Loading...
HomeMy WebLinkAbout20200100 Ver 1_401 Application_20200116T.E. ALLEN ENGINEERING, PC TERRY E. ALLEN, PE, MSE CONSULTING ENGINEER 2 &�20 b 100 Post Office Box 103 Rosman, North Carolina 28772 Phone (828) 8774883 Email: tealleneng@comporium.net Mobile (828) 553-3004 Firm # C-1997 so December 20, 2019 00 SUBJECT: Engineering Services for 401/404 Permitting to Enlarge the Existing 7000- Boathouse Foundation and Replace the existing Seawall at James T & Susan W Selmensberger Residence, 247 N Club Blvd, Lake Toxaway, Transylvania County, NC PIN: 8513-71-7363-000 NC DWQ, 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Dear DWQ: Enclosed, please find five (5) copies of the 401/404 application (PCN form). A check for the application review fee is also enclosed. This PCN to enlarge the existing Boathouse Foundation and replace the existing Seawall at 247 N Club Blvd, Lake Toxaway Transylvania County, North Carolina. The work shall be in accordance with attached Sheets C-1 through C-5. Lake Toxaway has a water quality classification of B; Tr. All disturbed areas not to be filled or flooded will be vegetated pursuant to the seeding schedule in the Erosion and Sediment Control Planning and Design Manual. If you have any questions or require any additional information, please do not hesitate to contact me at (828) 877-4883 or email tealleneng@comporium.net. Sincerely, Terry E. Allen, PE, MSE Consulting Engineer Enclosures 5 copies of 401/404 PCN Application Form Check for application review fee Copy Furnish w/ attachment: 401 PERMITTING Andrew W Moore NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, NC 28711 828-296-4500 Email: andrew.w.moore@ncdenr.gov NC FISH & WILDLIFE PERMITTING Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Bldg B Marion, NC 28752 828-400-4223 Email: andrea.leslie@ncwildlife:org USACE 404 PERMITTING Mr. David Brown, PG Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Ave, Room 208 Asheville, NC 28801-5006 828-271-7980, ext. 4232 Email: David.W.Brown@usace.army.mil Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 - Modification to Existing Seawall; 18 - New Boathouse Foundation or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes . ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ElYes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: BOATHOUSE, DOCK & SEAWALL IMPROVEMENTS at SELMENSBERGER RESIDENCE 2b. County: Transylvania 2c. Nearest municipality / town: Brevard 2d. Subdivision name: Lake Toxaway 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information ` 3a. Name(s) on Recorded Deed: James T & Susan W Selmensberger 3b. Deed Book and Page No. Date: 10/2019 Book: 00897 Page: 0141 Plat Book: F8 Page: 993 3c. Responsible Party (for LLC if applicable): 3d. Street address: 247 North Club Blvd. 3e. City, state, zip: Lake Toxaway, NC 28747 3f. Telephone no.: 828-713-0900 3g. Fax no.: 3h. Email address: Page 1 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terry Allen, PE 5b. Business name (if applicable): T.E. ALLEN ENGINEERING, PC 5c. Street address: P.O. Box 103 5d. City, state, zip: Rosman, NC 28772 5e. Telephone no.: 828-877-4883 5f. Fax no.: 5g. Email address: tealleneng@comporium.net Page 2 of 13 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 8513-71-7363-00 1 b. Site coordinates (in decimal degrees): Latitude: 35.144341 Longitude: - 82.95573 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.73191675 (from Transylvania County GIS) acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Toxaway 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah Page 3 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project, at the time of this application: This home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. There is an existing seawall (Bulkhead) along the shoreline. A portion of the existing seawall will be removed as necessary to install the new boathouse foundation. