HomeMy WebLinkAboutNCG140478_CoC_20200115STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE No. NCG140470
STORMWATER AND WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
The Lane Construction Corporation
is hereby authorized to operate wastewater treatment system(s) and discharge
stormwater and wastewater from a facility located at:
Lane Temporary Concrete Batch Plant - Statesville
2201 International Drive
Statesville
Iredell County
to receiving waters designated as Fourth Creek, class C waters, in the Yadkin Pee -Dee River
Basin, in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG140000 as
attached.
This certificate of coverage shall become effective January 15, 2020.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 16St day of January 2020.
r S. Daniel Smith
Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission