading is taken after the lime is mixed with the 503 sludge. le pH of this initial reading has to be above a pH of 12. 1--second pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12, le pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot Vs. revised: 12/21/16 VN Mt I the GALIBRATION FOR 503 LIME/SLUDGE SW-84s-An4nr. Town of Waynesville WWTP i566 Walnut Trail Waynesville, NC 28785 _`EPA ID: NC01119 ;ertification #: 194 Instrument ID: ORION DualStar pH/ISE Benchtop S/N:E09596 In Lab -quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/212023 DATE It// 9 TIME SLOPE EFF. Qq CAL. BUFFER PH 7.0 SU N TEMP. oC OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ORRECTED PH SU: r I1 2 H R PH SU 2 HR TEMP..°C ANALYST INITIAL 12.9 go, goc P5. vrlRECTED PH SU: 42 4 `6- 7 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL .ORRECTED PH SU: r z+ � — d , 2 ( = 13)9, Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C / ti / l' •.♦ / \ O. i.�4iv`\ f yip.. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. -'e initial pH reading is taken after the lime is mixed with the 503 sludge. ...e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12, T' a pH of the final reading (24 hours latter) has to be above a pH of 11.5. �6cument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C -'Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 J?4 ID: NC01119 ;ertification #: 194 ,,nstrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 n Lab quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot*: Exp. Date: PH 13.00 Lot #:Y27E016, Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. oC OF PH 13.0 SU BUFFER INITIAL I -� 6'biu J.Q ll .•� aJ� Y `ly , s: f (. ;7 �� 13 ,a` :OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC Z_ ORRECTED PH SU: /a,',(-c-,u 2 ' i)-3 j 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ...rtRECTED PH SU: Par 0 6- 24 HR SU 24 HR TEMP. °C ANALYST INITIAL )PH ' ')RRECTED PH SU: l';_) _3PS, - Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 4 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. --rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .__ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. „a pH of this initial reading has to be above a pH of 12. `lecond pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. .:::-,ument changes in lot #'s. revised: 12/21/16 Ah PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C _ Town of Waynesville WWTP -566 Walnut Trail " ,Naynesville, NC 28785 -�zQA ID: NCO1119 ;ertification #` 194 a:nstrument ID: ORION DualStar pH/ISE Benchtop -.`a/N: E09596 In Lab quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot*: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #. Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH. 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC /,� 3/(�i m 0 R R E C T E D PH SU: 2 H R PH SU 2 H R TEMP..°C ANALYST INITIAL -,r<RECTED PH SU: l9- 1 --o 3 @ 5 1 0, f5- 24 H R PH SU 24 H R TEMP. °Cf ANALYST INITIAL �TYd I 164 3 �'V✓ �a .✓ 7)RRECTED PH SU: 0-5-'f?, Iq z 1),1r) Post Calibration Verification TIME INITIAL Ph SU Temp. °C �� g10 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. ­rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. - initial pH reading is taken after the lime is mixed with the 503 sludge. a pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12: PH of the final reading .(24 hours latter) has to be above a pH of 11.5. _. '-ument changes in lot Vs. revised: 12/21 /16 rrt ]VIC I CK GALIBKATION FOR 503 LIME/SLUDGE SW-84B-an4nr Town of Waynesville WWTP 566 Walnut Trail Naynesville, NC 28785 �,P4, ID: NC01119 ;ertification #: 194 'nstrument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab Equipment Maintenance: SLOPE fDATE TIME EFF. PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot*: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 202.1 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OFJ QC BUFFER PH 7.0 SU BUFFER PH 7.0 SU BUFFER PH 10.0 SU TEMP. " C OF CAL TEMP. °C OF PH 10.0 SU BUFFER PH 13.0 SU BUFFER PH 13.0 SU BUFFER INITIAL iq,0 "( 13-oiN_ I q ,1-11C- f-5 . OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATEIaI} TIM�E� INITIAL P/Hp SU TEMP. °C .. ,���C� L�lI �y4 ���ila�� G`iL✓ 1 d�' �L[d �r Of�v ;��`0. ORRECTED PH SU: A) -0,,I � ' 11.7 � 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL ar�RECTED PH SU: 12 f_ -O, C T-.: /f9-15� - 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL _JRRECTED PH SU: /2, 5 `0,( Post C;AlihrAtion Varifirnfinn Ph Temp. TIME INITIAL 10 SU °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion -ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. -wrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. -i initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12, ~i pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21/16 I-rl Mt I tK VAt_IURAT10N FOR 503 LIME/SLUDGE SW-84r?-Ianan(- . Town of Waynesville WWTP 566 Walnut Trail +Naynesville, NC 28785 FP -A ID: NC01119 ;ertification #: 194 ,nstrument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab equipment Maintenance: SLOPE j TE 'TIME EFF. J jcyLa4�d" pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP7. °C OF QC TEMP. °C OF CAL TEMP. °C OF BUFFER PH .0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH BUFFER INITIAL g13.0+SU OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INMTEMP. DATE TIME DATE TIME INITIAL P a / JRRECTED PH SU: 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL �r<RECTED PH SU: N_ &9`; Q,355 R24HR SU 24 HR TEMP. °C ANALYST INITIAL a a9a c:�'�� ' .� -JRRECTED PH SU: ). 3 -,o * 13 - /). I Post Calibration VPrificatinn TIME INITIAL Ph 10 SU Temp. °C 7 ti lu 'l- d p c C 0 a Z 0� readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). aal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. -second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12, = pH of the final reading (24 hours latter) has to be above a pH of 11.5. _ _ument changes in lot #'s. revised: 12/21 /16 rn MC r CM t ALIMKA I IUN I -UM 503 LIME/SLUDGE SW-846-9040C ;Town of Waynesville WWTP 1i66 Walnut Trail Jaynesville, NC 28785 < 7"A ID: NC01119 ;ertification #: 194 instrument ID: ORION DualStar pH/ISE Benchtop i/N: E09596 n Lab equipment Maintenance: pH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due Date:10/2/2023 DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. oC OF PH 7.0 SU BUUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. oC OF PH 13.0 SU BUFFER INITIAL0, Lo:s in o 0 0 o mr'c I R-("() OLLECT COLLECT TIME ANALYSIS DATE ANALYSIS TIM/E-y ANALYST INITIAL INITIAL PH INITIAL TEMP.foC KaDA✓yyT/El( _ ySU Oil c JRRECTED PH SU: j � - o = 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL " �r�RECTED PH SU: Q'!G 1= Q_ .,9S 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL _ �)RRECTED PH SU: Post Calibration. Verification TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. --:rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. �;econd pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12_ .,s pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21 /16 ------' -'.-.-.-�-'v I vrx JVJ I-I1NICIOL000it SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 FOA ID: NC01119 ;ertification #: 194 hiacrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: I Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due —Date: 10/2/2023 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. uC OF PH 10.0 SU CAL BUFFER TEMP. °C OF PH 13.0 SU ;;ATETIME EFF.PH 10 t 7.0 SU BUFFER PH 10.0SU BUFFER PH 13.0 SU BUFFER � INITIAL u ,3�� `°" R p , COLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE DATE TIME INITIAL PH SU TEMP. oC 7TIME e� f I 12 (11 /^%J 1 �� ,ORRECTED PH SU: 0"L, (� V., (5 2 HR PH SU 2 HR TEMP../°C ANALYST INITIAL l �1 iP O- ,� . ,RECTED PH SU: _�, � „ a P 0 �—a 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 1) 4 19.6-ot r' �'� DRRECTED PH SU: Post Calihratinn Varifirn+inn TIME INITIAL Ph 10 SU Temp. °C 4� readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. .a initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. ,,1 of this second reading has to be above a pH of 12: -a pH of the final reading (24 hours latter) has to be above a pH of 11.5. �ument changes in lot #'s. revised: 12/21 /16 • %..hLjja1[N I JUN t-UR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F"A ID: NC01119 ;ertification #: 194 i,:oirument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 PH 7.00 Lot* Exp. Date:JUKE. 2020 PH 10.01 Lot #:A8172 Exp. Date: Exp. Date:JUNE. 2019 PH 10.01 Lot*. Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot* Exp. Date: Checked with Traceable Thermometer Serial *180410124 Cal Due -Date: 10/2/2023 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU BUPH °C OF CAL TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER NCEMP. PHBUFFER 10.0 SU BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL ld.00 ,OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: _ I.V. Ca 0 Ii' /�2. q ,2 2 H R 2HR ANALYST PH SU TEMP..°C INITIAL .RECTED PH SU: �,,�. w•,9 �, i.jj ff inm ­)RRECTED PH SU: I2'•G -6%19 - 0, iP Post Calibration Varifiratinn TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ,:ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. --'-rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ___ual pH = Measured pH +/- the correction Factor. - initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. --,econd pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12: pH of the final reading (24 hours latter) has to be above a pH of 11.5. °'-;ument changes in lot #'s. revised: 12/21 /16 t-N ME F ER CALIBRATION FOR 503 LIME/SLUDGE SW-84F-Ananr, Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 E" n ID: NC01119 ;ertification #: 194 ,..,,rument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab _quipmerit Maintenance: PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2,�.20 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date: OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C °C OF CAL TEMP. °COF TIME SLOPE EFF. BUFFER PH 7.0 SU PH 7.0 SH 10.0 SU BUFFER PH 13.0 SUDATE JOFfEMP. BUFFEBUFFER PH 13.0 SU BUFFER INITIAL I VC OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C [�-Alll A's - Q � i cj'i I a -&"�57 - - C DRRECTED PH SU: . U 'l - 0, 6 T ; 0- �- 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL RECTED PH SU: l; .i�, - , �. ^ /a- y 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL ►RRECTED PH SU: L' - q -- 0, / 5-- 12,--) 5— Post Calihratinn \/arifica+inn TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion :ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .-_-ial pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. - ,econd pH reading is taken 2 hours after the initial reading. ,-I of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. -- -ument changes in lot #'s. revised: 12/21 /16 1JH METER CALIBRATION FOR 503 LIME/SLUDGE SW-84F-c1n4nr. Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 E"A ID: NC01119 ;ertification #: 194 1,.-Lrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab quipment Maintenance: CAL. SLOPE BUFFER DATE TIME EFF. PH 7.0 SU PH 7.00 Lot#:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 TEMP. " C OF QC TEMP. °C OF PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 10.0 SU I BUFFER C1, 0 CAL TEMP. oC OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C C: ORRECTED PH SU: jd� 0 0, 9 c1 /j, Y,2 2 HR PJjHSU 2HR TEMP..°C ANALYST INITIAL Q( ,-RECTED PH SU: Q, 0. Q : I .3 51 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL >` -.3 1 /7,0`,(- gnu . -,)RRECTED PH SU: )1,3-0-. Ta j.).S ,Q Post Calibration VPrifirntinn TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion _: culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp., Measured - 25 Centigrade). ,-,ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. ~i pH of this initial reading has to be above a pH of 12. ==.econd pH reading is taken 2 hours after the initial reading. .ri of this second reading has to be above a pH of 12_ pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot Vs. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 E7A ID: NC01119 ;ertification #: 194 Insl:rument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab quipmentMaintenance: a",M ; pH 7.00 Lot#:A8165 Exp. Date.-JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE.2019 pH 10.01 Lot*: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC SLOPE BUFFER PH 7.0 SU BUFFER DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU TEMP. "C OF CAL TEMP. °C OF PH 10.0 SU BUFFER PH 18.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ORRECTED PH SU: /d•(o - U, 9 K1I3.1 2 H R PH SU 2 H R TEMP..°C ANALYST INITIAL I-�; � C �)o . d 3(- P < , ,r-,RECTED PH SU: Is- = 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL f2,C {tfC- (/T •_)RRECTED PH SU: 12. a Q, 31 Post Calibration VPrifiratinn TIME INITIAL Ph 10 SU Temp. °C Vreadings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ' ,ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. on , -rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .-,ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ,ument changes in lot #'s. revised: 12/21 /16 em mt-rER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F",N ID: NC01119 ;ertification #: 194 11—Lrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:" =/2/2023 CAL. TEMP. °C OF QC SLOPE BUFFER PH 7.0 SU BUFFER DATE EFF. PH 7.0 SU BUFFER PH 10.0 SU J %TIME TEMP. "C OF CAL PH 10.0 SU BUFFER BUFFER PH 13.0 SU /e. I • �r j _ r3, j. 0 :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC e ORRECTED PH SU:- 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL CU,. � C_ /I ,-. .RECTED PH SU: 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL A). 19 J 11C s . )RRECTED PH SU: �°: , - ��, 9 Id al Post Calihrntinn Varifir•atinn TIME INITIAL Ph 10 SU Temp. °C 10 TEMP. "C OF PH 13.0 SU BUFFER INITIAL ^ readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units - (Temp. Measured - 25 Centigrade). .-.jai pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. -,econd pH reading is taken 2 hours after the initial reading. ri of this second reading has to be above a pH of 12: pH of the final reading (24 hours latter) has to be above a pH of 11.5. ----ument changes in lot #'s. revised: 12/21 /16 t-H Mt= I tK CALIBRATION FOR 503 LIME/SLUDGE SW-846-nn4nr Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 E"'\ ID: NCO1119 ;ertification #: 194 ,„otrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab quipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date: J U N E. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date: OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Dat 3 SLOPE.0 . oC OF SU QC BUFFER TEMP. °C OF PH 10.0 SU CAL BUFFER TEMP. oC OF PH 13.0 SUDATE TIME EFF. ;BUFFERTPH FER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL %5�. oc e1, a r-_ V 51 � ,`i . I;� a�L,S' ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PHA SU TEMP. oC y I1. 0 C- ORRECTED PH SU: d�Z 7 -c.i J- , i.).6--: 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL <RECTED PH SU: _� •-f1. d 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL 6,9.(o In-0`r( S. -)RRECTED PH SU: Id.6 _o'i S< i:)-1-1.