Loading...
HomeMy WebLinkAbout20190211 Ver 1_U-5875_Permitting Mtg Minutes_181108_20181121Carpenter, Kristi From: Ben Crawford <bcrawford@sepiengineering.com> Sent: Wednesday, November 21, 2018 12:25 PM To: Caldwell, Betty A; Cabaniss, Jeffrey D; Johnson, Jay B; Capehart, Cadmus; Lane, Heather C; Call, William G; Ward, Garcy; Patterson, Robert D; Andy Howell; Bob Lepsic Cc: Danny Gardner Subject: [External] U-5875 2nd Permitting Meeting Attachments: U-5875_Permitting Mtg Minutes_181108.pdf All —Attached are the draft minutes from the meeting held at Division 2 on November 8tn Please provide any comment on the content of the minutes to me by November 30tn Thanks, and have a Happy Thanksgiving. Ben Ben Crawford, PE I Vice President Transportation Division Manager SEPI Engineering & Construction 1025 Wade Avenue I Raleigh, NC 27605 Direct: 919.573.9930 1 Cell: 919.395.7207 1 sepiengineering.com Connect with us: Linkedln I Twitter I Facebook Confidentiality Notice: This message is intended only for the designated recipient(s). It may contain confidential or proprietary information and may be subject to the attorney -client privilege or other confidentiality protections. If you are not a designated recipient, you may not review, copy or distribute this message. If you receive this in error, please notify the sender by reply e-mail and delete this message. Thank you. SEPI E NO IN EE RING& CONSTRUCTION U-5875 Permitting Meeting Date of Meeting: November 8, 2018 Project: U-5875 2nd Permitting Meeting Attendees/Association: SEPI Engineering & Construction, Inc. 1025 Wade Avenue I Raleigh, NC 27605 Main: 919.789.9977 1 Fax: 919.789.9591 sepiengineering.com Time/Location of Meeting: 10:00 - Division Conference Room - Division 2 Betty Ann Caldwell NCDOT Division 2 Jeff Cabiness NCDOT Division 2 Jay Johnson NCDOT Division 2 Cadmus Capehart NCDOT Division 2 Heather Lane NCDOT Division 2 Galen Cail NCDOT Hy draulics Garcy Ward DWR Robert Patterson DWR Andy Howell SEPI Bob Lepsic SEPI Ben Crawford SEPI Minutes A meeting was held to discuss the stormwater permitting for the U-5875 project. The overall approach to the hydraulic design and stormwater permits was discussed. The specific designs at the buffered areas were also discussed. The following items were discussed: General Comments 1. The project is currently in the ROW Acquisition phase. 2. The hydraulic system was designed to treat the stormwater discharged to Jurisdictional areas using swales to a length of 100 linear feet per 1 acres of additional impervious area due to roadway construction, per the approved hydraulic design criteria. 3. DWR will require that 100 linear feet of swale treatment per 1 acre of total drainage area, where reasonably possibly. SEPI will extend treatment swales where feasible to meet this requirement. 4. DWR requested that treatment requirements, treatment provided, existing drainage patterns, reasons for treatment lengths less than requirements, and any other necessary explanation be shown on the permit drawings. If this adds clutter, then it is acceptable to clearly reference additional information on the permit drawings. 5. DWR confirmed it is acceptable to use the existing ditches as swale length if the velocity requirements are met. This could include the use of permanent rock checks to reduce the velocities. SEPIPage 1 of 3 ENGINEERING S CONSTRUCTION Specific Areas Discussed • Unnamed Tributary (Sta. 26+50) and downstream parcels o Parcel17 ■ The head ditch draining the farm field appears to meet the intent of the treatment rules as the length of the swale is limited by the existing farm ditch. o Parcel15 ■ Treatment requirement length is met with current design. Show stream as connecting to pipe inlet under Dickinson Blvd. o Parcel13 ■ Proposed swale length doesn't meet requirements. SEPI to investigate existing swale outside of project limits to see if it meets design requirements for swales. Show stream as connecting to pipe inlet under Dickinson Blvd. o Parcel ■ Existing swale is covered by roadway improvements. No treatment is feasible here. o Parcel ■ Existing outlet pipe is perched and has a blowhole. Proposed design shows rip rap stabilization on the outlet. This is acceptable as long as rip rap is below mud line. • Greens Mill Run (Sta. 64+00) o Parcel28 • Swale treatment length does not meet requirements; it needs to be extended by approximately 300'. ■ Alternatively, a wet pond could be used. It would need to be approximately 125' x 250' in size. Division to coordinate with property owner to determine preferred path. o Parcel42 ■ Swale treatment length does not meet requirements. It needs to be extended several hundred feet. As long as treatment length is close to requirement length, additional impacts to parcel 44 can be avoided. o Parcel 35 & 36 ■ Proposed drainage approach retains existing outlet. This meets requirements. • North Fork Greens Mill Run (Sta. 127+50) o Parcel70 • Swale treatment length does not meet requirements. It needs to be extended about 40'. ■ It is possible to pipe the drainage through parcel 70 and extend the treatment back station to get the requirement. SEPI will not do this approach unless directed by Division. o Parcel72 ■ Swale treatment length does not meet requirements. It needs to be extended about 5'. o Parcel73 ■ Swale treatment length does not meet requirements. It needs to be extended about 120'. ■ SEPI to adjust ahead station ditch to treatment swale. Adjust pipe to outlet further from buffer to get treatment. SEPIPage 2 of 3 ENGINEEFINO 6 CONSTRUCTION Respectfully Submitted, Ben Crawford Project Manager SEPI Page 3 of 3 IN SIN16R IN 6 C U NET R U LT ION