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: Construct new 10'x14'-Y Addition to Existing Boathouse Foundation. A local variance/authorization may be required for the LTCA to encroach into the 15-FT Side Tard Setback. Remove existing timber seawall and replace with a new natural boulder seawall. Maintenance and repair for existing Docks. New work to be in accordance with Sheets C1 through C12. The boathouse foundation work will be performed "IN THE DRY" using a coffer dam to create a dry work area. Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. A minimum of three (3) rows of temporary Silt Fence shall be provided to separate the work area from the dry Lake Bed. All temporary Erosion Control Measures shall be removed prior to impoudment refill or at the conclusion of Boathouse Foundation work. All Trout Buffer disturbance shall be repaired in accordance with the NCDEQ-DLR Trout Buffer and Riparian Area planting requirements. See attached Sheet C3 for location of work. Page 4 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be -used: New Boathouse Foundation (84 LF of permanent impacts). BOATHOUSE FOUNDATION. The Boathouse Foundation work shall be performed "IN THE DRY" using a coffer dam to create a dry work area. Three (3) rows of Turbitidy Curtains shall be used in addition to the Coffer Dam. To comply with Water Quality requirements, the work will be performed in the dry. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ's Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF-400 from Rain -for -Rent with a 100 to 1 micron nominal rating (P.O.C. at Rain -for -Rent is Jeremy at 704-393-3345). The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the dredging areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a "dry work area" as described above. "High Early" cementious material shall be in the stone work to minimize curing time. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Furnish and install multiple layers of turbidity curtains as necessary to insure regulatory compliance. Permanent Fill (i.e., Boathouse Foundation) shall not exceed 25 cubic yards meeting the following requirements; (a) The quantity of discharged material and the volume of area excavated do not exceed 25 cubic yards below the plane of the ordinary high water mark or the high tide line; (b) The discharge will not cause the loss of more than 1 /10-acre of waters of the United States; and (c) The discharge is not placed for the purpose of a stream diversion. No disturbance within existing Vegetated Trout Buffer. Provide Turbidity Curtains around work area to maintian water quality. See attached Sheet C3 for location of work. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑Preliminary El Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 5 of 13 PCN Form — Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. TROUT BUFFER. All disturbance within the Trout Buffer shall be restored in accordance with the NCDEQ-DLR Trout Buffer and Riparian Area planting requirements. Page 6 of 13 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (pheck all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact IType of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404,, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ S6 ❑ P F❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 7 of 13 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T Temporary Coffer Dam for 01 ❑ P ®T Lake Toxaway Boathouse Foundation 75 Linear Lake 0.04 Acres Ft 02 ❑ P ®T Lake ToxawayTemporary Turbidity Curtain to Repair Seawall, 75 Linear Ft Lake 0.04 Acres Permanent Boathouse 03 ®P ❑ T Lake Toxaway Foundation (35 Linear Ft x 3 Ft Lake 0.02 Acres horizontal projection) 04 ❑P❑T 4f. Total open water impacts 0.10 Acres 4g. Comments: The work may be performed while the lake is at normal pool elevation, or during the upcoming Lake Draw - down. 1.0 NEW BOATHOUSE FOUNDATION new presast concrete block foundation to support new boathouse structure. 