-) Post Calibration VPrifirafinn TIME INITIAL Ph 10 SU Temp. °C P.S 1 10,1 ! readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. -rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -_ual pH = Measured pH +/- the correction Factor. - initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12, - ; pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE Town of Waynesville WWTP SW-846-9040C 566 Walnut Trail pH 7.00 Lot #:A8165 Waynesville, NC 28785 F Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: ^� I NC0pH 10.01 Lot#:A8172 ;er tification on *: #: 194 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: nacrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:Y27E016 5/N: E09596 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 _quipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL SLOPE BUFFER DATE TIME EFF. PHA 7.0 SU PH 7.0 SU BUFFER BUFFER PH 10.0 SU BUFFER TBUqFFERIN"TIAL PH 10.0 SU BUFFER PH 13.0 SU `�/�/1�C� {.d� /�4lrX l.(9� i�• IJC /0e� l~1 c _ :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: /91 1 .- e , I -�' /,;7..S 1 2 H R PH SU T H R TE9MP..oC ANALYST INITIAL / 9c _7 fl '`C— ' . J . -.,RECTED PH SU: 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL Q.� n'I"( CS. "7RRECTED PH SU: )Q, hr£%. 10 1j.3CJ Post Calihratinn Varifirntinn TIME INITIAL Ph 10 SU Temp. °C Io:(.5—I . 10,k CiagaC -' ' readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion u, ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. -rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -, .ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. -' pH of this initial reading has to be above a pH of 12. --econd pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ,ument changes in lot #'s. revised: 12/21 /16 VN METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 ID: NC01119 ;ertification #: 194 hiotrument ID: ORION DualStar PHASE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 PH 7.00 Lot*: Exp. Date:JUN_ E. 2020 PH 10.01 Lot#:A8172 Exp. Date: Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date: OCT. 2021 pH 13.00 Lot*: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL SLOPE BUFFER TIME EFF. PH 7.0 SU PH 7.0 SU BUFFER PH 10.0 SU BUFFER DATE BUFFER PH 10.0 SU BUFFER PH 13.0 SU 'OLLECTI COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DAATE TIME INITIAL PH SU TEMP. °C i S�/t jet 5 �? :i S� �?S %•c 1 u,,:�:� ORRECTED PH SU: /J & - 0,) I -: > 3 i 2 HR PH SU 2 HR TEMP..oC ANALYST INITIAL ".,rlECTED PH SU: .(„ -- --,Is = �° F ETEMP. ANALYST INITIAL )RRECTED PH SU-. tV, D - 6). l a - 11„) 9 Post Calibratinn Vprifirrafinn TIME INITIAL Ph 10 SU Temp. °C �i 7" r ��� TEMP. " OF PH 13.00 SU BUFFER INITIAL readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion —mlation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). --jal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIMEISLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F^'+ ID: NCO1119 ;ertification #: 194 -. Lrument ID: ORION DualStar pH/ISE Benchtop 2,/N:E09696 n Lab quipment Maintenance: CAL. TEMP. °C 0 SLOPE BUFFER PH 7.0 SU DATE TIME EFF. PH 7.0 SU BUFFER pH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date: OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 QC BUFFER PH 10.0 SU Iu,ra TEMP. °C OF CAL TEMP. °C OF PH 10.0 SU BUFFER PH 13.0 SU BUFFER PH 13.0 SU BUFFER INITIAL �r7ryy� J l0 OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C s �r=i��; : I s . J JRRECTED PH SU: fP', 7- 0,15 = 0, 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL q� d/ �; 6 J 6 2 I!, V1 L /T I^ .,�ECTED PH SU: �;�: - +, (Z 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL -')RRECTED PH SU: f d- 5 -- C. , d ! .= % 35- Post C21ihr2tinn VPrifirrafinn TIME INITIAL Ph 10 SU Temp. °C ' . readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion .�,,:ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -"jal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. ^'cond pH reading is taken 2 hours after the initial reading. ,,1 of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 ' '"i_ I CM UHLILSKATION FOR 503 LAME/SLUDGE Town of W SW-846-9040C aynesville WWTP 566 Walnut Trail Waynesville, NC 28785 E"A ID: NC01119 ,ertification #. 194 k.-crument ID: ORION DualStar pH/ISE Benchtop S/N:E09596 In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUN020 PH 7.00 Lot #: PH 10.01 Lot i 8172 Exp. Date: pH 10.01 Lot #: Exp. Date:JUNE. 2019 Exp. Date: PH 13.00 Lot #:Y27E016 Exp. DateQCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER P. °C OF CAL TEMP. °C OF EFF. PH 7.0 SU BUFFER PH 10.0 SUFFER 10.0 SU IPH BUFFER PH 13.0 SU]A�TTIME PH 13.0 SU BUFFER INITIAL 7�00 ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: B-. & •-0.I5 0_411i 2HR ANALYST PP RHS TEMP..°C INITIAL - 0c I-, _.,�iECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL )RRECTED PH SU: �Q , r, - Q , Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C — readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion _..;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. 'ection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). --jal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. cond pH reading is taken 2 hours after the initial reading. ,,1 of this second reading has to be above a pH of 12: pH of the final reading (24 hours latter) has to be above a pH of 11.5. iment changes in lot #'s. revised: 12/21/16 I'M ►viETER CALIBRATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 FDa ID: NC01119 ;ertification #: 194 Ii,o[rument ID: ORION DualStar pH/ISE Benchtop S/N: E09696 In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date: JUNE 2p19 PH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer __ Serial #:1804_10124 Cal Due Date:10/2/2023 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. oC OF CAL TEMP. oC OF DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU PH 10.0 SU BUFFER BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL Too '11 Yf . 6 y'b :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC ORRECTED PH SU: 32R ANALYST ..°C INITIAL -.,RECTED PH SU: /2— -0,12 7 19. 3 9 24 HR ANALYST ff TEMP. °C INITIAL �yb- , )RRECTED PH SU: 6�'ra7• �, G "a" � , Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C .— readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion _.-;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). --aal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. aH of this initial reading has to be above a pH of 12. =nd pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 rrl mt I I=H CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F^ ID: NC01119 ;ertification #: 194 iIoirument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab quipment Maintenance: bb PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date: JUN PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 _ Exp. Date: OCT. 20 12 pH 13.00 Lot*: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due -Date: 3 CAL. SLOPE BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. °C OF PH 10.0 SU CAL BUFFER TEMP. °C OF DATE TIME PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL (E�FF. -7 Gol �. l . i 20.E C I 12(0e, I OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME D�ATE TIME INITIAL PH SU TEMP. oC i d �� ; To 3 �� ,�� Via. to) ` P JRRECTED PH SU: _ / V S •- C', a S , [ga EISU HR MP..0C ETE ANALYST INITIAL ,r2ECTED PH SU N24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ­RRECTED PH SU: 1.23 --u; � 5` 7 12/; Post Calihrnfinn Varifirrntinn TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion _.._ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. —ection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ­ ial pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. cond pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. iment changes in lot #'s. revised: 12/21/16 SW-84R-gnanrr Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 E'-"N ID: NCO1119 ;ertification #: 194 Inoirument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: SLOPE DATE TIME EFF. 4 r PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due -Date: 3 CAL. TEMP. °C OF QC BUFFER PH 7.0 SU BUFFER PH 7.0 SU BUFFER PH 10.0 SU TEMP. "C OF CAL TEMP. °C OF PH 10.0 SU BUFFER PH 13.0 SU BUFFER PH 13.0 SU BUFFER IN T I A L �OLLECT S �1 c' COLLECT EANALYSISANALYSIS TIME ANALYS�SU INITIALP. TIALDA/°TEyTIME °C "ORRECTED PH SU: 1.), , 4 •..�A, B.s­- p. q�- 2 HR PH SU 2 HR TEMP..°C ANALYST INITIAL --�..RECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL JRRECTED PH SU: 12i K, 0, 1 Post Callhrnfion \/arifirntinn TIME INITIAL Ph 10 SU Temp. °C ✓'C/r �/ l / readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. --rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. PH of this initial reading has to be above a pH of 12. �,�cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, PH of the final reading (24 hours latter) has to be above a pH of 11.5. —cument changes in lot #'s. revised: 12/21/16 F-r-1 ivit I the CALIBRATION FOR 503 LIME/SLUDGE Tow f SW-846-9040C n o Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 J ^" ID: NC01119 ;ertification #: 194 I1locrument ID: ORION DualStar PHASE Benchtop S/N: E095% In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 PH 7.00 Lot*: Exp. Date:DUNE. 2020 PH 1001 Lot :A8172 Exp. Date: PH 10.01 Lot*: Exp. Date:JUNE_201g PH 13.00 Lot:Y27E016 Exp. Date: Exp. Date:OC_ pH 13.00 Lot*: Checked with Traceable Thermometer Exp. Date: _ Serial #:180410124 Cal Due_D__ate:10/2/2023 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER BUFFER PH 10.0 SU PH 10.0 SU BUFFER ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DjA�TEJI, TIME I/N�pITIAL PH SU TEMP. oC 9TIME >DATE ORRECTED PH SU: `' .� o.i, i ; %9 y 2 HR 2 HR ANALYST PH SU TEMP..°C INITIAL .). 3 (. � ( 1).' . " ..,RECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL •, )RRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C 1.69-1( 101, � .I, 'C CAL TEMP. oC OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL 'S sit. -eadings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion _-ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. factor Measured pH Q/the correction Facto 3- Measured - 25 Centigrade). —Hal pH Me initial pH reading is taken after the lime is mixed with the 503 sludge. -9H of this initial reading has to be above a pH of 12. �cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12: pH of the final reading (24 hours latter) has to be above a pH of 11.5. iment changes in lot #'s. revised: 12/21/16 a rrn ivit I tht CALIBRATION FOR 503 LIME/SLUDGE Town of W SW-846-9040C aynesville WWTP 566 Walnut Trail Waynesville, NC 28785 ID: NC01119 ;ertification #: 194 11-crument ID: ORION DualStar pH/ISE Benchtop S/N:E09696 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUN PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 __ Exp. Date:OCT. 2021 pH 13.00 Lot*: Checked with Traceable Thermometer Serial *:1804101124D Ca Due Dat 3 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER BUFFER PH 10.0 SU PH 10.0 SU BUFFER ' :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP_ °C i t Lc ORRECTED PH SU: (� dug, y % Lf S 2 HR 2 HR ANALYST PH SU TEMP..°C INITIAL _.,RECTED PH SU: ®;�, e,� ` 24 HR ANALYST a TEMP. °C INITIAL1 Pft r.5, )RRECTED PH SU: /0, 6 _. 0, 0 , q Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C CAL TEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INiTIAL ' ' readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion a,.;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. 'rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -r-lal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. -11H of this initial reading has to be above a pH of 12. �cond pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. invent changes in lot #'s. revised-12/21/16 a PH METER CALIBRATION FOR 503 LIME/SLUDGE Town of W SW-846-9040C aynesvllle WWTP 566 Walnut Trail Waynesville, NC 28785 EPA ID: NC01119 ;ertification #: 194 h oirument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: CAL. SLOPE BUFFER DATE TIME EFF. PH 7.0 SU `!51;"�Ai I � 99�,Lf I 'OLLECT COLLECT ANALYSIS ANALYSIS D�AITE TIME DATE TIME PH 7.00 Lot #:A8165 Exp. Date:JUN_20 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due 'Date: 3 TEMP. uC OFPH10.0 PH 7.0 SU BUFFER ANALYST INITIAL INITIAL PH SU ORRECTED PH SU: /), j - r� a r - J,?,3 s� ESU 2 HR ANALYST TEMP..°C INITIAL tr _.,RECTED PH SU: (4,,2, syj HR 24 HR ANALYSTH E24 SU TEMP. °C INITIAL )RRECTED PH SU.- Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C 23 TEMP. " C OF PH 10.0 SU BUFFER INITIAL TEMP. °C dry, `) °( CAL TEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIALou readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion —ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -Vaal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. -,qH of this initial reading has to be above a pH of 12. �cond pH reading is taken 2 hours after the initial reading. A of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 rH METER CALIBRATION FOR 503 LIME/SLUDGE TTo f SW-846-9040C ow o Waynesville WVVTP 566 Walnut Trail Waynesville, NC 28785 ID: NC01119 ;ertification #: 194 1ijocrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 PH 7.00 Lot #: Exp. Date:JUN_=0 PH 10.01 Lot#:A8172 Exp. Date: PH 10.01 Lot #: Exp. Date:JUNE, 2019 PH 13.00 Lot #:Y27E016 Exp. Date: �_ Exp. Date:OCT. 2021 pH 13.00 Lot*: Exp. Date: Checked with Traceable Thermometer �_ Serial #:180410124 Cal Due Date:10/2/2023 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU PH 10.0 SU BUFFER ' ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: aF; ANALYST INITIAL - _.,RECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL 19y '90-Jit )RRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C CAL TEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL oo '-' readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ,..:ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. ,ection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). --ial pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. --H of this initial reading has to be above a pH of 12. :cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. iment changes in lot #'s. revised:12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WVVTP 566 Walnut Trail Waynesville, NC 28785 9"A ID: NC01119 ;ertification #: 194 hio(rument ID: ORION DualStar pH/ISE Benchtop S/N:E09596 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date: OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due -Date: 3 CAL. TEMP. °C OF QC TEMP. °C OF SLOPE DATE TIME EFF. BUFFER PH 7.0 SU BUFFER PH 10.0 SU PH 7.0 SU BUFFER PH 10.0 SU BUFFER Too 0 ,ULLLU I COLLECT I ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C 5/3 It ORRECTED PH SU: Q. 6 - 0 m 0 _ M 2 H R 2 HR ANALYST PH SU TEMP..°C INITIAL 7 r 0 Oc 5, -.,RECTED PH SU: 1, .7 - f), 8­1 ! d„7 (. H 24 HR PH SU -.,RECTED PH SU: 1, .7 - f), 8­1 ! d„7 (. H 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 1,2, G. 'ge d".. P'� ,. "7RRECTED PH SU: Post C21ibr2tir)n VArifiratinn TIME INITIAL Ph 10 SU Temp. °C ri�ee F . IL I -5_V. CAL TEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -`aal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. --H of this initial reading has to be above a pH of 12. ;cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. :ument changes in lot Vs. revised: 12/21/16 r rh Mt I ER CALIBRATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 ;PA ID: NC01119 ;ertification #: 194 I,lacrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: SLOPE DATE TIME EFF. 9c%,G /K•', �. " PH 7.00 Lot#:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot*: Exp. Date: PH 13.00 Lot #:Y27E01 Exp. Date: OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Dat 3 CAL. TEMP. °C OF QC BUFFER PH 7.0 SU BUFFER PH 7.0 SU BUFFER PH 10.0 SU 'OLLECT COLLECT ANALYSIS ANALYSIS DATE TIME DATE TIME ANALYST INITIAL 3°/? �. Ws ;ORRECTED PH SU: IHR 2HR ANALYST TEMP..°C INITIAL -.,RECTED PH SU: 0,0 "al"j 1 24 HR 24 HR ANALYST PHSU TI MAP. f°C INITIAL g%/p� -ORRECTED PH Post Calibration Varifiratinn TIME INITIAL °C ETemp. 1 0s INITIAL PH SU /1• G TEMP. " C OF CAL PH 10.0 SU BUFFER BUFFER PH 13.0 SU INITIAL TEMP. OC TEM(.P3°CSOF H10UPUR lNiTIAL PV readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion .—culation may be used to correct the pH reading to the standard temperature of 25 centigrade. 'rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ^,ual pH = Measured pH +/- the correction Factor. , initial pH reading is taken after the lime is mixed with the 503 sludge. --H of this initial reading has to be above a pH of 12. �cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised* 12/21/16 PH METER CAL113RATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 ID: NC01119 ;ertification #: 194 Ii»crument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT 0221 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 3 CAL. TEMP. °C OF QC TEMP. °C OF DATE TIME SLOPE EFF. BUFFER PH 7.0 SU PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 10.0 SU BUFFER Q ') 1 ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C V/ /I � ( , "/ e', (" I'l-r ORRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP..°C INITIAL _.,RECTED PH SU: ,`� t;, Ic 5 ✓ 24 R ANALYST PH ESUTEMP.°C INITIAL "-)RRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C CAL ITEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL ,*readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion lation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). aal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. —H of this initial reading has to be above a pH of 12. ;cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. a revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 Fes:^ ID: NC01119 ;ertification #: 194 I,,orrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date:JUKE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Dat 3 CAL. TEMP. °C OF QC SLOPE BUFFER DATE EFF. PH 7.0 SU PH 7.0 SU BUFFERPH BUFFER 10.0 SU /TIMEo 'OLLECTI COLLECT I ANALYSIS ANALYSIS ANALYST TIME DATE TIME INITIAL pDATE ORRECTED PH SU: %� , = o q- � 2 HR 2 HR ANALYST PH SU TEMP..°C INITIAL -..RECTED PH SU: 0 0 R 24HR ANALYST U TEMP. °C R INITIAL --)RRECTED PH SU: Post Calihration Varifirnfinn TIME INITIAL Ph 10 SU Temp. °C TEMP. "C OF CAL TEMP. °C OF PH 10.0 SU BUFFER PH 13.0 SU BUFFER PH 13.0 SU BUFFER IN*[TIAL 1 INITIAL I INITIAL PH SU TEMP. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion —ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). aal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. —'H of this initial reading has to be above a pH of 12. ;cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail' Waynesville, NC 28785 ID: NC01119 ;ertification #: 194 Inn-irument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date.JUNE. 2020 PH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 pH 10.00 Lot #: Exp. Date: pH 13.0Lot #:Y27E016 __ Exp. Date: OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Dat 3 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. °C OF CAL DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU PH 10.0 SU BUFFER BUFFER PH 13.0 SU ^rPd�$ l-�' � `�'lalc> 7G'O �•S C MCI ��.�`� a✓.�•cre5 ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC ORRECTED PH SU: R ANALYST EESUTEMP.. oC INIITIAL ��_ �; J _.,RECTED PH SU:P •5 - o .p 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL rl �), q ac- , Il cc fin• S. --)RRECTED PH SU: j2,ly--t°?, #, - /,), )) Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C TEMP. " OF PH 13.0C SU BUFFER INITIAL (� a readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion .ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). aal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. —H of this initial reading has to be above a pH of 12. :cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised:12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE To SW-846-9040C wn of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 Fin ID: NCO1119 ,'ertification #: 194 Inorrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: CAL. TEMP. °C O DATE TIME i SLOPE EFF. BUFFER PH 7.0 SU PH 7.0 SU BUFFER 16h, 61 9 1-) d ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST DATE TIME DATE TIME INITIAL )A ORRECTED PH SU: q aaKYST AL _,,RECTED PH SU: 6 � 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL -)RRECTED PH SU: Post Calibratinn Vrarifiratinn TIME INITIAL °C EPTemp. PH 7.00 Lot#:A8165 Exp. Date:JUN_ E. 2020 PH 7.00 Lot #: Exp. Date: pH 10.01 Lot#:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 3 QC TEMP. °C OF BUFFER PH 10.0 SU PH 10.0 SU BUFFER INITIAL I—I—NITIAL PH SU TEMP. °C MP. °C OF BH 13.0 SU PHBUFFER 4'�m'c 1NiTIAL P.5. readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion --:ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ial pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. —H of this initial reading has to be above a pH of 12. :cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12, PH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE T SW-846-9040C own of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 -P--P,A ID: NC01119 ;ertification #: 194 li.,,rrument ID: ORION DualStar pH/ISE Benchtop S/N:E09596 In Lab Equipment Maintenance: PH 7.00 Lot#:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot#:A8172 Exp. Date:JUN_ E. 2019 PH 10.01 Lot*: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT 0221 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Dat 3 SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. °C OF CAL TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU PH 10.0 SU BUFFER BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL Lit ° C-3 .Q�,Ga �- ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C C ORRECTED PH SU: � f � � . Y'a 0HR 2HR ANALYST TEMP..°C INITIAL _.,RECTED PH SU: 112 •-61, 1y! 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL "')RRECTED PH SU: Post Calibration Verification FPh Temp. TIME INITIAL 10 SU °C - readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion - ,ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). jal pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. ---H of this initial reading has to be above a pH of 12. ;cond pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12 pH of the final reading (24 hours latter) has to be above a pH of 11.5. ument changes in lot #'s. revised: 12/21/16 PH Mt I tK CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C =.'own of Waynesville WWTP :66 Walnut Trail 1/aynesville, NC 28785 `- ,ID: NCO1119 artification #: 194 aistrument ID: ORION DualStar pH/ISE Benchtop =�'/N: E09596 I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot M Exp. Date: Checked with Traceable Thermometer Serial #.180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.,0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL I [?/l�Q��6� �',� :e?�.L1 �y� j�P`'Ca�° C I- 1. t�` 6� . ;OLLECT COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C DATE DRRECTED PH SU: 12,3 --- o6G 9 - 12a a 1 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 12.9 2 2,5c /�, ,.,RECTED PH SU: 6,66 IZ, �L( -)RREC' 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL i 2; zo;s r TFII PH SI 1• 12, 7� — 0 /z " i Post Calibration Verification 2, i�y TIME INITIAL Ph 10 SU Temp. °C �I.�✓�e 22 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. T`e initial pH reading is taken after the lime is mixed with the 503 sludge. ...e pH of this initial reading has to be above a pH of 12. esecond'pH reading is taken 2 hours after the initial reading. H of this second reading has to be above a pH of 12. •-e pH of the final reading (24 hours latter) has to be above a pH of 11.5. �cument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C - fown of Waynesville WWTP 66 Walnut Trail laynesville, NC 28785 -P--Q.ID: NCO1119 ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop "IN: E09596 I Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI - BUFFER PH 13.0 SU BUFFER INITIAL OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C TV '731/ !��'� ��65 2 3�L _ DRRECTED PH SU: I 12, — 6,0 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL = 4� �� I� Y •� C (� I f�,<RECTED PH SU 12i*� 9, (2 12,5J 1 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL -,DRRECTED PH SU: 1)-c' -(), d 5 =/,)< Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C •-I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. --)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). . ,tual pH = Measured pH +/- the correction Factor. -,-Ie initial pH reading is taken after the lime is mixed with the 503 sludge. ..:e pH of this initial reading has to be above a pH of 12. .second pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12. 7e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )cument changes in lot #'s. revised: 12/21/16 dh PH ME I ER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 66 Walnut Trail /aynesville, NC 28785 r-P4JD: NC01119 ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 _. j Lab quipment Maintenance: Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp: Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 PH 7.00 Lot MA8165 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI BUFFER PH 13.0 SU BUFFER INITIAL r OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C "All", _ DRRECTED PH SU: C? 2 H R PHT SU 2HR TEMP. ANALYST INITIAL I9 POC Esc Ic ! Vv -,r1RECTED 'PH SU: 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL "DRRECTED PH SU: 04C Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C w 1 .-I readings must be taken at 25 centigrade, ,or corrected to 25 centigrade. At other than 25 centigrade, a conversion . Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. --xrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. 6second pH reading is taken 2 hours after the initial reading. .)H of this second reading has to be above a pH of 12. --e pH of the final reading (24 hours latter) has to be above a pH of 11.5. _ -)cument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C --.own of Waynesville WWTP '66 Walnut Trail Waynesville, NC 28785 ^".ID: NC01119 ! ertification #: 194 jlstrument ID: ORION DualStar pH/ISE Benchtop "/N:E09596 :.i Lab quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI BUFFER PH 13.0 SU BUFFER INITIAL , OLLECT DATE COLLECT TIME ANALYSIS ANALYSIS TIME ANALYST INITIAL INITIAL PH�j SU INITIAL TEMP. o'C �4DATE _ ORRECTED PH SU: U, 0. 6, % .. 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL _)rtRECTED PH SU: " C' 4 O 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ' ­ORRECTED PH SU: 19- � -.,j . 1) --19.6 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. "' ie initial pH reading is taken after the lime is mixed with the 503 sludge. .. ie pH of this initial reading has to be above a pH of 12. ~second pH reading is taken 2 hours after the initial reading. dH of this second reading has to be above a pH of 12. T ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. __)cument changes in lot #'s. revised: 12/21/16 SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail _ )Waynesville, NC 28785 ;F_,A ID: NC01119 ertification #: 194 —Instrument ID: ORION DualStar pH/ISE Benchtop ,'S/N: E09596 In Lab 'Equipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #: Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFF'ER PH 10.,,0y SU BLUFFER PH 13.0 SU BUFFER INITIAL /r(� }& (�' � COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C C41 a� It :ORRECTED PH SU: /)' . a -'V' ; ' Q.5-1 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 12, -L ) 3, c P'5_ I UHRECTED PH SU: = I � 24 HR 24 HR ANALYST SU TEMP. °C INITIAL y,PH 20 ORRECTED PH SU: Post Calibratinn VPrifirntinn TIME INITIAL Ph 10 SU Temp. °C -I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. le pH of this initial reading has to be above a pH of 12. `—second pH reading is taken 2 hours after the initial reading. dH of this second reading has to be above a pH of 12. le pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21 /16 SW-846-9040C Fown of Waynesville WWTP 566 Walnut Trail Naynesville, NC 28785 ,= A ID: NC01119 ertification #: 194 instrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 n Lab :quipment Maintenance: pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 pH 7.00 Lot #:. Exp. Date: pH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 pH 10.01 Lot #: Exp. Date: pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE EFF. PH 7.0 SU BU?FF(3ER PH 10.�0)SLI BUFFER PH 13.0 BUFFER INITIAL JTIME 17,1,1/6 70 �jSU ;OLLECT DATEg COLLECT TIME ANALYSIS ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C g`yD/)ATE gy C— ORRECTED PH SU: 0),� — 'V .10I✓ = 121il 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL l{Uf,IRECTED PH SU: A2.5- , 01 IJ =fly 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL �•S .fit-��� `-ORRECTED PH SU: I•Q- �- L).0 7 /-).,q I Post Calihratinn VPrifiratinn INITIAL10 Ph SU Temp. °C /'}TIME �V fF l `( I�r 1 V1' d 2q, ; _. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ,)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. —.. a initial pH reading is taken after the lime is mixed with the 503 sludge. ...e pH of this initial reading has to be above a pH of 12. — second pH reading is taken 2 hours after the initial reading. dH of this second reading has to be above a pH of 12. ^e pH of the final reading (24 hours latter) has to be above a pH of 11.5. _cument changes in lot #'s. revised: 12/21/16 SW-846-9040C .l Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 .=PA ID: NC01119 ertification #: 194 'instrument ID: ORION DualStar pH/ISE. Benchtop /N: E09596 gin . Lab quipment Maintenance: Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lot #: Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 PH 7.00 Lot #:A8165 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH' 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL :OLLECT DATE COLLECT' TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C :ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL u-KRECTED PH SU: 10,b --o..o r ( a<-6 1 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL �C ORRECTED PH SU: 42, 4- o. o `) 'r /2 :3 I Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C �. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. .orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. `e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. ,)H of this second reading has to be above a pH of 12. ,e pH of the final reading (24 hours [after) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 SW-846-gn4nr. ;Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F-0-A ID: NC01119 ertification #: 194 ylnstrument ID: ORION DualStar pH/ISE Benchtop E09596 :In Lab Equipment Maintenance: PH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 PH 7.00 Lot #: Exp. Date: PH 10.01 Lot #:A8172 Exp. Date:JUNE. 2019 PH 10.01 Lott Exp. Date: PH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 PH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL /I dv 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ;ORRECTED PH SU: IJ- `o, o,3 = ®).'q7 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL ,(YRRECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. oC INITIAL qq r( ORRECTED PH SU: ►) 3 - r" ,t' ci -%d. a Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C -.-I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion flculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units'` (Temp. Measured - 25 Centigrade). -tual pH = Measured pH +/- the correction Factor. T,'ie initial pH reading is taken after the lime is mixed with the 503 sludge. ..ie pH of this initial reading has to be above a pH of 12. - second pH reading is taken 2 hours after the initial reading. dH of this second reading has to be above a pH of 12. ne pH cc° the final reading (24 hours latter) has to be above a pH of 11.5. )cument changes in lot #'s. revised: 12/21 /16 dh SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: F-D-^ ID: NC01119 pH 10.01 Lot #:A8172 ertification #: 194 � =1U Exp. Date:JUNE. 2019 �je1�q - pH 10.01 Lot #: C.s P2 Exp. Date: l'c,tj . 4c; j L,, Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:Y27E016 Exp. Date:OCT. 2021 S/N: E09596 c� pH 13.00 Lot #: ,,v � �o In Lab o Exp. Dater a Equipment Maintenance: �s��� Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER CAL TEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL 00 R% ;OLLECT DATE COLLECT TIME I ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C C14,9S (I Li—I's-d- 6 1 1.'0 � P. 5. :ORRECTED PH SU: / b` Q , 6, 3 A Ig q7 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL UHRECTED PH SU: q �-r�f,e ':I-C/ 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ORRECTED PH SU: 12,q —0,a5- -7 L2J5- Post Callhrntinn \/arifir atinn TIME INITIAL Ph 10 SU Temp. °C to h 0 I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion �culation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. ,..a initial pH reading is taken after the lime is mixed with the 503 sludge, PH of this initial reading has to be above a pH of 12. -" second pH reading is taken 2 hours after the initial reading. .,H of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21/16 rh Mt I tR GALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C --,Town of Waynesville WWTP i . i66 Walnut Trail pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 ,Vaynesville, NC 28785 pH 7.00 Lot #: Exp. Date: =j �4 ID: NC01119 pH 10.01 Lot #:WP2 Exp. Date: NOV. 2020 _ ;ertification #: 194 pH 10.01 Lot #: Exp. Date: istrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 /N: E09596 pH 13.00 Lot #: T 7r'-) Lt , Exp. Date: or t ao, L t i Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 :quipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ,OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME/ ANALYST INITIAL INITIAL SU INITIAL TECMP.. °C /PH ORRECTED PH SU: '12, 6 ,y2- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL .,rtRECTED PH SU: 1,9<5 - 0,109 7 hAti I 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ,)b5— J0t 5—,Z- �� -ORRECTED PH SU: A'2,. S - L - f A). 5 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 103 1 4RS• 1 16.1 V, (` J "t' J readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. �,,rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. 9 initial pH reading is taken after the lime is mixed with the 503 sludge. pH of this initial reading has to be above a pH of 12. P-second pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12. - „a pH of the final reading (24 hours latter) has to be above a pH of 11.5. current changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot MA8165 Exp. Date:JUNE. 2020 ;Naynesville, NC 28785 pH 7.00 Lot #: Exp. Date: ID: NC01119 pH 10.01 Lot#:WP2 Exp. Date:NOV.2020 ;ertification #: 194 pH 10.01 Lot #: Exp. Date: ,nstrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 '3/N: E09596 pH 13.00 Lot #: Exp. Date: . Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 :quipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL �3c00 1 ��r! L�,. �-�• ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C 13/tel In • 1 . � ' 3. ®�e ®�; l r�� —ORRECTED PH SU: fU— 01/41f=y- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL VriRECTED PH SU: /j.�; r d,q`"t a 9;?-qI 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL -"flRRECTED PH SU: -d. Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I04'fd t- , Ada 1 e 1 ? `'C' ..H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. correction factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _ _;tual pH = Measured pH +/- the correction Factor. .ie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. --second pH reading is taken 2 hours after the initial reading. ,H of this second reading has to be above a pH of 12. -ie pH of the final reading (24 hours [after) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 FI-I MtI MK L;ALIBKAI ION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: =r'4 ID: NC01119 pH 10.01 Lot #:WP2 Exp. Date:NOV. 2020 ,ertification #: 194 pH 10.01 Lot #: Exp. Date: instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 - Exp. Date:OCT. 2021 -,5/N: E09596 pH 13.00 Lot #: Exp. Date: n Lab Checked with Traceable Thermometer Serial M180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME E(F�F. PH�7.0 SU BUFFER PH 1g0n.0/SOU BUFFER PH') 13.0 SU BUFFER INITIAL 9 , 6 , rJ( . -7 C ] 0 . 0 a i, 9 G 3, do d<e`� e� ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ,/ i� ., �3 i� `7=� .S. j a o� ' C :ORRECTED PH SU: Q. IT 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 12_7 2.2.q' f-IS, uRRECTED PH SU: 61, 7 -- 0 + 9 4 = Q - 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL f° i9 ORRECTED PH SU: /I- -0119 , 1,).q;� Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C L6-tL la rL 5- to I j Q f/a ldl •1 0- .,. i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion dculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,tual pH = Measured pH +/- the correction Factor. -'ie initial pH reading is taken after the lime. is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. �e second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH .of 11.5. )cument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 66 Walnut Trail Vaynesville, NC 28785 ID: NC01119 ;ertification #: 194 istrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 ..i Lab :quipment Maintenance: PH 7.00 Lot MA8165 PH 7.00 Lot M PH 10.01 Lot #:WP2 PH 10.01 Lot #: PH 13.00 Lot #:M28F009 PH 13.00 Lot #: Checked with Traceable Thermometer Serial #:180410124 Exp. Date:JUNE. 2020 Exp. Date: Exp, Date:NOV. 2020 Exp. Date: Exp. Date:OCT. 2021 Exp. Date: Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 7 Ulrd V531 Ic"C"a, 1'GQ , )J�'C' I :OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INJTIAL TEMP. oC _ORRECTED PH SU: ld.5 o, Iq = /J- 39 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL 1 1,,-<RECTED PH SU: / 1. E -9- (3f.(2 - f2,.31 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL "ORRECTED PH SU: Q, Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C -I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _;tual pH = Measured pH +/- the correction Factor. le initial pH reading is taken after the lime is mixed with the 503 sludge. ,.e pH of this initial reading has to be above a pH of 12. P second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. -^e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icumeni changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C .'own of Waynesville WWTP 166 Walnut Trail - pH 7.00 Lot MA8165 Exp. Date:JUNE. 2020 Vaynesville, NC 28785 pH 7.00 Lot #: Exp. Date: ,4PAJD: NC01119 pH 10.01 Lot #:WP2 Exp. Date:NOV. 2020 ;ertification #: 194 pH 10.01 Lot #: Exp. Date: istrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 /N: E09596 pH 13.00 Lot #: Exp. Date: „1 Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 .quipment Maintenance: fj r CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU TIME PH 7.0LS�U BUFFER PH 10.0 SU BUFFER PH 13.0SU BUFFER yryyDATE. y/ 1 tiI�_52 pE�FF. 960� 7'1.Y �, 'INITIAL JOLLECT DATE_ COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ..ORRECTED PH SU:, d 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL q�� aSd ;;,rZRECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL g 11,%4L1.4 � "ORRECTED PH SU: l �rI-) 5/ = 1-23 `fir Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C T0:3:. 0 . (0. A-4, C ..H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion - Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _Aual pH = .Measured pH +/- the correction Factor-. T'-ie initial pH reading is taken after the lime is mixed with the 503 sludge. �e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. r,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21/16 . ........, ....,.. , ,v,• , vr% aVJ LIItlIG/3L6dU:7C SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A8165 Exp. Date:JUNE. 2020 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: ,F"k ID: NC01119 pH 10.01 Lot #:WP2 Exp. Date:NOV. 2020 Aaification #: 194 pH 10.01 Lot #: Exp. Date: nstrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 quipment Maintenance: CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME PH�/7.0 ER BUFFIC PH SLI BUFFER PH 13.0 SU BUFFER INIITIIAL 5T11' ` r�EFF. �V . �a/� pS�U l y 1J �, /10.0 r V j �. 3G` ;OLLECT DATE COLLECT TIMEq ANALYSIS DATE ANALYSIS ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C yellil ` c�TIME :ORRECTED PH SU: a 112 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL /I C 2(), 7t 4-1- -ur�RECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL •ORRECTED PH SU: f 1 a :3 � Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 0, 7^ IT aI ,A readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion dculation may be used to correct the pH reading to the standard temperature of 25 centigrade. —orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. ne initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. —second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. oe pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21/16 rF1 [NIC I CM t.ALRSKA I IUIN f UK WJ LIME/SLUDGE SW-846-9040C 'Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 'EPA ID: NC01119 1 ;ertification #: 194 Instrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 In Lab quipment Maintenance: pH 7.00 Lot MA8165 pH 7.00 Lot #: pH 10.01 Lot #:WP2 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 pH 13.00 Lot M Checked with Traceable Thermometer Serial #:180410124 Exp. Date:JUNE. 2020 Exp. Date: Exp. Date:NOV. 2020 Exp. Date: Exp. Date:OCT. 2021 Exp. Date: Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU TIME EFF. PCH7..�0 SU BUFFER PH 10.(0 SU BUFFER PH 13.0 SU BUFFER INITIAL �jDATE e4 I°u Cl (ift f t�%l.� �.• i 1 3, 0 a4/ �Q 17_... a s 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C T 12e tu �, i / ( ;ORRECTED PH SU: I2,C, h 2 HR PH SU 2 HR TEMP. OC ANALYST INITIAL a�r uriRECTED PH SU: 1)' .3 5— 24 HR 24 HR ANALYST PH SU TEMP. oC INITIAL ORRECTED PH SU: 0—j - c' a 9 re r / I . C.j ;I Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C ' V.„f .� r 1 V A �ll 1 Cv -.i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion lculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. T ie initial pH reading is taken after the lime is mixed with the 503 sludge. le pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. ,H of -this second reading has to be above a pH of 12. le pH of the final reading (24 hours latter) has to be above a pH of 11.5. Icument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP -566 Walnut Trail pH 7.00 Lot MA8165 _ Exp. Date:JUNE. 2020 Waynesville, NC 28785 pH 7.00 Lot#: fi1�if3-S Exp. Date: T(,.,c c)a t E—PA ID: NC01119 pH 10.01 Lot #:WP2 Exp. Date:NOV. 2020 1 ;ertification #: 194 pH 10.01 Lot #: 9 Id Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: . n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 quipment Maintenance: dd .��ec.� i0 �- On 711s�1 I eA CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI BUFFER PH 13.0 SU BUFFER INITIAL j6d.j '7- o o 0 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C .;ORRECTED PH SU: 1,2• V - 0,OX 2 HR 2 HR ANALYST PH SU TEMP. oC INITIAL �,-<RECTED PH SU: 0. 1 - 0' 0 5-:1116' 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL -ORRECTED PH SU: / �'O - o' I � = lj, 5,,2 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C do.44' C •H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,tual pH = Measured pH +/- the correction Factor. -ie initial pH reading is taken after the lime is mixed with the 503 sludge. .le pH of this initial reading has to be above a pH of 12. `second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. ge pH of the final reading (24 hours latter) has to be above a pH of 11.5. -)current changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Waynesville, NC 28785 pH 7.00 Lot #: EpA ID: NC01119 pH 10.01 Lot #:A9142 ;ertification #: 194 pH 10.01 Lot #: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 S/N: E09596 pH 13.00 Lot #: In. Lab Checked with Traceable Thermometer Serial #:180410124 quipment Maintenance: Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date.- Exp. Date:OCT. 2021 EXp. Date: - Cal Due te:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EP,FF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 1 V I �EI� �s ��V 6Y4� �'y 0 `il tll• pa •�C} ,�+ 9 dn� Q��s"♦a, �lASC ey,�('�J, ®. COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C F4, T`� �ldsda� 7A 11-7 'ORRECTED PH SU: 11 - 0<ja,< &2HR 2 HR TEMP. °C ANALYST INITIAL � . ar P< —. <RECTED PH SU: 1,9, (6 -- 0, 1 !!�- = %j, 46' 24 HR PqH� SU 24 HR TEMP. °C ANALYST INITIAL •-ORRECTED PH SU: 12 �,- o, 6 Sa= 01,y6— Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. T)e initial pH reading is taken after the lime is mixed with the 503 sludge. .. ie pH of this initial reading has to be above a pH of 12. le second pH reading is taken 2 hours after the initial reading. pH of this second reading has to 'be above a pH of 12. id pH of the final reading (24 hours latter) has to be above a pH of 11.5. >cument changes in lot #'s. revised: 12/21/16 rrn ivir- t r-K UAt_ItiKAI ION FOR 503 LIME/SLUDGEI SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: PA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 ,ertification #: 194 pH 10.01 Lot #: Exp. Date: nstrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 a/N: E09596 pH 13.00 Lot #: Exp. Date: —in Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL =0 �i is'7 ,�� `a A. CC A3.0c) �. ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC ORRECTED PH SU: /2.6-0a hie; !XI) 2 HR PH SU 2 HR °C ANALYST INITIAL TEMP. -,<RECTED PH SU: /�.. q 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL /p �CR l.3 G q/ � .9 . , .P • ORRECTED PH SU: Id.? ~o ° 8 �-_- 0), IT - Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 0e C� '-t a e b � f �. "C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. {rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. -e initial pH reading is taken after the lime is mixed with the 503 sludge. -.e pH of this initial reading has to be above a pH of 12. e second pH reading is taken 2 hours after the initial reading. PH of this second reading has to be above a pH of 12. •-• �_e pH of the final reading- (24 hours latter) has to be above a pH of 11.5. cument changes in lot #'s. revised: 12/21 /16 I'M ML I tR UALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C ;'Town of Waynesville WWTP 1-366 Walnut Trail "Waynesville, NC 28785 EPA ID: NC01119 Certification #: 194 ( -instrument ID: ORION DualStar pH/ISE Benchtop pH 7.00 Lot #:A9155 pH 7.00 Lot M pH 10.01 Lot MA9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 �."N /. E09596 pH 13.00 Lot #: Exp. Date: _ _-.'n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 quipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER • PH 13.0 SU BUFFER INITIAL COLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE DATE TIME INITIAL P/ HQ SU TEMP. °C yTIME 'ORRECTED PH SU: l9 , � - 0(T - P 1 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL _RRECTED PH SU: / a-(" aq, l a = I C(51 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL A4 a C_ "ORRECTED PH SU: Post Calibration Verification Ph Temp. TIME INITIAL 10 SU t /°C -H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion )Iculati6n may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _ctual pH = Measured pH +/- the correction Factor. -- 'je initial pH reading is taken after the lime is mixed with the 503 sludge. _fie pH of this initial reading has to be above a pH of 12. _,he second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. =•qie pH of the final reading (24 hours latter) has to be above a pH of 11.5. bcument changes in lot #'s. revised: 12/21/16 rrl Mt I tot (;ALIt$KAI IUN 1—UK 5U3 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 '•=PA ID: NC01119 ,ertification #: 194 nSLrument ID: ORION DualStar pH/ISE Benchtop /N: E09596 n Lab :quipment Maintenance: pH 7.00 Lot #:A9155 pH 7.00 Lot M pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: _ Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C 7 im tic, h, t I - — ORRECTED PH SU: 1j..3 / F" . 1')d 2 H R PH SU 2 H R TEMP. °C ANALYST INITIAL ��- -C _ .:RECTED PH SU: f lJ s 0, o 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL -ORRECTED PH SU: 11,E-- d!, � �-"- - 91,�'l Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C ,. i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. T'ie initial pH reading is taken after the lime is mixed with the 503 sludge. . , ie pH of this initial reading has to be above a pH of 12. le second pH reading is taken 2 hours after the initial reading. off of this second reading has to be above a pH of 12. �e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )cument changes in lot Ws. revised: 12/21 /16 PH MC I ER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 EPA ID: NC01119 'ertification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 .n Lab quipment Maintenance: pH 7.00 Lot #:A9155 pH 7.00 Lot M pH 10.01 Lot MA9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 pH 13.00 Lot M Exp. Date: _ Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC 4j, ;ORRECTED PH SU: 2 HR PH SU 2 HR TEMP. OC ANALYST INITIAL n 4 d:aaC -P 5 - . RECTED PH SU: 24 HR 24 HR ANALYST PH SU TEMP. °C IN/iITIAL )z a / 7, 6 'It f 150. "ORRECTED PH SU: 1;2:,05— Post Calibration Verification INITIAL Ph 10 SU Temp. °C �yyTIME l6'19 r'<- to,! I )o'gbC, ..-I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion )Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. T'ie initial pH reading is taken after the lime is mixed with the 503 sludge. . ne pH of this initial reading has to be above a pH of 12. >_e second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above'a pH of 12. -,,pie pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C .-own of Waynesville WWTP i66 Walnut Trail pH 7.00 Lot #:A9155 Vaynesville, NC 28785 pH 7.00 Lot #: -2A ID: NC01119 pH 10.01 Lot MA9142 :.ertification #: 194 pH 10.01 Lot #: istrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 /N: E09596 pH 13.00 Lot #: ..i Lab Checked with Traceable Thermometer Serial #:180410124 ;quipment Maintenance: Exp. Date:JUNE. 2021 Exp. Date: Exp. Date:.May. 2020 Exp. Date: Exp. Date:OCT. 2021 Exp. Date: _ Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU • BUFFER PH 13.0 SU BUFFER INITIAL ,OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC _ORRECTED PH SU: ,/;1.,5_-0.14 �1 /23,-2 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL ,jRRECTED PH SU: o.5 ` -'�' = (-j �'k 24 HR PpH{SU/ 24 HR TEMP. oC ANALYST INITIAL 1,2 ORRECTED PH SU: f ). ` .- 01 1 �/, &'j• Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C v —i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. T'ie initial pH reading is taken after the lime is mixed with the 503 sludge. ..te pH of this initial reading has to be above a pH of 12. ie second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ne pH of the final reading (24 hours latter) has to be above a pH of 11.5. -)cument changes in lot #'s. revised: 12/21 /16 F" IVIL 1 LfX VP1LILJFXP%I IVIV 1-VR UVJ LA NI Gj0L-UI U= SW-846-9040C .Mown of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot MA9155 ;'Naynesville, NC 28785 pH 7.00 Lot M —,-PA ID: NC01119 pH 10.01 Lot #:A9142 :ertification M 194 pH 10.01 Lot #: nscrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 a/N: E09596 pH 13.00 Lot #: Exp. Date: _ _�n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 :quipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF ' SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL '76 L .I"o 9'0,') `?:deg ��� /a 1,0C. l3-&* /V,K"C ? - 13 OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC 14A 76 'd 1 16 f- /V-, 6 ORRECTED PH SU: ";--o /;7- 3 j 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL 1'a � i47`'C 0'- :RECTED PH SU: 11 S^ - ). (S =A < 3 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL 131il 17 j"t- f ..7- —ORRECTED PH SU: lfZ r _Cab fe' A" 12,29- Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C --I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. :)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. --.;ie initial pH reading is taken after the lime is mixed with the 503 sludge. �,ie pH of this initial reading has to be above a pH of 12. le second pH reading is taken 2 hours after the initial reading. nH of this second reading has to be above a pH of 12. „C pH of the final reading (24 hours latter) has to be above a pH of 11.5. .,:)cument changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C own of Waynesville WWTP 166 Walnut Trail ";Vaynesville, NC 28785 PA ID: NC01119 'Certification #: 194 rstrument ID: ORION DualStar pH/ISE Benchtop pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot MA9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 /N: E09596 pH 13.00 Lot #: Exp. Date: _-i Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/212023 quipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU 'BUFFER PH 13.0 SU DATE TIME PH 7.0 SU BUFFER PH/10.0 SU PH 13.0SU BUFFER INITIAL ®µEFF. ypBUFFER Aw ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ?/2 VI '?�), 7- .1).6 1 q.L:�� ORRECTED PH SU: 2 ,• - �� a (�,'' 1,2, La 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL ,2RECTED PH SU: 11-� - Ca • Y5-- 24 H R 24 H R TEMP. °C ANALYST INITIAL qPH �S,9JU N ` W CORRECTED PH SU:;� Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C le')( eI r 5 10A I d a. o -;i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. Tie initial pH reading is taken after the lime is mixed with the 503 sludge. ..ie pH of this initial reading has to be above a pH of 12. ie second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. le pH of the final reading (24 hours latter) has to•be above a pH of 11.5. )current changes in lot Vs. revised: 12/21/16 rn enF- i Me< koAL10KAI IUN 1-UK SUJ LIMt/SLUDGE S W-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: .EPA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 :,ertification #: 194 pH-10.01 Lot #: Exp. Date: nstrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 -3/N: E09596 pH 13.00 Lot #: Exp. Date: n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 :quipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL lbdo G,-s, 9 ,o sesa- lo,o )ost- 13-0c) '20 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C :ORRECTED PH SU: 1212- d. , 15-� 01 !�J 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL rz-� 'C. ,ERECTED PH SU: Id iF 24 HR PH SU 24 HR TEMP.p°C ANALYST INITIAL —ORRECTED PH SU: �4A�_G9 4'ei�T /Q, r�6 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 11-t f'5. 16., p L"Cr� . -I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion )Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. _orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. .ie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. ie second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. . .e pH of the final reading (24 hours latter) has to be above a pH of 11.5. Dcument changes in lot #'s. revised: 12/21 /16 rt'I Mt I the UALIUKAI IUN FUR 503 LIME/SLUDGE SW-846-9040C town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 'A ID: NC01119 certification #: 194 nstrument ID: ORION DualStar pH/ISE Benchtop /N E09596 pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 ' pH 13.00 Lot #: Exp. Date: _ n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 :quipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PHr13.0 SU BUFFER INITIAL -?f d` & 6" 19,2 1 7 ,1 C /Lr d� �(. % � ! � G�� :�� is "'C ;OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ORRECTED PH SU: �;:(-G ,-10e /S ' 0� 2 H R PH SU 2HR TEMP. oC ANALYST INITIAL ,iRECTED PH SU: 7. ` 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL •ORRECTED PH SU: %'x% -1)F/��= /Q, Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C // l6 P-'5, to,( C; w. i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. T`e initial pH reading is taken after the lime is mixed with the 503 sludge. „e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. a pH of the final reading (24 hours latter) has to be above a pH of 11.5. - icument changes in lot #'s. revised: 12/21/16 rh MLI tK CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot M Exp. Date: 14 ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 '3ertification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 202'I S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #.180410124 Cal Due Date:10/2/2023 Equipment Maintenance: DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. oC OF PH 13.0 SU BUFFER INITIAL 12 COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC V- lo t"6 l i -7 :ORRECTED PH SU: 1 �� % s 9�47 � 19,5 2 HR PHp SU 2 HR TEMP.. °C ANALYST INITIAL 6V"`.� ICIPC ? Ve ,iRECTED PH SU: 1,17 •- 0{ 9 5 1.2. ITS 24 HR PH SU 24 HR TE/M/P.�°C ANALYST INITIAL / ,'-ORRECTED PH SU Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C -.1 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). -tual pH = Measured pH +/- the correction Factor. -)e initial pH reading is taken after the lime is mixed with the 503 sludge. ..ie pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. la pH of the final reading (24 hours latter) has to be above a pH of 11.5. _-)cument changes in lot Ps. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C -'Town of Waynesville WWTP 566 Walnut Trail, pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: 'PA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: Chvlcy'eC1,.'��� fru�u11 a CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL kl, (4.� 1 1`� V � ?'- I.?, co tl A P `COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. OC "e- Cl /�/' 1 ® X6 G -ORRECTED PH SU`. 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL .ERECTED PH SU: 24 HR PH SU 24 HR TEMP. OC ANALYST INITIAL • :ORRECTED. PH SU: /) ;3 - 0 .1 & ; n.i 'l Post Calihrgtinn Varifiratinn TIME INITIAL Ph 10 SU Temp. °C 10' t5- � 6. 1 Io.l c i 13( _d readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion �lculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. —)e initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. )e second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. is pH of the final reading (24 hours latter) has to be above a pH of 11.5. �ocument changes in lot #'s. revised: 12/21 /16 rn not I tK UALII3KArION FOR 503 LIME/SLUDGE SW-846-9040C -,'Town of Waynesville WWTP ^`i566 Walnut Trail Waynesville, NC 28785 !_�-A ID: NC01119 certification #: 194 Instrument ID: ORION DualStar pH/ISE Benchtop S/N• E09596 pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: _ In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 quipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. uC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 4dlo' I L"'o Lila) I I C"' 1 20- I I 1 10 6 1 90 -q'o( 0- 02 / %*7 -( ,OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C 6 Y�`�3 1 �.(� a( :ORRECTED PH SU: fP_y� 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 1. f a .i ,iRECTED PH SU: 112 a � () � d `j 12, �6 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ORRECTED PH SU: j; .S�-a Post Calibration Verification INITIAL Ph 10 SU Temp. °C /TIME. Cc- ,. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. _1 'e initial pH reading is taken after the lime is mixed with the 503 sludge. . ,e pH of this initial reading has to be above a pH of 12. —second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21 /16 rn IHIt I CK UALMSKAI IUN 1-UK 5U3 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: IzPA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: nstrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 3/N: E09596 pH 13.00 Lot #: Exp. Date: n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 =quipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME ATE De7lij TIME INITIAL PH SU TEMP. °C :ORRECTED PH SU: ��. •- a Os� ®�; 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ,iRECTED PH SU: 1;�_ Cf- 0-fa / a. 91 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL Q° 3 .;far Q I (_ j? S. -ORRECTED PH SU: 12_'1 m-0, i 0—( Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C its-I)LO I . 10, t 19 Y' -I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. -ie initial pH reading is taken after the lime is mixed with the 503 sludge. le pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Waynesville, NC 28785 pH 7.00 Lot #: q ID: NC01119 pH 10.01 Lot #:A9142 certification #: 194 pH 10.01 Lot #: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 S/N: E09596 pH 13.00 Lot #: In Lab Checked with Traceable Thermometer Serial #:180410124 Equipment Maintenance: Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 20?_0 Exp. Date: Exp. Date:OCT. 2021 Exp. Date: _ Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL :OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ;ORRECTED PH SU: o-if' 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL .ERECTED PH SU: LI � -- 0 , I .'� � i�-Ll 6 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 6 L -P a . "ORRECTED PH SU: _ d1.