HomeMy WebLinkAboutNC0039586_LV-2019-0373_20200120 C DUKE Kim E.Maza
Vice President
ENERGY Harris Nuclear Plant
54"13 Shearon Harris Road
Nev Hill,NC 27562-9300
JAW 2 0 2020
Serial: HNP-20-0021
Certified Mail Number: 7014 2120 0003 3196 6005
Return Receipt Requested RECEIVE.®
JAN 2 4 2020
Mr. Scott Vinson, Regional Supervisor NCDEQIDWRINPD S
Water Quality Regional Operations Section
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Subject: Duke Energy Progress, LLC —Shearon Harris Nuclear Plant (HNP)
NPDES Permit No. NC0039586
Notice of Violation &Assessment of Civil Penalty
Case Number: LV-2019-0373
Wake County
Dear Mr. Vinson:
On December 31, 2019, Duke Energy Progress, LLC received the subject Notice of Violation &
Assessment of Civil Penalty letter dated December 18, 2019. In accordance with the letter,
please accept this response for payment of the penalty regarding the Oil & Grease results for
August 2019.
As provided in our response dated November 13, 2019 (see enclosure), Duke Energy Progress,
LLC and the Shearon Harris Nuclear Plant has responded expeditiously and appropriately to
-.this minor effluent limit exceedance. No additional oil & grease exceedances at the subject
wastewater treatment system (Outfall 005) have occurred since this date. Payment in the
amount of$290.94, made payable to the NC Department of Environmental Quality, is being
forwarded under separate cover to the Wastewater Branch in accordance with instructions, in
the December 18, 2019 letter.
•
If you have any questions regarding this matter or wish to discuss in further detail, please do not
hesitate to contact Mr. Bob Wilson, HNP Site Environmental Professional at (919) 362-2444.
• / certify, under penalty of law, that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure"that
qualified personnel properly gather and evaluate the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, arid complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations:
Water Quality Regional Operations Section Page 2
Serial HNP-20-0021
Sincerely,
Kim E. Maza
Vice President, Harris Nuclear Plant
Duke Energy Progress, LLC
Enclosures: Payment for Civil Penalty Assessment
RA-19-0435 Response Letter dated November 13, 2019
cc:
'/Certified Mail Number: 7014 2120 0003 3196 5992
Return Receipt Requested
NC DEQ DWR Wastewater Branch (with original check)
Division of Water Resources
1617 Mail Service Center Raleigh, North Carolina 27699-1617
Water Quality Regional Operations Section Enclosure 1
H N P-20-0021
Harris Nuclear Plant
Payment for Civil Penalty Assessment
(2 pages including cover)
Water Quality Regional Operations Section Page 5
Serial HNP-20-0021
Harris Nuclear Plant
RA-19-0435 Response Letter dated November 13, 2019
(31 pages including cover)