2.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. Three (3) rows of Turbidity Curtains shall be installed in addition to the Coffer Dam. The dewatering discharge will be filtered to DWQ Water Quality, Standards prior to release. Turbidity Curtains to remain in place untll work is complete and the turbidity in the work area is less than 10 NTUs above background. 3.0 Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5L Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 8of13 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar -Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. 131 ®P❑T ❑Yes ❑ No B2 ❑P❑T El Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The work will be performed while the lake is at normal pool elevation. 1.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. 2.0 Boathouse foundation work will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. Three (3) rows of Turbidity Curtains shall be installed in addition to the Coffer Dam. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. Turbidity Curtains to remain in place until work is complete and the turbidity in the work area is less than 10 NTUs above background. 3.0 Where the work is performed during the upcoming Lake draw -down, temporary Silt Fence and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation Page 9 of 13 PCN Form — Version 1.3 December 10, 2008 Version 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Should project exceed 10% or 100' in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 10 of 13 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑Yes El No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 12 of 13 PCN Form —Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ® No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ® No 5c. If yes, indicate the U'SFWS Field Office you have contacted. ❑ Raleigh ❑ Asheville 5d.' What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? I ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ® No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? S. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? James T. Selmensberger Applicant/Agent's Printed Name to 12 Date ppddWAgerTrs nature (A nt's gna re is lid only if an authorization letter from the applicant isprovided.) IJ Page 13 of 13 PCN Form — Version 1.3 December 10, 2008 Version Provide Handrails & Guardrails per Code. (2) 1.75"x24" PT Rim Band I V I uu (2) #5 Top Bars Continuous L4x4xj" x 4"—Long Galy Steel Clip Angle with J" Galy Bolt f each each leg. Typical each end of Joist. '' NEW 8% 24" Concrete Bond Beam, continuous all around. 2' Raise Height of the existing J (� 3 Stirrups at 8" on center Boathouse by adding a NEW 8"x24" Concrete Bond Beam all around. SEE DETAIL ON SHEET (2) #5 Bottom Bars Continuous C-7. I�I �I I I II Clean top of existing CMU Wall and apply Prior to installing NEW Concrete —` I F liberal amount of Epoxy Bonding Grade Beam; Furnish and install �t III I Compound immediately prior to placing two 2 3 vertical bars in each () # ;. I I new Concrete Bond Beam. hollow cell of the existing CMU I J I I I l Boathouse Wall and grout wall I solid with 4000 PSI cementious grout. Do not grout wall with mortar. 32" I II f=1 #5 Vertical Dowel Bar at 16" on center, I` embedded 32" minimum 'into existing CMU Two (2) #3 vertical bars in each I• III (Block) Wall and secured in place with hollow cell of the existing CMU —\ I J I I I SET/ET Epoxy Adhesive or equal. Boathouse Wall and grout wall solid with 4000 PSI cementious grout. � I I� III I�I it I 0 Copyright 2019 Terry Allen PE, T.E. ALLEN ENGINEERING PC, Terry E. Allen Engineer. All Rights Reserved Worldwide. 