Loading...
HomeMy WebLinkAbout20160924 Ver 2_PCN Combo - Smith 2020.r_20200121Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* Version* 2 20160924 Is this project a public transportation project?* r Yes r No Reviewer List:* Stephanie Goss: eads\szgoss Select Reviewing Office:* Raleigh Regional Office - (919) 791-4200 Submittal Type:* 401 Application Does this project require a request for payment to be sent? r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Maria Polizzi Vft is subaitting the inforrration? Email Address: Maria@spanglerenvironmental.com Project Information Existing ID #: Existing Version: 16-0924 1 20170001(no dashes) Project Name: Smith Farms Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Wake Please upload all files that need to be submited. Oickthe upload button or drag and drop files here to attach document PCN Combo - Smith 2020.r.pdf 31.02MB Only pdf or Iv17 files are accepted. Describe the attachments: The attached document is a revised PCN for the Smith Farms project. This project is currently permitted, and this PCN has only slight changes. Changes are described in the narrative on page 11. W By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: Submittal Date: 1.21.2020 Is filled in autocratically. Environmental Planning Environmental Permitting Environmental Consulting Environmental Construction Management Expert Testimony 4338 Bland Road Raleigh, N.C. 27609 phone 919-875-4288 fax 919-875-4287 TOLL FREE 1-866-SPANGLER www.spanglerenvironmental.com January 17, 2020 James Lastinger US Army Corps of Engineers 3331 Heritage Trade Drive RE: Request for Permit Amendments – Smith Farms Mr. Lastinger and Ms. Higgens: Please accept the enclosed revisions to the Smith Farms project, regarding Phases 2-4 encompassed in the 2017 permit with ID SAW- 2014-01347. To clearly illustrate the differences mentioned above, please see the attached documents which highlight areas of impact, types of impacts, and a numerical comparison between the permitted impacts and the current impacts. Additionally, the updated impacts maps are attached. Please feel free to reach out for additional information or with any questions, and we thank you for your time. Sincerely, Spangler Environmental, Inc. Maria Polizzi Senior Scientist – Land Resources Karren Higgens NC Division of Water Resources 401 & Buffer Permitting TABLE OF CONTENTS PCN FORM 1-10 AVOIDANCE & MINIMIZATION NARRATIVE 11 IMPACT TABLES 12-14 STREAM IMPACTS 12 BUFFER IMPACTS 13 WETLAND IMPACTS 14 IMPACT MAPS 15-48 BUFFER IMPACTS 15-36 STREAM IMPACTS 37-45 WETLAND IMPACTS 46-48 OTHER DOCUMENTS 49-64 MITIGATION CREDIT RECEIPTS 49-50 TOWN OF APEX BUFFER DETERMINATION 51-64 Page 1 PCN Form – Version 1.4 January 2009 Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: 2b. County: 2c. Nearest municipality / town: 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Smith Wake Apex Smith Farms See attached table and deeds See attached deeds Lennar Carolinas, LLC 909 Aviation Pkwy, Ste 700 Morrisville, NC 27560 (919) 337-9444 Mitch.Barron@Lennar.com Page 2 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Lennar Carolinas, LLC Lennar Carolinas 909 Aviation Pkwy, Ste 700 Morrisville, NC 27560 (919) 337-9444 mitch.barron@Lennar.com Jim Spangler (Maria Polizzi) Spangler Environmental Inc. 4338 Bland rd Raleigh, NC, 27609 (919) 875-4288 maria@spanglerenvironmental.com Page 3 PCN Form – Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude:Longitude: 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: 3e. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. See attached table -78.5539 230.33 Reedy Branch WS-IV;NSW Cape Fear River Basin The subject property is partially wooded developed with residential structures,barns,sheds,wells,and a dirt road.Ponds associated with historical agricultural use have been constructed on the property. There is a sanitary sewer easement and an electrical easement in the southwest of the property. the land use in the general vicinity is a residential or undeveloped. 3.704 The purpose of this project is to construct a residential subdivision on the subject property. The project is a residential subdivision that will involve grading/earth moving and utility work by using grading and excavating equipment. Spangler Environmental Corps delineation verification site visits made on 7/23/14 &3/14/16.A Town of Apex site visit was make on 8/5/14 and the determination was updated on 9/6/19. Revised PJDs and buffer determinations are attached to this submittal. A PCN for Phase I of the Smith Farms project (SAW 2014-01347)was submited on 9/20/16,and has since been approved. This is a portion of a Planned Unit Development (PUD)zoning area.The project has 4 phases.Only Phase 1 has detailed design prepared and approved. No plans for further development of this PUD beyond what is contained in this submittal have been prepared, submitted, or approved. 35.4364 8,655 Page 4 PCN Form – Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W2 W3 W4 W5 W6 2g.Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts 3i. Comments: Choose one Choose one Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - See Attached Tables Choose one -- See Attached tables - - - - - - Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one - - - - - - Choose one Choose one Choose one Choose one Choose one - - - - - - - - - - Page 5 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 O2 O3 O4 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) 5a. Pond ID number 5b. Proposed use or purpose of pond Flooded Filled Excavated Flooded Filled Excavated P1 P2 5f.Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.Project is in which protected basin? Neuse Tar-Pamlico Catawba Randleman Other: 6b. Buffer Impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 B2 B3 B4 B5 B6 6h.Total Buffer Impacts: 6i. Comments: Choose one Choose Choose one Yes/No See attached tables for a breakdown of buffer impacts and totals. - - - - Choose one Choose one Choose one Choose Choose Choose Choose one - - - - - - Yes/No Yes/No Yes/No Yes/No Yes/No ) Page 6 PCN Form – Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Type: Type: Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. See attached avoidance and minimization narrative. Sediment and erosion control measures will be implemented in order to control runoff and other discharges from activities to be conducted in the fill areas. 285 warm 55,795 0.408 496 stream credits, 55795 buffer credits and 0.408 wetland credits have been purchases. Receipts from DMS are attached. Riparian buffer Choose one Choose one Page 7 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f.Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Total Zone 1 impacts (various) 13,576 40,728 Total Zone 2 impacts (various) 9,185 13,778 54,505 DMS has already received payment for 55,795 credits worth of mitigation,no additional mitigation is required at this time. See attached table for additional details on the "reasons for impacts". Page 8 PCN Form – Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Apex Apex Page 9 PCN Form – Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Municipal sanitary sewer will service the subject property. Page 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Applicant/Agent's Printed Name _______________________________ Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date Raleigh NCNHP National Marine Fisheries Service essential fish habitat mapper. EDR NEPAreport;Apex Historical Society;NC State Historic Preservation Office While the area that is designated as the project contains portions of the 100 year floodplain,the only development that will occur in the floodplain is the installation of sanitary sewer utility lines. the installation of the utility lines will adhere to the National Flood Insurance Program Floodplain Management Requirements published by FEMA. FEMA flood maps panel #'s 33720072100J and 3720072200J with effective date of May 2,2006. Maria Polizzi for James Spangler 01-17-2020 Environmental Planning Environmental Permitting Environmental Consulting Environmental Construction Management Expert Testimony 4338 Bland Road Raleigh, N.C. 27609 phone 919-875-4288 fax 919-875-4287 TOLL FREE 1-866-SPANGLER www.spanglerenvironmental.com Avoidance and Minimization Narrative and Explanation of PCN Revisions Due to modifications to the greenway, additions to the sewer easement and a requirement by the Town of Apex to have a second crossing in order to access the northwestern corner of the property, slight changes have been made to the impact maps for Phases 2-4 of the Smith Farms project. The majority of the changes only impact buffers; however, some stream impacts have varied as well. The purpose of this memo is to highlight all changes that have been made to the designs and to provide an understanding of why each of these was necessary for the project. Additionally, it is important to mention that total permanent stream impacts have not increased, and have actually decreased from 283 linear feet to 261 LF. Similarly, the wetland impacts have been reduced from 0.223 acres of impacts to 0.06 acres. The first major change is the addition of the second crossing. Originally, a crossing was proposed on Watering Can lane, which