Loading...
HomeMy WebLinkAbout20200018 Ver 1_WRC Post Contract IRT Site Visit (1-14-2020) Meeting Minutes_20200127Strickland, Bev From: Leslie, Andrea J Sent: Monday, January 27, 2020 9:08 AM To: Shawn Wilkerson; Tugwell, Todd J CIV USARMY CESAW (US); Wiesner, Paul; Haupt, Mac; Davis, Erin B; Kim Browning Cc: Ullman, Kirsten J; Tsomides, Harry; Haywood, Casey; Eric Neuhaus Subject: RE: [External] RE: Laurel Valley Site_DMS# 100140: Post Contract IRT Site Visit (1-14-2020) Meeting Minutes Thanks for the notes. Shawn, if you can place what you mentioned (the upper reach of UT1 Reach 2 should be considered for enhancement... to the big S curve downstream), that would be good. And I suggest using the terms 'right' and 'left' to mean river right and left... see note 14 in your summary. Otherwise, looks good. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Shawn Wilkerson <swilkerson@wildlandseng.com> Sent: Saturday, January 25, 2020 8:45 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Kim Browning <Kimberly.D.Browning@usace.army.mil> Cc: Ullman, Kirsten J <Kirsten.Ullman@NCDENR.gov>; Tsomides, Harry <harry.tsomides@ncdenr.gov>; Haywood, Casey <Casey.Haywood@ncdenr.gov>; Eric Neuhaus <eneuhaus@wildlandseng.com> Subject: [External] RE: Laurel Valley Site_DMS# 100140: Post Contract IRT Site Visit (1-14-2020) Meeting Minutes CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Todd The only change that the IRT discussed was on approximately 200 feetjust downstream of the driveway crossing going to enhancement (that I remember). Was there other things that I missed - I can't tell from your comment. Shawn -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Friday, January 24, 2020 2:36 PM To: Wiesner, Paul <paul.wiesner@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Cc: Ullman, Kirsten J <Kirsten.Ullman@NCDENR.gov>; Tsomides, Harry <harry.tsomides@ncdenr.gov>; Haywood, Casey <Casey.Haywood@ncdenr.gov>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Eric Neuhaus <eneuhaus@wildlandseng.com> Subject: RE: Laurel Valley Site_DMS# 100140: Post Contract IRT Site Visit (1-14-2020) Meeting Minutes Paul, the notes look good in general. Number 11 relates to the potential that the stream may drop out sediment in the floodplain and lose its bed and banks, and there is discussion about maintaining the channel, however, it needs to be noted that we would not want to see maintenance except possible in the first couple years of monitoring only. Also the discussion regarding some of the changes to the approaches we discussed, particularly on Reach 2 should note that what was originally proposed may not be acceptable, so if the changes cannot be made as we discussed, I think we would need to reassess the proposed ratios. Thanks, Todd -----Original Message ----- From: Wiesner, Paul [mailto:paul.wiesner@ncdenr.gov] Sent: Wednesday, January 22, 2020 2:03 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Cc: Wiesner, Paul <paul.wiesner@ncdenr.gov>; Ullman, Kirsten J <Kirsten.Ullman@NCDENR.gov>; Tsomides, Harry <harry.tsomides@ncdenr.gov>; Haywood, Casey <Casey.Haywood@ncdenr.gov>; Shawn Wilkerson <swiIkerson@wild landseng.com>; Eric Neuhaus <eneuhaus@wildlandseng.com> Subject: [Non-DoD Source] Laurel Valley Site_DMS# 100140: Post Contract IRT Site Visit (1-14-2020) Meeting Minutes of The meeting minutes from the January 14, 2020 IRT post contract site visit are attached for your review. Please let us know if you have any additional comments, questions or concerns. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile paul.wiesner@ncdenr.gov <mailto:paul.wiesner@ncdenr.gov> Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.