1 CONCRETE BOND BEAM DETAIL C—� Not to Scale . PRELIMINARY — NOT FOR CONSTRUCTION BOATHOUSE, DOCK & SEAWALL T.E. ALLEN ENGINEERING, PC Prepared for: Jim & Susan Selmensberger z IMPROVEMENTS 422 Vanderbilt Rd FIRM # C-1997 s James T & Susan W Selmensberger Residence PO BOX 103 Asheville, NC 28803 I o �] q o ^ I 247 N Club Blvd, Lake Toxaway ROSMAN, NORTH CAROLINA 28772 828-713-0900 N Transylvania County, NC Y ty� (828) 877-4883 MOBILE (828) 553-3004 828-475-4576 jimMail adiumbuilders.com susiepaselmensberger.com PIN: 8513-71-7363-000 email : tealleneng®comporium.net Two (2) #5 Bars top & Bottom from Bond Beam to be — Continuous throughtout #4 Bars @ — 12" O.C. each way, compression face steel E■ SITE RETAINING WALL BEHIND THE BOAT DOCK TO HAVE STONE VENEER. SEE SHEETS C-3 & C-4. L © Copyright 2019 Terry Allen PE, T.E. ALLEN ENGINEERING PC, Terry E. Allen Engineer. All Rights Reserved Worldwide. rW__� /_ REINFORCED CONCRETE FOUNDATION RETAINING WALL " CL Vertical Wall Reinforcing, Tension Face, See Table W1 Horizontal Wall Reinforcing, Tension Face, See Table W1 UNBALANCED FILL AGAINST ANY PORTION OF THE FOUNDATION WALL SHALL NOT EXCEED 12—FT. Backfill wall w/ #57 clean washed stone. Stone fill to extend to within 2—ft of grade. Top 2—ft of fill to be satisfactory top soil. Provide Non —woven needle —punched geotextile fabric between stone and soil backfill. _ 2" Dia Sch 40 PVC thru—wall drain pipe @ 5—ft on center. Cover fill side \of pipe with galvanized hardware cloth to prevent loss of stone fill thru pipe. Vertical Dowel Bar, size and spacing to match Tension Face Vertical Wall Bar, See Table W1. Lap Splice to be 60 bar diameters. 4" Dia HDPE perforated drain pipe, routed to daylight. J J Z I I I I CONCRETE FOOTER A I I � C I L I B All footers shall bear on satisfactory & stable insitu material having a minimum bearing capacity of 2000 PSF. Where unsatisfactory an/or unstable material is encountered; 1. Over excavate and remove all unsatisfactory and/or unstable material to a depth necessary to ensure the structure foundation bears on satisfactory material with a min bearing capacity of 2000 PSF. 2. Line excavation with a geotextile fabric equal to Mirafi 50OX and backfill- to the required subgrade elevation with #57 clean stone. Anti —Slide Key required where footer bears on soil. #5 Vertical Keyway Dowel Bar © 12" O.C. & #5 bottom bar continuous. Anti —Slide keyway may be omitted where footer is pinned to rock. CONCRETE FOUNDATION RETAINING WALL for BOATHOUSE Not to Scale PRELIMINARY — NOT FOR CONSTRUCTION L rn o E U O U a� E-000 v L �Of00 a� cn o�n o� � w L c jaU0)u-) E c 0 ai uZ(Z) 't I I'vE •D V7 C Qj M Lr) 0 0) �I��t �@ n Ns0000 to EN WNN E a.i5 tQa000:= W � W Q � C, Q U Cd U o W F- too Z o Iu o W r�i a O t- ULcI U� O Ca 0 rn v C O rnZ�a Q E� N O o OQ 03 ti NONE 1 12-12-2019 1 C-8 SHEET 8 OF 12 © Copyright 2019 Terry Allen PE, T.E. ALLEN ENGINEERING PC, Terry E. Allen Engineer. All Rights Reserved Worldwide. TABLE W1 — WALL DIMENSIONS & REINFORCEMENT WALL HEIGHT "H" (Feet) WALL THICKNESS "W" (Inches) TENSION FACE VERTICAL WALL BARS HORIZONTAL WALL BARS 8 8 #4 @ 9" O.C. #4 @ 12" O.C. 9 8 #4 © 9" O.C. #4 ® 12" O.C. , 10 12 #5 @ 9" O.C. #5 @ 12" O.C. 11 12 #5 @ 9" O.C. #5 @ 12" O.C. 12 12 #6 @ 9" O.C. #6 @ 12" O.C. 13 12 #6 @ 9" O.C. #6 @ 12" O.C. 14 12 #6 @ 6" O.C. #6 @ 12" O.C. MAX HT OF UNBALANCED FILL AGAINST ANY PORTION OF THE FOUNDATION WALL SHALL NOT EXCEED 12—FT. THE RETAINING WALL SHALL BE LATERALLY SUPPORTED ALONG THE TOP EDGE WITH STRUCTURAL ROOF DECK FRAMING. ALL ROOF DECK FRAMING SHALL BE IN PLACE AND COMPLETE PRIOR TO PLACING MORE THAN 8—FT OF UNBALANCED FILL AGAINST THE RETAINING WALL. TABLE F1 — FOOTER DIMENSIONS & REINFORCEMENT WALL HEIGHT "H" (Feet) FOOTER WIDTH "B" (Feet — Inches) FOOTER HEEL "C" (Feet — Inches) FOOTER THICKNESS "T" (Inches) FOOTER REINFORCING STEEL LONGITUDINAL FOOTER BARS (TOP & BOTTOM) TRANSVERSE FOOTER BARS (TOP & BOTTOM) 8 4'-5" 2'-4" 12" 5 #5 #4 @ _9" O.C. 9 5'-4" 3'-0" 12" 5 #5 #4 @ 9" O.C. 10 5'-4" 3'-0" 12" 5 #5 #4 @ 9" O.C. 11 6'-2" 3'-8" 12" 6 #5 #5 @ 9" O.C. 12 6'-2" 3'-8" 12" 6 #5 #5 @ 9" O.C. 13 6'-2"- 3'-8" 12" 6 #5 #5 @ 9" O.C. 14 6'-2" 3'-8" 18 6 #5 #5 ® 9" O.C. CONCRETE RETAINING WALL DIMENSION & REINFORCING - FOX RESIDENCE Not to Scale U O • U a�i r7 ;n a� Eo0 v� m Nor� C Lo-Ec o �Zo- I I'vE 'a V) Uj M lf') O o=�L— N N .0 00 'y EN tn00NN E F 0- � d' Q 00 oD e_ N U m C � o E CD Z �Zn E o 2 z O N C 1.J.1 O N .J rn — J Q E Lj .� U N 4 3 � � Q Ed U c w F onozo x w CO, U W 6aU��' 0 > w 3�.? U)a C4 0 Q (~ N h 0 U m CIS NONE I 12-12-2919 1 PRELIMINARY — NOT J � c-9 FOR CONSTRUCTION SHEET 9OF 12 NOTES o SPECMCATDONS �w CONCRETE FOUNDMON WALL M SELMENSBERGER REMBENC E 1. All work shall be in accordance with the 2018 edition of the North Carolina State Residential Building Code, ACI 301 — Specifications for Structural Concrete for Buildings, ACI 318 — Building Code Requirements for Structural Concrete, AC1 306 — Cold Weather Concreting and all other applicable codes, ordinances, and regulations. 2. Assumptions: Weight of assumed backfill = 115 pcf Soil Bearing Capacity = 2000 psf 3. EXCAVATION, FILL AND BACKFILL FOR Retaining Walls — Only satisfactory material shall be used for fill or backfill behind retaining wall. Satisfactory material for fill or backfill supporting building foundations and/or slabs shall be limited to materials classified in ASTM D 2487 as GW, GP, GP —GM, GW—GM, GC, GP —GC, SW, SP, SM, SW—SM, SC, SW —SC, SP—SM, or SP—SC. 4.0 CAST —IN —PLACE CONCRETE — Concrete shall have a 28 day compressive strength of 4000 psi and shall have 5 to 7% entrained air. No water shall be added to fresh concrete on site. A super —plasticizer add mixture, specified by the concrete mix designer, may be added on site to increase slump; directions shall be printed on each trip ticket. All trip tickets shall be maintained by the Contractor as part of the project record. NO WATER SHALL BE ADDED TO THE FRESH CONCRETE ON SITE. 4.1 COLD WEATHER CONCRETE REQUIREMENTS — See ACI 306. 4.1.1 Adequate equipment shall be provided for heating concrete materials and protecting concrete during freezing or near —freezing weather. 4.1.2 All concrete materials and all reinforcement, forms, fillers, and ground with which the concrete is to come into contact shall be free from frost. 4.1.3 Frozen materials or materials containing ice shall not be used. 4.1.4 The ambient temperature shall be 40 degrees F and rising before concrete beginning concrete placement. 5. REINFORCING STEEL 5.1 Reinforcing steel shall conform to ASTM A615, grade 60 (fy=60,000 psi) and shall have standard deformations. All lap splices shall be 60 bar diameters unless otherwise noted. 5.2 All reinforcing steel shall be accurately and securely tied and anchored in place to prevent dislocation during the placement operation. 5.3 Provide corner bars, 48 bar diameters x 48 bar diameters, at each continuous footing and foundation wall corner. 5.4 Provide 2" clearance for all wall steel. All footer reinforcing bars shall have a minimum of 3" of concrete cover. 5.5 Size & spacing of Vertical Hook Dowels shall match the Vertical Wall Steel. 6.0 CONTROL JOINTS — Provide control joists in retaining wall at intervals not exceeding 20 feet. 7.0. STEEL HARDWARE — Steel connectors on exterior applications shall be hot dipped galvanized or stainless steel. Steel connectors on interior applications shall be primed or power coated. 