would extend into the NW corner of the property. However, during the Town of Apex’s review of the construction drawings, they determined that based on UDO section 7.5.4E a second access was necessary to alleviate traffic issues during peak hours since more than 50 lots were proposed. Because this section of the property can only be accessed by crossing the stream, another crossing has been added on Rise and Shine Road. Both crossings have been designed with minimization in mind. The crossing at Watering Can lane is positioned at the location of an existing dirt road and 40 ft piped crossing underneath. By choosing this location, the total new impacts are reduced by 40 ft, since this area has been impacted previously. Additionally, the crossing on Rise and Shine Road was situated on a relatively straight stretch of stream in order to minimize impacts to buffers, and headwalls on both crossings are planned to decrease the width of the crossings and therefore limit stream impact. The other major change is the extension of the sewer easement into phases 2-4. On the previous submission there were no stream impacts related to sewer easements or outfalls, but due to a request from the Town of Apex utility department, the easements are now extended through this phase to allow for connection to adjacent properties. This additional section of sewer easement has greatly increased the amount of buffer that will be impacted, and will cause temporary impacts to streams. No permanent stream impacts will be caused by this extension. Lastly, the greenway has been adapted since the initial submission, in order to comply with the ADA requirements. This included adding several switchbacks, which were not included in the original straight shot design. There are no stream impacts related to the greenway; however, there are slight changes to the buffer impacts. There have also been a few changes that have reduced stream impacts, which include reducing the listed impacts for crossings with pre-existing impacts, eliminating impacts from the greenway and eliminating 25 ft. of fill impact to unnamed stream (stream Q). To clearly illustrate the differences mentioned above, please see the attached documents which highlight areas of impact, types of impacts, and a numerical comparison between the permitted impacts and the current impacts. Additionally, the updated impacts maps are attached. Page 1111 Stream Impact #P or T Type of Impact Stream Name Per or INT Type of Jurisdiction Average Stream Width Impact length (LF) S1 P Culvert Reedy Creek (stream O)PER DWQ 7 148 S2 P Culvert Unnamed (Stream A)PER DWQ 5 100 S3 P Fill Unnamed (Stream Q)INT DWQ 2 25 S4 P Piling Unnamed (Stream E)PER DWQ 8 5 S5 P Piling Unnamed (Stream A)PER DWQ 5 5 Stream Impact #P or T Type of Impact Stream Name Per or INT Type of Jurisdiction Average Stream Width Impact length (LF) 1 P Crossing Reedy Branch PER DWQ 7 108 2 P Crossing Unnamed (Stream A)INT DWQ 5 53 *S3*P Removed / Not Needed Unnamed (Stream Q)INT DWQ 2 -25 *S4*P Removed / Not Needed Unnamed (Stream E)PER DWQ 8 -5 *S5*P Removed / Not Needed Unnamed (Stream A)PER DWQ 5 -5 3 P Crossing Unnamed (Stream A)INT DWQ 4 100 4 T Sewer Reedy Branch PER DWQ 22 31 Original Impacts 5 T Sewer Unnamed (Stream A)PER DWQ 12 20 Adjusted Impacts 6 T Sewer Unnamed (Stream A)INT DWQ 7 34 New Impacts Current Stream Totals All Impacts: 346 ft All Permanent Impacts: 261 ft Original PCN Impacts: Streams Current PCN Impacts: Streams Original Stream Totals All Impacts: 283 ft All Permanent Impacts: 283 ft Page 1212 Buffer Impact # Permanent (P) or Temporary (T)Reason for Impact Stream Name Buffer Mitigation Required? Zone 1 Impact (SF) Zone 2 Impact (SF) B1 P Road Crossing Reedy Creek (Stream O)No 8,000 6,200 B2 P Road Crossing Unnamed (Stream A)No 6,000 4,000 B3 P Greenway Unnamed (Stream E)No 300 200 B4 P Greenway Unnamed (Stream A)No 300 200 B5 P BMP Grading Unnamed (Stream Q)Yes 2,200 1,450 Sheet # of Buffer Impact Permanent (P) or Temporary (T)Reason for Impact Stream Name Buffer Mitigation Required? Zone 1 Impact (SF) Zone 2 Impact (SF) 3 P Stream Crossing Reedy Creek Yes 10,494 6,978 4 P Stream Crossing Unnamed (Stream A)No 6,282 3,857 5 P Stream Crossing Unnamed (Stream A)No 6,951 5,341 6 P Greenway Bridge Unnamed (Stream E)No 1,666 971 7 P SCM Pond Reedy Creek Yes 309 201 8 P SCM Pond Unnamed (Stream A)Yes 364 243 9 P SCM Pond Unnamed (Stream E)Yes 300 222 10 P SCM Pond Reedy Creek Yes 386 253 11 P SCM Pond Unnamed (Stream A)Yes 633 431 12 P SCM Pond Unnamed (Stream A)Yes 343 210 13 P SCM Pond Unnamed (Stream E)Yes 306 204 14 P SCM Pond Unnamed (Stream A)Yes 538 405 15 P SCM Pond Unnamed (Stream E)Yes 212 239 16 P Sewer Outfall Reedy Creek No 1,874 1,255 17 P Sewer Outfall Unnamed (Stream E)No 1,805 2,153 18 P Sewer Outfall Unnamed (Stream E)No 601 5,223 19 P Sewer Outfall Unnamed (Stream A)No 600 3,574 20 P Sewer Outfall Unnamed (Stream E)No 448 2,033 21 P Sewer Outfall Unnamed (Stream E)No 302 1,863 22 P Sewer Outfall Unnamed (Stream A)No 1,907 2,267 Original PCN Impacts: Buffers Current PCN Impacts: Buffers Original Buffer Totals Zone 1: 16,800 SF Zone 2: 12,050 SF Impacts Requiring Mitigation Zone 1: 13,576 Zone 2: 9,185 Current Buffer Totals Zone 1: 36,321 SF Zone 2: 32,582 SF Zone 3: 132,875 SF Page 1313 Wetland Impact # Permanent (P) or Temporary (T)Reason for Impact Type of Wetland Impact Area (SF) W1 P Fill Bottomland Hardwood 0.223 Wetland Impact # Permanent (P) or Temporary (T)Reason for Impact Type of Wetland Impact Area (SF) W1 P Sewer Easement Bottomland Hardwood 1,030 W2 P Grading Bottomland Hardwood 1,563 0.06 Original PCN Impacts: Wetlands Current PCN Impacts: Wetlands Original Wetland Totals (Acres) 0.223 Current Wetland Totals (Acres) Page 114 SMITH FARM FUD IMPACT MAPS - PHASES 2-4 IJJJ-- -----1- U5 111G"WAY 64 _--------7—I T---- / a / jl L _ FUTURE MIXED-U5E PHA5E TOTAL BUFFER IMPACTS ZI-34,616 5� Z2-3F Z3 - 1-,5-30,SSB SF TOTAL LINEAR STREAM IMPACTS PERMANENT - 261 LF TEMPORARY - - LF TOTAL WETLAND IMPACTS 2,593 5F fo.0G AC.) SHEET INDEX I COVER SHEET 2 OVERALL BUFFER IMPACT MAP 3 REEDY BRANCH CREEK CROSSING 4 WATERING CAN LANE STREAM CROSSING 5 RISE AND 5HINE ROAD STREAM CROSSING G GREENWAY CREEK CROSSING 7 SCM POND#3 IMPACT 8 SCM POND#4 IMPACT 90 SCM POND #51MPACi 1 SCM POND#G IMPACT II SCM POND#7 IMPACT 12 SCM POND #81MPACT 13 SCM POND #91"FACT 14 IM SCM POND #10 PACT I5 SCM POND #II IMPACT G SEWER OUTFALL BUFFER IMPACTS I 17 SEWER OUTFALL BUFFER IMPACTS 2 8 SEWER OUTFALL BUFFER IMPACTS 3 1 9 SEWER OUTFALL BUFFER IMPACTS 4 20 SEWER OUTFACE BUFFER IMPACTS 5 21 SEWER OUTFALL BUFFER IMPACTS G 22 SEWER OUTFALL BUFFER IMPACTS 7 23 OVERALL STREAM IMPACT MAP 24 EX. STREAM IMPACT I 25 STREAM IMPACT I 2G EX. STREAM IMPACT 2 27 STREAM IMPACT 2 28 STREAM IMPACT 3 29 TEMPORARY STREAM IMPACT 4 30 TEMPORARY STREAM IMPACT 5 31 TEMPORARY STREAM IMPACT G 32 OVERALL WETLANDS IMPACT MAP 33 WETLAND IMPACTS 1 34 WETLAND IMPACTS 2 o GRAPFIC SCALE aoo PRELIMINARY PLANS NOT FOR CONSTRUCTION U J J EL w w z ILD w �p a 221 N. SALEM ST. SUITE 001 PO BOX 1062 APEX, NC 27502 Office: 919-387-1174 Registration: P-0151 www.jonescwasen.wm IL1 ILJ ^L L.L LLJ 0 U 1 1 "=200' 1 PLK I DECEM13EP 2, 2019 152G 1(?(V � �� 1 / (err,` — —� c it /ii s��J (� D T r // / �1/�/� i� CL — �// ls_ s / �_ ' 1' � C7 �,J VO"AY'D A� / o - E cR Div ab W E 1 J 2 PRo �oN Is ID P3IN�rA rz{� /�� //�N� / NOR$ERT AMD LIBT�I RUBA u u O / 0 SEG4441i 505CALE0511 Ef5T W �) l / /PI}IIIPPA C,�11ER Clfr )PIN 7O r24A /E / V/ 7 I� l YONEYi i N\ r ` o �1 C �7 �lll// w /ll' f (()1 DF a s ; P o o 11 c 1 O//S sEA sN,NE RDA 1 *� _\ ��� //j/ �\V��� 7Ne 1 Q O rorA� Bu�ER IMPAc s sa �� o P ❑ ❑ ❑ // //J<q �. `� ❑ ���/ / ( / ZONE IMPACT 36�4PI 6P .0 w J I) / I l / \ �I \ \ ❑... P O O O / Q ❑ ❑ ❑ HFYi ZONE 21MPA(.T 31,923 SF U El S\ \ ONE3IMPA 32,8255F 221 N.44LEM Si o / / � o °❑ opo° , ///JJ)��1 + � POBOOx1062 APEX, NC 27502 Office 9lon: P-„51 - � 5 f � � 1 �) 5 < � v� � �/1 /�� ,' II � a a o a. 9_. D ❑ / � � ((���� � � 74 aey n�em�: P 0,5, �- /) — (D ° f/ s �rl�d�r v�f �p t�� (� \� ry ❑ ❑1 �� // LL it ) )>j o ❑ ° UDR �� v �l/F/ V t� o Q ,// o uo o o = L JY)) �\\r�� \\�\n�l I, � J �� �/ /� �A \ I' iaoA o o o ❑ ❑ ❑ ❑ ❑ ❑ �as�. ' ,ti�`~I�9��) `� .f ` z L r'� ❑❑ ❑ ❑ =fit\ ( Q \\ Li I / \ \�`—✓EEC`A fjA�GHER �� F.3 �, O O O i / ^� i�\ o r - Q W LL VAVA v ZONE : R dw / mac/ /,- LL Z LL s i -r _ J SJ a� LLJ �' /f �`� i �i @ // ) P z��-� s c �Ro ,t i%� f ✓ . /,/:vncA� `� 1 ( l W �7511-- w`` ` q►' `moo' 1 ( j j �A �� (� o _ / L'Fa I — Ill /� ti � f/ PLK s tv v ' �ti� ���—zoo' 7-7 DECEM13EP z, 2019 _I�f/-yK4 / ill ��\ i, / J ��'� C /� ✓ _� �/� �� E �' \�� /Ir _... / — `.. _ \ RN GRAPHIC SCALE �/ PRELIMINARY PLANS �� PDND i��—////� �VA 2 NOT FOR CONSTRUCTION 1526 RCA 50' TOWN OF APEX STREAM BUFFER (ZONE 3) _—----�---- -� IMPACT = 8,7G5 SF 50' ZONE 3 1 III I III=I I=I 11-I I TOWN of AJEX IIIII= I III= I I I II 1�1- I I I I- III I=1III I I I STREAM BUFFER _ _ 20' JORDAN LAKE I III I=I II =I I f I STREAM BUFFER (ZONE 2) IMPACT = 3,5 15 SF 20' ZONE 2 \\ r III- =IIIII III IIIII III ____--- JORDAN LAKE AA,— — ----- STREAM BUFFER 30' ZONE I JOKE_ EX. FL AY _ STREAM PUBLIC DR. if BUFFER EASE. — — — — — — — — - 30' ZONE I \ JORDAN LAKE STREAM \ \ BUfff�E-F7 DOUBLE BOX \ - O' ZONE 2 WITh _ _ _ _C_ULVERT5 JORDAN LA.S,E— / PRECA-S,T, 5TgZkm,13UFFER 1- ADWALL — ----- ------ - AL& _— — — — — — — — — -- ENEPFAF&=- EX. 40' TOWN \ "EX. 50' ZONE 3 OF CARY TOWN OF APEX SANITARY STREAM BUFFER SEWER \\ EASEMENT \ ---- ,' - --------------�--' /►ttr i.