Loading...
HomeMy WebLinkAboutSWA000065_(4)Gardner Mini Storage Detail - 190912_1/27/20201/A A/r-C CLASS 1 of B' EROSION CONTROL STONE FRONT VIEW A B L - DJ44TANCE S ACH THAT L PIOIKS A and B ARE OF EOUAL ELEVATIONS CHECK DAM DETAIL 1. PLACE STONE TO 77-E LOVES AAD DIII EAGONS &TOWN ON THE PLAN ON A FILTER FASW FOLrVDA77ON 2 KEEP THE CENTER STOLE SEC7701V AT LEAST 9 7 S BELOW AA7LA4L G910U V WHEW THE DAM ABUTS 77-E C HAMVEL BAWS. 3 EXTEAD STU NE AT LEAST 15 FEET 6EYOAD THE DUTCH BANK TO KEEP WATER FROM CUT774G ARO(hVD 7HE ENDS OF THE ChEC1C DAM 4. SET SPACING BETWEEN DAMS TO ASSUW THAT 77-E ELEVA7701V AT 7HE TOP OF 77-E LOWER DAM /S 77E SAAE AS 7HE ELEVA7IQN OF THE TOE OF THE GPPFR DAM 5. PROTECT 77-E CHANIIEL AFTER 77-E LOWEST CSC DAM FROM ALEAVY FLOW THAT COLD CAUSE ER+OISM 6. MAKE SJfE THAT 7HE CHANNEL PEACH ABOVE THE A40ST L P57REAM DAM IS STABLE 7. ENSUE THAT 07HER AAE49 OF 7HE CHANNEL, SJCH AS CUL VERT ENTRANCES BELOW THE C ECKS DAM AfE NOT SJBJECT TO BLOCKAGE FROM DAR ACED STONES END FILTER HAKUWAKE END FILTER CLOTH HERE CLOTH NO CLOTH HERE 2FIL�FAB�2' STL. POST PVC END CAP \ PVC TEE PVC ELBOW PVC END CAP PVC PIPE 1/2" HOLES IN UNDERSIDE END VIEW TOP OF SILT FENCE TO BE AT LEAST 1' ABOVE TOP OF STONE WASHED STONE MIN 18" AND rFILTER FRB. MAX 24" IN _ / ON GND HEIGHT HARDWARE CLOTH / BURY WIRE FENCE, FILTER U & WIRE FENCE FABRIC & HARDWARE CLOTH IN ONLY FRONT VIEW TRENCH SECTION 06 Silt Fence Outlet NTS SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULUTUR4L LIMESTONE. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE * RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RE -SEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. ** REPAIR AND RE -FERTILIZE DAMAGED AREAS IMMEDIATELY. TOP -DRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVER SEED WITH 50 LB/ACRE OF KOBE IN LATE FEBRUARY OE EARLY MARCH. SOIL/SEED ED REP RA ION UID LIIV S 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3" DEEP OVER ADVERSE SOIL 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH J. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACE SMOOTH AND UNIFORM 4. APPLY AGRICULTURAL LIME, ,FERTILIZER AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW-) 5. CONTINUE TILLAGE UNTIL WELL PULVERIZED, FIRM AND REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 61NCHES DEEP 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR R£SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF GRANDSTAND SHOULD BE OVER 60Z DAMAGED, RE-ESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED 10. PH SHALL BE BETWEEN 6.0-6.5 PREFERABLY * APPLY THE FOLLOWING AS A PART OF PERMANENT SEEDING OPERATION 1. AGRICULTURAL LIMESTONE AT A RATE OF 2 TONS/ACRE 2. FERTILIZER 10-10-10 ANALYSIS AT 800-1000 LB/ACRE J. SUPER PHOSPHATE AT 500 LB/ACRE OF 2OZ ANALYSIS SUPER PHOSPHATE 4. MULCH AT RATE OF 2 TONS (APPROXIMATELY 80 BALES) OF SMALL GRAIN STRAW/ACRE 5. ANCHOR OR TACK WITH LIQUID ASPHALT AT A RATE OF 400 GAL/ACRE OR EMULSIFIED ASPHALT AT 300 GAL/ACRE (REFER TO THE EROSION AND SEDIMENTATION CONTROL DESIGN MANUAL PAGES 6.11. (3, 4 AND 5)\ WATER SURFACE SCHEDULE 40 PVC PIPE FLEXIBLE HOSE ARM ASSEMBLY PERSPECTIVE VIEW NOTE: SKIMMER TO BE TETHERED PERMANENT SEEDING SCHEDULE SHOULDERS, SIDE DITCHES, SLOPES MAX. J.