8.0 FOOTERS — All footers shall bear on satisfactory insitu material. No portions of the foundation shall bear of fill dirt or fill soil. Contractor shall verify that the site has stable geotechnical conditions. Top of footings shall be located below the frost line. Footings shall be stepped where it is necessary to change the elevation of the top surface of the footings or where the slope of the bottom surface of the footings will exceed 0.1 unit vertical in ten units horizontal (1% slope). © Copyright 2019 Terry Allen PE, T.E. ALLEN ENGINEERING PC, Terry E. Allen PRELIMINARY — NOT Enaineer. All Riahts Reserved Worldwide. FOR CONSTRUCTION L U U U a� ;=vim v L a� M—NooMOW2 0 c n06) w E c Z 0 N N v -v I 1 =o += v—� obiCL >'a) v© N r 00 00 cn ;v +=N tnNN E CL�5d'¢0000:= v, U rZ QN Z c� o w �a E UJ _ oZ !C .00 U z o w a&� F w� m� J rn C _J o a� Li U Q C Cd Q �0U W tnoZo Z 06 w m ;~av_ U W ,� O> C� O C4 Fn > n YJ a >� 0 — zi Z rs, Q M N O oa NONE 1 12-12-2019 1 C-10 SHEET 10 OF 12 M07ES o SPEM OC AUMNS W CONC REE G OO UNDD G°iMM MALL (CONTINUED 9.0 Contractor shall verify and establish the wall alignment and top —of —wall elevations prior to beginning work. Do no locate any part of the structure within any set —back, easement, right—of—way, floodway, flood fringe, trout stream buffer zone (or other buffer zone or set back). Contractor shall obtain all required permits prior to beginning work. Contractor shall locate all property boundaries prior to beginning work. Contractor shall locate, flag and protect all underground utilities, including the adjacent sewer line, prior to beginning work. DO NOT LOCATE RETAINING WALL WITHIN THE ON —SITE WASTEWASTE SETBACK. 10.0 SITE DRAINAGE — Provide ductile iron sleeves for stromwater discharge pipes to pass through the concrete retaining wall. All stormdrain pipes shall have a minimum slope of 1%. The finish grade shall be sloped to drain stormwater away from the structure. Do not disturb the underground stormwater retention system or foundation drainage & waterproofing system located adjacent to the proposed retaining wall. 11.0 CONDITIONS FOR USE OF THIS PLAN — All portions of the existing structure were designed by others. This retaining wall detail is applicable for the Boathouse at the SUBJECT Residence only. THESE DETAILS & SPECIFICATIONS SHALL NOT BE USED ON ANY OTHER SITE OR AT ANY OTHER LOCATIONS. By accepting this plan, you and any others to whom it is distributed, agree to a strict limitation of liability for Terry E. Allen PE, T.E. ALLEN ENGINEERING, P.C., and its employees to an amount not to exceed the fee paid in hand. 12.0 Coordinate all work and verify all dimensions for the new (28'x3O') Boathouse Structure with the Architectural Plans by C. Allen Brown, ,Architect. Field verify all dimensions with the Architectural Plans prior to ordering materials or beginning work. 13.0 VARIANCE, SPECIAL AUTHORIZATION and 401 / 404 PERMITTING ARE REQUIRED. The proposed new Boathouse may be located within the side yard setback and immediately adjacent to the side property line. Prior to beginning construction or ordering materials, the Owner and/or the Contractor shall obtain a Variance and Special Approval from the Lake Toxaway Community Association and from the POA for the Boathouse to be located within the side yard setback. A Written Authorization —for —Construction and a Release —of —Claims shall also be obtained from the adjacent property Owners prior to beginning work. The Authorization —for —Construction and the Release —of —Claims shall be prepared by an NC licensed Attorney experienced in environmental and real estate law. A 401 Water Quality Permit from the NCDEQ—DWR and 404 US Army Corps of Engineers Permit are also required. No portion of the new structure shall extend beyond any adjacent property line. © Copyright 2019 Terry Allen PE, T.E. ALLEN ENGINEERING PC, Terry E. Allen Engineer. All Rights Reserved Worldwide.' O E to U U N f� 1: N N af N rn , �0c02-0 r� cU,o1n E c �4- In-v I I-6E -v Ul C y to