Loading...
HomeMy WebLinkAboutNCG140478_CoC_20200115STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140470 STORMWATER AND WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Lane Construction Corporation is hereby authorized to operate wastewater treatment system(s) and discharge stormwater and wastewater from a facility located at: Lane Temporary Concrete Batch Plant - Statesville 2201 International Drive Statesville Iredell County to receiving waters designated as Fourth Creek, class C waters, in the Yadkin Pee -Dee River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective January 15, 2020. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 16St day of January 2020. r S. Daniel Smith Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission