Loading...
HomeMy WebLinkAboutSW6191004_PN_95396_Multipurpose_Training_Facility_SWM_and_ES_Calcs_Narrative_Rev01_1/22/2020CIVIL CALCULATIONS SOTF Multipurpose Training Facility P N 95396 The civil calculations attached are for the storm water management and erosion and sediment control analysis. 100% Submittal: 12 July 2019 Revised for SWM Permit SW6191004: 16 January 2020 Prepared by: (I Stantec Stantec Consulting Services Inc. 801 Jones Franklin Road, Suite 300 Raleigh, North Carolina, 27606 (919) 851-6866 //Fax (919) 851-7024 CA :Q SE 4 = F,y N /11111W07 1020 TABLE OF CONTENTS Sediment Erosion Control and Stormwater Management Project Narrative....................................................................................................................01 NRCS Report..............................................................................................................03 Rip -Rap Outlet Protection Sizing............................................................................07 Water Quality Volume Calcs...................................................................................12 Channel Sizing and Velocity Calcs..........................................................................19 DrainageArea Maps................................................................................................21 Ft. Bragg, SOTF Multi -Purpose Training Facility Project Sediment Erosion Control and Stormwater Management Narrative The proposed project known as Fort Bragg SOTF Multi -Purpose Training Facility project consists of a new concrete training facility along with access/maintenance roads, and storm drainage. The new training structure is similar to a walk -out basement in terms of grading and access. This report presents the sediment and erosion control and stormwater management calculations for the project. The property is located on Fort Bragg in Cumberland County, North Carolina with access to the site from Lamont Road. The project is located in the north/northwest portion of the compound. The scope of work for the project includes civil site work and minor electrical site utilities design along with clearing and grubbing of existing trees. The project is located in a wooded area on the north side of a crowned highpoint which drains primarily to the north and east with a smaller share of drainage to the southeast. The site consists primarily of hydrologic Group A soils (see NRCS report) which has been corroborated with favorable infiltration rates (3.3 in/hr and 2.02 in/hr—see geotechnical report submitted under separate cover). SEDIMENT AND EROSION CONTROL The site sits on a crowned high point with gradual slopes typically less than 6% within the limits of disturbance (LOD). The primary disturbance activity for the construction of the facility will be excavation; therefore, the primary means of sediment leaving the site will be within storm drain systems and in the initial stage of clearing and utility trenching. The perimeter is protected with a combination of sediment fence, J-hooks, and sediment fence outlets. The storm drain system