-+ / ♦ r `------------ ------ —, 1 r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r/♦ / r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r/♦♦♦ r♦ 0 4"/ r r r r r r r r r r r r r r♦ r r r r r r r r r r r r r r r♦ ♦� r r r r r / r/ r/ r r r r r r/ r/ r r r r r r r r r r r r r r r r r r r / r/ r r r r r r/ r/ ✓r r r r r r/ r r r r r r r r r r i r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r\r r r r r r r r — r r r r r r r r r r r r r r r r r r r �t►♦ / r r r 070, r r r r r r — r r r r r r r r♦ r r r r r r / \ — ---L4,LLOODPL PUBLIC DR. EASE. / �30' JORDAN LAKE TOP Ofk \STREAM BUFFER (ZONE I) BANK_ — — I M PACT =-5 7 284 -,U — — — — REEDY g — i 5_0' JORDAN LAKE 'STREAM BUFFER (ZONE I) — — > IMPACT = 5,210 SF -- 20' JORDAN LAKE STREAM BUFFER (ZONE 2) IMPACT = 3,4.G3 SF — — — — — — — — — - 50' TOWN OF APEX STREAM BUFFER (ZO.UE IMFACT_;��4 SF \ 20' \ GREENV.VAY EASFFKA ENT 5TREAM CR055ING-5UFFER IMPACTS ZONE IMPACT ® 10.494 5E ZONE 2IMPAGT ® 6.9-- ZONE 31MPALT I 1,3G9 51 0 10 20 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION ZH K SALBA sr SURF OM PO B000 IW2 OM— 919-M-1174 : "51 _..._ i N� 0 0 Lu _Z Q (s) Q � � = 3 0 ILI L ' U Z �z Q LLI LL O U � � U Z (L (3 U) Q Lu �jQ o 1 1"=20' 1 PLK 1 DECEM13EP 2, 2019 3 152G / 2 �� ✓ // / // .' TOP OF f/\\BANK IG298^I-F.- ey 12< JO AN CAKE // i v // ♦♦ // i �%, Y� \ "/�(� 49G �� a \ STREAM B FFE�(ZONE/ 9510.3 S.F/ / / i //�♦ 1 r `fW �72.G 1 .9 i —�9�OWP�4f=APEX \ TREAM BUFFER (ZONE 3) 7 I M PACTc 4-t 5 f I\ / v\ �� \ �--- -�� - �` III ( .� � // ♦' I;' /_/ SUB IC DR./� / 30' JORJ.AN LAKE 3-08 l ��79.4 S.F / ` AS STREAM BUf / `ftR (ZO0 1) / .— — — � / / /RPEX / — 1-1 / 1 M PACT/� 3 b I� / \ /�O' TOWN , .1 / /�♦ / i l BW-27W-27.9 / 01 48.4 S j: \ -STREAM BU Ei� (ZONE 3) �% (/ (////� 98 IMPAC J 1,9005F / AO \ / / / ETAINING 3P 5TP.EAM CRO55ING - BUFFER IMPACT5 ZONE 1 IMPACT ® 1,28251 ZONE 21MPACT ® Z.-SF ZONE 31MPACT 8,�63 SF U J ' J W 0 a 0 Z_ co E w W z W .C� W APE( He 27302 ol5= 919-M-1174 Rpbfttlon: M51 Gfi)2.0 S.I \ — — ------ f /'� /' AL /# 15 I I l / , / �(/ Z804)5.2 S.f.// UBLIC dR. TW- T) zo EASEBW-/2725 i L0 P-','EAM BUPf`ER (`L NE 1) IMPACT/= G 1 // I�♦ I Hill♦ ♦ � PRECAS,,J 1, III -III 1089� 3 S ION I \ ^ ,L A�� AREA // "IlhlAl)75P LL I I \ (ri ' / INCLUDeD IN SEWER �/ / I IIII \ / / ( Q � Z w P') // OU�lL ALL IMPACT ,�� (TYPO ,�j I IIII— \\ / O Q Z -- / \ i ♦ 20' JOR,/AN LAKF// / - _ \ �� /��. 3 l l Q / ��,�,s� IIIII I � 2 2 Jl / STREA FFER Z E 2 — Z �o z IMPdIV�T=2,1(9SF ) // / J\ \ ) l�s / i --------------- �; \ / / 5 yTOWN O APEX - ^/� STAM BUF R (ZONE/3) i 1 Z /rl'fv1PACT/ 6,712/!�F // j \ �i / I I \ •• w w VAS WIOUE3. Dr. [�TI1 /— — \♦o/�� v�J/ �// ��� // /i�^` �� \ 2 ,� 2 _ , I �l,q IIEASEI o /!!8 9/ cJ.F, o 10 20 aDECEM13EP 2, 2019 fl I GRAPHIC SCALE IMPAVokEA / �/ i SCI(il INCLUOT' P IN POND / P�J�� -� #� / ! I J 49G .0 S.F. \ PRELIMINARY PLANS = — --� j'/#8 IMP / / � / I NOT FOR CONSTRUCTION 4 _ (SEE SI�ET /2) / ,� / / \ _ p \ ti 86 152G /!�85 S.F. 7. Jo 4 140r IkTTNANCE O �� �/J /LEVEL /30 -10RDAN'�eISE _ _� l y -• / / / / / `, RP M BUFFER vphlf n _ \ 5 low 4.6 S.F. 59G5.9 S.F. i /� // /li I -49 ■■� -- 30�Z� 1 J / / 20%J6RDAN EKE `� / ,30k J&DkM-L'8 �' JORDAN L6Kf - _ 1 STREAM BUFFER / STREAM BU �Ef� (ZONE j STREAM / "`• M (ZONES 1) IMPA T = / IMPAC-T = 2, 1 92 S� BUFF f� / / 29 / / / / / \\ J� I ' / / 3\555 --�— 20r—pNE 2 4 JO DAN LAKES WPEAM / ,�\� 9177.2 S.F. O� / 0 og / , / ( STREAM CR055ING-BUFFER IMFACTS ZONE I IMPACT ® 6 951 SF ZONE 2 IMPACT ® 5,341 SF ZONE 3IMPAGT 05F U J 'c J � aW C7 � Z Co W o z Lu W w V I� L5 A;;(NC 2M 015= 919-M-1174 Rpbfttlon: M51 20' JORDAN LAKE �' ���� // / 1 �i o Z / STREAM BUFFER (ZON 2 i / / / O1 JOI�DA/ N � v� � N LAKE / IMPACT = 32 SF / / / \ STRIIAM BU'rER (ZONE 2 o (� /YiV1PACT = 280 SF / /LLJ WA O 632 314 LLJ / / / — — / / / l i� ♦♦;j / \� ��\ 13349 � S.F. ) Q THE / / / : DR. EASE: �� / Q Z p -- PROTECTION LL O Q FENCE (TYP ' Lu ♦♦BAD / /-277�/ /262.0 / / / i �// / / 2�W-27,4.0 ` Q / LLJ _ \ , 29'�ORDAN LAKE // J i / //// i / // 9023. 1 ,..f . \ �' // (f o W STKEAM�3UFFER (ZONE 2) / / , , / / / Q [� j � // IMH`ACT = 837 SF o — I "=20' PLK / �; ////pDECEMBER 2, 2019 / 1 / / 0 10 20 40 XW-277�2 BW-j 5.3 12 �� i _ / RCA_--- WIDTV/ GRAPHIC SCALE 7�)C) fRA c, F // : / iR npi PRELIMINARY PLANS 5 NOT FOR CONSTRUCTION 152G I V I I I �, `�\ r l I i i // ofl; I 960 .9 S. I I 1 Il // / l� IMPACT AREeINCLUD D,-ON I 1 i \ \ `r \ \\ I I \\ ^ //� I \ SEWER OLfiFALL 1 ACT I 1 i (SEE PIViEET ) / ,lli 11 � �.�'=•_ \ 1 I � \—���\I\ � ; � � , \ \ \ / / l I li l l / �\ '=- • } , c3 1 \ � y \ \I I I I I I Itlll% fl llI / \� Icy\ \ I IIIIII ; I\ \ ; I 29 l l a\5OWN F APEX % II I II IIItI! +I / i11640.5 \ F. ( ) I ?\ I➢Q j. IMP T= 2,y96 �FIt \ I 1 F� \ 1 I \ I I 00, O o_ I / 1Q % IIIII\ \ �\ ✓\/ / / /� / / / h \ \TOP Of \ I `\ 1 ) \i � / / I i / (/ / / \ l 20�J0KV N LAKE `� 1 I / 11 I , \ 9444.8\S.F. \ 1 STRE�vI BUFFER (ZONE 2)/ f ` BANS 1jll I \ I ( / / I 1gI`_AGT_ 409 SF 30/JOR,AM LAKE / STRE BU F R (ZONE I) , X� \ I � C /� 68I SF / / /� ����AM UFjF�R/(Z NE/ I,�, / / l I ;e:•;.. \ `� T I I�AT/= 93DSF�'/\— I l / / ' // / % / _�-I- - % l; — — P ° \I z� �• .tee ! i II 1 I I Ill//(/ ���L—� ��� �\ ���.• =�°= I - I � �:;: •:1=:-��°=:%.°. I � iTn A IfI/ \� �' \ I cJOIIJ�RD IN 1_4 \ i \ 50' T N OF APEX \\ \ / UFF (ZO T �E�, — NE 2) � �\TREAM BU E� (ZONE 3) i \ i INAP 5 S� i ` \i 1 \ 1PACT = 3, 12-1 SF I BW-263.0 /10704.? S.F. r. // 'T/ACT A EA INCLUDED ON 1 / /SEWER UTFALL'IMPACT 1 (SE�SIrET 17) /� I cr)l �'�i TW-2162.0 / i BW-P56.0// TOP Cl\ / / BAN \ / i I �Di It TW 00 254. / / d / / AN n GREENWAY-5UFFER IMFACT5 ZONE I IMPACT ® 1.665 5F ZONE 2 IMFAa Up 9 1 SF ZONE 3IMFAUgo 5,21�SF I ' I I I I 1 I � - o Io zo no 1 \VA GRAPHIC SCALE I PU PRELIMINARY PLANS NOT FOR CONSTRUCTION U J J W a Z p� W E W Z w lip :E .SURF ODI PO BODC IW2 APEX 1x27302 001— 919-M-1174 "51 I N� �zo 0 ILJ Q Z L Z CZ LLJ LLp _ � U LLJ ~> Q LU ILI a Q° _ �° 1 "=20' PLK DECEMBEP 2, 201 9 G 152G ht9P 1 13/2.05.f. N N ` \ ` AREA-- PARK 5cMM A �\ YARD INLET (TYP.) ,../ / 50' TOWN OF APEX— — — — — — — \ XTREAM BUFFER (ZONE 37r, — \ / IMPACT = 51 1 51' 20' JORDAN LAKE RCA STREAM BUFFER (ZONE 2) IMPACT = 201 SF IMPACT AREA INCLUDED 30' JORDAN LAKE \ IN REEDY BRANCH CREEK STREAM BUFFER (ZONE 1) I CROSSING IMPACT IMPACT = 309 SF \ (SEE SHEET 3) --� \ -------------- S�A�A4 20 0 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION i� _.SURE OM _.. POBODC1W2 APEX HC27302 ol5= 919-M-1174 Rpbfttlon: M51 wwwJawao�mm l� N� �z. z. LU 0) o Q8 �L3 U Z � Q L Q � tL z o 0 z L � 0 �� ::) U T LLJ tn I Q° 1 "=20' 1 PLK DECEMBEP 2, 201 9 7 152G //%// 1 5" RCP o== N / �0��/O= / / / I / cTCH4 25 BA5fN (TYP/.)///MPACT AVA/ I / INCLI/DED IN / / ; I I I I/ 6" RCP SEWER QUTFALL IMPACT / // I 111579.8IS.F. I / (5v 5HEET/17) / l / I I I //I/ //\\ 27 I /I / / 4 1 1 57 .4 S.F.1 \ U J J W 0 a Q z Co w E z W w I� L5 POBM112 ARK HC2M 011lm 91%W-1174 pAgbft m: "51 LLJz, SCM \ \ \ 13397.3 5 Q / I / /'� Q /20' JORDAN LAK STEAM BUFFER (ZO 2) RISR LL_ I ' ,I IMPACT = 243 S '�� ��\\-- I-- — J �, 0 Ln 0 -- , — // / DI5CHAR___ G� 1 1� \\ l �,��� �Ni i / — — TO EX./ CHAN41-LLJ -- // Yi / / o 50' TOWN OF AP�C— / / /'�TREAM BUFFER (ZONI E) I \ =zo PLK I IMPACT = GOG 51A I / 1/ / 1 pDECEMBER 2, 2019 o io zo 30' J9RDAN LAKE / 11 /) GRAPHIC SCALE / STREAM/BUFFER (ZONE 1)/ / IMPACT = 3G4 SF / PRELIMINARY PLANS (� ^ \ NOT FOR CONSTRUCTION 8 1526 -36 300 I5uFFE222 5F � �'�— � — — IMPACT SEWEROc (SfEE 50_VWN C(F APEX S�KEAM\PUFFER`(ZONE 3) IMP��T\= G84\5F / / RISER 1 / ; I/�I I I� I !p� Il / � l ► / � / / I I TbP oF� I SANK I I / I \ IMPAd AREA I apDEO IN SEARIOUTIF LL IIMPAC-T,/ E EIET I\8) \i \ I /\ \ Uu. 1 \ \ 1 1L1 1 \ I 1 R TAININGI 9 i / 1 �� �LL#I71 i cr) I �\ � \\ \ i \I I Q 1l s /�\ \� o �, I A Icess IEasE TV -274.6 I I B-272.P qW-27 ---4/ 13� I I I / J,1 Il i II 1 I I 1 I �.jI I II TW-270.� / BW-269.5 bba&.!5�5.F. POND #5 - BUFFER IMPACT5 ZONE I IMPACT ® 3O05F ZONE 2IMPALT ® 2225E ZONE 3IMPALT 68451 0 10 20 40 GRAPHIC SCALE PRELIMINARY PLANS `l NOT FOR CONSTRUCTION L5 ZH K SALBA sr SURE OM PO eoz IM2 APEX Mc 27302 OM— 919-M-1174 "51 w Q L � z Q L Q z LL 0 L- Q m w Q U L Q z 0 U 1 1"=20' 1 PLK 1 DECEM13EP 2, 2019 9 152G I/ \� / / /REIAINIi�\\ -- 2 / /COM�IN�T/0�J / 74/ 9.6 F. I li -NEE ko EtTIP�J E \ )I ` ACCESS EASEMEhT \ RCA 0 SAT 1-1 BA r5IN Ty J 2 /CBI A04�.8�'.F.I / / i // / �� ' � ICI\\ \ `\ \\ V—/ RETAINING WALV#2 MALNUNANGf EASE. I_ _/ P STORM / \/ \/\ i ' SCM RETAINING/\ r �n / 783 .6 5.