-1) SEEDING DATES SPECIES RATE AUGUST 15-NOV 1 TALL FESCUE 300 LB/ACRE NOV 1-MARCH 1 TALL FESCUE AND 50 LB/ACRE MARCH 1-APRIL 15 TALL FESCUE 300 LB/ACRE APRIL 15-JUNE 30 HULLED COMMON BERMUDAGRASS 25 LB/ACRE JULY 1-AUGUST 15 TALL FESCUE 120 LB/ACRE JULY 1-AUGUST 15 BROWN TOP BILLET 35 LB/ACRE SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2: 1) SEEDING DATES SPECIES RATE MARCH 1-JUNE 1 SERICEA LESPEDEZA AND 50 LB/ACRE MARCH 1-APRIL 15 SCARIFY AND ADD TALL FESCUE 120 LB/ACRE JUNE 1-SEPT 1 TALL FESCUE AND 120 LB/ACRE JUNE 1-SEPT 1 BROWN TOP MILLET 35 LB/ACRE SEPT 1-MARCH 1 SERICEA LESPEDEZA AND 70 LB/ACRE SEPT 1-MARCH 1 TALL FESCUE 120 LB/ACRE TEMPORARY SEEDING SCHEDULE PVC VENT PIPE FRONT VIEW SKIMMER NTS SEEDING DATES SPECIES RATE FERTILZER JAN 1-MAY 1 - - 750 LB/ACRE 10-10-10 ANNUAL LESPEDEZA (KOBE) * 170 LB/AC 750 LB ACRE 10-10-10 MAY 1-AUGUST 15 GERMAN MILLET * 40 LB/ACRE 750 L /ACRE 10-10-10 AUGUST 15-DEC 31 TALL FESCUE 120 LB/ACRE 1,000 LB/ACRE 10-10-10 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. 1PLACE S7CW707HELN39AADDAfi9V V6SOA%W0JV71EPLANONAFi7ERFAB9CFOUVG471CN 50' MIN. 2KEEP 7FEC&V75RS7aESEC71ONATLEAS7*OACiWB OWNA7LR4LCi9l0&DIN 71EC MAS=7FEOi4N S4WS BUT SUFFICIENT TO KEEP 31E00S7VtEATLEASl15FEETBFY0ND71EQ7CHOAA(K701aS6PWA75RNigNp/T71NGAROLMD7FE6MQF71EClEaDAM SEDIMENT ON SITE SCHEDULE 40 PVC PIPE 42:7B°ACWB°7H'EBVA4M370A 7HAT71fBEVA7ICWAT7hE70POF7hELCMVB9aW67FES6AEAS71EE EA7MOF 7HE 7VEOF7FEUFFMDAM 2„`-3" STONE TO BE USED``::.;. 5 P119101ECT 71E CyfAMEL AF1H41/f L0MYESTQHEC7<014MfiA0/hE4W fiCMV 1/iAT CaOLLD 04U'2= 671OA4! EXISTING (SURGE STONE OR RAILROAD:,. ROADWAY BALLAST) 0 S MAKESLME 7HAT71f CHAANK AE4CHABOVE7FEA=rLFWW_AMDAMESTA&E ° 7. BWE#E 7HAT 07HP9 AREAS CIF 71-Ea Ml1EL, SJCHAS C'tLM?T6VM4NCEB BaOW 7/f C W-CKS G4A4 AF E NIOT Ae.ECT 70 B'-OC KAGEPROMEI&LACED SRNM ORIFICE PLAN PLATE 20' OR WIDTH OF MIN. PROP1.5 CONSTRUCTION PVC TEE RIP -RAP PAD ER ACCESS ROUTE WHICHEVER REQUIRED VARIES �� IS GREATER. UNDER SKIMMER \//��/�/ 9+MIN. 4�wr" \ 2 BOTTOM SURFACE CLASS 1 or B 50' MIN. 15' MIN. EROSION CONTROL EXISTING ROADWAY STONE FRONT VIEW MIN 6" MIN. "C" ENCLOSURE WATER ENTRY UNIT SEE N.C. DENR EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATION & DESIGN CRITERIA. #5 WASHED STONE FIL TER SECTION 'A A" MAX. A L B `FABRIC UNDER STONE o CROSS SECTION L - DISTANCE SSUCH THAT FIAd 17S A and BATE OIFEOUAL ELEVA770AS 50'-0" MINIMUM LENGTH ROADWAY CHECK DAM DETAIL EXISTING MIN. STONE DEPTH WIDTH 25 NTS GRADE SEE