Loading...
HomeMy WebLinkAboutNCC200306_NOI Application_20200124Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/23/2020 11:06:57 AM (NCG01 NOI Submission) Approve by McCoy, Suzanne 1/24/2020 7:44:47 AM (Review- Construction NOI 21064) • The task was assigned to McCoy, Suzanne by round robin distribution 1/23/2020 11:07 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 27, 2020 5:00 PM 1/23/2020 11:07 AM Submit by McCoy, Suzanne 1/24/2020 2:58:21 PM (Payment Verification for NCC200306) * Lindwood Jackson • McCoy, Suzanne assigned the task to McCoy, Suzanne 1/24/2020 2:57 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 6, 2020 5:00 PM 1/24/2020 7:44 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Cambridge Park Townhouses 2. County* Alamance 3. Highway or Street Jones Drive Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Mebane 5. State * NC 6. Zip Code * 27302 7. Latitude * Enter the latitude in decirral degrees 36.0516 8. Longitude* Enter the longitude in decinal degrees (MJSTbe negative) -79.2914 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/03/2020 Estinated Construction Project Start Date 10. Date to End* 12/15/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Residential, Other than SFE (1522) Standard Industrial aassification for Ceveloprrent 12. Acres to be 11.20 disturbed* (including off -site borrow and waste areas) 13. Total site area 11.20 (acres) * 14. Post- 5.90 construction (Estimated) impervious area (acres) * NCC Project NCC-ALAMA-2020-Cambridge Park Townhouses Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Little Haw Creek Wate rbody* %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 16-20-3 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization GHD-Cambridge Park Mebane, LLC Name * 2. First Name* Jeff IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* White If Corporation, enter Pegistered Agent Last %rre 3b. Title Manager 4. Permitee E-mail jwhite@greenhawkcorp.com Address * 5. Permittee 919-861-2912 Telephone No.* 6. Permittee Mailing Street Address Address* 1330 Sunday Drive Address Line 2 Suite 105 city Raleigh Fostal / Zip Code 27607-5196 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 1330 Sunday Drive Address Line 2 Suite 105 Cty Raleigh Fbstal / Zip Code 27607-5196 State / Ftovince / Faegion NC Country us State / Frovince / Fbgion NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration _.................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Jason Contact - First Name * 3. Primary Site Deane Contact - Last Name * 4. Title Project Manager 5. Site Contact E- jdeane@greenhawkcorp.com mail Address* 6. Site Contact 252-268-4024 Telephone No.* 7. Organization GreenHawk Development Name 8. Site Contact Street Address Mailing Address* 1330 Sunday Drive Address Line 2 Suite 105 Cty Raleigh Fbstal / Zip Code 27607 9. Consultant Name (Optional) First and Last narre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion North Carolina Country USA D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/15/2020 Approved * 2. E&SC Plan Project ALAMA-2020-019 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan NCDENR Approved Grading Permit.pdf 7.09MB Approval Wst be RDFfornat letter/documentation 6. NOI Certification Cambridge Mebane Signed NCG01 Notice of Form 57.67KB Intent.pdf Wst be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Jeff White Title Manager Organization GHD-Cambridge Park Mebane, LLC Date * 01 /23/2020 F. Tracking and COC Info NOI Tracking No. 21064 NC Reference No. NCG01-2020-0306 Uses 'count number' variable (incremrented by SP) Certificate of NCC200306 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 306 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)