(, -v. Q., q5-- Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C --i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion .,._,Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). —:tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. T`�e pH of this initial reading has to be above a pH of 12. --econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21/16 PH I ILTER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F-714 ID: NC01119 certification #: 194 Instrument ID: ORION DualStar pH/ISE.Benchtop S/N:E09596 In Lab Equipment Maintenance: pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2 221 Pr-1 13.00 Lot #: Exp. Date: _ Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 DAaT/Er SLOPE CAL. BUFFER PH7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 1/0.0 SU TEMP. °C OF PH 10.0 SU CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL /TIME /�E(.FF. �BUFFER 1 3 -0c 2OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C S� �1, F'(- ;ORRECTED PH SU: JA 7 0. / `� � /)„j =SUTEMP. ANALYST INITIAL ,-ERECTED PH SU: Q -0- I-� � 0,157 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ORRECTED PH SU: i). q,j ,15- p _ ' Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C o. �. I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. -•e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. —current changes in lot #'s. revised: 12/21 /16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 P`�4 ID: NC01119 certification #: 194 Insrrument ID: ORION DualStar pH/ISE Benchtop SIN: E09596 pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2r,21 Exp. Date. Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 Pr-7 13.00 Lot #: Exp. Date: _ In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: DATE TIME 4EFF.PH CAL. FFER 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFERINITIAL ? 6o 0Z. Roo ae -OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ;ORRECTED PH SU:- C< a t = 2 HR PH SU 2 HR T��E'�MP. °C ANALYST INITIAL .ERECTED PH SU: 11(0 -i1. 9 .V j j.4� :24 HRFTEMP. H SU 4 HR ANALYST INITIAL j°C ORRECTED PH SU: /,,,A,: — 0 , B �- = D- 3 5 Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C dLaa'C i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ,)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. �e pH of this initial reading has to be above a pH of 12. ;econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. �, �cument changes in lot #'s. revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 F�q ID: NC01119 3ertification #: 194 Instrument ID: ORION DualStar pH/ISE Benchtop S/N: E09596 In Lab Equipment Maintenance: PH 7.00 Lot #:A9155 PH 7.00 Lot #: PH 10.01 Lot #:A9142 PH 10.01 Lot #: PH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: _ Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 DATE d TIME � SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. oC OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C ;ORRECTED PH SU: A2, 7 ro'I � ' 0." 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ,ERECTED PH SU: 1-1-2 -0 J ,� ; �d,'j 9 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL /13 go: X°C P. 5 - ,.ORRECTED PH SU: > ; .3 ._n,66 /,), (� Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ,)rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. „e pH of this initial reading has to be above a pH of 12. ,econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. -cument changes in lot #'s. revised: 12/21 /16 VH not I tK cwt-If3KATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 ` Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: P- A ID: NC01119 pH 10.01 Lot#:A9142 Exp. Date: May. 2020 :;ertification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 �,S/N: E09596 pH 13.00 Lot #: Exp. Date: ;In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ,OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C �: � ;ORRECTED PH SU: Id. q.-- 2 H R PH SU 2HR TEMP. °C ANALYST INITIAL 1t). q 41 "a . _ 15. iRECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL y1 / 2. 2 1 2,-L_ ! -ORRECTED PH SU: 2,1 - o.1 � t a 0 Post Calibration Verificatinn TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion 'Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. __e initial pH reading is taken after the lime is mixed with the 503 sludge. „e pH of this initial' reading has to be above .a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. cument changes in lot #'s. ^l z revised: 12/21/16 PH METER CALIBRATION FOR 503 LIME/SLUDGE SW-846-9040C .-'Town of Waynesville WWTP j566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: "'A ID: NC01119 pH 10.01 Lot MA9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09506 pH 13.00 Lot #: Exp. Date: ;In Lab Checked with Traceable Thermometer Serial M180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE% TIME PH�e 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL gAEF�F/y. q o�_ to, co 'C 3, 0, 20- 5 C -OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL SU INITIAL TEMP. oC %`/ ,ZC: c� B `n IJ BI �/x `ei I �i I �'� •� ppPH A l ` r ;ORRECTED PH SU: 2 HR PrrHSU 2 HR TEMP'. °C ANALYST INITIAL 1�vC•� i�Yd` � C`�. ,ERECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL Id-61 dod C_ e. s . ORRECTED PH SU: � , 4 A ®;. i S�: (9.) S� Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C ",d readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .3tual pH = Measured pH +/- the correction Factor. — -le initial pH reading is taken after the lime is mixed with the 503 sludge. ­e pH of this initial reading has to be.above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. Id pH of the final reading (24 hours latter) has to be above a pH of 11.5. .ocument changes in lot #'s. revised: 12/21/16 rr7 not I the GALIESKATION FOR 503 LIME/SLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail 'Waynesville, NC 28785 -7-qA ID: NC01119 certification #: 194 'nsirument ID: ORION DualStar pH/ISE Benchtop 3/N: E09596 n Lab quipment Maintenance: pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 pr-I I J.UU Lot #: Exp. Date: _ Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. oC OF I SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL ii=,�l �.c�� io.0 ai•I"C 13.0o V040c ps. �OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC fS. /P.(V lq,�Oc RECTED PH SU: IQ.(o - 0 ,1 z 1,,? -q( 2 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL fas. �I.LIAC P.s .iRECTED PH SU: 24 H R PH SU 24 H R TEMP. oC ANALYST INITIAL /2,3 10.1 1 d ps, -ORRECTED PH SU: / 2.3 ­0 I s-= Q, /6-- Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C /®'ao I ?S. 10,( -91-g0� I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. -1e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. Second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. a pH of the final reading (24 hours latter) has to be above a pH of 11.5. -..current changes in lot #'s. revised: 12/21/16 awl V - L.- %, %­ Qj<mi jury rUK OU3 LIMt1bL000t t SW-846-9040C ,,,_,)Town of Waynesville WWTP 1566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: 7-"4A ID: NC01119 pH 10.01 Lot MA9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 In Lab pH 13.00 Lot #: . Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 1.0.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 4 ('9;6� 11,V 1.60 2;z3®L 10•0 I. C 93.06 1 2o-7 "C ps, ;OLLECT DATE COLLECT TIME ANALYSIS E ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC �ss) �nD'Af�T� ;ORRECTED PH SU: %)*0e/9 - 0.,Z2 2 HR PH SU 2 HR. TEMP. oC ANALYST INITIAL Ia.3 a6.1"( Ps- iRECTED PH SU 12,3-0.1.1; jab (j 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL (f,l a0.0ac _ORRECTED PH SU: I I•'9"0a (5�� 19.6 5- Post Calibrntinn Varifinntinn TIME INITIAL Ph 10 SU Temp. °C /6; P( t 5_ 10,1 ad -91c i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ..irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. rie initial pH reading is taken after the lime is mixed with the 503 sludge. ..,e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ,d pH of the final reading (24 hours latter) has to be above a pH of 11.5. )current changes in lot #'s. revised: 12/21 /16 r'n MCI cK t ALMSKAI IUN FOR 503 LIME/SLUDGE Town of Waynesville WWTP SW-846-9040C 566 W alnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: 'A ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 202..0 certification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 S/N: E09596 Exp., Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. °C OF PH 10.0 SU CAL BUFFER TEMP. °C OF PH 13.0 SU DATES� TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL OIL 2(. oC 10.-o d_0.G"C �OLLECT DATE COLLECT TIME ANALYSIS DATEg ANALYSIS TIME ANALYST INITIAL INITIAL P%Hj SU INITIAL TEMP. °C � � 1 ,ORRECTED PH SU: 2 HR PH SU 2HR TEMP. °C ANALYST INITIAL 12 .ERECTED PH SU: Q. (� 0, 12 = (2.4(�/ 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL —ORRECTED PH SU: (off . -)�' ® 0 , f 5-- = f�' �0 Post Calibration \/arifi(-.atinn TIME INITIAL Ph 10 SU Temp. °C or 3 � i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. _. e initial pH reading is taken after the lime is mixed with the 503 sludge. -?—PH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )cument changes in lot #'s. revised: 12/21/16 rn Mr-1 crc t ALIUKAI IUN FOR 503 LIMEISLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot#: Ex Date: �A ID: NC01119 p' pH 10.01 Lot MA9142 Exp. Date: May. 20?..0 certification #: 194 pH 10.01 Lot #: Ex Date: Instrument ID: ORION DualStar H/ISE Benchto P• P p pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: DATE TIME 4EFF.PH CAL. FFER 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL 4.6� ,00 �C /O•C) d0. /3.00 20, T. ]OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C 61jig 6 W'6-? e, �. /,?, � 17.qlc, ;ORRECTED PH SU: IV. y3 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL la, -I I'I.VC ? Z,. iRECTED PH SU: �' �• 7 -� , (5� 0 a i� 24 HR 24 HR ANALYST Hy SU P, TEMP. °C INITIAL �3 -ORRECTED PH SU: Dd2sq-6,rr, 13, g-- Post Calibratinn Varifiratinn TIME INITIAL Ph 10 SU Temp. °C 10) U P.15 , /®• �0.019 i readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. T',ie initial pH reading is taken after the lime is mixed with the 503 sludge. ,,e pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. id pH of the final reading (24 hours latter) has to be above a pH of 11.5. ncument changes in lot #'s. revised: 12/21 /16 SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Naynesville, NC 28785 pH 7.00 Lot #: Exp. Date: =AA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 20?0 certification #: 194 pH 10.01 Lot #: Exp. Date; -ristrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 '/N: E09596 pH 13.00 Lot #: Exp. Date: n Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 ~quipment Maintenance: E CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME FF. PH 7.0 SU BgU/1FFER PHJ1uy0,.o SU B��/jUFFER(p P HSU BU�(JFFER INITIAL 6lE� v'l V13.0 g/� ,OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL P�Hj SU TEMP. °Cv ORRECTED PH SU: 11-7 - 0=fry fg- 2 HR PH SU ORRECTED PH SU: 11-7 - 0=fry fg- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ERECTED PH SU:y Q--7 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL ��. 26=a°C, f. 5. -ORRECTED PH SU: 12-5-,,a , I - - 0, 3s-- Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C 04 C -.-I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion llculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. --le initial pH reading is taken after the lime is mixed with the 503 sludge. ne pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. Ile pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot #Is. revised_ 12121116 rn Mmi Mm l ,KL-10KAI1LJN 1-UK JU:3 LIMWSLUDGE SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: %-OA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 20?..0 certification #: 194 pH 10.01 Lot #: Exp. Date: Instrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INI HAL COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. OC �['D-'I i 6s5--� qmhq 7;(90 P,5• � . /y- d/1,(- :ORRECTED PH SU:42,'®e fgs j/ 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ,ERECTED PH SU: , /). 5e 24 HR PH U 24 HR TEMP. °C ANALYST INITIAL pS' l0 /2. 20.,3(— Ci t_. . ..ORRECTED PH SU: /?. C —0. (� = M L 6- Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C rv:oy e's. to.( ;OoGo(- --1 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units'` (Temp. Measured - 25 Centigrade). .:;tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. 7e,pH of this initial reading has to be above a pH of 12. ,econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. Id pH of the final reading (24 hours latter) has to be above a pH of 11.5. Dcument changes in lot #'s. revised: 12/21 /16 ...r . v.... "url /uLU UL7C Town of Waynesville WWTP SW-846-9040C 566 W alnut Trall Waynesville, NC 28785 pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 I-2A ID: NC01119 pH 7.00 Lot #: pH 10.01 Lot #:A9142 Exp. Date: Exp. Date: May- 20?..0 certification #: 194 pH 10.01 Lot #: Exp. Date: Insl:rument ID: ORION DualStar PHASE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 n Lab pH 13.00 Lot #: Exp. Date: Checked equipment Maintenance: with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. oC OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. oC OF PH 13.0 SU BUFFER INITIAL •'sal too, Q �a ©. t 3.D0 0.0 i ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ?136))111 `?: 0V Od fi b 1.2 97— 12,6 l L 9� ORRECTED PH SU: 12,6 0. (6- Q S,9 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 2, l Ju.,. ( C I� iRECTED PH SU: 12 ' % - � i _ Q, 5 �� 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL 1�•5- �®•;'Ic- .f C, CRRECTED PH SU: /Q• - a r5 = d a.-35— Post Calibration Verifirntinn INdITIAL Ph 10 SU Temp. °C (TIME �, I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. )rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. e initial pH reading is taken after the lime is mixed with the 503 sludge. P_pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. ­)cument changes in lot #'s. revised: 12/21/16 11 "nL- I L-M �-.tAL-ID CKJ JUN 1-UK bU3 LIME/SLUDGE Town of Waynesville WWTP SW-846-9040C 566 W alnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: A ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: M_ ay. 20?..0 certification #: 194 pH 10.01 Lot #: Exp. Date: Insirument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 10/212623 '=quipment Maintenance: TIME SLOPE CAL. BUFFER PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SLI TEMP. oC OF PH 10.0 SU BUFFER CAL TEMP. oC OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL (DATE l ? r u I:00 �EFp�F. -1 Ga 7-0f3 4 3 dc-I Mo IXVC / 7- 00 .0i ? " C ?+ S . ;OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C i�s t ?:05' g t T11 e�S. /? ��/L(PC ORRECTED PH SU: /;-/-%-,D, /n. /2,42 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL ,ERECTED PH SU: _ IQ.(, - (nja w B).. L/ 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL s /�'Vc- j`' S. -ORRECTED PH SU: 1- f - 0 • 9 s f . 