NOTE B. %big 7NO7E Wawm SVESLOPE OF 7DD "LL BF 2'l TEMPORARY DI VERSION DI TCH NTS DESIGN OVERFILL 6" A SETTLED TOP FOR SETTL MENT 5 ' , MIN. 5' MAX. • 1 SIDE EMERGENCY BY-PASS FILL ���,� ����/� SLOPE MAX 6" BELOW SETTLED NA TURAL� TOP OF DAM GROUND TURAL FIL TER FABRIC 3 1: 1 SIDE GROUND MIN. SLOPE MAX. A STONE SECTION DRAINAGE AREA MINIMUM WEIR LENGTH (ACRES) (FEET) 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 FROM TABLE 6.60a DESIGN OF SPILLWAYS EARTH HOG WIRE ATTACHED TO POSTS WITH LENGTHS OF WIRE BAFFLE INSTALLATION - STEP I B TO BAFFLE (TYP.) 011 sFo��� T°�T CLASS J1 RIP RAP PERSPECTIVE VIEW BAFFLE INSTALLATION - STEP 2 +',t> too, •• 40 • 0.00 -r FABRIC FOLDED OVER HORIZONTAL • ��4 �/y .0! • '*o *�7� ?S HORIZONTAL POST *..1 . �•`S7�1i9t t+�A� iD�•���G��r�? BURL DINDTRENCH s xs" TRENCH, 9/13/2019 BACKFILLED AND COMPACTED SECTION A T OPENING NO TES. 1. DRIVE STEEL FENCE POST AT LEAST 18" INTO SOLID GROUND 2. WOOD POSTS ARE NOT ACCEPTABLE J. USE STAPLES 1' APART TO ATTACH FABRIC TO "HOG WIRE" 4. BAFFLE SPACED AS PER APPROVED PLAN. GRA VEL AND RIP -RAP SEDIMENT TRAP NTS PROFILE NOTES: A) MINIMUM WIDTH OF CONSTRUCTION ENTRANCE PAD SHALL BE 20 FT. SEE PLANS FOR LOCATION, ACTUAL WIDTH AND CONFIGURATION. B) STONE SHALL BE CRUSHED AGGREGATE BASE. C) THE ENTRANCE SHALL BE MAINTAINED TO PREVENT TRACKING OR FLOW- ING OF SEDIMENT ONTO ROADWAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. TYPICAL CONSTRUCTION ENTRANCE PAD NTS IN CHANNELS, ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH tea, ALL V-SHAPED PERMANENT DITCHES SHALL BE JUTE MA TIED WHEN A T 2: 1 SLOPES AS SHOWN IN DETAIL ABOVE. MAINTENANCE OF GRASS LINED CHANNELS During grass establishment period, check channel after every rainfall. After grass is established, periodically check the channel; check it after every heavy rain event and make repair immediately. Remove al significant sediment. Keep the grass in healthy, vigorous condition at all times MAINTENANCE OF TEMPORARY AND PERMANENT SEEDING Inspect seeded areas for failure and make necessary repairs, soil amendments, and reseedings. Monitor the site until long term stabilit has been established DIVERSION DITCH MAINTENANCE Inspect diversion ditches periodically for wear and after every heap rainfall for erosion damage. Immediately remove sediment from the flow area and repair ditch. When permanent road drainage is established , remove the ditch and fill channel to blend with the natural ground, and appropriately stabilize the disturbed area. JUTE MESH LINED DITCH MAINTENANCE Inspect jute mesh at least weekly and after each significant (1/2" or greater) rain fall event and repair immediately. Good contact with the ground must be maintained and erosion must not occur beneath matting. Any damaged area shall be repaired and stapled. Monitor and repair jute mesh lined ditches as necessary until ground cover is established. 