Loading...
HomeMy WebLinkAboutNC0024911_authorization to construct_19981215 State of North Carolina Department of Environment and Natural Resources &14 0 Division of Water Quality !I James B. Hunt, Jr., Governor ilk Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director D E N - R Decemberl5, 1998 Mr. W.H. Mull General Manager Metropolitan Sewerage District of Buncombe County Post Office Box 8969 Asheville,North Carolina 28814 a Subject: Permit No.NCO024911 Authorization to Construct ATC No. 024911 ACD MSD Buncombe County WWTP Buncombe County Dear Mr. Mull: On October 8, 1998, the Division of Water Quality received your request for Authorization to Construct(ATC) in accordance with NPDES Permit Number NCO024911. The plans and specifications for the bar screen replacement have been reviewed and it was determined that they are satisfactory. Authorization is hereby granted to replace and upgrade the existing bar screen at the Metropolitan Sewerage District WWTP. The enclosed copy of the approved plans and specifications must be maintained on file for the life of the facility. The following condition applies to the issuance of this Authorization to Construct: ➢ The existing bypass structure shall be formally closed and eliminated in accordance with Alternative B as specified on Sheet 6 of 8 of the approved plans and specifications. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0024911 issued August 28, 1995, and shall be' subject to revocation unless the proposed bar screen is constructed in accordance with the conditions and limitations specified in Permit No. NCO024911. - In the event that the facilities fail to perform satisfactorily,including the .creation of nuisance conditions,,the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement'wastewater treatment or disposal facilities. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper Authorization to Construct ATC No. 024911 ACD ' MSD Buncombe County WWTP Page 2 of 3 The Asheville Regional Office,telephone number(828)251-6208, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in-place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion and prior to the operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has .been installed in accordance with the NPDES Permit. Mail the Certification to the following address: Department of Environment and Natural Resources Division of Water Quality NPDES Unit, 9'Floor Post Office Box 29535 Raleigh,North Carolina 27626-0535 The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)which have jurisdiction. In closing, I would like to state that it is the Division's ultimate goal to provide quality service to the public. Please take a moment to review the procedure you followed in applying for this Authorization to Construct in addition to the Division's response to your project needs. If we can improve our service to you in any manner, please bring it to our attention. We appreciate your cooperation during the review process and we look forward to working with you in the future. If we can be of further assistance to you or if you would like to suggest any,improvements we can make to strengthen our customer service efforts,please do not hesitate to contact Jeff Myhra of my staff at(919) 733-5083, extension 597. 7nceer �y, reston oward,Jr.,P.E. cc: Central Files NPDES Unit,Permit File Asheville Regional Office, Max Haner Technical Assistance and Certification Unit