U') v v — >rd op n N c ao ao ;v EN coNN E � o-t5qtaaoao— In U N F a. N c� z m L&J a E W "o n o z c 0 5a 1'1" 1 (00 v c z �d w� JZE m- J Q � E WME 12-12-2019 1 PRELIMINARY — NOT I I C-11 FOR CONSTRUCTION J l SHEET I I OF 12 1. All work shall be in accordance with the latest edition of the NC State Residential Building Code Section R327 and all other applicable codes, ordinances and requirements. -2. The Detail & Specifications shown herein are for a Natural Boulder Retaining Wall. 3. Satisfactory material for fill or backfill behind retaining walls and other structures shall be limited to materials classified in ASTM D 2487 as GW, GP, GM, GP —GM, GC, GP —GC, SW, SP, SM, SW—SM, SC, SW, SC, SP—SM, SP—SC, CL, ML and CL—ML. Satisfactory materials shall be placed in 6" compacted lifts. Material shall be compacted to 95% of the maximum dry density. Classification of backfill materials shall be determined in accordance with ASTM D 2487 and the moisture —density relations of soils shall be determined in accordance with ASTM D 1557. RIPRAP Toe Apron to provide compensatory habitat. NCDOT Class 2 Riprap. u7 w w _ STONE FOUNDATION PAD. Provide- 3'x16"xContinuous stone foundation pad consisting of #57 clean stone wrapped in Mirafi 50OX geotextile fabric or equal. 4. BOULDERS. Boulders shall be sound natural granite. Maintain minimum boulder wall thickness of 2—ft. All boulders used in retaining walls shall be sound durable granite. Provide chinking stones to reduce gaps between boulders to less than 1 inch. Securely stack boulders to ensure that boulders have a positive angle of 5—degrees or more with respect to the horizontal. 5. WALL BATTER. Wall batter shall be 0.25H:1V or shallower. 6. HORIZONTAL SCOUR SHOULDER. Maintain minimum 3 feet wide horizontal shoulder at toe of wall to prevent scour and undercut. 7. EMBEDMENT DEPTH. Embed toe of wall a minimum of 1—FT into undisturbed residuum. 8. FOUNDATION BEARING AREA. locate boulder retaining wall foundation on undisturbed residuum with a minimum bearing capacity of 2,000 PSF. 3' +/— Retaining Wall See Note 2 V4 9. FINISH GRADE BEHIND WALL. Provide 3H:1V or shallower. 10. CHIMNEY DRAIN. Provide No. 57 clean stone wrapped in non —woven needle punched geotextile fabric with o minimum thickens of 1—foot. 12. BLANKET DRAIN. Provide No. 57 clean stone wrapped in non —woven needle punched geotextile fabric with a minimum thickens of 1—foot. 13. STONE FOUNDATION PAD. Provide 3'x16"xContinuous stone foundation pad consisting of #57 clean stone wrapped in Mirafi 50OX geotextile fabric, or equal. 14. This is a Conceptual Retaining Wall Detail. The location, alignment, and up slope embankments & retaining walls were designed by others. By accepting this Plan, you and any others to whom it is distributed, agree to a strict limitation of liability for Terry E. Allen PE, T.E. ALLEN ENGINEERING, P.C., and its employees to an amount not to exceed the fee paid in hand. Non —woven needle punched geotextile fabric. Chimney Drain Behind Wall. Provide No. 57 clean stone wrapped in non —woven needle punched geotextile fabric with a minimum thickens of 1—foot. I Mirafi 50OX geotextile fabric or equal. © Copyright 2019 Terry a Allen PE, T.E. ALLEN ENGINEERING PC, Terry Existing Undisturbed Residuum with minimum E. Allen Engineer. All bearing capacity of 2000 PSF. Do not bear Rights Reserved retaining wall on unsatisfactory of unstable Worldwide. material. THIS DETAIL SHALL NOT BE USED FOR BOULDER SITE RETAINING WALLS. BOULDER SEAWALL DETAIL C 12 Not to Scale L N N o E O O U Q M L 1. L: aEi 00 aLi N N O��� O I� y w�Zof IvE Cn C N M LO a N a=ter`— C11 D n Nt0000 -FA EN tnNN :E a_��Qaorocn Q b 3 Q � �Cd a � cdUc W on0Z,o Z x w N x Z M a o r; W U . , /U W cn a ? kr) 00 �U O EnZFa °d r- ti 1 12-10-2019 1 PRELIMINARY — NOT l I I C-12 FOR CONSTRUCTION J SHEET 12 OF 12