�. / / �r I �JI I / r,\ ! /� \\ � I \\/' )� 50' TOWN OT r EX / I I \ `�` RISER STREAM BUFFER (ZONE 3) IMPACT = 542 SF____� � � /ice ' DISCIIARG� �� TO Cl;14NEL 64 260 / I 3:1 I \�-- — SLOPE /20' JORDAN LAE��` \ 1� TW-268.0 / STREAM BUFFER/ �� (ZONE 2) IMPACT BW-258.0 253 SF I ) ) \ \ 5"TOA UTIILITY \ ) \\ \\ \ \ \ \� f ` // l / / %LTor OF STRIP (TYF.) \ \ \ .SANK KTAII)JING // //' / / ALIT# I ) , / j / / /,301' JORDAN CAS / RF/YAIN NG y�� / / /I / i (ZONE Q IMPACT J/ WALL 12 / // / I/� 1 I = 3N SF / 11897.0 S.F. POND #6 - BUFFER IMPACTS ZONE I IMPACT ® 3865F ZONE 2 IMPACT ® 253 51 ZONE 3 IMPACT10 1 542 SF 0 10 20 40 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION U J J W � a 0 Z Co W o z W w 0) L5 ro & &2 APEX NC 27502 ol5= 919-M-1174 Rpbfttlon: M51 l N� �zo 0 ILJ It Q� pL U L z `L L Q — Q L � ILz o -L z L � U Lu Q ° 1 "=20' PLK DECEM13EP 2, 2019 10 152G IMPACT AREA-WC-tUDED IN / �'/ 5EWER OUTFALL IMPACT ��i"I � 1 RETA NING O / 4 (5EE 5HEET 22) / ' % / WALL #8/ I �� ��j �� •�� �,,- / / 1 OAS a Jo DAN LAK / > 0) 5 EAM 6UFFER (7/ONE y / 4/ )IMPl�CT=ZO 5F -0 ITOA Al i r \ AO �pS�M J / / 3(/ 16RD N LAY�E \ / 5T 9'(vl BUFFER ENE/ I — \5 / I )` PACT = 32 15E 20' JOfDAN LAW 15TREAMbUFFER ( NE 1 2) IMCT = 22�/fiF 131 27.E 529 RISER // I I I I SCM #7 I I \ T111 \ P ECTION / / \\ \ / I 1RCA 1 1 \NCE (TYP.) / �� •� / \ 1 �\ 11 I N \ \ 41) 30'JORDPNl�LAKE REAM BUFFE(Z (ZO�t`J.IMPACT =1 12 5 ly*' �/ \ ♦� / a I I I / TREE \ ♦�♦♦��// // // f I 1 I // /PROTECTIQW ONE I C ♦♦� <, /i , / 5F �� i �♦� /J /��i / / /: _ �i I I I / / / / l VAR. WIDT \ 20 / t1— PUB. DR. EASE. Jn� i ——I Joo C3;3'4P7.9S—— vE WE-R li/ 1 A11 v/-P 1 17.3 S.F. / 1 425/5.0 S.F. I / / 4255,,C S.F. i —DR P INLET I(TYP.) I , 42�5.0 S.F. II 1 425�.0 S.F. I' 4255.05.1'. 'I I \ 25 / 4255.0 j F 1 U I N RCP STiORM / DRAIN/(TYP.) 2� 42�5.OS. H. /4255-Qj. 4G95.96 F • - � A,yAyA4 Illll��i�llll 2 3 0 0 o ao GRAPHIC SCALE D2 2 // PRELIMINARY PLANS / NOT FOR CONSTRUCTION U J J W L C7 Z_ pb W E z W w W i"i _.s5w o—� _.. PO eoz msz APEX HC27302 011lm 919-M-1174 ��: "51 -AWJ— I o N� �zo 0 w� Q° �L3 U LL Z L Q — Q L � LL z Q - z LL �� 0 �m � U w Q ° 1 "=20' 1 PLK DECEMBEP 2, 2019 II I52G 1 � v J c 9L )I 2G62.0 S.F. ' Z /PUBLIC Dip,. / � I I \ / `� Ca w E i-- 112 12.6�5 _ / \ . / ; EASE i I 4f _I \ / /' W rn W _ Lu `o \ / \ i / ♦♦ �� PRECAST / I / TREE I Oc _ � I PROTECTION ,• ^ /.L /�� /' �� 11�AID) P POND #8 -BUFFER. IMPACT5 ZONE I IMPACT ® 3435E ZONE 2IMPACT up2105E ZONE 3I-ACT 8,584 5F C SURE 0M -------------- L — . IMP fC AREA INCL ED IN / / `� PEXHC2O BOX 5z --------_ / .' // /I WAf$IfNGCAN EIMPACT / ----------------- dl1m 919.i®-7174 (5EE 5H 4) IMPACT AREA INCLUDED IN \ \ I TOP OF 5EWER OUTFALL IMPACT /�I///\ \ BANK (5EE 5HEET 20) / // \,P� r� s�—fit r r}sy rr� n��T�► j / / / 0�,.(�,�0 P� �\�/ P / / r ' ♦ \ 36�6RDAN LAKE STREAM BUF o (ZONE 1)I'A = �// pF W --------------------------------------------- - / Q 20' JORDAN,4p\ / 0/ —I `JC4A STREAM 207ER / Q�C — #� // / i L U (ZONE WIDAPACT =/ / P '/ // I / \ ♦ / 50' TOWN OF APX I ,� / / / ^ \ \ ♦ i / / 5TREAM l3FFER / / / / / �� / �� /�� VAR. Wl LL L (ZONE-3)MPACT -/ — // / /// i' PUB/VI �(ztlz / \I i ♦ — — / 8,584 SF / _ �6 / // / / !` / / .' FrASE. LL O Q 505G.2 S.F. �_ 0 �� /,�' / r .y/ 4752.25. ' / / `� LLJ \\ I I 1\ ( RISER 7.0 RETAINING \ �\ e �\\ / Q ° 6.5 WALL 3 / // ` I / 47` ° PLK 39G1 � � Io zo ao �\\ \ ` / pDECEMBER 2, 2019 / 11 \� \ '\ ` 4 GRAPHIC SCALE 124 S O 5 %4.4 S.F. 286 / q� / 3 9 \� / � PRELIMINARY PLANS \ / NOT FOR CONSTRUCTION 12 30 G 1 1.0 5.�. / I( ` �� z 1526 I \ \ I I I\ I /X�� 1 08,�2.7 S.F. 50,S l I Y I1VT�A�T A INCLUDED A A ( SEWER O�l`F\ALL IMF%CTI— /\�� (SEE 5119�T 20) `y- \k I I\ — � \ \\ I � PtX btREAAM BUi fE (lE 3) =- - - - - - - - - - - �./ C/�/ //�'� IM��C�T AREA INCaJDED Ipl— / CES //ER OUTFAL-,fMPAOT \� EAS -'� ---/ /\/ RCA IIMPAC,�-4,67,65���\ / l � � Il )� \�i�—mil-- — � � �• rnl0 1 ��_1t• is i6 a 1 _ 1 1 20',1S]�DPcN'tAF�E STkTAM BUFFER(ZONE 2) \ IMPACT = 204 S_F__ /f 30' JORDAN LAKE SZREAM BUFFER (ZONE 1) IMPACT = 30G SF i POND ,19-BUFFEP. IMPACT5 ZONE I IMPACT ® 305 51 ZONE 2IMPACT ® 20451 ZONE 3 -ACgo 4,- SF I 0 10 20 40 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION U J 'c J cc a z Co Lu E W W z c w I� .C� W 3 ZH w 51LLBA ST. SURE OM PO BODC IW2 APEX Mc 27302 OM— 919-M-1174 "51 Z �_j L U L Q 0 U 1 1"=20' 1 PLK 1 DECEM13EP 2, 2019 13 152G 1 31 27.& S.F. 529 It P TECTION / / \� NCE (TYP.) l/c /-- / 1 ` POND #10-BUFFER IMPACTS ZONE IMPACT ® 53Ell ZONE 21MPACT ® 405 5F ZONE 31MPACT 0 SF -306.0 -3Q4.0 / 25 TY�B C / LAND,SCAP %BUFFER / / / CATCH SIN Mti .) / TW-3Si4.0 / 0\. ' i� RtTAIN NG � WALL �5/ 1 'too 52 //' 3f0 RAN LAKE I i ♦•'1 //// / / / / 5;FREAM BUFFET$ (ZONE I l ••' J j // 10E F 957.S.. I) IMPACT = 53 SF i—E:4- el / 20' JO�D LAKE / / I / / — ✓ / / //f 5TREAM PER (ZONE y� �=-�j 2) IMP T - 405 SF) \ 4 '• / / / �8S.F. 5 S / ( //ANa ' I S E�SEIvk> NT / / ol � /a Az PR / I -- r�\�\� —/ y��� --�i� / j//' ��— 1 14/5.9 S.F. / /� , IM ACiAREA INCLUDED jORDAN L6K� 3 16 I / / / 11 P115E AND 5HINE EAM� o 0 o ao \ROAD IMPACT 5TR/ / BUFFFI�__- GHIC SCALE 1_----- 2 20 pNE / / / / \ RAP JO DAN LAKE^ /// / 11896.0 S/.F./ / i 5 REAM/ PRELIMINARY PLANS 9 177.2 .F. �p / /„ NOT FOR CONSTRUCTION / S��/ / / I I ve / / (/ / I 1 J� 15 / / / / / ,. U J J W 0- a C7 � z Co w m z z W w .C� W Po Boot tosz APEX NC 27302 gllx 919.3®-1174 Rpbfttlon: M51 �r I o N� zo LLJ n� zo �1 1 0 p L U L 1 L �Q � L O �z 0 0 L Ln z 0 ILI Q ° 1 "=20' PLK DECEMBER 2, 201 9 14 152G 5 8 —F 112585. S.F. 1 5 ��''— � / / ! / �/ \ // ' _J /cn I II IIII I+ II ► \\ I I \ I IA-3. 1 5.F f �\ IIIIII 11 ; I II , I I , IX I I I IIIIII I' INCLII�kcy I��ffal I�Deb1\ N RI TrI�I�TL I 15 S.F.\ CATCH IIMI \BASIN (TYP—.) /o Ov// \I I \\ 90 I I I I I I I I � IIIIII III I III III 3Q, -�oA SANS \► � \ � \ � , I / � � \ �� � : � / I I IIIII 1 I`II I I II III ( III I I \ R EA5�- I _ \ 1\ \\ 507 vAR. wID 80.3 sPUB. l 05 EASE.I \ � 5 / jCM#1\I, 1835.4_ I, I I I I II I Ioc II 111\ /IIIII i 1� IIIIII (I I (1 I\ 1 I► ' 56-,p N OF STREAM BINXER I, L 3)\ \IMPA � _ �, 18 �F \ III e• �,��` \ / // /\ III I I III IIIIIIII \\\ y l \ � .IFS • / I / / 1 ( III IIIII; III III II \` \� I� \ ; \ �� ; / / 564 75l15.45. 11 \ I I III III II II \ 1\I h \ I 18 cP AC�cE55 EA 1 1� I III III(, II IIIII I I /� � R\ LAKE SEMEN II I \ \ 1 111 II IIIII I I STRE/ M �L (ZONE 1) i �{ \ \ RIP -RAP OIYCH '1 II I I I 1 I I II II IIIII I I IVAPAT 3\ SF I, \ \ \ TO ¢11XN lEL 50G 20 \J5R AN LAK/ I :• yI 565 ` '703VRE MBL?F ER (ZO E 137,5.�SF.In�P�cT 14 239 POND #II-6UPEEK IMPACT5 ZONE I IMPACT ® 31251 ZONE 2IMPACT ® 2395P ZONE 31MP- EM :, SP I � \ IIIII \III I ;III ► I ► �,` � \ ,\ > �'� � , , y\ I I ' I I I f ( / r/ - / �.: � I I I I \ ►I I I \IIII II I I \ ; II I IV � I I I I I I ' I ( I I I 1 ' _r /a. I \\ 1 ' \ IIIII v IIIII I I -- 0 10 20 40 MPACT df+A /FL DED Ik SEWER/oc LMPAC < (Es�T o)GAHIC SCALE� :5(S67 1 14.7 \\ I I I I I I I I I I 1 1 I /^ /, I X I I I I I I I I I I0� I I �I ll PRELIMINARY PLANS i NOT FOR CONSTRUCTION I \/ I I I I 0 II \l I \III I I IIIII \ i� �\ \ \ 1 I ✓ �\\ y I \ \\ \\I f"IbI ) I 19157 .5 F. U J ' J W � a C7 Z Co w E z io Z w .C� WCC .4 SURE OM POBODC1M2 APEX 1x27302 015= 919-M-1174 RpIvIntlon: M51 wwwJawao�mm I o N� �zo zo LLJ No �L3 U L 1 L z Q — L _ �z 0 0 L En z 0 ILJ Q° 0 1 "=20' PLK DECEMBI 2, 2019 15 152G 15W-253.0 .---�------- ----WALL#I — — — - \ \ - - ------------------------- - - — — — — — — — — — — �/� \ — — — — — — — — — — — — — —— EX. FLOODPLAIN l lQ �l l � / ) — 1/�/,EZLANDS - flllllllllll Tr_,L, ♦ ♦ ♦ ♦ I \ , r♦r♦r♦rr.�!'r �I I I I I��� �� _ _ 50' TOWN OF AP _ ��` ������ I lI11 50'ZONE3 � TOWN OF APEX I / I STREAM BUFFER (ZPNE 3) � I II I / STREAM BUFFER _ I IMPACT = I ,G2/2 SF I -I I I I II � - --- 20',d6RDAN LAKE ------ JORDAN FER STREAV BUFFER (ZONE 2) IMPACT = G42 SF _ — 30' ZONE I - / / - — / JORDAN LAKE \— STREAM 30' JORDAN LAKE — STRAAM BlYffER (ZONE I } BUFFER— / \ /IMPACTS 9545E /��\--- -----_-----,=--�— N--�—_— _ — :-- REEDYBRANCH CREEK�— I ZONE 30' I— _,5T<EAM BUFFER (ZON �I Y J / /— TOP OF \ - JORDAN LAKE - IMPACT = 92 BANK \ STREAM BUFFER_ \,� �� ,/�� — 20 LAKE �� _ —�� — — _ ----__ O'ZONE 2 / STREAM BUFFEP/ZONE 2) / ORDAN LAKE IMPACT =IG 13 SF / EAM BUFFER _ i , , _ \� / 50' TOM—O.P APEX 5 / / I STREAM BUFFER (ZONE 3) , TQ , \ — IMPACT = 851 SF— ♦1�♦1����j��u��rl� F2 F♦_..�—�� , r, r r r r r rl r r r r♦ r, r, r ♦♦♦ r r♦ r ♦L,. ♦ r♦ r r r r r r r, r r r r r r r♦ r i sj r r, r------------- ♦♦♦ r r r r♦ r♦ r r♦ r r r♦♦♦ / \ , r r r r r r r r �r ♦ r r r r r r, r r r r r r r r r♦ r r r r r, r, r r r / ♦ r r ♦ r ♦ r ♦ v ♦\.. r=♦s— i_ �—♦�_ .� — ,--r ..� ♦ r � r r r r r ♦ v ♦7 � r r r ♦ — — — / �, — — —�� — rrrrrr�♦►♦�T�rrr, r,rrrrr r♦r♦rr�J��L, r, iv�rrr / � rrT i ♦ r ♦ r r ♦ 71r r ♦ ♦ ♦ ♦ ♦ r ♦ r r ♦ r ♦ r ♦ A ♦ I-♦ ♦ ♦ ♦ i /�'{A r�=♦ r \f Tip / r r r r r r♦ r r r .� r, r, r r r r r r♦ r♦ r♦ r r , r,♦, r, r r r .r♦ r �r r--r "� / t I� 1 ♦� 1 /� .L♦ 1 .L♦ l .�♦ J- ♦—F �- I—♦\ �- /—/ �- ♦—♦ t I—♦ j III----♦♦ -r r-♦ ti-�'�S t r-♦ r ♦ r ♦ r , r , r`( r , r rF yr r ♦ r ♦ r ♦ r , r %r , r , r �r� r r ♦ r ♦ r ♦ h, r , i �I \ \ // // r ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ J—'i', r ♦ r ♦ r ♦ ♦ ♦ � ♦ r , r ♦ r ♦ I ♦ I ♦VI ♦ I ♦ ♦ \, WETLANDS. 1 o 1Q o qo \ \ / / / / ♦ r r r r r r .� r r (TY'P.� r, r, , r, r♦ r r r r / / \ GRAPHIC SCALE / � ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ \ \ / ♦ /------_♦ PRELIMINARY PLANS NOT FOR CONSTRUCTION i U J J W a 0 Z ca W o z W W w50 lip 0) .C� W .5 PO BOX IW2 APE( HC 27302 OBI— 919-M-1174 R�BW�tlon: M51 l N � _ 01 W � � Q U L 3 L L Z [V L L- LL0 m Ui J Q m � O W W^^ LU �^ QO O 1 "=20' PLK DECEM13ER 2, 201 9 I 152G NcC ED����\ '��\�� �\'=`;•. �. /' \ s / — ! / / / \ I I I I \ �P�SENw Y IMP�,CT // . :. \ .; i� CL 0- io l 11 II \ �I I I I \ \ _ 2 J�*ANjLAKE\ III= III—IIV \\ \\ STREAN\UfF ONE ; — —IIII y I \ 20' PU IC W m i III IIII \ I \ \ i I 2GODR. E sE. W — \ Ti1K-2G3.5 C7 ! / / / / / / / , p/ , IIII BW/2G3.0 /10704.3S.f. ® z / // 050' T N Ok APEX j III — � W V /j SfE Bump (ZON 1 ' II II�� I I P r , IIII II I I iii DR wY5.0 /lip6/ \ Al c I UBEB �. o>�l /��TAN Iff— /b FII 2�G0.0/9 BW254 u=J / ; / / / -/�j // /���/�// / / I IIII III / �I `NQVJ�5 / 1 I7 0.2 F. / .1� -• N r�\ j I / WALL # IlG/ es°I // I I -26�q 2G.o / l f -- IIIII — \ III I I f l 2 5 6 sun = ro Soot I= ARK Mc vsos oNlm %9-M-1174 \ �III�IIII i I 1 // / \ 1— , / 7 / I II II , 1102 .G S.