Loading...
HomeMy WebLinkAbout20200112 Ver 1_PCN Form Submission (4)_20200122DWR Dlrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200112 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review 1a. Name of project: R-5740 Woodville Road Widening Project 1a. Who is the Primary Contact?* Paul Williams 1b. Primary Contact Email:* pcWlliams2@ncdot.gov Date Submitted 1/22/2020 Nearest Body of Water Deep Creek, Mills Creek Basin Pasquotank Water Classification SC Site Coordinates Latitude: 36.155969 A. Processing Information County (or Counties) where the project is located: Perquimans Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: R-5740 WBS # (?) 50198.1.1 1a. Type (a) of approval sought from the Corps: Longitude: -76.316596 Version#* 1 Reviewing Office* Washington Regional Office - (252) 946-6481 1c. Primary Contact Phone:* (252)482-1861 L.1 W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 11. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown 1j. Is the project located in a designated trout watershed? d Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NC Department of Transportation 2b. Deed book and page no.: NCDOT ROW on SR 1329 Woodville Road 2c. Responsible party: NCDOT - Division One 2d.Address Street Address 113 Airport Dr. Address Lim 2 City State / F ,ovine / Flegion Edenton INC Postal / Zip Code Country 27932 USA r Yes r No r Yes r No V 2e. Telephone Number: 2f. Fax Number: (252)482-1861 (252)482-8722 2g. Email Address:* peWIliams2@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Paul Williams 3b. Business Name: NC Department of Transportation 3c.Address Street Address 113 Airport Dr. Address Une 2 CRY State / Province / Fbgion Edenton NC Rbstal / Zip Code Country 27932 USA 3d. Telephone Number: 3e. Fax Number: (252)482-1861 (252)482-8722 3f. Email Address:* pcWlliams2@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: ff appropriate) 1c. Nearest municipality/ town: Hertford 2. Project Identification 2a. Property Identification Number: 2b. Property size: 11.7 2c. Project Address Street Address SR 1329 Woodville Road, from SR 1300 New Hope Road to SR 1331 Red Banks Road (North End) Address Lim 2 CItY State / Province / Ragion Hertford NC Postal / Zip Code Country 27944 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Deep Creek, Mills Creek 3b. Water Resources Classification of nearest receiving water:* SC 3c. What river basin(s) is your project located in?* Pasquotank 3d. Please provide the 12-digit HUC in which the project is located. 030102050503 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The land use in the area is primarily agriculture and silviculture with rural residential housing. SR 1329 (Woodville Road) is currently 2-lanes 9' each with +/-2'-0" grassed shoulder. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Location Map.pdf 1.27MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soil Map A.pdf 1.45MB Soil Map B.pdf 1.04MB 4f. List the total estimated acreage of all existing wetlands on the property: 1 4g. List the total estimated linear feet of all existing streams on the property: 400 4h. Explain the purpose of the proposed project:* The purpose of this project is to improve safety by widening an existing 18 ft. paved surface roadway to 22 ft. This route is a primary corridor for citizens in this part of Perquimans county. The road experiences tractor trailer usage associated vdth the agriculture industry and the current narrow roadway creates unsafe conditions for the volume of traffic. 4i. Describe the overall project in detail, including * p ) g indirect impacts and the type of equipment to be used: This project involves the widening of a two lane secondary road from 18 feet to 22 feet of asphalt surface, for a distance of 4.4 miles. This will begin at the intersection with SR 1300 New Hope Road and extend to SR 1331 Red Banks Road (North End). This will include some minor shoulder widening to accommodate the wider travel lanes. Some minor drainage improvements to roadside ditches wil be made to retain and improve drainage of the roadway. This Wll include several culvert replacements (Sites 1, 2, 4, and 5) indicated on the permit drawings. 4j. Please upload project drawings for the proposed project. R-5740_Permit Set Half Size.pdf 2.15MB R-5740_HYD_SMPv2.07_20191112.pdf 201.36KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: By Clay Willis, 2016 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown f N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Clay Willis Agency/Consultant Company: NCDOT Other: 5d1. Jurisdictional determination upload 6. Future Project Plans O Unknown 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries r Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type"(?) 2c. Type of W. 2d. W. name 2e. Forested 2f. Type of 2g. Impact Jurisdicition*(?) area* 11 1 Ditch relocation - P Bottomland Hardwood Forest Site 1A Yes Both 0.010 excavation (acres) 1 Hand Clearing T Bottomland Hardwood Forest Site 1A Yes Both 0.050 (acres) Ditch relocation P Bottomland Hardwood Forest Site 1 B Yes Both 0.010 excavation (acres) 1 Hand Clearing T ff-mland Hardwood Forest Site 1B Yes Both 0.030 (acres) Ditch relocation - P Pine Flat Site 3A Yes Both 0.010 excavation (acres) Hand Clearing ��T Pine Flat Site 3A Yes Both 0.020 (acres) 3 Hand Clearing ��T Pine Flat Site 3B Yes Both 0.010 (acres) 4 Fill Slope and Rip Rap - P fferine Swamp Forest Site 4A Yes Both 0.020 Fill (acres) 4 Ditch relocation - P Riverine Swamp Forest Site 4A Yes Both 0.020 excavation (acres) 4 Hand Clearing T Riverine Swamp Forest Site 4A Yes Both 0.020 (acres) Fill Slope and Rip Rap - P NOIwNCWAM TYPES Site 46 Yes Both 0.010 Fill (acres) Ditch- P NOIaNCWAM TYPES Site 4B Yes Both 0(acres) xcavationation 4 Hand Clearing T NOIv NCWAM TYPES Site 4B Yes Both 0.010 (acres) 4 Fill Slope - Fill P Riverine Swamp Forest Site 4C Yes Both 0.010 (acres) 4 Ditch relocation - P Riverine Swamp Forest Site 4C Yes Both 0.020 excavation (acres) 4 Hand Clearing T Riverine Swamp Forest Site 4C Yes Both 0.050 (acres) 5 Fill Slope and rip rap - P ry-rine Swamp Forest Site SA Yes Both 0.020 Fill (acres) Ditch relocation - P Riverine Swamp Forest Site 5A Yes Both 0.040 excavation (acres) 5 Hand Clearing T Riverine Swamp Forest Site 5A Yes Both 0.070 (acres) Fill Slope and rip rap- P Riverine Swamp Forest Site 5B Yes Both 0.020 Fill (acres) 5 Ditch relocation - P Riverine Swamp Forest Site 5B Yes Both 0.040 excavation (acres) Hand Clearing T Riverine Swamp Forest Site 5B =Eth 0.110 (acres) 2g. Total Temporary Wetland Impact 0.370 2g. Total Wetland Impact 0.610 2g. Total Permanent Wetland Impact 0.240 2h. Comments: Impact acreage has been rounded up. Actual quantity of impacts are 0.07 acres permanent fill, 0.13 acres of excavation, and 0.39 acres of temp. hand clearing. See attached permit drawings and impact table. 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type* Type of 3gSwidth * 3h. Imact ❑ �[3f. (?) urisdiction* length* S1 Site 1A - culvert install Tem orar P Y Dewaterin 9 Unnamed Trib. Intermittent Both 3 28 dewatering Average (feet) (linearfeet) S2 Site 2A - culvert install Tem orar P Y Dewaterin 9 Unnamed Trib. Perennial Both 8 31 dewatering Average (fee) pines fcet) S3 Site 2A - stabilization Permanent Rip Rap Fill Unnamed Trib. Perennial Both SAverage 14 (feet) �rfeet) S4 Site 2B - culvert install Tem orar P Y Dewatering 9 Unnamed Trib. Perennial Both 8 15 dewatering Average (feet) (linearfeet) SS Site 4A - Stream Excavation Permanent Excavation Dee Creek P Perennial Both 30 51 and Rip Rap Average (feet) (linearfeet) S6 Site 4A - culvert install Temporary Devatering Deep Creek Perennial Both 30 14 dewatering Average (feet) (li �rfeet) S7 Site 4B - Stream Excavation Permanent Excavation Dee Creek P Perennial Both 30 48 and Rip Rap Average (feet) (lirrfeet) ��F e 4B - culvert install Temporary Dewatering Deep Creek Perennial Bothwatering Average (fee) (lines feet) S9 Site 5A - Stream Excavation Permanent Excavation Mills Creek Perennial Both 20 44 and Rip Rap Average (feet) (linearfeet) �01 Site 5A - culvert install Temporary Dewatering Mills Creek Perennial Both 20 15 dewatering Average (fee) (lines feet) S11 Site 5B - Stream Excavation Permanent Excavation Mills Creek Perennial Both 20 51 and Rip Rap Average (feet) (lirearfeet) Sf2 Site 5B - culvert install Temporary Dewatering Mills Creek Perennial Both 20 9 dewatering Average (feet) (lirfeet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 208 150 31. Total stream and ditch impacts: 358 3j. Comments: See attached permit drawings and impact table. Extensive rip rap stabilization required by hydraulic design. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Proposed fill slopes in wetlands have been set at 3:1 or less, to reduce the impact foot print. Waterline relocations will be bored from high ground to high ground. The overall project widening has been established at the minimum distance to provide for the projects safety improvements. The alignment of the road will remain as it currently is, reducing any new impact to adjacent properties. Road will be closed during Site 4 and 5 culvert replacements. An offsite detour will be utilized, eliminating the need for temp. fills for an onsite detour. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The project will follow NCDOT guidelines and BMP's for culvert installation and we will implement an erosion control plan, prior to any land disturbing activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): r DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? f Mitigation bank W Payment to in -lieu fee r Permittee Responsible program Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. r Yes r No 4b. Stream mitigation requested: (linear feet) 4d. Buffer mitigation requested (DWR only): (square feet) 4f. Non -riparian wetland mitigation requested: (acres) 4c. If using stream mitigation, what is the stream temperature: 4e. Riparian wetland mitigation requested: (acres) 0.20 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments Request letter will be sent to DMS. Their response will be submitted when received. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Located in the Pasquotank River Basin 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments: This project fits under the minimum criteria checklist or Categorical Exclusion for NCDOT projects. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This project is widening an existing roadway from 18' to 22' and will not result in access to new lands or create potential development interest along the project area. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? C Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Data Explorer Website Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* National Marine Fisheries Database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Cultural Resources Unit 7c. Historic or Prehistoric Information Upload 16-02-0093NOSurveyUpdate.pdf 1.69MB AR16-02-0093NoSurveyUpdate.pdf 3.05MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: Project has been designed and reviewed by a professional engineer service, including hydraulic engineers, wtfiich review for floodplain impacts. 8c. What source(s) did you use to make the floodplain determination?* NCFloodmaps.00m, Zone AE at Deep Creek and Mills Creek Miscellaneous Comments DCM did not claim jurisdiction on any site in the project area. (email attached) NCWRC recommendsthe February 15 to June 30 moratorium for in water work at these locations. (email attached) Miscellaneous attachments not previously requested. DCM JD Updated.pdf NCWRC In -Water Work Moratorium Email.pdf 201.7KB 240.69KB Signature v W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Paul Collins Williams, Jr. Signature C�ar(aw r�.dl� tee, rT. Date 1 /22/2020