Loading...
HomeMy WebLinkAboutNC0024911_authorization to construct_19870814 LyT Rr n� '�O�iew'�• 1" State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms S. Thomas Rhodes, Secretary August 14, 1987 Director Mr. William H. Mull Engineer-Manager a..a MSD of Buncombe County z=' PX. Box 8969 AUG 14 1987 Asheville, NC 28807 =o ENGINEERNG SUBJECT: PeP� iNtNB C0024911 Authorization to Construct MSD of Buncombe County Wastewater Treatment Plant (Segment II and III Expansion) EPA Project No. C370391-08 Dear Mr. Mull: The final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the Segment II and Segment III expansion and modifications to expand the capacity of the existing 25 MGD wastewater treatment plant to 40 MGD by replacement of the existing mechanically cleaned bar screens with two (2) new mechanically cleaned bar screens with conveyor system, replacement of the existing raw sewage pumps with three (3) variable speed sewage pumps, demolition of the existing detritors to provide space for the new influent channel to the primary rotating biological contactor (RBC) basin 1, modifying all existing clarifiers and aeration basins to retrofit with a- total of 152 single stage RBC's, modifications to the existing blower system to consist of the replacement of three (3) existing blowers with four (4) new centrifugal multi-stage blowers (of which two (2) will be temporary blower facilities) and including a new air filter system; three (3) new variable speed recirculation pumps, replacement of three (3) existing return sludge pumps with two (2) existing 1,400 gpm submersible pumps relocated from the temporary final backwash transfer pump station approved in Segment I expansion, new chlorine feed equipement, eight (8) sampling duplex pumping systems with 50 gpm submersible pumps, emergency bypass, system with flow monitoring and a 54" diversion gate value, new administration/ laboratory building, new service building, electrical unit substation, associated yard piping, electrical work, and appurtenances. Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer Do not proceed with construction until the Authorization-to-Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval if Federal Funding is desired for project construction. The permittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facili- ties is 50% completed. This Authorization-to-Construct is issued in accordance with Part III, Paragraph C of NPDES Permit No. NCO024911 issued July 2, 1984, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0024911. The permittee shall obtain a sludge analysis and a sludge E.P. toxicity analysis; and obtain approval of these analyses from the Division of Health Services, Solid Waste Management Branch prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Environmental Management's Water Quality Section and the Regional Office. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors responsibilities shall be in complying with these acts. The selling or free distribution of wet, dried, composted sludge or sludge-like materials from wastewater facilities without prior review and approval by this Division is illegal. One (1) set of final approved plans and specifications is to be forwarded to you, one (1) set to the Environmental Protection Agency (EPA), and two (2) sets to the Corps of Engineers.