will use inlet protection and rip -rap outlet protection to prevent sediment laden water from leaving site. There is only one point of entry/exit to the site where a temporary construction entrance/exit is located (the western most edge of the LOD). A concrete washout station is also provided near the entrance/exit. All stormwater facilities will be constructed last, once all drainage areas have been stabilized. STORMWATER MANAGEMENT The site has been broken down into two main drainage areas (one for each infiltration facility) for the purposes of determining the required stormwater management volume for each infiltration basin. The site has been graded to capture all the impervious areas either in storm drain systems or surface flow via swales and sheet flow. The impervious areas consist mainly of the concrete roof/pad of the training facility and the maintenance/crane access road which is comprised of 12 inches of NCDOT #4 washed stone laid on geotextile fabric. The northwestern portion of the site is captured primarily through a storm drain network with false sumps at manholes with grated inlet tops. This network outfalls to an infiltration basin: SWM#2. The northeastern portion of Page 1 of 27 the site enters SWM #2 via sheet flow. The southeastern portion of the site primarily enters SWM#2 via a small swale with a small portion entering via an inlet which drains via 15" RCP (Gov. mandated minimum pipe size) to an outfall. The southwestern portion of the site drains to a SWM#1, an infiltration trench, which is a graded as a false sump. A rock weir overflow was designed for this facility to channel the water through a specific part of the berm such that the overflow would not enter the channel leading to SWM #2. Page 2 of 27 Z b M „9Z,b o6L 4L 0 09v%w ii 06b£03£ OL££68� 0£££68� oleo a 06Z£68� 09v%w 0W%w OZC%M OCC%M 06ZOBR Z b b 09Z%m O) V M„9Z,b o6L O O N — O) N (6 d -0 _ ) O N O Z = � o z N � a w rg Lr) 'G Q Po t N a O y '> T i N to M M i o No i N 7 � V) z Q Z U M„Zb,b o6L ^� 09Z£68� �i, z 0 0 Page 3 of 27 z 0 CQ G O LL z a 0 z w w J a Q N — N 7 U) m U O 0-0 O U y a) U O O O) E ai Q m Q m m NE E 32 y 0) 0 O O " N m (6 O- p O U m a) _0y E y > O O a) C > Q O -0 U) 6 > m 0 m rn E E p o a)m m m E N O C m N y U) a) m E rn rn E a) U — a) -0 m y E 2 7 Q N N U) a) m m wE UU)i O O m O N a) UU) a) m N m m a) I N 6 C `p V O -C y -O m U) 3 C m Q E C U)NN O E U) » - '— a) N O O- O O m E —0 Cc: U m m ay) a�i `� 00 o Q " aaaci U) a) U) U) (n O N L -6 a) -p m Z O o Z N n 2� -6 E v'i o > CL m 0 a w a) U) m 2 0 Q O a) O a) m E U m m W CL N m U)mCLy m L U N y a) O C N p m _ m D O_ O a) a) p N O w Q >+ � U U .�.. 0 a) > �_ � p -O rn O- U) O m p_ E E T m a) 2 E- '� m m O-0 m O O_ p N E N a) 7 u) U O N U) a) .o Q w '6 a) a) O � N a) m-0 a) m o a) U)J N .y a) m 0 fOA O- C O Q Utl) i a) O -0 a) Z E U O a) m m .o a) a) °) m m a) m 0 N p_ "-0 E O >, t N N m m O) N m m a) E O a) 0 C m U) (6 U .N C Q m O -O m T_ aE aa) O ` a) E Q m- a) 0 0 a) y O4(5 fOA (n i O y U O O_ a) (n a) E O N O. L a) C E FL E cn U U O 6 Q m H o UScn cn D v m H U .9 5 a) N y N C N L as °- o U L ° o a N N 0 N r m