18"RIP RAP DITCHES MAINTENANCE OVERLAPti,'�/ Rip Rap should be inspected periodically for scour c dislodged stones and control of weed and brush JOIN STRIPS BY ANCHORING growth. AND OVERLAPPING MAINTENANCE OF SEDIMENT BASIN Check sediment basins after periods of significant runoff Remove sediment and restore the basin to its original dimensions when sediment accumulates to one half the TYPICAL JUTE MESH LINED DITCH design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment NTS for piping and and settlement. Make all necessary repair immediately. Remove all trash and othr debris from and pool area. 8'-0" CENTERS (MAXIMUM) 1 g" GRADE TRENCH FILTER CLOTH METAL WIRE FENCE FENCE POST NOTES: FILTER CLOTH TIE FILTER CLOTH TO POST WITH STEEL WIRE. TRENCH FLOW EXTEND WIRE FENCING AND FILTER CLOTH INTO TRENCH. 8" TRENCH SIZE IS 4" X 8" X LENGTH I J 1 OF SILT FENCE 18" 1 TYPICAL SIL T FENCE DETAIL NTS ► F II10►/_1►161:111115i10Ke7AVAID Maintain gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require top dressing with stone. after each. After each rainfall, inspect any area trapping sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked ont public roadway. SEDIMENT FENCE MAINTENANCE Inspect sediment fences at least once a week and after each raifall. Make any required repairs immediately. Repair or replace the fabric of sediment fence if collapsed, tore, decomposed or become ineffective. Remove sediment deposit as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been stabililzed. The contractor shall remove from behinc silt fence when it becomes 0.5 ft deep at the fence CHECK DAM MAINTENANCE Inspect check dams and channels for damage after each runoff event. p g Chec submergence and deposition above the check dam and erosion from high flows around the edges. Correct all damage immediately. if significant erosion occurs between dams, install protective rip rap linear in that portion of the channel. Remove sediment accumulated behind the dams and allow the channel to drain through the stone check dam. Add stone to check dam as needed SILT FENCE OUTLET PROTECTION Inspect silt fence outlet at least once a week and after each significant rainfall (1/2 inch or greater). Clear mesh wire from any debris or othr objects to provide adequate flow for subsequent rains. Remove sediment and and to gravel when needed. Should fabric or wire of fence collapse, remove and replace and add gravel as needed. When removing sediment, take care not to damage or undercut the wire mesh or fabric and add replace stone as needed a a co � o o r4 ko I O W � V C0 lulq w maw C~ ti ti a O U H O U J Lid F z N E Z Q W Z " O rn � Q� N z U pz co 0 O co 4 0 U w 0 W m O_ W 0 rZ w 0 Q 0 O z DATE: 6-6-2019 SCALE: 1 "=40' DESIGNED: SWB CHECKED: SW8 DRAWN: SWJ APPROVED: SWB SHEET: SITE PLAN 4 °F 4 CAD FILE:- MS PROJECT NO: 2019.03