Loading...
HomeMy WebLinkAbout20190211 Ver 1_U-5875_SMP_20191212_20191212Hi hwa North Carolina Department of Transportation t F gStOYYY Highway Stormwater Program g° = STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 44677.1.1 TIP No.: U-5875 County(ies): PITT Page 1 of 3 General Project Information WBS Element: 44677.1.1 ITIP Number: U-5875 Project Type: Roadwa Widenin Date: 11/27/2018 NCDOT Contact: Betty Ann Caldwell, PE Contractor I Desi ner: JAndy Howell, PE Address: 1037 W.H. Smith Blvd PO Box 1587 Address: SEPI Engineering & Construction 1025 Wade Avenue Raleigh, NC 27605 Greenville, NC 27835 Phone: 252-439-2808 Phone: 919-747-5389 Email: bacaldwell ncdot. ov Email: ahowell se ien ineerin .com City/Town: Greenville 1 Count ies : Pitt River Basin(s): Tar -Pamlico CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 2.411 miles Surrounding Land Use: lAgricultural fields w/ residential development; limited forested areas adjacent to streams Proposed Project Existing Site Project Built -Upon Area ac. 33.5 ac. 19.9 ac. Typical Cross Section Description: The proposed cross section is 4 - 12 foot lanes with 5 foot bike lane, curb and gutter section, and grassed shoulder seperated by a raised grass median. The shoulder point to shoulder point width is 105 feet 3- 12 foot lanes with varying paved shoulder. The existing road has a shoulder section with roadway ditches. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 35100 Year: 2040 Existing: 23517 Year: 2020 General Project Narrative: (Description of Minimization of Water Quality Impacts) The purpose U-5875 is to widen and upgrade SR 1203 (Allen Road) from SR 1467 (Stantonsburg Road) to US 13 (Dickinson Avenue) to a four -lane divided facility with a raised median and curb and gutter in Greenville. The project replaces 3 existing crossings to Reinforced Concrete Box Culverts. There is no direct discharge to surface waters or buffer zones. The ultimate receiving water source is Green Mill Run. Existing land use in the vicinity consists primarily of agricultural fields with scattered rural residences. Opportunities for Swale treatment exist primarily on the east side of Allen Road as the west side of Allen Road has more existing development. Where practical, full treatment via swales has been provided. Where not practical, constraints to treatment are described in detail in the "Additional Comments" section of the Swales section of the Stromwater Management Plan. Surface Water Body 1 : waterbody Information Green Mill Run NCDWR Stream Index No.: 28-96 NCDWR Surface Water Classification for Water Body Pr mary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: Impairments: I 303d listed for Benthos Severe Nar, AL, FW Aquatic T&E Species? I Comments: NRTR Stream ID: JGreen Mills Run Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? No I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Highway North Carolina Department of Transportation Storrtm"�tr 7, „<,,..,,.,, Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 44677.1.1 TIP No.: U-5875 Count ies : Pitt Page 2 