o m a y w m `o m U U 0 Z in O Q R R C 7 LL 0 n■■oF mii o a o O w y 0) `o y a o > w H 2) a° o a 0 0 0 c Q v rn Q m 0 Z rn Q 16 co co Q v) .j 0 0 a y O m -0 0 0 0 o a. o 0 a m m 0 Z rn Q a m m S L 1 1 ❑ ❑ 0 0 O co m Z Page 4 of 27 Hydrologic Soil Group —Cumberland County, North Carolina Soil Map - Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand, 2 to 8 percent slopes C 1.0 11.3% BaD Blaney loamy sand, 8 to 15 percent slopes C 0.2 1.9% TR Torhunta and Lynn Haven soils A/D 0.7 8.1 % WaB Wagram loamy sand, 0 to 6 percent slopes A 6.9 78.6% Totals for Area of Interest 8.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2019 Page 3 of 4 Page 5 of 27 Hydrologic Soil Group —Cumberland County, North Carolina Soil Map Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/12/2019 Page 4 of 4 Page 6 of 27 — DATE 20190703 DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) / X / PROJECT NAME Multipurpose Training Facility P70-77M 0 178451232 Fort Bragg, NC MTB UHLUKLU BY UL5 Storm Outlet Structure - A7 FES No.= A7 Pipe Dia= 15 in Q 1 o = 2.76 cfs Qfull = 4.52 cfs Vfu l l = 3.7 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Zone Dso DmAx Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Storm Outlet Structure - B2 FES No.= B2 Pipe Dia= 15 in Q 1 o = 2.64 cfs Qfull = 4.80 cfs Vfu l l = 3.90 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s 3 Length Zone Dso DmAx Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Q10/Qfull = 0.61 V/Vfu I = 1.05 V = 3.8 fps = 1 = 4 in = 6 in = A = 12 in = 5 ft = 4 ft Q10/Qfull = 0.55 V/Vfu I = 1.02 V = 4.0 fps = 1 = 4 in = 6 in = A = 12 in = 5 ft = 4 ft Page 7 of 27 ' ' • • DATE 20190703 DESIGN PHASE PRELIM CONSTR / X / REVISION RECORD OTHER (SPECIFY) PROJECT NAME Multipurpose Training Facility PROJECT NO 178451232 LOCATION Fort Bragg, NC BY MTB CHECKED BY DLS Storm Outlet Structure C-1 and C-2 FES No.= *N/A Pipe Dia= 12 in Q 1 o = 2.84 cfs Qfull = 3.56 cfs Vfu l l = 4.53 fps From Fig. 8.06.b.1: Zone From Fig. 8.06.b.2: D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width = 3xDia *Culvert Projecting from Fill Q10/Qfull = V/Vfu I I = V= 0.80 1.11 5.0 fps = 1 = 4 in = 6 in = A = 12 in = 4 ft = 3 ft Page 8 of 27 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Stormwater Infiltration #1 Overflow-Q10 Trapezoidal Bottom Width (ft) = 10.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 244.50 Slope (%) = 1.85 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 2.84 Elev (ft) 246.00 245.50 245.00 244.50 244.00 2 4 6 Section 8 10 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jul 3 2019 = 0.16 = 2.840 = 1.68 = 1.69 = 11.01 = 0.14 = 10.96 = 0.20 12 14 16 Depth (ft) 1.50 1.00 0.50 ffixere, -0.50 18 Page 9 of 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 06 / 28 / 2019 Hyd. No. 1 Channel 1 Hydrograph type = Rational Peak discharge = 2.864 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 859 cuft Drainage area = 1.250 ac Runoff coeff. = 0.29* Intensity = 7.902 in/hr Tc by User = 5.00 min OF Curve = Pope_AAF_IDF_Hydrographs.J�e/Rec limb fact = 1/1 Composite (Area/C) = [(0.950 x 0.38) + (0.300 x 