HomeMy WebLinkAboutSW6191202_20-01-21_Allendale Substation -Comment Response Letter_1/23/2020January 21, 2020
Corey Anen
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral and Land Resources Stormwater Program
512 North Salisbury Street
Raleigh, NC27699-1612
Phone: 910-707-3649
Email: Corey.Anen&ncdenr.gov
Re: Project Name: Allendale I I5kV Substation
Stormwater Permit No. SW6191202
Comment Response
1. Reviewer Comments: Documentation from the NC Secretary of State or other official documentation
showing the title and position held by the person who signed the application is required [15A NCAC
02H .1042(b)(ii)]. This can also be in the form of a letter signed by the registered agent or a principal
executive office of the level of vice-president or higher [15A NCAC 02H .1040(1)] granting authority to
the individual who signed the application.
Response: Attached is the requested letter from Lumbee River EMC.
2. Reviewer Comments: Please complete Part III.4 of the SWU-101 application with the contact
information for the local jurisdiction for building permits.
Response: The information has been added to the application as requested.
3. Reviewer Comments: Please complete a low density supplemental form. The Supplement EZ form
can be downloaded from the Stormwater Design Manual website.
Response: Attached is the requested form.
4. Reviewer Comments: Please place the swale in a permanent recorded easement that extends to the
nearest public right-of-way in accordance with General MDC 9. The substation does not need to be
included in the easement.
Response: An easement has been added to the plans as requested. See revised sheets.
We hope that we have addressed all your comments, should you need any clarification please feel free to
call or email. Sincerely,
ELECTRICAL CONSULTING ENGINEERS, INC.
Shane Brandwood
Electrical Consulting Engineers,
Inc 115 Oakland Avenue, Suite
102
Rock Hill, SC 29730
Office: 704-372-6673
Mobile: 704-763-7467