71 Post Calibration Varifiratinn TIME INITIAL Ph 10 SU Temp. °C /0""b I P'S. 1 10. t )0.elcC . I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -,rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. — e initial pH reading is taken after the lime is mixed with the 503 sludge. e pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. u pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot Xs. revised: 12/21/16 ••�. v��unr�I wltl rVM Z)U.S LIIVIC/SLUUGL SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: F-�A ID: NC01119 pH 10.01 Lot #:A9142 Ex Date: May. 20?.0 certification #: 194 p' --- - pH 10.01 Lot #: Exp. Date: Insrrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180 110124. Cal Due Date:1012/2023 Equipment Maintenance: DATE TIME TEFF.PH AL. FER .0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH10.0SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL S7 ®c /0 a 0 r 9, ®� 3 ,00 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C qtj !l 1 -7 X0 �l�i I i s®G p.5 . 9. (o /1?. /"C- :ORRECTED PH SU: l�• 6 _ 6110 t p al I 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL iRECTED PH SU: IQ. G -0 o 1 -- 24 HR PH SU 24 HR TEpMP.e°C ANALYST INITIAL _ORRECTED PH SU: �� • �. ;i i : Post Calibration Verifiratinn TIME INITIAL Ph 10 SU Temp. °C todI'(L' P'S'. I0.1fill/ ®� I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. - ie initial pH reading is taken after the lime is mixed with the 503 sludge. ,tepH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading .has to be above a pH of 12. ,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. -)cument changes in lot #'s. revised: 12/21/16 Town of Waynesville WWTP SW-846-9040C 566 W alnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: POP, ID: NC01119 pH 10.01 Lot#:A9142 Ex Date: Ma 02..0 CpH 10.01 Lot #:ertification #: 194 p. --Exp. Date: 1--Lrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 10/2/2023 Equipment Maintenance: DATE TIME SLOPE EFF. CAL. BUFFER PH 7.0 SU TEMP. oC OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL 'OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC "ORRECTED PH SU: 11 `6 -0.21 = 113 1 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 9-2� 11Q7"C f, P :5- RECTED PH SU: Ill. (0 — 0° f A). �(r 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL LQ,r 106,. S-® p, s-. CRRECTED PH SU: 0. �5-- 0a 9 V d 10.7.2 Post Calibration VPrifiratinn TIME INITIAL Ph 10 SU Temp. °C I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. irrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). :tual pH = Measured pH +/- the correction Factor. " e initial pH reading is taken after the lime is mixed with the 503 sludge. .�_e.pH of this initial reading has to be above a pH of 12. -�cond pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21/16 • •- a a_n I RJN rUK bU3 LIME/SLUDGE Town of Waynesville WWTP S W-846-9040C 566 IA/al t T 1 nu ral pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: ':-:'A ID: NC01119 Exp. Date: pH 10.01 Lot #:A9142 Exp. Date: May.202 0 certification #: 194 pH 10.01 Lot #: _arument ID: ORION DualStar H/ISE Benchto Exp. Date: P p pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 ')/N: E09506 pH 13.00 Lot #: n Lab Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 10/2/2023 equipment Maintenance: DATE TIME CAL. SLOPE BUFFER EFF. PH 7.0 SU TEMP. °C OF PH 7.0 SU BUFFER QC BUFFER PH 10.0 SU TEMP. °C OF PH 10.0 SU BUFFER CAL BUFFER PH 13.0 SU TEMP. °C OF PH 13.0 SU BUFFER INITIAL It tt, e�� �U�a �.®fi -1,0-70� 0.0 �.� d� 1J.SC• `� ��- OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C Ittlr a DRRECTED PH SU: _ 42- 6 - qg.,, of ,y Oa 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL RECTED PH SU: /I (-0, 11 ' = (q, t) ::2:4HR 24HR TEMP. °C ANALYST INITIAL �U l �r.�5- ®( �•�. .. )RRECTED PH SU: /13 2 Post Callhratinn Varificatinn TIME INITIAL Ph 10 SU Temp. °C 101,fs— P5a . I 10�k 14,vo — readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion __..�ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. Tection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). --ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. :_pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. ;ument changes in lot #'s. revised: 12/21/16 . ......,..v -ww uvl S W-846-9040 C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 P-QA ID: NC01119 pH 7.00 Lot #: Exp. Date: 3ertification #: 194 PH 10.01 Lot #:A9142 Exp. Date: May. 202..0 crument ID: ORION DualStar �H/ISE p pH 10.01 Lot #: Benchto p pH 13.00 Lot #:M28F009 Exp. Date: S/N: E09596 pH 13.00 Lot #: Exp. Date:OCT. 2021 In Lab Equipment Maintenance: Exp. Date: Checked with Traceable Thermometer Serial #18 0410124 Cal Due Date: 10/2/2023 CAL. SLOPE BUFFER DATE TIME EFF. PH 7.0 SU TEMP. "C OF QC TEMP. °C OF PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 10.0 SU BUFFER 9e C- ,/OL CAL TEMP. ' C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC 91fG I �,®q 9 �:0�' f,S' /� A6,7'f ',ORRECTED PH SU: Off . (a •- 0, a y 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL P.S. .RECTED PH SU: �Q.qg 24 HR PH S�Uy 24 HR TEMP. °C ANALYST INITIAL ORRECTED PH SU: Id<g 6, g.I -- uj I Post Calibrntinn Varifiratinn TIME INITIAL Ph 10 SU Temp. °C 1.1 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. -orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pH = Measured pH +/- the correction Factor. -. ie initial pH reading is taken after the lime is mixed with the 503 sludge. +I;.pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. ,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. icument changes in lot #'s. revised: 12/21/16 S W-846-9040C Town of Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 FDA ID: NC01119 pH 7.00 Lot #: Exp. Date: certification #: 194 PH 10.01 Lot #:A9142 Exp. Date: 2..0 May. 20 pH 10.01 Lot #: rument ID: ORION DualStar H/ISE Benchto P p pH 13.00 Lot #:M28F009 Exp. Date: S/N: E09596 Exp. Date:OCT. 2021 In Lab pH 13.00 Lot #: Checked with Traceable Thermometer Serial #:180410124 Cal Exp. Date: Equipment Maintenance: Due Date: 10/2/2023 SLOPE DATEp TIME EFF. CAL. TEMP. °C OF QC BUFFER PH 7.0 SU BUFFER PH 7.0 SU BUFFER PH 10.0 SU -7.,16 1 1 ?a del to. TEMP. "C OF PH 10.0 SU BUFFER MVC CAL TEMP. °C OF BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL ,OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C ORRECTED PH SU: ( .i d : aA - (a.q(o 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL RECTED PH SU: (0 -0, 15= /Q.q_e" 24 HR PqH SU 24 HR TEMP. °C ANALYST INITIAL Id. ,�+ d '�• �' DRRECTED PH SU: /a.Z/®oe 1 ?> i�-Z Post Calibration Varifiratinn TIME INITIALIN'/� ITIAL Ph SU Temp. °C topag! - id �- [ 10.0 ///99�10 '( qo readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion culation may be used to correct the pH reading to the standard temperature of 25 centigrade. —..rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). tual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. „a.pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. u pH of the final reading (24 hours latter) has to be above a pH of 11.5. cument changes in lot #'s. revised: 12/21/16 t-Hi-IOMIAI 1UN t-UH 503 LIME/SLUDGE S W-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Waynesville, NC 28785 Exp. Date:JUNE. 2021 pH 7.00 Lot #: Exp. Date: °AID: NC01119 Certification #: 194 pH 10.01 Lot #:A9142 Exp. Date: May. 202.0 pH 10.01 Lot #: _.rument ID: ORION DualStar pH/ISE Benchtop Exp. Date: S/N: E09596 pH 13.00 Lot #:M28F009 Exp. Date:OCT. 202? In Lab pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #. Equipment Maintenance: 180410124 Cal Due Date:10/2/2023 CAL. SLOPE BUFFER TEMP. °C OF PH 7.0 SU QC BUFFER TEMP. °C'OF PH 10.0 SU CAL TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER BUFFER PH 13.0 SU PH 13.0 SU BUFFER INITIAL ld®Q Too as 30C /0, 0 EMCT ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C � l �� i.,,01 P.S, / Ii 1?.ct',c- ORRECTED PH SU: /,9, %- ®. a41 d f, q6 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 1Ai f V.& L '; i -RECTED PH SU: I��. % _ a /g /Q.t5-2 HR 24 HR ANALYST SU TEMP. °C FPH INITIAL .0 -JRRECTED PH SU: Post Calihratinn VarifV-n i- TIME INITIAL Ph 10 SU Temp. °C readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ;ulation may be used to correct the pH reading to the standard temperature of 25 centigrade. 'rection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). , ual pH = Measured pH +/- the correction Factor. initial pH reading is taken after the lime is mixed with the 503 sludge. ;pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. :ument changes in lot #'s. revised:12/21/16 To f SW-846-9040C wn o Waynesville WWTP 566 Walnut Trail Waynesville, NC 28785 pH 7.00 Lot #:A9155 Exp. Date:JUN_ E. 2021 �"A ID: NC01119 PH 7.00 Lot #: Exp. Date: Certification #: 194 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 .-,rument ID: ORION DualStar S/N: E09596 pH/ISE Benchtop pH 10.01 Lot #: PH 13.00 Lot #:M28F009 Exp. Date: In Lab pH 13.00 Lot #: Exp. Date:OCT. 2021 Equipment Maintenance:10/2/2023 Exp. Date; Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: Date. SLOPE CAL. BUFFER TEMP. °C OF PH 7.0 SU QC TEMP. °C OF BUFFER PH 10.0 SU CAL TEMP. °C OF DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER BUFFER PH 13.0 SU PH 13.0 SU 0 1g r�� Y-7 �.00 BUFFER INITIAL 9o,t®� COLLECT COLLECT DATE TIME ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME INITIAL PH SU TEMP. oC 7 M-0 I q s. CORRECTED PH SU: 2 H R 2 H R ANALYST PH SU TEMP. °C INITIAL �oI D -RECTED PH SU: ��% 67- 0, E am ORRECTED PH SU: 113 -da I Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C 10' e,S. A.0 dO.'76C hf. Y I l , J ci I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion dculation may be used to correct the pH reading to the standard temperature of 25 centigrade. rrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). lual pH = Measured pH +/- the correction Factor. -a initial pH reading is taken after the lime is mixed with the 503 sludge. �pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. pH of the final reading (24 hours latter) has to be above a pH of 11.5. Cument changes in lot #'s. revised:12/21/16 r 1 IV1G 1 CR lrHL10ICHl IVIV rum DU3 L11VIt/JLUUht SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot#: Exp. Date: F"A ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: ,rument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 12.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL b3/ Ic"1,4 q%0 �� �1,-70 10,E -0,9"C � a COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ,ORRECTED PH SU: 2 HR PH 2 HR TEMP. °C ANALYST INITIAL pr�SU RECTED PH SU: KP.ti a -- `« =t .�- 119d-'- 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL CORRECTED PH SU: llo —Q. �i � //, cn Post Calibration VPrifiratinn TIME INITIAL Ph 10 SU Temp. °C W 3 f .. 5. Wo 4C20 I'D (_ -H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. "orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,ctual pH = Measured pH +/- the correction Factor. he initial pH reading is taken after the lime is mixed with the 503 sludge. ',bp pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. I,u pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot #'s. revised:12/21/16 rn MCI MM l.AL10MAI1UN t'UK bU3 LIMt1JLUUht SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2621 Waynesville, NC 28785 pH 7.00 Lot#: Exp. Date: �:"A ID: NC01119 pH 10.01 Lot#:A9142 Exp. Date: May. 2029 Certification #: 194 pH 10.01 Lot #: Exp. Date: Lrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M2817009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date. In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL '4 7' -) r m,, 7.0o 21,16C /0 o 0 �70- (,`C- 155,60 �? . 3 C Iq S . COLLECT DATE/ COLLECT TIME ANALYSIS DATES ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC CORRECTED PH SU: ./q, , - 0,1g, a / g8 F)�- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL /R-3 19 , w, 6C ?.5 , RECTED PH SU: tQj. - 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL 2. 1 /9, 301/ 'Ps. CORRECTED PH SU: 04 " t 19 - I/, I) - Post Calibration Verificatinn TIME INITIAL Ph 10 SU Temp. °C ,H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. `;orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _ctual pH = Measured pH +/- the correction Factor. 'he initial pH reading is taken after the lime is mixed with the 503 sludge. by pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. „e pH of the final reading (24 hours latter) has to be above a pH of 11.5. locument changes in lot #'s. revised:12/21/16 -11-+ -1vlm 1-VR JuJ LIIVIG0LUUl7C SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: P"A ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: 1. -Lrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot#:M28F009 Exp. Date:OCT. 2021 S/N: E00596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL (a 7,0- Ato 19 C COLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC t `,-!3 t'] a(o ,ORRECTED PH SU: o' ie, % !. 2 H R PH SU 2HR TEMP. °C ANALYST INITIAL RECTED PH SU: id 0, -• 0 1 (d _f S- 24 H R PH SU 24 H R TEMP.'C ANALYST INITIAL .:ORRECTED PH SU: 1 a..0 -- I9 7 A G'2 Post Calibration Verificatinn Ph Temp. TIME INITIAL 10 SU °C ev- -?5. -I readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ilculation may be used to correct the pH reading to the standard temperature of 25 centigrade. `correction factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .actual pH = Measured pH +/- the correction Factor. he initial pH reading is taken after the lime is mixed with the 503 sludge. 'he pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. lid pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot #'s. revised:12/21/16 -ivu �� �.r�uu[�rir rvry r LJM OU3 LIIVIC/JL000r— SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot#: Exp. Date: f::'A ID: NC01119 pH 10.01 Lot#:A9142 Exp. Date: May. 202n certification #: 194 pH 10.01 Lot #: Exp. Date: _,rument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28Fo09 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date: 1 0/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL COLLECT DATE,y COLLECT TIME ANALYSIS DAgTEp ANALYSIS TIME ANALYST INITIAL INITIAL SU INITIAL TEMP. °C y^ eePH tl �ORRECTED PH SU: �2� 12,q�5- 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL dam" y- )9adar- P. 5. RECTED PH SU: I l .5- 01 15- ':� / ), 31' 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL /"j,q Md" P-!�, CORRECTED PH SU: Post Calihmtinn \/arifiratinn TIME INITIAL Ph 10 SU Temp. °C /02($ ;?C 9G'j 10,1,'D(' e taken at to 25 centigrade. At other than 25 ce culationgmay beb used to correct the pHdread reading to the sta dad temperature of 25 centig adentigrade, a conversion orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). _ctual pH = Measured pH +/- the correction Factor. he initial pH reading is taken after the lime is mixed with the 503 sludge. -hp pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. 1z pH of the final reading (24 hours [after) has to be above a pH of 11.5. locument changes in lot #'s. revised:12/21/16 1V1V f VEC JUJ LIIVI1Z/0LUUL7= SW-846-9040C Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot#:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot#: Exp. Date: F-"A ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 certification #: 194 pH 10.01 Lot #: Exp. Date: _,rument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 SIN: E09596 pH 13.00 Lot #: Exp. Date: _ In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL Q{ y ® -I�G.P °®�% �F(j/� VtiG•7 �� Q� (� CIO, aC d��j �i� /J o(i'0 n 6t_ P COLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC 9/pok � log fS, A4G I0,$"c -ORRECTED PH SU: ,� t I� / ,1� 2 HR PHSUTEMP. 