0.03)] / 1.250 Q (cfs) 3.00 rM 1.00 0.00 0 1 — Hyd No. 1 Channel 1 Hyd. No. 1 -- 10 Year 2 3 4 5 6 7 8 9 Q (cfs) 3.00 2.00 1.00 1 0.00 10 Time (min) Page 10 of 27 Hydrograph Report 2 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 Channel 2 Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.420 ac Runoff coeff. Intensity = 7.902 in/hr Tc by User OF Curve = Pope_AAF_IDF_Hydrographs.J�e/Rec limb fact Composite (Area/C) = [(0.137 x 0.95) + (0.283 x 0.30)] / 0.420 Q (cfs) 2.00 1.00 0.00 0 1 — Hyd No. 2 Channel 2 Hyd. No. 2 -- 10 Year Friday, 06 / 28 / 2019 = 1.693 cfs = 5 min = 508 cuft = 0.51 * = 5.00 min = 1/1 2 3 4 5 6 7 8 9 Q (cfs) 2.00 1.00 N 0.00 10 Time (min) Page 11 of 27 1 /16/2020 NCDEQ BMP Manual INFILTRATION BASIN #1 & #2 1.0" Water Quality Volume (WQv) (ACTUAL DRAINAGE AREA TO SWM DEVICE) Rv = runoff coefficient (Runoff/Rainfall) Rv = 0.05 + 0.009( 1 ) Where "I" = % Impervious ("Simple Method" - Schueler, 1987) WQv = 1.0"RvA 12 Infiltration Basin #1 Fill in Values: M0718 DA Impervious Area (Ex. & Prop.) "1" = Percent Impervious of DA "A" = "DA (Acres) "Offiste area = 4,261 SF Answer: WQv = 0.022 Ac. Ft. Cubic Feet Required Cubic Feet Provided 976 1,520 Infiltration Basin #2 Fill in Values: 0.606 DA Impervious Area (Ex. & Prop.) "1" = 27.3409 Percent Impervious of DA "A" = 2.215 *DA (Acres) "Offiste area = 6,045 SF Answer: WQv = 0.055 Ac. Ft. Cubic Feet Required Cubic Feet Provided 2,381 2,569 = 11 282 SF impervious area A = Actual Drainage Area to SWM Device Rv= 0.374732 WQv= 0.37 inches CN(WQv)= 91.4 Use to comp. Q,-- = 26 380 SF impervious area A = Actual Drainage Area to SWM Device Rv= 0.296068 WQv= 0.30 inches CN(WQv)= 89.3 Use to comp. Q,-- Page 12 of 27 DRAINAGE AREA & IMPERVIOUS AREA Pre -Development Impervious Area (Within Drainage Areas) Infilt #1 0 SF Infilt #2 0 SF Post Development Impervious Area (Prop. & Ex.) (Within Drainage Area) Infilt #1 11,282 SF Infilt #2 26,380 SF Post Development Impervious Area (Prop. & Ex.) (Excudes Gravel) Infilt #1 2,352 SF Infilt #2 10,785 SF Project Limit of Disturbance (Using as Project Area) LOD 158,994 SF Pre -Development Impervious Area (Within LOD) LOD 0 SF Post Development Impervious Area (Prop. & Ex.) (Within LOD) LOD 37,662 SF Post Development Impervious Area (Prop. & Ex.) (Excludes Gravel) LOD 13,137 SF 1.0" Volume For Project Area (LOD) Using Simple Method Per Runoff Volume Simple Method NCDEQ Stormwater BMP Manual PRE -DEVELOPMENT RVPRE = 0.05 + 0.9 * IA _ Existing Site Impervious Area IA Total Area (Project Area) _ 0 IA 158,994 1A = 0.00 RVPRE = 0.05 POST DEVELOPMENT RvPosT = 0.05 + 0.9 * 1A _ Developed Site Impervious Area (Prop. & Ex.) IA Total Area (Project Area) 37,662 IA_ 158,994 1A = 0.24 RVPosT = 0.26 RvPosT = 0.12 (NO Gravel) Newly created Impervious area for the Project = 37,662 SF Page 13 of 27 1.0" VOLUME REQUIRED For Project Area (LOD) Using Simple Method Simple Method V = 3630 * P * (RVPOST - RVPRE) * DA P (1.0") = 1 IN DA = 158,994 SF DA = 3.65 AC V = 3,487 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (DOES NOT FACTOR IN PRE -CONDITIONS IMP. AREA, REMOVES Rvpre FROM