Loading...
HomeMy WebLinkAbout310347_Inspection_20170101� � � � � .� � � � v � � `� e �a vl � ��^ '1 ^ `� �l` � � ei � � . �� � � \ -�?� �� - � � �`_ � � � � � � � � ,� V� �� J C: Division of Water Resources Facility Number L �J� - 3 % 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Complia -Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: � Departure Time: County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: ,/ c�lL► C'g Certified Operator: Back-up Operator: Location of Farm: Swine Owner Email: Phone: Title: Latitude: Phone: Integrator: Certification Number: /7<ZZ76 Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer I I --d Non -Layer Wean to Finish W n to Feeder eeder to Finish Z j Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Dry Poultry Capacity POD. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: _ a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ o ❑ YesrNo ❑ Yes ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 21412015 Continued FacilitX-Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes E To ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): d Observed Freeboard (in): 3 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 1 �oD ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes El"No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [! No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑/ �No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Quo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes M No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes eNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E] No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Z1 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ][�No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes eNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes dNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [—]Yes �No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ENo ❑ NA ❑ NE Page 2 of 3 21412015 Continued Fa�cilit}�-Pv umber: 2-2(4 Date of Inspection: � 24. Did the facility fail to calibrate waste application, equipment as required by the permit? ❑ Yes D-140 ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Ej`No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes U 1Ve ❑ NA. ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [—]Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [r No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E�No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Q'�10 ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 'CVI S `JP -( Phone: lj� �J Date: j 21412015 Division of Water Quality / Facility Number - O Division of Soil and Water Conservation O Other Agency Type of Visit: ompliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ODRoutine ,O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: �r eparture Time: County-4221_v� Farm Name: L Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Q e Certified Operator: Back-up Operator: Location of Farm: Swine Phone: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. 4NLayer Non -Layer Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Dry Poultry Capacity Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? Longitude: Region:,% f- , Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ NA ❑ NE [:]Yes EfNo ❑ Yes ff No ❑NA ❑NE ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWQ) [:]Yes No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ZNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes PfNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412011 Continued ,.:'jFacility Number: :�/ - 6 i% Date of Inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 0 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes p'No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ,ETNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes eNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes Jallo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? 0 Yes E2-No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require 0 Yes [�Wo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ❑ NE maintenance or improvement? 'L2�No 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ,E'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes '12 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E�- No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes L2'No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 0 Yes J2-No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes .ETNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes J2"No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �'No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes J2 No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes _J�fNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ZNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued ,_ Facility Number: - Date of Inspection: G� 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes j2pNo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Jallo the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ NA ❑ NE ❑NA ❑NE ❑ Yes ETNo ❑ NA ❑ NE ❑ Yes 'Jallo ❑ NA ❑ NE ❑ Yes )zNo ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes J2 No ❑ NA ❑ NE ❑ Yes ,�No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes J21No ❑ NA ❑ NE ❑ Yes [:2 No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: / Page 3 of 3 Phone: Date: K ,3 % 21412011 Division of Water Quality Facility Number 0 Division of Soil and Water Conservation �___ 0 Other Agency Type of Visit f�Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit 9outine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: % Arrival Time: Departure Time: County: Q4 4 ab 0 Region: �f 2 Ce2 E Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: C � Title: Onsite Representative: SHIP o%4Sn r/l Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Owner Email: Phone: Phone No: Integrator: Operator Certification Number: , Back-up Certification Number: Latitude: = e = 6 = Longitude: = o = 1 Design Current Design Current Capacity Population Wet Poultry Capacity Population l❑ayer 1I ❑ Non -Layer Dry Poultry Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cowl I Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 2 No ❑ NA ❑ NE ❑ Yes )21 No ❑ NA ❑ NE ❑ Yes ETNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes plio ❑ Yes ©No ❑ NA ❑ NE ❑ Yes 2TNo ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes P" No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes F�rNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in):� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Wr No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes rxl�lo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes '7VNo" ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE IEZ ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes ff No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 0 Yes Z No ❑ NA ❑ NE ❑Yes No ❑NA ❑NE ❑ Yes FNo ❑ NA ❑ NE ❑ Yes A No ❑ NA ❑ NE ElYes No ❑ NA ❑ NE ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes PNo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Z_N0 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [-]Yes VNO ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: jDate of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the perm' ? ❑ Yes No 23. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E(No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes A No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? []Yes �No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes O'No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ?No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 4No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes rNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). uS� 3 r �i -From 316 //2- -0 Reviewer/Inspector Name: Reviewer/Inspector Signature Page 3 of 3 LL'ow LG Phone: 7/� /�- 7y� Date: 211412111 Division of Water Quality Facility Number L �!� - E�A 0 Division of Soil and Water Conservation f 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: "x Arrival Time: 91; Departure Time: County:. Farm Name: Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: A,90 YkdJ7 Certified Operator: Back-up Operator: Location of Farm: Swine Phone: Title: Latitude: Phone: Region: Integrator: f Certification Number: / �2 Z Ca Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current nry Pnnitry Canaeity Pnn_ Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ZNo ❑ NA 0 NE ❑ Yes E f No ❑ NA ❑ NE ❑ Yes RfNo ❑ NA ❑ NE ❑ Yes ZNo ❑ Yes jfNo ❑ Yes V"'No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412011 Continued Facility Number:31 _3 ate ofInspetion: j Waste Collection & Treatment 4. is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ZNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ZNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) .,,Z 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ONo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes '12 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes PNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes F_IrNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes JZNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes _2 No ❑ NA ❑ NE ❑ Yes Jallo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes J"No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes FNO ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412011 Continued Facility Number: jDate of Inspection: 24. Did toe facility fail to calibrate waste application equipment as required by the permi ? ❑Yes No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �' o the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes JE2'No ❑ NA ❑ NE ❑ Yes L2-No ❑ NA ❑ NE ❑ Yes ;2-No ❑ NA ❑ NE ❑ Yes �o ❑ NA ❑ NE ❑ Yes �o ❑ NA ❑ NE ❑ Yes [.Pdo ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes J;�'No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes �No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑,F6 ❑ NA ❑ NE IComments (refer to question #): Explain any YES answers and/or any additional recommendations or an3Tother comments. I Use drawings of facility to better explain situations (use additional pages as necessary). 