Loading...
HomeMy WebLinkAboutNCC200233_NOI Application_20200123Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/20/2020 3:05:12 PM (NCG01 NOI Submission) Approve by McCoy, Suzanne 1/21/2020 8:05:42 AM (Review- Construction NOI 20879) • The task was assigned to McCoy, Suzanne by round robin distribution 1/20/2020 3:05 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 22, 2020 5:00 PM 1/20/2020 3:05 PM Submit by McCoy, Suzanne 1/23/2020 9:40:45 AM (Payment Verification for NCC200233) * Beacon Acquisitions LLC • McCoy, Suzanne assigned the task to McCoy, Suzanne 1/23/2020 9:40 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 3, 2020 5:00 PM 1 /21 /2020 8:05 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Beam Road Industrial Site Mass Grading 2. County* Mecklenburg 3. Highway or Street Beam Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Charlotte 5. State * NC 6. Zip Code * 28217 7. Latitude * Enter the latitude in decimal degrees 35.1840 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.9340 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/01/2020 Estimated Construction Project Start Date 10. Date to End* 02/01/2021 Estimated Construction Project End Cute 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Developrrent 12. Acres to be 43.50 disturbed* (including off -site borrow and waste areas) 13. Total site area 73.62 (acres) * 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-MECKL-2020-Beam Road Industrial Site Mass Grading Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Coffey Creek Wate rbody* Narm of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-137-4 Index No.* NCWaterbody Index N nber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Beacon Beam Road LLC Name * 2. First Name* Sean IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* McDonnell If Corporation, enter F3egistered Agent Last %rre 3b. Title Director Build to Suit 4. Permitee E-mail sean@beacondevelopment.com Address * 5. Permittee 7045977757 Telephone No.* 6. Permittee Mailing Street Address Address* 500 East Morehead Street Address Line 2 Suite 200 city Charlotte Fbstal / Zip Code 28202 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 500 East Morehead Street Address Line 2 Suite 200 Cty Charlotte Fbstal / Zip Code 28202 State / F rovince / Faegion NC Country us State / Frovince / Fbgion NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Kevin Contact - First Name * 3. Primary Site Clark Contact - Last Name * 4. Title Superintendent 5. Site Contact E- kclark@interconbuildingcorp.com mail Address* 6. Site Contact 7049424544 Telephone No.* 7.Organization InterCon Name 8. Site Contact Street Address Mailing Address* 211 Atherton Street Address Line 2 City Charlotte Fbstal / Zip Code 28203-5602 9. Consultant Name (Optional) First and Last narre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/09/2020 Approved * 2. E&SC Plan Project LDGP-2019-00259 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* City of Charlotte Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Letter of Approval modified April 2019 - Beam Road Approval 27.05KB Industrial Site Mass Grading REVISED.pdf letter/documentation Mast be R7Ffon-rat 6. NOI Certification NCG01-eNO1-Certification-Form-signed.pdf 83.94KB Form Mist be PDFfon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Sean McDonnell Title Director Build to Suit Organization Beacon Beam Road, LLC Date * 01 /20/2020 F. Tracking and COC Info NOI Tracking No. 20879 NC Reference No. NCG01-2020-0233 Uses 'count number' variable (incremrented by SP) Certificate of NCC200233 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 233 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)