EQUATION) V = 1,648 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (EXCLUDES GRAVEL) STORMWATER VOLUME SUMMARY CALCULATIONS TOP OF INFILTRATION SURFACE AREA @ DEPTH OF VOLUME *VOL. **INFILTRATIO TOTAL TOP OF ***BOTTOM EMBANK IMPERVIOUS BASIN # BOTTOM PONDING VOIDS N RATE VOLUME BASIN OF BASIN SHWT MENT AREA PONDING PONDING TREATING (SF) (FT) (CF) (CF) (IN/HR) (CF) (FT) (FT) (FT) (FT) (SF) 1 724 1.50 1,086 434 3.30 1,520 243.00 240.83 >237.75 244.50 11,282 2 2,855 0.90 2,569 2.02 2,569 223.77 223.44 219.16 224.67 26,380 *Assumes a Void Ratio of 0.4 for the 1.5-2.5 inch speficied stone. Accounts for only the 4 feet of stone does not include pea gravel and sand. ** Based on observation from the geotechnical engineer SHWT = Seasonal High Water Table ***The bottom of sand filter layer where in -situ infiltration rate occurs Impervious Area Treating 37,662 sf Newly created Impervious Area 37,662 sf 1.0" WQV Required, Project Area (LOD) (Simple Method, Pre -Development Conditions NOT Considered) 3,487 cf 1.0" WQV Required, Drainage Areas Only (Simple Method, Pre -Development Conditions NOT Considered) 3,357 cf 1.0" WQV Required, Drainage Areas Only (Simple Method, Pre -Development Conditions NOT Considered, NO Gravel) 1,648 cf 1.0" WQV Provided 4,090 cf Page 14 of 27 Infiltration Basin #1 SA = DV (K/1 VFW DV (Required)= 976.43 cu ft K= 3.30 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) 1 99 Surface Area Provided = 1 724 Infiltration Basin #2 SA = DV 0.718 *DA (Acre! (K/12/FS*T) DV (Required)= 2,380.52 cu ft K= 2.02 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) = 393 Surface Area Provided = 2,855 Page 15 of 27 NC DEQ Draw Down Time: Infiltration Basin #1 Total Volume Provided: 1,520 cu.ft. Infiltration Bottom Area: 724 sq ft. Maximum Release Time: 72 hrs Overflow Berm Elev: 244.50 Bottom of Basin: 1 243.00 Infiltration Rate: 1 3.30 in/hr Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 243.00 Draw Down Time for only Infiltration with FS: 15 hrs Infiltration Basin #2 Total Volume Provided: 2,569 cu.ft. Infiltration Bottom Area: 2,855 sq ft. Maximum Release Time: 72 hrs Overflow Elev: 224.67 Bottom of Basin: 1 223.77 Infiltration Rate: 1 2.02 in/hr Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 223.77 Draw Down Time for only Infiltration with FS: F 11 hrs (Boring 1-02) OK (Boring 1-01) Ce77 Page 16 of 27 Tee Consmner UgWid used:-Wniclpal W9w Depth of 1Y~ 1abke: M, Water Temp ('Pk 0 OF lest location: 1-121 Depth of OMerred Wirier 26A inches Cmmramm tapactty qu an aingrF se rI Z* Sight rube 1_ '1 MOM t agr u q Flare rate used: 1OS Hal■ pi2m4W.. 2A irxfics Stwt Saturatiorc 7d3d Wirer Fiend: 7 irxheS Hale Radius: 1.20D Hale GID"m - 33 iruhes Test ar m_ AIM 0 '® ®®®® Page 17 of 27 T4w rd"Cr uquld 1lsedt Munk" Water Test LDuff an: 1-02 Depth t+f WM&f TaMe- �96" WelerTMW4 "FK Depth Df -D6served Water d" "�efS now rblrwed: 105 Hole Qiame[er: vnsfarrts:I CARC-ity Ucluici 59 uIQ €M -um M[ 55 'IF dd irKhem 14 irwhem SI�TuErt IL Or, 51Ai15etLPfxb*4: 15,0D iWe1lYHeed: 5 lmhee tar+ge u c L n Hole Radrai 1.20D Hale Daplh: 5+6 inthee FS Q c Page 18 of 