� / w \ �' \ ,j�/ " I / \ / / / IIIII // / / / -i / I / I I I Q / 1 w \-7II/ C273i / 27, \ \ � l I / / ! ' / / � / \/ �/ / / / IIIII ; / / •- / / 4 I/� 113 9. S.F I I Q o HOA W 15" CP 1Afil� � % I I / /l l 1 I I I I IR�M POK Q ° U ;I / \; I / �r ,/ J� o=�= / ��IIIII //// J/// \ / / / / / // o �°T�,z smJ III=fII, I ,cz /40 // — / LLJ VAR. WIDVl i I Q � BASNCH )\ 1 PEASE.1 . I 26 I J LL % \ l O 262 [L IL G07G9 5F ...LL z Q � ; / ////► , �• 1 / ego \ I I / , / // I / ,/ , / I o \ \ I Q III l l I l % //// \ � ( ( 1 ,t I / ; / --- 1/,! m II l/l / f'/ l /Ill � I I /� / /// / i / IIIII IIIII= / r � I \ � ��.- -•_• � � /IIIII IIII= /IIII==} / \ II5A8.4S.F.\ \ �� W 1 — 1IICIV,/ / / / �` / 2 — W AIIIII 111 1III ! \ // /// / / / / / // � �- �;� / IIIII—IIIII= / / / / / \ I \ I \ \h• � '� _ � ` � Q ° 01 Ky//\// / / �11/ I 1 I SCM \ \ `\ �\ \\ 13397.35.F�i�/ ---�—� �� IIII III I #4 �IIIIJ� �5 0 o so DECEM13EP 2, 2019 IIII — // o / I11 I III I _I A'9 5.F_ — 9485.2 �NC UDED INPOND RJR I / \� / /— — — —� GRAPHIC SCALE /IIII (sEe sryEET 8) /j PRELIMINARY PLANS 17 oISCHAROf I �� \ j��� — — — — — — /i' \ I NOT FOR CONSTRUCTION 152G 5EWER OUTFALL - 6UFFEK IMPACr5 ZONE 1 Im- ® 05F ZONE 2Im- ® -5F ZONE 3IMFAa 1�,5655F = o Y I .7JZPACT=1,985f J MPACT = 1,398 SF J J/ l;11 /NIM CT R CUD1N '�Pr#51\A rOND ICI III l/ // // � mil�IIIII V I / I ; / \ �� / / J I III IIIIIII /1 / \ \/ \\\� , /-1 M�A r� 'l�/IIII IIIIIIIII IIIII I I / ��) / // f �/ �� �// /4;/ 111� I"I TVANKF / /II III 11I \ r \ \ 5TI \� �o SF �, \ MAI TH CAENTr��� � �� TIN: Q72�-02-36� ZONED\ P.-80 \ \ 7 / UJE: 511 GLE IFM \ \ \ I I l II I II ;` i 111I I d / �I I / J \ /� Sil IIII I — \—'��—��y II I iu II I l Ji' ���Jl / AN � F5BE3O;th %) IfC�II/rr/�t)lam/ �hiIIl�l I I I Ti I I i/ / / Y / 3f/JORDAN LAZOKE/ / 5T AM BUFFER (AfE I) __ /IMPACT / / BW-266.0 = 60)�- �_ / / / 3 W-270.4 1 I W-266.5/ 24 20' JORDFCR / 5TREAM B}1F ER (ZONE 2) IM =4005F I I G90.7 5fi, i TW-270.q Bw-2 5 •' �/ / RISER / 5A5 / ` AI IINCy I A J I4 274. / BW=272.� 27 8 ' I �=27� I 3 1 1 I I I I I I 19601.9 5.i. i 7 TO OF AP 5TRkyAM BU FER (ZO E 3) / / / / / / / �'•� //I//////�\ ;'._,\\\ 1 �� \ \1 1911 IMPACT=I21,099 \ \ I / :. ��� \ � ; �� 1 \► � I Sul , 1 I I \ / //// /\\� ���� \IIII i 1 II II=1 i I I \ 9 \ �+ J l i /ll1 F \ � 21 I a 1 /I 16�5 SeF. 1 Y °;�;N1 lilt II TOP BA /1 (� JV�( F) ��IMN^Dff I ACT K,u 'TW-267.0 / / 03 BW-2GGj RETAININC-WALL 16IINTEN / 1 EA5E.ANC 0' / / 30f? / J 1 9 1 .7 5.F/ / 0 CATCH 6905 2 F. I i - 289 6862.E 5.r. _ 290 6�`D095.F— I I �- 1 EO 4 \ l \ 0 S.F. I I , I � l— I` C90 5.F. I \ 2qJG / \75� / 97 WIDT IJ \ B. DR PUBUC— 51DEWALK 5A5E.— \ \ ' / / ROMMPON I - J C- 7349.8 5�� l / 59 SEWER OUTFALL- BUFFER IMPACT5 ZONE 1 Im- ® 601 S' ZONE 2IMPAGT ® 5,223 SF ZONE 3 IMFAa 22 49� 5F Zi1 PL 5A1a15T. SUITE OM PO B000 IW2 APEX INC 27302 d5= 919.i51-1174 RpIubwtlon: "51 Na - m ' Z' cn w� �o U : 3 L 1 Qz � ,r L L- \ Qo m 4290.: \ �1290.9 5.F. / / m 0 •4G90.5V..F. / c Lu w � � 343.2 5.F. Q oa 1 =40' PLK p DECEM13EP 2, 2019 .� 0 20 40 Bo GRAPHIC SCALE PRELIMINARY PLANS 18 NOT FOR CONSTRUCTION 152G LAWN FIR jl I 566 71 14.7 S.F. G325. �6J ` / —i Z I I I •_ • `� \\ / l �0�5 I I II 70 / / I 0 I / / I I ` / • I \ 'I G298. I�.F 8.5.F. I ��J \V �—�__ I VAR. WIDT VAR. WIDTrT I I I 568 PUB, DR. EASE. 2 I I I E. L 49G J \ I 567 0420.55.F/ / G1�.85.� 5\f. �1 I\ PUB. DR. / — — / / \ \ 9510.35.5, / 50\� — ---- / 'l I 'R37P_.4 S.F. — — — / Hill \ 498 \ LL,, \'\ CAT / / /// / \ ---�5'--/\08R2.7 S.F. - A \ JI 2)52.0 5.F. z lI 2 6 F� ' / / / "61111111111= ABASE7����/ J 9282.�S.F. �' — IIIII , / 9893.5 5.F. — J — / / i — / / / JO A n-5,02 / ` — — / E STREAMBUP//.i/.I (ZO ff/2) 1>4KCT � 5EWER OUTEALL- BUFFER IMPACT5 ZONE I IMPACT ® COO v ZONE 2IMPACT ® 3,57431 ZONE 3 IMPACTNo 11,144 Zl U J ' J W 0- 5 z Co W o Lui z W m w V U I� L5 PO BODC IW2 APEX MC 27302 001— 919.351-1174 "51 J -<20' PUBLIC / PROTECTION .�STREAM BUF�P� / — — (T P) � I IIII cry N o /(ZON 3) TMPACT = /I 15,9085F/ ��IN III �W/ / ^ / // / �_�1m mar-mr_rlm-mr�Im71i11�Ilil�lll IIII/MPA SCM / / /' //� �Tiir7iTn=im1=7Im �l—i IIIII-IIIII II I Ill I �H �H I _ III % j ' / 7 �!' NCLUTED IN / / ° r� / /G l WAT ING CAN/ W — = EIM // PC/ � � ril r \ — — — / IIII / \ O' JORDAN LAKE TOP OF / L ����— `LTEAM BUFFER BANK �/y F �E / / L \ (ZONE 2) IMPACT RI5ER \ EAS LLJ -------- _ ---- _ f__-- f— ----f — NCLUVDED�NPOND . � i // // // 5 Q % z J % J \ V ` / /� % / / \� l / • #8 IMPACT 0 CD RCA J Illy—_ ��/ / �/ — --��--�1F577T I2) i� \ \ \X —u� ' ✓ / % / Q / / / Vl�l�� zoo / / // / / / / — L 50'TOWNOf A� / /CD — ZONE 3)IAS_ I \ II 275 SP 270—PDAN LAKE // / O L1 TREAM BUFFER f / / z (Z l� E2)IMPACT=—,� // / / / Yy _ /' r ' / / 421 �sl zo 1 ■ IMPACT AREA INCLUDED / / I I / RETAINING / \ / \ ` 3 ■ ■ IN PON�#9 IMPACT / / / TW-2G7.0 / / \\ / WALL 3 ■=� / i / / / 5W-2GG.5 / / / 1 1 / (5E� 5MEET 1 3)__---��%' / / / / / / / i \ 1 =30' PLK 1 30' J DAN LAKE — / /Z�Q j / 1 '1 NE 1) IMPACT =r�i /_ _ / / TW-270.4 / ' \ �� / / / DECEMBER 2, 2019 1 GOO 5F rC1J`D / / / BW-2GG.S 5 4.4 S.F. / 0 15 30 Go 12 ✓T IMPACT AREA / / / ✓ 0„ GRAPHIC 5C LE INCLUDED IN WEK / / / 3 G I .0 5. � OUTFALL,IMPACT / / / / I I G90.7 -270.�x / / RCP PUB. DR. / EA5E. / I 39 PRELIMINARY PLANS 19 �fw-2 7.0 / / 406 ) � NOT FOR CONSTRUCTION BW-2GG� �o O 461�7.0 S.F. 152E , / RETAININGhF/ALL IS / \ Jbi N t PAYE LONG I I — — _ PIN: OZ22-03 /373, ZONED : R-50W \ \ 1 \ I / �U5VACANT \ 1 \ 1 ( 1 1 11 1 1 1 111 _ �r \\ I \ \ I I 1 1 I I PI I' IIII,11I II1IIII IIII \IIII 1J' i5E I� I I III II II I I IIIIII ` IIII III IIIIII; r► I II IIII II i III I B I A 1 I'II �\\IIIII M�� 1 I;I IIIII, Ild� II�1\IIIIIII II 11� 1 III I I� l I I I lI I lllllj I, I III;I IIIII'\ l,l IIII\ IIIIII\III 1 I' l�Illl III III i II ///'I/ Ilillvv 1 II I /; IIII I I I I\II \ 1 II III I l II / I ' I \ I I\ Ill I I II\j� I /// / /1/ — IMPACT AREA INCLUDED IN J C 5— OUTFALL IMP CE5 / RCA IMPC✓T AREA INCLUDED IN POND #9 IMPACT /. j 5EWER OUTFALL- BUFFER IMPACT5 ZONE I IMPACT ® 4485E ZONE 2IMR— ® 2.0335E ZONE IMPAa 13,6185E 0 20 40 50 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION U J 'c J io 0- a z Ca w E W io Z W W .58 221 w SALSA ST. SURE OM PO BOX IW2 APE( HC 27302 om_ 919-M-1174 �BW�tlon B: "51 I o N� a rrnn W V/ Q U L 3 L L Qz � L L- Q0 m Ui J I— \ Q c>7 m � 0 w w Q o 1 1"=40' 1 PLK 1 DECEM13EP 2, 2019 20 152G • � � II I � I I II / IIIIIIII 1 1I ! �I�I IIIII p l \ i I IIII\1 I I 1i IIIII II III l l 11 1 ------------------------- Fr�El 11 I' Itl AET�; I — I, II III\`; ;IIII I ll\ Hill I � IIIII I, 1 � 2A LA Ell / i; Hill 4A IIFFE 1 i / I r \\ 25'TYPE B LAND�f',,�P\BUFFER 11 I \ \ I I (57] -Z--,�\ 5 r \ \ II I I ,,► I I I_I� � — 1 \ f I III li 111110 lid) \\ 54 \TOWN bF APEX \` ` 15719.7 S.F. _ sTR�AM Bu�FER � rt.� IIII 11 I I;I I / I I I I 1 III I III— (ZONE ) IMPA�T G 2 5F \\ \ \ \ \\ \\ \\ \\ \\ \ \I \ \\ \\ ��1 I I; �I; I IIIII► i !III I lj II I/ I � I I \I I I \ ` I I I IIII Illlll I, it\\ III Ilj I IIII � l � / I \ I; III I;l IIII , I IIII II III Ij \ / I I l / /; I III IIII'++, I,IjI11l1;1 I III \ I je/ 1/4 \, I II \ \ III I JI l Il �I 112I' �IDA N/ L+E 11 l \ \ I I I I �lnh BUFF R II I p \ \ I I I I II � I �� I I I I II III ; Ill I I II I / II III � I IIIIII I I 'III III III I III I I I o 5EMP, OUTEALL - 6UEEEK IMPAQ5 ZONE 1 IMPACT ® 3 25F ZONE 2Im- ® 1,-51 ZONE 5 IMPACT 6 922 SF IIIII-\\ \\\ \► \I ���—_—� \� ,, \i `\ E U I X IIII —'I I `1 1; 144G9.G S��\ IIIII .— I� ' Hill I -I Ilk 11 IIII \� /Q. / I \ I IMPA�T APA INC/CUDED IN/Q� POND # I I I PACT I /U Hill/� ( EE SHE 15) /m / / / (� I+2�5 S.F.LEI \ IIIh \ \ l o 0 0 40 il GRAPHIC SCALE A PRELIMINARY PLANS \ I \ 10580.3 S.F� NOT FOR CONSTRUCTION � : _ wit IM PO BO1C f062 APEX HIC 27302 011lm 919-M-1174 Rpbifttlon: M51 �r l o N� w Q U (] L 3 L DL I Qz � �n L- LL0 m Ui J > Q cn m D � 0 ILJ Lu LU Qo �° DECEM13EP 2, 2019 21 152G /1 loo,Y I N, r \ \201 \ \ S ORDAU FEf� —130'IJIORD/AI4 L*E / I I ! .� \� — \ 'J / 1 � ` �20' J�RDAN LAKf� \ Vq \ / STEg1� B�JFFIER qs \ (ZONE ?� IMPACT �TR'FAM BUFFS— F \ X: ¢N�y 1) IlV"CT S , `' I BETA NIP4G T�G74 Sj/ / / 1 ,O '(' SF I I O i l �c ��`. (ZONE 2) IMP�3C , �I IT � 4YAN LAX / /�O O��� ��� _ TRfAV BUFF R > vj Jai \ \ \ \ \ //(Z¢NE l/) IMPA T - / l // >0 ,4-1 IL 52 I 1,2084 8 S.F\ \ __---- / /+/ o I (D 120' IJ0 DAV LJKE / / / // � � /I 12 B I STkEA�vI P/UFFrR (Z,)NE/2)�MPAFT I i 09DANAO /KE BUF R/r)ST CAM � �j/MA(ZCE 1AAC CT/IIAREA\ \ ///40SF/ INCLUOED IN 14127.19�./ P%ND /7 1MPAC/P 0 JO,AN LA1E / I ' / STREAIM BUF[/ER i I I (ZON,V �) IMPACT 529 _/ A50� RISER M \ \ — I I I SCM #7 I I \ I 1 z / / I T P ECTION / ��\ \\ \ I I 1RCA 1\ I 1 1 / / / I I \\1I \Q i I 1 I NCE (TYP.) 1 )11 88 S.F� l 5EWER OUTEALL- BUFFER IMPACT5 ZONE I IMPACT ® 1,-5F ZONE 2 IMPACT ® 2,2 7 Sl ZONE 5IMPACT NU O, 0 10 20 4o GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION s�1 SURE OM PO eoz msz APEX NC 27302 gllx 919-M-1174 Rpbfttlon: M51 wwwJawao�mm l N� w Q U L 3 L 1 Q[V LLJ L li- QO m Ui J Q m 0 ILJ Lu LU Q I (() 1 "=20' 1 PLK DECEMBER 2, 2019 22 152G This location will be permitted separately r r r r r r I r ♦ , ♦ „ \ � \ I \ I \ I I I r r r r r r \ I \\\ \I I I -rt-------------- - 50' ZONE 3 I \ \ \ TOWN OF AFEX \ \ \ \ I STREAM BUFIFER \ \ \ \ 207ZONE2 ----------- STREAM BUFFER-- JORDAN LAKE � 30'ZONE I STREAM \ \ BUFFE/IMPAC� \ II R \ \ / \ _ - - — — — — — — — ________-f REED — — — — — — — — — — — -- 30' ZONE I _ -- __---- �JORDAN LAKE \ \ I \V— STREAM ���� EX.90, 1\ I \ \-------- �` BUfl�EiF\17' MANHOLE ��— OVAL CMP_—___---- - — — — — — — — — — — — — 20' ZONE 2JORDAN '�(T�YP.)