of 3 Additional Waterbody Information Surface Water Body 2 : North Fork Green Mill Run NCDWR Stream Index No.: 28-96 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: Impairments: 303d listed for Benthos Severe Nar, AL, FW Aquatic T&E Species? Comments: NRTR Stream ID: Stream SE Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body 3 : 1 Unnamed Tributar, to Green Mill Run NCDWR Stream Index No.: 28-96 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters NSW Other Stream Classification: Impairments: 303d listed for Benthos Severe Nar, AL, FW Aquatic T&E Species? Comments: NRTR Stream ID: Stream SA Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Surface Water Body 4 : 1 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: 303d listed for Benthos Severe Nar, AL, FW Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body 5 : NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Pr mary Classification: Supplemental Classification: Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Hi hwa North Carolina Department of Transportation 4� g rmwater ,o Highway Stormwater Program STORMWATER MANAGEMENT PLAN'°"'"A (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 44677.1.1 TIP No.: U-5875 County(ies): PITT Page 3 of 3 Swales Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width ft Front Slope (H:1) Back Slope H:1 Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length (ft Longitudinal Slope % Q2 cfs) V2 (fps) Q10 (cfs) V10 (f s Rock Checks Used BMP Associated w/ Buffer Rules? 4 FROM -Y- STA 21+50 LT (3)Unnamed Tributary to 3.0 3.0 3.0 1.4 141 300 1.70% 3.2 1.9 4.1 2.1 No Yes TO -Y- STA 25+00 LT 4 FROM -Y- STA 21+90 RT (3)Unnamed Tributary to 0.0 3.0 3.0 0.4 39 178 1.30% 1.1 1.3 1.4 1.4 No Yes TO -Y- STA 24+00 RT 4 FROM -Y- STA 21+26 LT (3)Unnamed Tributary to 2.0 3.0 3.0 2.6 255 255 0.50% 11.4 1.8 14.8 1.9 No Yes TO -L- STA 21+65 RT 5 FROM -L- STA 24+23 RT (3)Unnamed Tributary to 2.0 3.0 3.0 1.1 107 122 0.50% 4.0 1.4 5.3 1.5 No Yes TO -L- STA 26+05 RT 5 FROM -L- STA 26+25 RT (3)Unnamed Tributary to 3.0 3.0 3.0 16.1 1606 695 0.52% 23.6 1.8 30.9 1.9 No Yes TO -L- STA 33+76 RT 7 FROM -L- STA 53+78 RT (1)Green Mill Run 3.0 3.0 3.0 9.2 920 922 0.91 % 30.2 2.0 39.6 4.0 Yes Yes TO -L- STA 63+70 RT 8 FROM -L- STA 63+90 RT (1)Green Mill Run 3.0 3.0 3.0 10.7 1067 1.38% 29.1 2.0 38.2 4.0 Yes Yes TO -L- STA 71+61 RT 12 FROM -L- STA 121+50 RT (2)North Fork Green Mill 4.0 3.0 3.0 4.7 474 492 1.20% 14.2 2.0 18.5 4.0 Yes Yes TO -L- STA 127+10 RT 13 FROM -L- STA 128+05 LT (2)North Fork Green Mill 3.0 3.0 3.0 3.6 356 500 0.30% 10.9 1.5 14.1 1.6 No Yes TO -L- STA 134+00 LT 13 FROM -L- STA 129+00 RT (2)North Fork Green Mill 0.0 3.0 3.0 2.0 197 200 0.30% 7.0 1.3 9.1 1.5 No Yes TO -L- STA 131+00 RT Additional Comments Recommended length was calculated based on the total drainage area. Where practical, an effort was made to treat the total area on the project through grassed swales. The swale from -L- Sta 26+25 to Sta 33+76 RT is 695 feet long. The recommended Swale length is 1606 feet which accounts for 11.07 acres of offsite agricultural