27 1.0" VOLUME REQUIRED For Project Area (LOD) Using Simple Method Simple Method V = 3630 * P * (RVPOST - RVPRE) * DA P (1.0") = 1 IN DA = 158,994 SF DA = 3.65 AC V = 3,487 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (DOES NOT FACTOR IN PRE -CONDITIONS IMP. AREA, REMOVES Rvpre FROM EQUATION) V = 1,648 CF = VOLUME REQUIRED FOR PROJECT AREA USING SIMPLE METHOD (EXCLUDES GRAVEL) STORMWATER VOLUME SUMMARY CALCULATIONS TOP OF INFILTRATION SURFACE AREA @ DEPTH OF VOLUME *VOL. **INFILTRATIO TOTAL TOP OF ***BOTTOM EMBANK IMPERVIOUS BASIN # BOTTOM PONDING VOIDS N RATE VOLUME BASIN OF BASIN SHWT MENT AREA PONDING PONDING TREATING (SF) (FT) (CF) (CF) (IN/HR) (CF) (FT) (FT) (FT) (FT) (SF) 1 724 1.50 1,086 434 3.30 1,520 243.00 240.83 >237.75 244.50 11,282 2 2,855 0.90 2,569 2.02 2,569 223.77 223.44 219.16 224.67 26,380 *Assumes a Void Ratio of 0.4 for the 1.5-2.5 inch speficied stone. Accounts for only the 4 feet of stone does not include pea gravel and sand. ** Based on observation from the geotechnical engineer SHWT = Seasonal High Water Table ***The bottom of sand filter layer where in -situ infiltration rate occurs Impervious Area Treating 37,662 sf Newly created Impervious Area 37,662 sf 1.0" WQV Required, Project Area (LOD) (Simple Method, Pre -Development Conditions NOT Considered) 3,487 cf 1.0" WQV Required, Drainage Areas Only (Simple Method, Pre -Development Conditions NOT Considered) 3,357 cf 1.0" WQV Required, Drainage Areas Only (Simple Method, Pre -Development Conditions NOT Considered, NO Gravel) 1,648 cf 1.0" WQV Provided 4,090 cf Page 19 of 27 Infiltration Basin #1 SA = DV (K/1 VFW DV (Required)= 976.43 cu ft K= 3.30 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) 1 99 Surface Area Provided = 1 724 Infiltration Basin #2 SA = DV 0.718 *DA (Acre! (K/12/FS*T) DV (Required)= 2,380.52 cu ft K= 2.02 in/hr FS= 2 T= 72 hrs Min. Surface Area (SA) = 393 Surface Area Provided = 2,855 Page 20 of 27 NC DEQ Draw Down Time: Infiltration Basin #1 Total Volume Provided: 1,520 cu.ft. Infiltration Bottom Area: 724 sq ft. Maximum Release Time: 72 hrs Overflow Berm Elev: 244.50 Bottom of Basin: 1 243.00 Infiltration Rate: 1 3.30 in/hr Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 243.00 Draw Down Time for only Infiltration with FS: 15 hrs Infiltration Basin #2 Total Volume Provided: 2,569 cu.ft. Infiltration Bottom Area: 2,855 sq ft. Maximum Release Time: 72 hrs Overflow Elev: 224.67 Bottom of Basin: 1 223.77 Infiltration Rate: 1 2.02 in/hr Factor of Safety (FS): 1 2.00 Bottom of Infiltration Basin Elev: 223.77 Draw Down Time for only Infiltration with FS: F 11 hrs (Boring 1-02) OK (Boring 1-01) Ce77 Page 21 of 27 Tee Consmner Liquid used:-uniclpal W9w Depth of 1Y~ 1abke: M, Water Temp ('Pk 0 OF lest location: 1-121 Depth of OMerred Wirier 26A inches Cmmramm tapactty qu an aingrF se rI Z* Sight rube 1_ '1 MOM t agr u q Flare rate used: 1OS Hal■ pi2m4W.. 2A irxfics Stwt Saturatiorc 7d3d Wirer Fiend: 7 irxheS Hale Radius: 1.20D Hale GID"m - 33 iruhes Test ar m_ AIM 0 '® ®®®® Page 22 of 27 T4w rd"Cr uquld 1lsedt Munk" Water Test LDuff an: 1-02 Depth t+f WM&f