Loading...
HomeMy WebLinkAbout20191664 Ver 1_Wetlands Impact Map_20200122Notes: 1. No construction of the fill for the wetland impact shall commence until all materials needed for the impact are staged on site. 2. Establish clearing limits per approved plans. Clear and grub impact area as needed. Temporary seed and mulch disturbed area. Do not clear or disturb any unpermitted areas. 3. Install drainage. Fill, compact and finish area for building pad. 4. See the construction plans for additional details. 5. See wetlands permit for additional requirements. /mop s Total Property EV ................ 2.79 Ac. /Base Total 404 Wetlands ..... 0,102 Ac. ofi Beat Total Impact ................. 0.102 Ac. 5ti 4 \� / S 76°Ob'04' E — / 24.18' EIR C / j.l'A6 Project: �1L / EIP E U Bent EIR 0P N 09°44'31 Disk Base Bent N 09°44'31" E 10.02' NE HARBOR CHURCH SWANSBORO O Town of Swansboro, Onslow County, North Carolina 20. S 35021'29" E 14.11' / .Proposed Stormwater ♦ Treatment Area W ♦ W ♦ ♦ Bo ♦ . ♦ W ♦ .� W W � W Lot �1 Ref: D.B.5018,Pg.243 M.B. 76, Pg. 228 Owner. MORTON ACADEMY Norman Patrick Wells D.B. 480, Pg. 237 R-85F Zone Museum Legend: AG - Above Ground BG - Below Ground D.B. - Deed Book ECM - Existing Concrete Monument EIP - Existing Iron Pipe EIR - Existing Iron Rod M.B. - Map Book Pg. - Page R/W - Right-of-way SIP - Set Iron Pipe • •"j - Wetlands • •man a • dammma - Wetlands Line S 36°54'47" E 339.16' _0 SPAG IIIIIIIII�JIIIIIIIII I IIIIIII� Proposed roposed Parking Lot Permeable ParkingLot Proposed Building , a w♦ . ♦•1•��•♦ +� Future un R^ Building I o •�♦ + Expansion m. t a ♦ ♦ ♦ n 26" W Proposed Concrete Sidewalk One Harbor Church, Inc. 502 W. Ghurch Street Swansboro, North Carolina 28584 0.102 Ac. Wetlands Impact (Fill) Wetlands Impact Map -Sheet 1 of 1 Rev. 1/22/20 -change to 404 impact Date: 11/18/19 Scala: 1"=60' Field hook: n/a File Name: OnoHarborChurch-Impact.dwg COGO: 17970GR.crd Drawn: JJs Joh Noe S190103-6980 Disturbed 536°59'44"E 133,00' Town of 5wansboro D.B. 495, Pg. 840 M.6.15, Pg. 26 G/E Zone Recreational Park Puture Parldng Exp ansion rJ Vicinity Sketch Not to Scale Pauline C. Stroud D.B. 258, Pg. 473 Pg. 228 Pauline M.6. C. Stroud D.B. 618, Pg. 517 76,Pg.228 BELLAND PHILLIPS Engineers - Surveyors - Planners Cedar Point, North Carolina 604E Cedar Point Blvd. Phone (252) 393-6101 - www.ParkerJacksonville.com N.C. Firm License Number: F-0108 unur,� CAgO'% 00 3iNE POP��� t� tt�c`°• i