2 HR °C ANALYST INITIAL RECTED PH SU: ;2 —,) -D, pC'' b U-)oqs`- 24 HR PH SU 24 HR TEMP. oC ANALYST INITIAL CORRECTED PH SU: /.�•'V- 0,f T % IaeV_,� Post Calibration Vprifinatinn TIME INITIAL Ph 10 SU Temp. °C Wto 1 95. 10 �0 ,10� IH readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion calculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ,orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). actual pH = Measured pH +/- the correction Factor. 'he initial pH reading is taken after the lime is mixed with the 503 sludge. _ttP.pH of this initial reading has to be above a pH of 12. econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. .,e pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised:12/21/16 SW-846-9040C_-'-.-._----- Town of Waynesville WWTP 566 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 Waynesville, NC 28785 pH 7.00 Lot #: Exp. Date: ':_0A ID: NCO1119 pH 10.01 Lot#:A9142 Exp. Date: May. 20?..0 Certification #: 194 pH 10.01 Lot #: Exp. Date: _=rument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 S/N: E09596 pH 13.00 Lot #: Exp. Date: In Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 Equipment Maintenance: CAL. TEMP. °C OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 3.0 SU BUFFER INITIAL /-0Gi ®.o >a�. �Q.Q jc /1f / .60 j9:'7 % a COLLECT COLLECT TIMp�E"l.�] ANALYSIS ANALYSIS TIME��+y' ANALYST INITIAL INITIAL H� SU INITIAL TEMP. oC �jDATE- �D+AgTEJ QP,• /t:K < �f ! , � ac CORRECTED PH SU: Id (-0P T'�; -9. zff 2 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL 19. ? "L P, 5, RECTED PH SU: 11 (0 -0. ld, eta - 24 H R PH SU 24 H R TEMP. °C ANALYST INITIAL ,ORRECTED PH SU: / ,� fi a/�; � _� Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C A)1/1 1 A - 1 16,1 1 /9= cp ,)H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ;orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). actual pH = Measured pH +/- the correction Factor. -he initial pH reading is taken after the lime is mixed with the 503 sludge. ,'he pH of this initial reading has to be above a pH of 12. ^ econd pH reading is taken 2 hours after the initial reading. pH of this second reading has to be above a pH of 12. I'd pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised:12/21/16 SW-846-9040C )wn of Waynesville WWTP i6 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 -aynesville, NC 28785 pH 7.00 Lot #: Exp. Date: ?AID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 ertification #: 194 pH 10.01 Lot #: Exp. Date: —3trument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot#:M28F009 Exp. Date:OCT. 2021 N: E09596 pH 13.00 Lot #: Exp. Date: Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 luipment Maintenance: CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL % y� f 2 0 cJ t /i OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C 14 '7• W `d ORRECTED PH SU: (q, (0 -a a , K :: 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL ' , �,,<RECTED PH SU: ll cl - o , (61d 24 HR 24 HR ANALYST PH SU TEMP. oC INITIAL _ORRECTED PH SU: 113 T0. t5's /9-Is- Pnst Cnlihration Verification TIME INITIAL Ph 10 SU Temp. °C W t cl 9.5, I to. � �'to I(,, "C H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion )Iculation may be used to correct the pH reading to the standard temperature of 25 centigrade. orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ctual pH = Measured pH +/- the correction Factor. he initial pH reading is taken after the lime is mixed with the 503 sludge. he pH of this initial reading has to be above a pH of 12. —b-q. second pH reading is taken 2 hours after the initial reading. dH of this second reading has to be above a pH of 12. he pH of the final reading (24 hours latter) has to be above a pH of 11.5. ►ocument changes in lot #'s. revised: 12/21 /16 • , • • �•` ..• SW-846-9040C own of Waynesville WWTP 36 Walnut Trail -laynesville, NC 28785 -P.A ID: INC01119 pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 ertification #: 194 pH 10.01 Lot #: Exp. Date: '-istrument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 /N: E09596 pH 13.00 Lot M Exp. Date: i Lab �quipment Maintenance: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL :OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C to N/7 f. -�' - I -) - (' ORRECTED PH SU:-•�`� %• 2 HR 2 HR ANALYST PH SU TEMP. oC INITIAL i 1.5- d0.2°C e, 5. ` ,u.<RECTED PH SU: 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL _;ORRECTED PH SU: �•� " ��� /�~i Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C iH readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion ;alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ;orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). kctual pH = Measured pH +/- the correction Factor. ,-he initial pH reading is taken after the lime is mixed with the 503 sludge. "he pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. �H of this second reading has to be above a pH of 12. "he pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised: 12/21/16 SW-846-9040C awn of Waynesville WWTP -36 Walnut Trail �Jaynesville, NC 28785 PA, ID: NC01119 artification #: 194 ^strument ID: ORION DualStar pH/ISE Benchtop _!N: E09596 Lab equipment Maintenance: pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 pH 13.00 Lot #: Exp. Date: Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 101do I . ri 9 o A "q/, 0 " c /6.o '40, V"6 1 / 9 OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C /fit J-2 1 1 "-1 , ORRECTED PH SU: P" - y 2 HR 2 HR ANALYST PH SU TEMP. oC INITIAL )24 20 `C_ P.; . u,,RECTED PH SU: 24 HR PHSU 24 HR TEMP. oC ANALYST INITIAL pa J1.5 '! vij 1c �.S, CORRECTED PH SU: d �0 S Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion 31culation may be used to correct the pH reading to the standard temperature of 25 centigrade. :orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,ctual pH = Measured pH +/- the correction Factor. 'he initial pH reading is taken after the lime is mixed with the 503 sludge. he pH cf this initial reading has to be above a pH of 12. 'he second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. 'he pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised: 12/21 /16 SW-846-9040C awn of Waynesville WWTP - 36 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 .daynesville, NC 28785 pH 7.00 Lot #: Exp. Date: P-A_ ID: NCO1119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 ertification #: 194 pH 10.01 Lot #: Exp. Date: ­nsirument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 _IN: E09596 pH 13.00 Lot #: Exp. Date: i Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 —quipment Maintenance: CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL .. To�',. qIli, ? -7,00 �0.7 �c VO -� aQ•2 ©C- /300 do,/ gC_ P�<.. ,OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. °C /O 1 h1 -I 0`? f S, I P A l ,� A( ORRECTED PH SU: e� �• "l� G� t i a I 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL u,,RECTED PH SU: 1,2,. , — 0.1 �,A z ia, I "d 24 HR 24 HR ANALYST PH SU TEMP. °C INITIAL 1)o ;?0,e C- P.. 5. ;ORRECTED PH SU: oo }, �� �'= M Pnct C alihratinn VPrifiratinn Ph Temp. TIME INITIAL 10 SU °C 10�P•I- e.g. I 9o, 1 1 (10,6A. H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ,orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). Lctual pH = Measured pH +/- the correction Factor. .'he initial pH reading is taken after the lime is mixed with the 503 sludge. the pH of this initial reading has to be above a pH of 12. `bp_second pH reading is taken 2 hours after the initial reading. .)H of this second reading has to be above a pH of 12. 'he pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised: 12/21/16 i SW-846-9040C )wn of Waynesville WWTP - )6 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 aynesville, NC 28785 pH 7.00 Lot #: Exp. Date: _ P_A.ID: NCO1119 pH 10.01 Lot MA9142 Exp. Date: May. 2020 artification #: 194 pH 10.01 Lot #: Exp. Date: ^strument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 _.'N: E09596 pH 13.00 Lot #: Exp. Date: Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 -quipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL /A OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. °C /b 7R I°.V f S, o).S'- /g'S-0C. DRRECTED PH SU: is::- ;'9 3.zt 2 HR PH SU 2 HR TEMP. oC ANALYST INITIAL cRECTED PH SU: 0 24 HR 24 HR ANALYST PH SU TEMP.'C INITIAL J9. 9 I et, 6-,Ic ORRECTED PH SU: � �U -9 i VS � 110 T- Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C -1 readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion Ilculatior. . may be used to correct the pH reading to the standard temperature of 25 centigrade. Drrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). �tual pH = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. ie pH of this initial reading has to be above a pH of 12. -')---second pH reading is taken 2 hours after the initial reading. .H of this second reading has to be above a pH of 12. ie pH of the final reading (24 hours latter) has to be above a pH of 11.5. ocument changes in lot #'s. revised: 12/21 /16 d6 SW-846-9040C -)wn of Waynesville WWTP `i6 Walnut Trail aynesville, NC 28785 PA ID: NC01119 ertification #: 194 strument ID: ORION DualStar pH/ISE Benchtop pH 7.00 Lot #:A9155 pH 7.00 Lot #: pH 10.01 Lot #:A9142 pH 10.01 Lot #: pH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp. Date: Exp. Date:OCT. 2021 —,'N: E09596 pH 13.00 Lot #: Exp. Date: _ — Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 juipment Maintenance: CAL. TEMP. oC OF QC TEMP. °C OF CAL TEMP. oC OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL 0/l?llq 6' "0 9�13 1 0` —,)(XC 1e.0 d1.0't 1�-.06 P?d. 9 Esc, P-5. OLLECT COLLECT ANALYSIS ANALYSIS ANALYST INITIAL INITIAL DATE TIME DATE TIME INITIAL PH SU TEMP. oC ORRECTED PH SU: 1,13 n, o,`) = Q, 01 2 HR 2 HR ANALYST PH SU TEMP. oC INITIAL la•q jo.(, ?., . "l„<REC-i ED PH SU: /,?. 4 — 0.1A- = I" 24 HR 24 HR ANALYST PH SU TEMP. oC INITIAL _ORRECTED PH SU: ,I 1I.0A Post Calibration Verification Ph Temp. TIME INITIAL 10 SU °C 10 a' P 16.E 20,< 0 1 H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. .orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,ctual pH = Measured pH +/- the correction Factor. .'he initial pH reading is taken after the lime is mixed with the 503 sludge. 'he pH of this initial reading has to be above a pH of 12. 'h second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. *he pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised: 12/21/16 SW-846-9040C own of Waynesville WWTP ;i6 Walnut Trail pH 7.00 Lot #:A9155 Exp. Date:JUNE. 2021 —(aynesviife, NC 28785 pH 7.00 Lot #: Exp. Date: PA ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 ertification #: 194 pH 10.01 Lot #: Exp. Date: `-strument ID: ORION DualStar pH/ISE Benchtop pH 13.00 Lot #:M28F009 Exp. Date:OCT. 2021 _,!N: E09596 pH 13.00 Lot #: Exp. Date: i Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 quipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLI BUFFER PH 13.0 SU BUFFER INITIAL o1fxl� I tl1� 0 7rfi . � �� s�WC 1 � �°.f?� r" :afi A OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC q. ORRECTED PH SU: 2 HR 2 HR ANALYST PH SU TEMP. °C INITIAL ..RECTED PH SU: Y1 a' _0 � I'' :: 12.. I I 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL /)" ""A 2-7,-�,,C- P,S- ;ORRECTED PH SU: /A ~•0•ao a il�q(� Pnct (:alihrntinn Verification Ph Temp. TIME INITIAL 10 SU °C 110"a H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. :orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ,ctual pH = Measured pH +/- the correction Factor. 'he initial pH reading is taken after the lime is mixed with the 503 sludge. 'he pH of this initial reading has to be above a pH of 12. The_ second pH reading is taken 2 hours after the initial reading. )H of this second reading has to be above a pH of 12. 'he pH of the final reading (24 hours latter) has to be above a pH of 11.5. )ocument changes in lot #'s. revised: 12/21 /16 5VV-d4b-9U4IJU mown of Waynesville WWTP �66 Walnut Trail pH 7.00 Lot MA9155 Exp. Date:JUNE. 2021 �`/aynesville, NC 28785 pH 7.00 Lot M Exp. Date: " ID: NC01119 pH 10.01 Lot #:A9142 Exp. Date: May. 2020 _. certification #: 194 pH 10.01 Lot #: Exp. Date: _istrument ID: ORION DualStar pH/ISE Benchtop pH 1.3.00 Lot #:M28F009 Exp. Date:OCT. 2021 IN: E09596 pH 13.00 Lot #: Exp. Date: '-i Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 —quipment Maintenance: CAL. TEMP. oC OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU BUFFER INITIAL (0 11,s -7.co ` ,00 1`c /0'a A1""� 13.o,3 -�OLLECT DAT,� COLLECT TIME ANALYSIS DATES� ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC fE "ORRECTED PH SU: 1 . sI` 0, -/ -Z I"). C1 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL d.t P. s. —0-RREC "+ ED PH SU: J 2- Gs — 0 -'21 � i p, ? 9 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL )")- I J1 Y60c, P", ORRECTED PH SU: `Y _ Post Calibration Verification TIME INITIAL Ph 10 SU Temp. °C "d readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. Drrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). ;tual pl-; = Measured pH +/- the correction Factor. ie initial pH reading is taken after the lime is mixed with the 503 sludge. `ie pH of this initial reading has to be above a pH of 12. second pH reading is taken 2 hours after the initial reading. _ pH of this second reading has to be above a pH of 12. "ie pH of the final reading (24 hours [after) has to be above a pH of 11.5. -ocument changes in lot #'s. revised: 12/21/16 SW-846-9040C )wn of Waynesville WWTP i6 Walnut Trail -`"aynesville, NC 28785 ID: NC01119 certification M 194 ...strument ID: ORION DualStar pH/ISE Benchtop PH 7.00 Lot #:A9155 PH 7.00 Lot #: PH 10.01 Lot #:A9142 PH 10.01 Lot #: PH 13.00 Lot #:M28F009 Exp. Date:JUNE. 2021 Exp. Date: Exp. Date: May. 2020 Exp: Date: Exp. Date:OCT. 2021 'N: E09596 pH 13.00 Lot M Exp. Date: _ Lab Checked with Traceable Thermometer Serial #:180410124 Cal Due Date:10/2/2023 -guipment Maintenance: CAL. TEMP. °C OF QC TEMP. oC OF CAL TEMP. °C OF SLOPE BUFFER PH 7.0 SU BUFFER PH 10.0 SU BUFFER PH 13.0 SU DATE TIME EFF. PH 7.0 SU BUFFER PH 10.0 SLl BUFFER PH 13.0 SU BUFFER INITIAL 'OLLECT DATE COLLECT TIME ANALYSIS DATE ANALYSIS TIME ANALYST INITIAL INITIAL PH SU INITIAL TEMP. oC ORRECTED PH SU: 1-9. � 0 , ) : 1 _4 2 2 HR PH SU 2 HR TEMP. °C ANALYST INITIAL QIJ 1t,71_ P,Sr -ORRECTED PH SU: /�,), -) D, )g z 01- d 24 HR PH SU 24 HR TEMP. °C ANALYST INITIAL `P- V' - ,f- y.`e. ORRECTED PH SU: i0�-5-- n,1 ® ) A ^ Post Calibration Verification Ph Temp. TIME INpI,TIAL 10 SU °C H readings must be taken at 25 centigrade, or corrected to 25 centigrade. At other than 25 centigrade, a conversion -alculation may be used to correct the pH reading to the standard temperature of 25 centigrade. ;orrection factor (CF) = 0.03 pH units * (Temp. Measured - 25 Centigrade). .,ctual pH = Measured pH +/- the correction Factor. 'he initial pH reading is taken after the lime is mixed with the 503 sludge. he pH of this initial reading has to be above a pH of 12. ►V second pH reading is taken 2 hours after the initial reading. ,)H of this second reading has to be above a pH of 12. 'he pH of the final reading (24 hours latter) has to be above a pH of 11.5. -)ocument changes in lot #'s. revised: 12/21 /16