HomeMy WebLinkAboutNCG140009_Inspection Report_20200128ROY COOPER
Governor
MICHAEL S. REGAN
secretary
S. DANIEL SMITH
Director
Southern Concrete Materials
Attention: Jeff Lamm
Post Office Box 5395
Asheville, North Carolina 28813
NORTH CAROLINA
Environmental Quality
January 28, 2020
Subject: Compliance Evaluation Inspection
Permit: NCG140000
Certificate of Coverage: NCG140009
Macon County, North Carolina
Dear Mr. Lamm:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on January 23, 2020.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
Sincerely./] "-
7
Isaiah Reed, CPSWQ—CEPSCI, MS4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 US. Highway 70 1 Swannanoa, North Carolina 28778
NOHIHCM.p1Wl
oawnr..xmun�mni amH 828.296.4500
Compliance Inspection Report
Permit: NCG140009 Effective: 08/01/17 Expiration: 06/30/22 Owner: Southern Concrete Materials
SOC: Effective: Expiration: Facility: Southern Concrete Mat -Macon
County: Macon 49 Wells Grove Rd
Region: Asheville
Franklin NC 28734
Contact Person: Jason Greene Title: Phone: 828-707-8502
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/23/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Certification:
Phone:
Entry Time: 01:OOPM Exit Time: 02:30PM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete StormwaterfWastewater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
E Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG140009 Owner -Facility: Southern Concrete Materials
Inspection Date: 01/23/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On January 23, 2020 this facility was inspected for compliance. I met with Troy Smith and Mattison McClure on site. The
inspection was performed primarily to assess the current secondary containment situation on site. Based on the inspection
findings, and conversations with other DEQ staff, it is concluded that secondary containment has not yet been provided on
site as required by the permit.
Several possible alternatives were discussed on site, many of which would satisfy the requirement. The floor of the container
remains the primary reason for secondary containment modifications. The permittee is directed to provide a written plan of
action to address the secondary containment issues to this office.
This facility will be re -inspected on or after March 4, 2020. If the above items have not been addressed, further action will be
taken.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NGG140009 Owner -Facility: Southern Concrete Materials
Inspection Date: O1/23/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment. See summary for more information.
Yes No NA NE
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
❑ ❑ ❑ E
❑ ❑ ❑ E
❑■❑❑
❑ ❑ ❑
❑❑❑■
❑❑❑■
❑❑❑■
❑ ❑ ❑
❑❑❑■
❑❑❑■
❑ E ❑ ❑
Page 3 of 3