--_�-- - — — — — — T$.EAic/1'BUFFER_—= �F-- -------------- ------ ___ __—---)L--�---� ---- 50'ZONE3 \\ \\� \ \--\—-'-- ` �N1\1�A2EX _ _ _ _ l E—X -FO' TOWN OF CARY STREAM BUFFER ` ' \ \ \ \ \ jAM KY SEWER EASE. �.ir i._. ♦ r ♦ \--------------�1 — \ I \ \\ \ l \ \ / I r I r I I r r r r I r♦ r♦/ r/ r I r I I I ♦ , ♦ , r ♦ r I r I r I r ♦ r ♦ ♦ ♦ / ♦ ♦ r ♦ r ♦ r ♦ r ♦ r ♦ r ♦ r / \� \ \ \ \ \\ \ / I r I r I I r r r r r r r r r/ r/ r I r I r I I, r r r r r r r♦ I / ♦,♦, r, r r r r r r r, r r♦♦♦♦♦ r, r, r r r r r r r, r „ � \ \ � r, r, r, r, r, r♦ r♦ r r r r r r r r, r, r, r, r♦ r♦ r♦ r r r / r, r, r, r, r, r♦ r♦ r r, r r, r, r, r, r, r♦ r♦ r r, r /r , I \ r r r, r, r, r, r♦ r♦ r r, r, r, r, r, r♦ r♦ /♦ r r r r r r � 4-- \ i , „ „ r r , r , r , , , , r ♦ r r r r r r r r , �``, r „ „ , , , �\ \ \ Imo\\ \ // r r r, r, r r r, r♦ r♦ r , r, r r r r r♦ r♦ y ♦ r r r r r r r r — \ I , / r ♦ , / ♦ , , , , , , , , , r ♦ , , , , , , , , ,\, , , , / ♦ / , \ \ \ \ r♦ r/, r r r r r r r ♦ r r r r r r it /r / r/ r/ r/, r r \ N, — — ♦ r� r r EX. STP.EAM IMPACT I STREAM I.— oftft-wo - LF O 10 20 40 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION U J J W a Z ca E W z� 0W lip� L5 8 ZH K SALBA sr SURE OM PO eoz IM2 APEX Mc 27302 OM— 919-M-1174 "51 1 1"=20' 1 PLK 1 DECEM13EP 2, 2019 24 152G rrrr♦/ \ RCA -- — 50' ZONE 3 I •.,------- TOWN OF AJEX \\ STREAM BUFFER \ \ 20ZONE 2 JORDAN LAKE ----- STREAM BUFFER PUBLIC DR. _ 30' ZONE I \ �\ \ EASE. STREAM TOP O PUBLIC DR. \' \ \ STREAM IMPACT BUFFER — — 30 ZONE I \ JORDAN LAKE \ \ J — \ STREAM EX.,- 5 U ffffF,7 MANHOLE _ _ _ _ DOUBLE BOX- 0' ZONE 2 (T�YP.) — — — _ CULVERTS WITh— JORDAN LA, ,E— PREC— _ STsfAVK DUFFER L --------- — — — — ----f�NBWAL ----------------- EX. 40 TOWN _ _ \ 50' ZONE 3 OF CARY \ — TOWN OF APEX SANITARY \ EX. 40' TOWN OF CARY \ \ SANITARY SEWER EASE. _ STREAM BUFFER SEWER \ EASEMENT /►t t' jam► / / ' / ^ \ ` \ — — — — — — — — — — — — — — — — — — — — — — — -- r/♦♦♦ r♦ 0 4"/ / r/ r/ r r r r r r/ r/ r r r / r/ r r r r r r/ r/ ✓r r r r r r/ - \ -\ 2 OI r r r r r r r r r r r r r r r r r r r r r r r r r r i r r r r r r r r r _ \ \ \ GREENV�AY rrrr//♦/♦/rrrr♦ /rrrr\♦/rrrr♦/ � \ � � Q � EAS�FfG1ENT r/\r r r r r r r r r r r r r r r r r/ r/ r / r r r r r r/ �t►/ / r r r r r r r r r r \: \ \� - r� VII — ---Z4,LLOODPL STREAM IMPACT I PERMANENT STREAM IMPACT GROSS IMPACT = - LF EX. IMPACT 1 =24 LF NET IMPACT = - LF 0 IO 20 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION U J J io 0- a V C caw E w Z = w 50 I� L5 3 ZH r1. SALBA sr SURF OM PO BODC IW2 AK— Mm gll— 919-M-1174 Rpbfttlon: M51 wwwJawao�mm 1 1"=20' 1 PLK 1 DECEM13EP 2, 2019 25 152G TOP OF / //&)O��P%��/ BANK r / o� 1-7 / j / 2�cmp 5TREAM --------! IMPACT EX. GRAVEL/\ DRIvE/ / / l /13 O� Ot" EX. STREAM IMPACT 2 I-- IMPACT 10*4loO I 40 LF 0 10 20 40 GRAPHIC SCALE ��� PRELIMINARYPLAN5 - — — --� �'/ / / / / / / / / \ \ // / I NOT FOR CONSTRUCTION T21 w SALBA ST. SURE OM POBODCIW2 APEX HIC 27302 00- 919-M-1174 Pam: "51 N w Q D L L U L Q W w 1 1"=20' 1 PLK 1 DECEM13EP 2, 2019 2G I52G 2 �� ✓ / /' ' / TOP OF /� \ _ \ �\`\ Ij� �\ / P� \f/\\BANK /i 1-7 262 \ \ 1.5 9510.3 S.F/ �i / / //�� / r 2.G \03-79.4 S.F.--- W-27.4 198 ETAINfNG G62.0 S.F. ------ALL/# 15 /PUBLIC dR. , / I I \ ,' 804)5.2 S.i EASE I I \ j/ \, / / �i BWA272.05 iSAM /I ACT � l /167IV PRECAS,�' i / 1 089� 3 S ION 28 , I -----------------' i 286 J , VAS WI E TI1 IOUB. Dr. ----- \✓•��/� ,��JF��O�F ���/ /// ���' // /'�^` �� \ 2� � 2,, ,'' I 64 IIEASEI ---------�\ SGlril #� 100, J 49G .0 S.F. ----\ STREAM IMPACT 2 PERMANENT STREAM IMPACT GROSS IMPACT EY. IMPACT NEf IMPACT =93 lF =40 LF -53 LF U J • J W a C7 � Z_ Co Lu E W z W w lip L5 AP H6 27302 011lm 919-M-1174 �Um: "51 ,'.. l N� zo �zo LU � o Q� Q Z 3 L N z U L �z 0 ~ � C m LLJ 10 "=20' PLK 0 10 20 40 . DECEM13EP 2, 2019 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION 27 152G /'85 S.F. /' �' /I j / �`�� / I lL 'L�/ �Nv s- ✓ LEVEL/ �`-_ — ��.�`� / 5.9 S.F. / i / ,! �// �` 6 / I/ /I� I \ 3Oil JORDAN LPG STREAM BUFF 294 /' / `. Ji I /� ' / 20 -ENE 2 �\�` g /LPUBLIP JO DAN LAKE DR. EA51f. S REAM U STREAM IMPACT 3 PERMANENT 5TREAM IMPACT *0%,000 1 - LE APEX 1x27302 011lm 919-M-1174 PAghft1lon: M51 wwwJawa. �4�// - — — ' 9 177.2 S.F. 3` 1 5 cv LLJ 1001 8.� S.F. (!) o / / Q 532 P. 314 / / / z ,p l ` 120I 5.8 S. — /� �'ST��AM I \\`� / // G < Q � V PACT CZ rL L / / 100 LF// , `� 1 3349 f3 S.F. % i / Q -- —/ / / / ol Pb au C LL 0 / 5 3 / , / / DR. EASE i4- W / 9027.8 S.F. TOP OfBA (3 / 1 ;7.2 I Few-� 292 Q.0 o i i 1 "=20' PLK DECEM13EP 2, 2019 o to zo ao GRAPHIC SCALE PRELIMINARY PLANS 28 NOT FOR CONSTRUCTION 1526 RETAINIIRG-------- — —.�', — _----WALL#I ---- - — — — — — — — - ---------- EX. FLOODPLAIN \ — � V) — / /c Z/ iz �00 k r r r r r r r r / \ /— —� -- --- ---��� �V,ETLAND5, / ---- �l l"I / r r r��.,r 50'ZONE3 TOWN OF APEX r / STREAM BUFFER 20 ZONE JORDAN LAKE 30' ZONE I — TEMPORARY JORDAN LAKE _ STREAM STREAM I M PACT UffE �E�DYBRANCH CREEK_----� (� — / // TOP O \� JORDAN LAKE / / / BANK \ STREAM BUFFER_ 20'ZONE2------ — ---- -----_ �/ORDAN LAKE —_ ir 55 ------ / -- ------------ ` 1 / I / r / / / / rl / r / r / r / r / I r r / r ♦ / r / r / I � � / I / r 1 \ �r/ r-, / . / / / r / r / r / r / / r / r / Cr / r / r / / I -4- / r / aNfTGLANDS/ (' y f A \ \ \ r r r \ r STREAM IMPACT 4 TEMPORARY STREAM IMPACT 0 0 20 40 GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION PO BOX U2 APE( HC 2M OBI.. 91%W-1174 B gbfty n: "51 IOU NU 0 Lu � I Q� U L L L ' L � Q L LLJ �z _0 T) Z � ~ > (�^1 0 V / C Lu LU Q0 O I "=20' PLK DECEM13ER 2, 201 9 29 152G , 7a,\ RISER / / CES \\ I \� ////// /// \ y/ \ \ =�•' RCA / i ZI (J) I TEMPORARY STREAM IMPACT =20LF Ge BW-2G6RETAINING WALL 16 � MA1NTENANC / �� I �/ / I \\\/ •� \\ �,�' i / / / / / / / EASE. / 888&.55.F 5TREAM IMPACT 6 TEMPORARY ST. IMPACT lIftW - ' /10 - RAP pl NI / I 7�7 / /'4 / '' GHIC SCALE a / A � / I 1� t l PRELIMINARY PLANS RISER / / NOT FOR CONSTRUCTION ]YI I C IM PO BLOC IW2 APE( HC 27502 gllx 919-M-1174 Rpbfttlon: M51 l� N� �0 0 w Ln Q� U L L Q Q �z _0 T) L� �> rn LLJ LLJ a Q ° 1 "=20' PLK DECEMBEP 2, 2019 30 152G �. / I / Ile- 0 TIL 25) \ L,-T Or of,-, \AC ESS AEA RE A N KG MPROAf�Y / / \O g i k'� L 8/ r5:D3 Lf f _Z_ 4Q \\ \ \ 5 2 \ I I I I 064.8 S.F Au 529 0\\ _ RISER // I I I 11 \\ SCM #7 1 l i ` T P ECTION / \ / �� \ \ I jRCA \ NCE (TYP.) /✓/ �` \� 11 11 I l\ �i 11 I I I / / / ) /— / I 5TREAM IMPACT ? TEMPORARY STRFNv11 ,P o 10 Zo 40 GRAPHIC SCALE PRELIMINARY PLANS _30a _ _ NOT FOR CONSTRUCTION U J ' J W 0 a 0 Z as W o W W Z W w I� L5 A SURE OM POBODC1W2 APEX HC27302 gllx 919-M-1174 Rpbfttlon: M51 _AWJ_ l (1N V ! 0 0 Lu zolQu U p=3 Q �L L Q Q�L ILLJ �z _0 T) L� �m W LLJ �< Q° 1 "=20' 1 PLK DECEMBER 2, 201 9 31 152G -- ------ _qq n 0�22-I-/P�7� \ \ r )I it 7 r�/ I 1 I SEiP V EAIRRT I �� / SE��I ��1blAyDD11 j- � Iw e o -i - 9� _� � p /rzo.��C,f Is DiYlDkb INr� (� /P LIPPA C,�IIERCIi ✓ �O7RBER�TOAMD�fLIt A �I kUBA u / p J //'SEC444i1ON5 TI1AT COP3�tATE `�: bT22 24 IBA / J YONEYi ptpn/�� i O p J To !tE 509LA� I11`EfS, �Gs 5 L � saM p 11Of (( 114 v e -m o os-ERDA� �i o o P ❑ ❑ ❑ < p O Q / ElEl �� 1 i \ I 7wIlli S� l0 / /� o i � P ❑° ❑ p o � ���r�i������/r� :I D. - PR � � J _/j�L J'' �(�( //!/ I�I�IJ ~�1 / ` -•Gf / t �e row ��\`3 �� \~����\\\ � 7 l< o 1 o 0 0 o 0 / _ � � � a� � �� K5 VI�� �� s �� 115 ���` ;' %)� I l ( L ❑ ❑ po 9 ° 4 �/ v� %ffj�irr 1 S rl� 1 El 0 /NoIII Jl n ❑ p ❑ plRl \v� `� ���� ��V r //�\ll�\A\ %� �' \I 1\, i,� ❑ �'� o p p �A�s �/ ��ljl� �� /l/ 1 o o 1V\\ �\ �) ���r / uo i Li ����\\��C��� �- J �-yl ��� � "Y � )j_. O / �oA o � Y \i p ❑ ❑ ❑ ❑ ❑ ❑ ❑ `asM.' � _,���~r't���)\� \� J , ` Ell \1\ f _ ✓ A ER L\VA ZONE : R tlW �;f / 0 �� d;; J -- !i = !�i ✓ /�/,[� � � 7 � � � l �: � � II II � I (/ .� � ,-� Ex s� ,, � � � 1 l � � L(l ! J ��j ���1 ����i v � �`" IJrIiN%E`��� � � �` , °►' I ,`moo' � � �-� `� ,-�JS f � j /� � \V���l W- c OJ/A' PDN� � TOTAL WETIAND IMPACT5 WEflANDS IMPACT 2,593 SF (0.06 AC.) o loo zoo noo GRAPHIC SCALE PRELIMINARY PLANS NOT FOR CONSTRUCTION C U rn ^` J E V(A/ J OIll C V J U z — OZ$ Lu Lu E N LJJ m W z N Lu I0I c m N C w U SURE 001' PO BOX 1062 APEX, NC 27502 Office 919 387-1174 Reg.mtlon: P 0151 www.jonescnoasen.wm N� LL W� Q z3 U L Q � 1 z _ L z 11 z L 0 11J J w w QQ (li o 1 PLK DECEM13EP 2, 2019 33 152G BW-253.0 .---�------- --r-- RETAINIRr, — '� _ _------- ----WALL#I — — — - / \ — —------------------------- — — — — — — — — — — — / — — — — — — — 1 \ EX. FLOODPLAIN ,LQ �O�/ � "'mil ,r/♦/♦rER./♦/♦/♦ r i 7►rjy� 50' ZONE 3 � TOWN OF APEX STREAM BUFFER j / y JORDAN LAKE SUFFER 30' ZONE I — — — JORDAN LAKE / / STREAM �E�DYBRANCHCREEK / / .