TaMe- �96" WelerTMW4 "FK Depth Df -D6served Water d" "�efS now rblrwed: 105 Hole Qiame[er: vnsfarrts:I CARC-ity Ucluici 59 uIQ €M -um M[ 55 'IF dd irKhem 14 irwhem SI�TuErt IL Or, 51Ai15etLPfxb*4: 15,0D iW81lYHeed: 5 lmhee tar+ge u c L n Hole Radrai 1.20D Hale Daplh: 5+6 inthee FS Q c Page 23 of 27 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Channel 1 10 Yr Storm Rational Method Triangular Side Slopes (z:1) = 12.00, 12.00 Total Depth (ft) = 0.60 Invert Elev (ft) = 244.50 Slope (%) = 0.46 N-Value = 0.040 Calculations Compute by: Known Q Known Q (cfs) = 2.86 Elev (ft) Section 246.00 245.50 245.00 244.50 244.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jul 3 2019 = 0.50 = 2.860 = 3.00 = 0.95 = 12.04 = 0.33 = 12.00 = 0.51 2 4 6 8 10 12 14 16 18 20 Reach (ft) Page 24 of 27 Depth (ft) 1.50 1.00 0.50 ffixere, _n tin Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Channel 2 10-Yr Storm Rational Method Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 225.50 Slope (%) = 4.84 N-Value = 0.040 Calculations Compute by: Known Q Known Q (cfs) = 1.69 Elev (ft) 227.00 226.50 226.00 225.50 225.00 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Friday, Jun 28 2019 = 0.40 = 1.690 = 0.64 = 2.64 = 3.30 = 0.41 = 3.20 = 0.51 .5 1 1.5 2 2.5 3 3.5 4 4.5 Reach (ft) Page 25 of 27 Depth (ft) 1.50 1.00 0.50 -0.50 V A ✓ ��—� \\V / _ \\ \ \ V A A V A \ \ �r—� V v �` /��,0(� LDS LOD ��LOp �� `-� / L. ' A � \ LOD D �—T' \ \ V A —`-' r A \ l A \ V A �a i�LOD LOD 241��-� �� \ A \ 242 v ti \ V A T- � �-0 243 0 -A \ \ \ \ \ V A \ ✓�✓ - _ •• 242._ \ \ 243 - �����- _ ••� + --�� 13 \ �� 3 ��� \�A7 T\ \ \ V �\ V � ����-�� ✓�R� 4 •• 4 7� 7 �\ 3 A\ AV V -T- Cv� \1 s ��/ i oy_-19oO \ \ -�• L �2"4�S _ - CMN22'3n�d3 'ii P�' i •2•43- -�o I 1\ il�4 $\V\ \ \7\ A\ \1sV� 5 -244'- 1-1 A \ 10A � .4V �14 nC� i 4 \"\ D15"\CA30\1�SSV1s \ 45,-- 15 12�L 0 ,�2\ 23 r172d4\ \ AA \ A \ ���V\ \ V • o - - • 2 \ 14 11 \ \ \ \ 1 V V J 233.65 0 A \ \ \ \ \ \ \ V A 1$ 235 2 • _D\2� / L L\ ` \T��\ �� A '247.0'� 13 240 6 �•• �LOD • 3 • 2Qs L� L�D L0� 19 22.8V �� \ V • K 2 246 211JW 246SO RO D L.D L 6 \ SWM�+ �/ �24 z44s SD �5. ? \ V —��LUU roe D A \ \ V A \ LOD V it2 ��� 46 246.V •• �C? 0� \•• •�"'��S . ��.• •N •• •• \ " DI 15"RCP 15"RC - CLAS IVA \ o -^ � � zd� � �� \ OFFSITE � SD p SD�'.RC D SD o S p 5D � � T� • • S M y 244.75 246 245.5,Y •. OFF lr' ��g� +243.3 'Q \ 245.5 2qS��, 5246. — E LOD \ LOD LOD 15 •• \ SWM# \� x 245.5 LOD �OD— LOD 180D q 244.5 243.5 �� ✓ 2465 .64' ^ 245.64 � � E L00 _ LOD �_ co ® E [� 12" RC \ CL SS IV 245.36 �246.7 Q a BLDG5 E 246. �U� 2 n \ E / 2Q • L� 243 244.8 C24 tea' \ i �rr�nin .• SWM DRAINAGE AREA .. SWM DRAINAGE AREA-OFFSITE 244-245 8" DI 245.5 245.5 SEE 45. GRADING DIP NOTE 2 ON $i 233 \ SHEET CG102 A 244.5 �244 5 �� \ V V \ \� C 244A. • o 245.7 �� SC244.25 iii A 232.65 �243.5 233 \/SD �D 115"RSA P - CLASS IV �D \ 235 P 243 2 243 X d / � •• �� A E243.5 +�i$j/+� \ 9 � 20 vD�� \ X �r LOD LOD LOD A OD LOD L D (�� \ LOD �_ LOD LOD �- L0D R M 0�� STORMWATER MANAGEMENT DRAINAGE AREAS WM10 SCALE:1"=30' 0 30 00 SCALE IN FEET E % (9 SWM PERMIT SET I I US Army Corps of