drainage coming to the project via an existing Swale. The 695 feet Swale is sufficient to treat the drainage area minus the 11.07 acres of agricultural land. See Attatchment 1, aerial imagery in the area. The Swale from -L- Sta 63+90 to Sta 71+61 RT is 693 feet long which is not as long as the recommended length. In this area, it is not possible to created a longer Swale because of limitations from Parcel 44 at Sta 72+00 RT. Creating a longer Swale would require taking a business. 1025 Raleig SEPI Tel:91 ENGINEERING & Fax:9' O (9 CONSTRUCTION Licens 'Y 2077 PITT LAND DEVELOPMENT, LI y J taw T _ 02SS- 72.51 8' NANNIE SUE CRAWFORD BEST FIELDSOf - \. TRADE LAND COMPANY.LLr ' NALDS REAL ESTATE t_ . RETENTION POND N � E E CHnan E D E _ ,-,� Ems- D ^�,F F --- F - F--_F--- F - F _-- F E - E _ - - F �g F - E CR _ by JJ _ - =,c=00 o SSED SWAIZ;R DETAIL 11 PF' \- PROPOSE CA N-PLACE RCBC FLOODPLAIN BENCH CL 'I' RIP % r r ' •! 11.07 ACRES OF THE (TOTAL 16.06 ACRES) DRAINAGE AREA COMING TO THE PROPOSED HEAD DITCH IS COMING FROM AN EXISTING OFFSITE DITCH WHICH CURRENTLY DRAINS DIRECTLY TO THE JURISDICTIONAL STREAM. THE EXISTING DITCH DRAINS PRIMARILY AN AGRICULTURAL FIELD. NO SUBSTANTIVE CHANGES TO THE EXISTING CONDITION ARE PROPOSED COMING TO THE HEAD DITCH AT STA. 2 9 + 00 RT. i SPECIAL CUT 3-FT BASE GRASSED SWALE SEE DETAIL 4 1'. Tm STANDARD 3-FT BASE DITCH W/CL B RIP RAP SEE DETAIL 21 GRADE- 6.96% DDE = 62.5 CY CL 'B' RIP RAP=35.7 TONS GEOTEXTILE=53 CF DETAIL 3 SPECIAL CUT DITCH ( Not to Scale) Front t Ditch Natural 3'1yt Slope Ground ? D F\o Min. D = 1.0 Ft. FROM -L- STA. 23 + 00 TO -L- STA. 24 + 78 LT 0 `- CL 'I' RIP RAP Q� EST. 7 TONS • EST. 15 SYGF NNA SPECIAL CUT 'V' 14 GRASSED SWALE SEE DETAIL 9 CL 'I' RIP RAP EST. 7 TONS EST.15 SYGF A 0 J REMOVE 7]f! r.2 1b. wr GRASS SWALE DATA GRASS SWALE DATA )A= 1.07 ACRES DA= 16.06 ACRES ;LOPE= 0.5% SLOPE= 0.52% t r ♦� %' -OTAL IMP. AREA=0.76 ACRES TOTAL IMP. AREA=2.61 ACRES 1DDITIONAL IMP. AREA=0.39 ACRES ADDITIONAL IMP. AREA=1.36 ACRES REQ. = 107 FT L REQ. = 1606 FT ► �l �" PRO. = 122 FT L PRO. = 695 FT W = 4.04 CFS Q2 = 23.61 CFS /2 = 1.38 FPS V2 = 1.79 FPS )2 - 0.71 FT D2 = 1.66 FT i yet )10= 5.30 CFS Q10= 30.92 CFS ♦ -� `! 110= 1.48 FPS V10= 1.92 FPS >10= 0.81 FT D10= 1.87 FT � ♦-_ �` ._- J 4 + 23 -L- TO 2 6 + 05 -L- RT STA. 2 6 + 2 5 -L- TO 33 + 76 -L- RT • �•� DETAIL 9 i • . ` SPECIAL CUT GRASSED SWALE �� Sr _ ♦ . , ( Not to Scale) Front M1� ~�� !//_ ♦ �. { : '� S v.1 � o� Ditch Natural g'• �g( Slope t _ Ground ?'I k\o� Ir Min. D=1.5 Ft. r i _ 50' 0' 50, 100' FROM -L- STA. 28 + 50 TO -L- STA. 33 + 76 RT. ~ �+�• GRAPHIC SCAL �. DETAIL 11 SPECIAL CUT GRASSED SWALE ( Not to Scale) Natural o, Front GroundD 121" o yet Ditch � � � Slope 4 _B] Min. D = 1.5 Ft. B = 2.0 Ft. DETAIL 21 �► STANDARD BASE DITCH ( s_ Natural Not to Scale) Natural Ground �'•/ n� \ Ground '• JN1 Geotextile B Min. D=1 Ft. Max. d -1 Ft. B= 3 Ft. R t r FROM -L- STA. 24+23 TO -L- STA. 26+05 RT. FROM -L- STA. 26+25 TO -L- STA. 28+50 RT. Type of Liner- CL B Rip -Rap FROM -L- STA. 28 + 50 (75 RT) TO STA. 28 + 82 (135 RT) z '