--- _ J \ \ _ f — // TOP O �� JORDAN LAKE — — / / BANK \ STREAM BUFFER --_-- ORDAN LAKE ----- EAM BUFFER /�`V// -- \ - //,/♦r 1 WETLAND IMPACTS — = 1,030 SF r r r r r r r rl r r r r r r r r r r r r r r r r r r / ♦ / r r ♦ r ♦L,. / r / / r ♦ r ♦ r / ♦ / r r r r / r ♦ r r ♦ r ♦ r ♦ / ♦ / / r r ♦ r ♦ r / v /\.. r=/s— i_ �—/�_ .� _ e--n ..� / r � ♦ r ♦ r r / v /7 � r r r ♦ — — — _ — / _ r r ♦►/�T � r r r/ r/ r r r r r r/ / � rrT i / r / r r ♦ 71♦ r ♦ / ♦ r ♦ r ♦ r r ♦ r ♦ r ♦ A ♦ I-♦ / ♦ / i /�'{A r�=/ r \C / r r r r r r/ r r r .� r/ r/ r r r r r r/ r/ r/ r r r r/♦/ r/ r r r ITq r r/ r �r1\�'r--r "� / � l I� 1 /� 1 /� � .Lt 1 .Lt l .�/ J- ♦—♦ �- I—/\ �- /—/ �- ♦—/ t I—/ j i—, -r /—/ ti-VH t .r-/ �♦ r / ♦ / ♦ / ♦ / r1A /rTJ-'/i�'r / r / r / / r r r r r / r / . / ✓ .�V♦ / ♦ / ♦ / / / / / / / NVEI/LAN, D,15♦ . ♦ / / / r / ♦ r ♦ . ♦ . / / / / ♦ D IQ 2D 4D (TYf .� / / / \ / \ GRAPHIC SCALE � � � ♦ � ♦ � ♦ / � / � / \ i PRELIMINARY PLANS NOT FOR CONSTRUCTION i WETLAND I IMPACTS WETLAND IMPACT 1030 SF .0 wIC I PO eoz IM2 001— 919-M-1174 "51 i N� �.0 o Q� Q L 3 — � I � z U L L �z _0 0 _ (n z ~> g w (�^1 > V / W U 1 � Q o O 1 "=20' PLK DECEM13EP 2, 2019 33 152G ���• i V �U.j OM ,IL i1�Fill" "��, Wiz"■ � poi I ism AM ��, , �� Page 49 ROY COOPER Gm·ernor MICHAELS. REGAN Mit:Jgatwn Services 1!'4VIIIGHMENTALGUilLITY Mitch Barron Lennar Carolinas, LLC 909 Aviation Pkwy Suite 700 Morrisville, NC 27560 Project: Smith Farm County: Wake 401 permit#: 16-0924 404 permit#: 2014-01347 DMS ID#: MR-00055 Amount Paid: $231,310.00 Check Number: 916671 RECEIPT October 26, 2017 The NCDEQ Division of Mitigation Services (OMS) has received a check as indicated above as payment for the compensatory mitigation requirements of the 401 Water Quality Certification/Section 404/CAMA Permit(s) issued for the above-referenced project. This receipt serves as notification that your compensatory mitigation requirements assigned to OMS associated with the authorized activity as specified below have been satisfied. You must also comply with all other conditions of this certification and any other state, federal or local government permits or authorization associated with this activity including G.S. § 143-214.11. The OMS, by acceptance of this payment, acknowledges that the Division is responsible for the compensatory mitigation requirements indicated below associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit. Mitigation responsibility assigned to the OMS is nontransferable. The mitigation will be performed in accordance with the In-Lieu Fee Program instrument dated July 28, 2010. River Basin Mitigation Location Mitigation Type Quantity 18-dhlit HUC) Cape Fear 03030002 Warm Stream 496 Cape Fear 03030002 Riparian Wetland 0.408 Refunds of payments made to NCDMS are only approved under certain conditions. All refund requests must be submitted in accordance with the Division's refund policy. If you have any questions or need additional information, please contact Kelly Williams at (919) 707-8915. cc: Todd Tugwell, USAGE -Raleigh; James Lastinger, USAGE Dalton Cook, agent Sincerely, State ofNorth Carolina I Environmental Quality I Mitigation Services 1652 Mail Service Center I Raleigh, NC 27699-1652 I 217 W. Jones Street, Suite 3000 919 707 8976 T Secrt!l(1f'.I' Page 50 WATER RESOURCES DEPARTMENT Dalton Cook Environmental Scientist Spangler Environmental, Inc. 4338 Bland Road, Raleigh, NC 27609 Subject: Stream Buffer Determination June 27, 2019 Smith Assemblage Feature 'D' Origin Determination Cape Fear-Jordan Lake Watershed Dear Mr. Cook, I Apex 18-018 On June 27, 2019, Mr. James Misciagno went to the subject site to evaluate one {1) drainage feature and determine if it was subject to the Town of Apex (Town) riparian buffer rules. Based on the information obtained during the site visit and per the requirements set forth in Section 6.1.11 of the Town Unified Development Ordinance {UDO), I concur with the stream classification as shown on the attached sketch dated June 2019 and summarized below. Drainage Shown as Shown as on Determination made Determined Buffer Feature on USGS Soil Survey in the field Width Feature-D Intermittent Intermittent Intermittent 50 feet Origin This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the Division of Water Resources {DWR) or Delegated Local Authority in the Jordan Lake watershed may request a determination by the DWR Director. An appeal request must be made within sixty {60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR -401 & Buffer Permitting Unit; 1617 Mail Service Center, Raleigh, NC 27699-1617. Otherwise the appeal procedure will be in accordance with UDO Section 6.1.11. If you dispute the Director's determination, you may file a petition for an administrative hearing. You must file the petition with the Office of Administrative Hearings within sixty (60) days of receipt of this notice of decision. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official State holidays. To request a hearing, send the original and one {1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. A copy of the petition must also be served Page 51 to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699-1601. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulator Field Office) at (919) 554-4884. If you have any questions, please do not hesitate to contact me at (919) 249-3413. Sincerely, Michael S. Deaton, PE Stormwater & Utility Engineering Manager Attachments TOWNOFAPEX The Peak of Good Living PO Box 250 Apex, NC 27502 I (919) 249-3400 I www.apexnc.org Page 52 Legend -• Important Perennial =-Unimportant Intermittent = Marginal Stream -Jurisdictional Linear Wetland [ New Parcels D Pond � Jurisdictional Wetland � Too Thick to Evaluate E3 Did not evaluate 50' Town of Apex Buffer D ProjectArea 100' Town of Apex Buffer ProJect No. l21G8.WI 5cale: I"= 300' 8/5/14 Field Sketch Map Smith Assemblage Wake Co., NC 2-foot Contours from NCDOT GIS 20 IO Aenal from NCOneMap GIS 0 150300 600 900 1,200 Feet Soil & Environmental Consultants, PA It II:? I ,ll, .. 1 ;,,:,uw u .. ht �llllt t,11, 11 .. h .. :!1 :-.1 :?7i,I \' 1'�1111t• 1')1'1) H \(, l1)1.(1 I I .. , j'U'lt ,1 Ir, •>11,7 ,uuln.u,m Page 53 r I NC DWQ Stream Identification Form Version 4.11 Date: June 6, 2019 Project/Site: Smith Assemblage Latitude: 35.7300 Evaluator: Dalton Cook County: Wake Longitude: 78.9238 Total Points: Stream Determination (circle one) Other Stream is at least intermittent 28 if?. 19 or oerennial if?. 30* Ephemeral Intermittent Perennial e.g. Quad Name: New Hill A.Geomorphology (Subtotal = 15 ) Absent Weak Moderate Strong 1•· Continuity of channel bed and bank 0 1 2 3 2.Sinuosity of channel along thalweg 0 1 2 3 3. In-channel structure: ex. riffle-pool, step-pool,0 1 2 3 rioole-pool sequence 4.Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7.Recent alluvial deposits 0 1 2 3 8.Headcuts 0 1 2 3 9.Grade control 0 0.5 1 1.5 10.Natural valley 0 0.5 1 1.5 11.Second or greater order channel No= 0 Yes = 3 "artificial ditches are not rated; see discussions in manual B H d I (S Iy ro ogy ubtotal = 65 12. Presence of Baseflow 0 1 2 3 13.Iron oxidizing bacteria 0 1 2 3 14.Leaf litter 1.5 1 0.5 0 15.Sediment on plants or debris 0 0.5 1 1.5 16.Organic debris lines or piles 0 0.5 1 1.5 17.Soil-based evidence of high water table?No = 0 Yes = 3 10 oqy u tota = C B I (S b 65 18. Fibrous roots in streambed 3 2 1 0 19.Rooted upland plants in streambed 3 2 1 0 20.Macrobenthos (note diversity and abundance)0 1 2 3 21.Aquatic Mollusks 0 1 2 3 22.Fish •. 0 0.5 1 1.5 23.Crayfish 0 0.5 1 1.5 24.Amphibians 0 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26.Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other= O *perennial streams may also be identified using other methods. Seep. 35 of manual. Notes: Sketch: ,/' '. ' ·-···· Page 54 ______ 'Jown of c;:1/-pvc August 13, 2014 Steven Ball 11010 Raven Ridge Road Raleigh, NC 27614 Subject: Dear Mr. Ball, Stream Buffer Determination Smith Assemblage Site Primary Watershed -Jordan Lake Watershed P.O. BOX25O APEX, NORTH CAROLINA 27502 �pex 14-0lq On August 5, 2014, I met with you at the subject site to evaluate numerous drainage features including four (4) ponds and de termine if they were subject to the Town of Apex (Town) riparian buffer rules. Based on the information obtained during the site visits and per the requirements set forth in Section 6.1.11 of the Town Unified Development Ordinance (UDO), I concur with the drainage features as shown on the attached map titled "Field Sketch Map" and summarized in the table below. Shown as on Shown as on Determination Determined Drainage Feature USGS Soil Survey made in the field Buffer Width Feature A Perennial Perennial Not Contested 100 feet Feature B Perennial Perennial Not Contested 100 feet Feature C Perennial Perennial Not Contested 100 feet Feature D Intermittent Intermittent Intermittent 50 feet Pond D Present Present Subject 50 feet Feature E Intermittent Perennial Ephemeral 0 feet (14 Points) Page 55 Town of Apex Stream Buffer Determination (Apex 14-010) Page 2 of 3 Pond E Present Feature F Intermittent Pond F Not Present Feature G Intermittent Feature H Not Present Feature I Intermittent Feature Z Intermittent Pond Z Present Present Not Subject 0 feet Intermittent Ephemeral 0 feet (17.5 Points) Not Present Not Subject O feet Perennial Ephemeral O feet (15.5 Points) Intermittent Ephemeral O feet (4.5 Points) Perennial Not Present in Field O feet Not Present Not Present in Field 0 feet Not Present Not Subject O feet This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the Division of Water Quality (DWQ) or Delegated Local Authority in the Jordan Lake watershed may request a determination by the DWQ Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Ian McMillan, DWQ Wetlands/401 Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. Otherwise the appeal procedure will be in accordance with UDO Section 6.1.11. If you dispute the Director's determination, you may file a petition for an administrative hearing. You must file the petition with the Office of Administrative Hearings within sixty (60) days of receipt of this notice of decision. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official State holidays. To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699- 6714. A copy of the petition must also be served to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699-1601. Page 56 Town of Apex Stream Buffer Determination (Apex 14-010) Page,3of 3 This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. If you have any questions, please do not hesitate to contact me at (919) 249-3413. Sincerely, /JU,/Q. L)�;c_,Michael S. Deaton, PE Environmental Programs Manager Attachments Page 57 Legend -• Important Perennial --Unimportant Intermittent 000000 Marginal Stream -Jurisdlctlonal Linear Welland (J New Parcels LJPond � Jurisdictional Wetland Im] Too Thick to Evaluate Did not evaluate 50' Town of Apex Buffer 'I • • . I: : ProJect No. 121G8.WI ProJect Mgr.: 56 Scale: ,. = 300' 8/5/14 Field Sketch Map Smith Assemblage Wake Co., NC 2-Foot Contours from NCDOT Gl5 20 IO Aerial from NCOneMap Gl5 0 150300 600 900 Feet 1,200 PE R,USACE SITE VISIT WJT/i JAMES LASTINGER 7/2�/14 and MIKE DEATON TOWN OF APEX 6/5114 Soil & Envirnnmcntal Consultants, PA KIi:? I 111. 111 �w .. , llu.1\I, 'Stnh 1111, ltl!,�.li." �7M\ • I'\,"'' ('Jl'J) AU, \')111 • I 11 ('Jl')J IHl, •>U,7 ,,,o,11 , ,,,.,, Page 58 Legend s ProJect No. 121G8.WI ProJect Mgr.: SB Scale: Soil Survey Map Smith Assemblage Wake Co., NC I"= 1,000' 1970 Printed Wake Co. 5011 Survey 1-----, Map 5heet5 G4 t GS 2013-10-0 I Feet Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.• Raleigh, NC 27614 (919)846-5900 • (919) 846-9467 Web Page: www.SandEC.com ; Page 59 Legend ProJect No. 121G8.WI ProJect Mgr.: SB Scale: I"= 2,000' 2013-10-01 2013 U5G5 T opograph1c Map 5m1th Assemblage Wake Co., NC 2013 New Hill USGS Quadrangle 0 Feet Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.• Raleigh, NC 27614 (919)846-5900 • (919) 846-9467Web Page: www.SandEC.com Page 60 NC Division of Water Qua lity-Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 Stream Identification Form Version 4.11 Date: Evaluator: Total Points: Stteem is al /east Intermittent /f'i!. 19 or rennisl if� 30' A.Geomorohology (Subtotal = 1 °· Continuity of channel bed and bank 2. Sinuosity of channel along thalweg 3. In-channel structure: ex. rlffie-pool, step-pool, rinnle-oool sequence 4. Particle size of stream substrate 5. Active/relict floodplain 6. Depositional bars or benches 7.Recent alluvial deposits 8. Headcuts 9.Grade control 10.Natural valley 11.Second or greater order channel ) artlflclal ditches are not rated, see dlscussl�s In manual B. Hvdroloav (Subtotal= ,,,, ... ) -12.Presence of Basenow 13.Iron oxidizing bacteria 14.Leaf litter ·15, Sediment on plants or debris 16.Organic debris lines or piles 17.Soil-based evidence of high water table? C.Bioloav (Subtotal=t./ ) 18.Fibrous roots In streambed 19.Rooted upland plants in streambed 20.Macrobenthos (note diversity and abundance) 21.Aquatic Mollusks 22.Fish 23.Crayfish 24.Amphibians 25. Algae 26.Wetland plants in streambed ProJectJSlte: Latitude: County: Longitude: Determination (clrcle one) Other e I Intermittent Perennial e.g. Qued Name: Absent Weak Moderate 0 a, 2 0 (i 2 0 d) 2 0 {1J 2 � 1 2 0 1 � <ti) 1 2 U)> 1 2 0 � 1 0 0.5 ( 'Ii No('0)Yes= 3 (6) 1 2 UP 1 2 1.5 a>0.5 0 (1,5'.) 1 0 (b.� 1 No =llY Yes= 3 3 tJ 1 3 IV 1 I 1 2 1 2 0.5 1 0 0.5 1 0 0.5 1 0 0.5 1 FACW = 0.75; OBL = 1.5 Olher::((.') 'perennial streams may also be Identified using other methods. See p. 35 of manual. Notes: Sketch: 41 Strong 3 3 3 3 3 3 3 3 1.5 1.5 3 3 0 1.5 1.5 0 0 3 3 1.5 1.5 1.5 1.5 Page 61 NC Division of Water Quality -Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 NC DW Stream Identification Form Version 4.11 Date: Project/Site: PM Evaluator: Total Points: Stream Is at lees/ intermitti,nt if'i!. 19or erennla/if'i!.30' A.Geomorpholoav (Subtotal = 11· Conllnuity of channel bed and bank 2. Sinuosity of channel along thalweg ii. t., 3. In-channel structure: ex. riffle-pool, step-pool,rinnle-oool seauence 4. Particle size of stream substrate 5. Active/relict floodplain 6.Depositional bars or benches 7. Recent alluvial deposits 8. Headcuts 9. Grade control 10.Natural valley 11.Second or greater order channel ) . art1ticlal ditches are not rated eee dlscuso!ons In manual"lf.� B.Hydro!cav <Subtotal = 12.Presence of Baseflow 13.Iron oxidizing bacteria 14.Leaf litter 15.Sediment on plants or debris 16.Organic debris lines or piles county: IJ4 Y-i Absent 0 0 0 0 {fJ) 0 0 � 0 0 No ::(l) 0 0 1.5 0 0 Weak rP Ci) a> V 1 1 d> 1 o'.S) 0.5 a> lV If") �.5> .6.5> 17.Soll-based evidence of high water table?No =(O) C.Bioloav <Subtotal = '!,.� \ 18. Fibrous roots in streambed 3 2 19.Rooted upland plants In streambed 3 (1) 20.Macrobenthos (note diversily and abundance)Q 1 21.Aquatic Mollusks 0 1 22.Fish ,1 0.5 23.Crayfish 0 � 24.Amph ibians J) 0.5 25.Algae Io 0.5 Latitude: Longitude: Other e.g. Qv11d Name: Moderate 2 2 2 2 2 � 2 2 1 t'U Yes= 3 2 -�('21 0.5 1 -8 CD Yes= 3 A 1 2 2 1 1 1 1 26.Wetland plants in streambed � FACW::: 0.75; OBL = 1.5 Other,R •perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: 41 Strong 3 3 3 3 3 3 3 3 1.5 1.5 3 3 0 1.5 1.5 0 0 3 3 1.5 1.5 1.5 1.5 Page 62 NC Division of Water Quality-Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 NC DW Stream Identification Form Version 4.11 Date: Evaluator: Total Points: Str11am Is at /11ast intormitlonl If?. 19 or ronnla/ if?. 30' A. Geomorphology (Subtotal = 1•· Continuity of channel bed and bank 2. Sinuosity of channel along thalweg � .; 3.In-channel structure: ex. riffle-pool, step-pool, rioole-oool sequence 4.Pa11icle size of stream substrate 5. Active/relict floodplain 6. Depositional bars or benches 7.Recent alluvial deposits 8.Headcuts 9.Grade control 10.Natural valley 11.Second or greater order channel ) art1fic1al ditches ere not rated, see discussions in manual B. Hvdroloov (Subtotal =) 12.Presence of Baseflow 13. Iron oxidizing bacteria 14. Leaf litter 15.Sediment on plants or debris 16.Organic debris•lines or piles 17. Soil-based evidence of high water table? C.Bioloav (Subtotal =I.,{ ) 18.Fibrous roots in streambed 19.Rooted upland plants in streambed 20. Macrobenthos (note diversity and abundance) 21. Aquatic Mollusks 22.Fish 23. Crayfish 24. Amphibians 25.Algae 26. Wetland plants in streambed P roJect/Slte: County: Absent 0 0 0 0 (0') 0 �il., ( D u> 0 b ttb 1.5 0 0 3 3 � D p 0 0 D Latitude; Longitude: Other o.g. Quad Nama: Weak Moderate /T) 2 d>2 d)2 d)2 1 2 A 2 1 2 1 2 � 1 ((5.,) 1 No,(Q) Yes= 3 1 2 1 2 <:1> 0.5 (O.� 1 Q5J 1 No= 0 Yes� � 1 <2> 1 1 2 1 2 0.5 1 0.5 1 0.5 1 0.5 1 FACW = 0.75; OBL = 1.5 Other =y1 ) •perennial streams may also be Identified using other method�. See p. 35 of manual. Notes: Sketch: 41 Strong 3 3 3 3 3 3 3 3 1.5 1.5 3 3 0 1.5 1.5 0 0 3 3 1.5 1.5 1.5 1.5 Page 63 NC Division of Water Quality -Methodology for Identification of Intermittent and Perennial Streams and Their Origins v. 4.11 Date: Evaluator: Total Points: Stream Is at least intermittent if 'i!. 19 or erennlal If '2 30' A. Geomorohology (Subtotal = 1•· Continuity of channel bed and bank 2. Sinuosity of channel along thalweg 3. In-channel structure: ex. riffle-pool, step-pool, rinnie-oool seauence 4.Particle size of stream substrate 5.Active/relict floodplain 6. Depositional bars or benches 7.Recent alluvial deposits 8.Headcuts 9.Grade control 10.Natural valley 11.Second or greater order channel ) artificial ditches are not rated. see discussions 1n manual B.Hvdroloav (Subtotal =I ) 12.Presence of Baseflow 13.Iron oxidizing bacteria 14.Leaf litter 15.Sediment on plants or debris 16.Organic debris lines or piles 17.Soil-based evidence of high water table? C.Bioloov (Subtotal=I l 18.Fibrous roots In streambed 19.Rooted upland plants in streambed 20.Macrobenthos (note dlveN1ity and abundance) 21. Aquatic Mollusks 22. Fish 23.Cray1ish 24. Amphibians 25.Algae 26. Wetland plants in streambed Project/Site: Latitude: County: Longitude: Absent 0 � � «P j ) I ) � m 0 0 rmlnatlon (circle one) Other termlttent Perennial e.g. Quad Name: Weak Moderate (p 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 � 1 0.5 (D Non> Yes= 3 p, 1 2 tf) 1 2 1.5 1 0.5 0 � 1 0 D 1 Not I,) Yes= 3 3 2 tf'J 3 2 1 ) 1 2 h\ 1 2 0.5 1 b 0.5 1 0 0.5 1 0 0.5 1 FACW = 0.75; OBL = 1.5 Otherf I ) J •perennial streams may also be ldenllfied using other methods. See p. 35 of manual. Notes: Sketch: 41 Strong 3 3 3 3 3 3 3 3 1.5 1.5 3 3 <!I) 1.5 1.5 0 eel\ 3 3 1.5 1.5 1.5 1.5 Page 64