Engineers w 0 z 0 a U w z Q SHEET ID SWM101 Page 26 of 27 \�_ -_L - - r r- - -- - , - ---- - -ter \ 1 `� _ ✓-0�-i15p� COD ��LOD `� / - Lo ��L01 r - 241��-� �242 � � ✓ �� � 242 - - - -2 43 242.1 __243'- awn �.13 1 ♦ _ - 243'-3 ,1,41 �� 7 4 7 �� $ -24 A1� D 15"RCP _ 14� 1 A r CLASSIVS233.95 2A29 o „14 o 8 45-� 14 246' _ � � 43� � 5 \� 15 � 12 ��0, 1 33 „DIP 7 24 4\ "'� �I 2 232.5 235 233.6) �7a 2 02J +247.0'A 1 ( 240 CLOD - _ w ✓ ✓�� 13 /O � 2� l ✓ j� � � � -� � � �- � � I �� I � 246 � �(i. • ..246.5 A3� s � � � � ��� SO ROD �I f 246. 44.8 SD 75•RCp �_ i i� V LOUD_ COD I 1 \ ` L \ 8 45�\ \ 46 �Sp� boo � � 8„ DIP 43� 15 R P ��,�,,�� 15"RCP C �� �D 5' SO IDS SD� SD ��'0 )\ I 00 sd, \ y�244.75 246 VIC H A t# +24.3' �Qs v� 2455 Art - g 1 �o \ 245�� +241 2 E E LOD LOD LOD LOD 1 5 • '� o� �� �� X245.5 LOD E�OD !O 244.5 /C1 LLOD�i 2 �D-_� tam ✓ ° -� _ � 45.64 5 i � E L� LOD /fib Sp 12" RC 0-` CLASS IV �. ,X246.7,. j 5 245.36 BLDG •. E 246. g 1,66 aQ ©X243 247.P L 2 o �-+ � '� _�� S W M boo \ 44.5\ (J-) STORM DRAIN AND CHANNEL DRAINAGE AREAS SCALE: V=30' o an ao SCALE IN FEET goo �- ) •. LOD ' LOD 245.5I 245.5 , �;I/ \ FFN>=2: i SELGR/ T NoTE: SHEEN 1 � *ILI) 13 V10 10\ SL 1 D \� 10 j L Q + A L 0 L \D <0� 22.8� LOD AS SO jj1J �244.55\ 244 3 b�J �D I I V/y "RC -CLsS IV �D o O 23 1 \ \ J �15"RCP-CL�SS�IV a B2� SU SD� SO SO �--a > ->• > - • �' L / / OD -� LOD LOD � LOD �_ LOD LOD L0� '.. 1- 0.013 STORM DRAINAGE SCHEDULE CONTINUED � STORM DRAINAGE SCHEDULE -CONTINUED 9- 206 h= 21 1- 7.92 INLET INLET INLET Cc INLET TOTAL INLET PIPE Tc TIME Cc RUNOFF q q SIDE- CAPACITY SEGMENT UPPER LOWER UPSTREAM TOP PIPE '.. FROM TO AREA AREA IMPERVIOUS RUNOF= DISCHARGE AREAS TIME TIME OF GONG. INTENSITY COEFF_ DISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. COVER (SF) (AC) (%) COEFF. (CFS) (AC) (MIN) (MINI (MIN) (IN/HR) (CFS} ICES) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) (FT) ''.. AO Al 7.324 0.17 25 0.46 0.81 0.17 5.00 0.00 5.00 7.92 0.48 0.61 0.00 0.0054 15 4.8 3.9 48 0.21 227.88 227.60 23205 2.83 ''.. All A2 19.054 0.44 27 0.47 1.64 0.44 5.00 0.00 5.00 7.92 0.47 1.64 0.00 0.0054 15 4.7 3.8 112 0.49 227.50 226.90 231.80 2,94 ''.. A2 A3 2.296 0.05 45 0.59 0.25 0.49 5.00 0.49 6.49 7.78 0.19 1.85 0.00 0.0037 15 3.9 3.2 68 0.36 226.80 226.55 213.90 15.74 A3 A4 2..374 0.05 39 0.56 0.24 0.54 5.00 0.84 6.84 7.67 0.49 2.06 0.00 0.0041 15 4.1 3.4 86 0.43 226.45 226. 10 244.80 16.99 A4 A5 2 850 0.07 21 0.43 0.22 0.61 5.00 1.27 6.27 7.55 0.49 2.24 0.00 0.0052 15 4.7 3.8 77 0.34 226.10 225.70 243.80 16.34 '.. A5 A6 0 0.00 0.30 0.00 0.61 5.00 1.81 6.61 748 0.4S 2.22 0.00 0.004, 15 4.3 3.5 Si 0.44 225. 60 225.20 241.70 14.74 AS A7 0 0.00 0.30 0.00 0,61 5,00 2,04 7.04 7.35 0,49 2.18 0.00 0,0049 15 4,5 3.7 102 0.45 225.10 224,60 236.00 9.54 '.. 61 32 13,963 0.32 10 0.37 0.93 0,32 5,00 0,00 5.00 7.92 0,31 0.93 0.00 0,0056 15 4,8 3.9 270 1.15 227.50 226,00 232.65 3.79 ''.. Ci C2 27,655 0.63 41 0.57 234 0.63 5.00 0.00 5.00 7.92 0.57 2.84 0.00 0.0100 12 3.6 4.5 50 0.18 243.50 243.00 246.50 1.91 SWM PERMIT SET I I US Army Corps of Engineers w 0 z 0 a U w 0 Y K SHEET ID SWM 102 Page 27 of 27