31 r5alln V f C,,,-,X Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: �J _' ZK Date: 2141 011 ��'1)ivision of Water Quality Facility NumbeE:�:�® Division of Soil and Water Conservation O Other Agency I Type of Visit e 7Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance X,� I Reason for VisitomRoutine 0 Complaint 0 Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Feparture Time: County: < Farm Name: �/7 f'��� Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: c Certified Operator: Back-up Operator: Location of Farm: Swine Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Region: Latitude: = e = i Longitude: = ° = i Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ urkey Poults ❑ Other Discharces & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ,["No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes oNo ❑ NA ❑ NE ❑ Yes ,No ElNA ElNE ElYes No ❑ NA ❑ NE Page I of 3 12128104 Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): — - 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes Z No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes 21No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ No ❑ NA El NE, N 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes J To ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ YesNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NA ElNE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ,,PoN0 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? El Yes �No ElNA ElNE 15. Does the receiving crop and/or land application site need improvement? ElYes E 'No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No El NA El NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ,E No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑-do ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): IReviewerAnspector Name / (,� Phone: 7V2 Reviewer/Inspector Signature: Date: r Page 2 of 3 IM8104 " Continued ` Facility dumber: Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes XN' o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ZNo ❑ NA ❑ NE the appropriate box. ❑ WUp ❑ Checklists ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes oNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 2'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes M'No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? 'P1110 ❑ Yes0"NNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes O No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ZNo ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [ o ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes E)Ao ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes �' o ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by [:]Yes ZNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes -;2,<o ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes 2 N ❑ NA ❑ NE Additional Comments and/or Drawings: Xs- As — Page 3 of 3 12128104 r Facility Numbert/ 7 ,0,]Jivision of Water Quality 0 Division of Soil and Water Conservation ® Other Agency Type of Visit _C G<ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit XRoutine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Region:Lti!G Farm Name: Owner Name: Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: Title: Phone No: Onsite Representative: �92 i Integrator: Certified Operator: Operator Certification Number: Back-up Operator: Location of Farm: Swine Back-up Certification Number: Latitude: = o = 1 Longitude: = ° = i Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes V(No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes / No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 12128104 Continued Facility Number: Date of Inspection /I Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ElYes o ❑ NA ❑ NE V a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE StrU7re 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �j y 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes J2 o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes [1,No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) / / 9. Does any part of the waste management system other than the waste structures require El Yes ram]' 11� o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes _9'K0 ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes l` "'o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 2<o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [2'No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?[] Yes No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes []- to ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ YesTo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name - �� / s e j Phone: �% f — Reviewer/Inspector Signature: Date: Page 2 of 3 [a1-161v4 uUncanueu .' Facility Number: } Date of Inspection i Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropirate box. ❑ WUp ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ Yes J& ❑ NA ❑ NE �No ❑ NA ❑ NE ❑ Yes 0No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 9No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes _J�Yko ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ,0 No ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes XNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes '�]'No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,Q'No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes PAo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes PNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes J2�No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 91flTo ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes [2(No ❑ NA ❑ NE Additional Comments and/or Drawings: ze 'fall? 117/11c 9 a .315* 9 011 0 0 zor 9,e -5-ze,�e ­5 Page 3 of 3 12128104 I'Division of Water Quality Facility Number j ® Division of Soil and Water Conservation ® OtherAgency, Type of Visit compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit',(D'Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: eparture Time: County: Region: Farm Name: Owner Email: Owner Name: _ Mailing Address: Physical Address: Facility Contact: Onsite Representative: J6-S,eoO61 Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Title: Phone: Phone No: Integrator: Operator Certification Number: Back-up Certification Number: Latitude: = c = , = Longitude: = ° = , Design Current Design Current Capacity Population Wet Poultry Capacity Population i❑ Layer �� ❑ Non -Layer Other ❑ Other Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other DischarlZes & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWQ) Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow c. What is the estimated volume that reached waters of the State (gallons)? Number of Structures: d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes OTo ❑ Yes EI'No 12128104 ❑ NA ❑ NE ❑ NA ❑ NE Continued Facility Number: — Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: ❑ Yes 17No ❑ Yes ❑ No Structure 5 ❑ NA ❑ NE ❑ NA ❑ NE Structure 6 Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes RfNo ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes ONo ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes '7No VNo ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes oNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes VNo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes ONo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes W No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes ZNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �*o ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments., Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: - - -- - Reviewer/Inspector Signature: Date: %2 O 12128104 Continued F .611ty Number: ra Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes Po ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ;TNo ❑ NA ❑ NE the appropirate box. ❑ WUp ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes U-No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes J?-No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ; No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes �2rNo ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ZNo ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes PNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ;No ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes gNo ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes gNo ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes YrNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes �No ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? El Yes / El NA El NE 33. Does facility require a follow-up visit by same agency? ❑Yes No ❑ NA ❑ NE Additional Comments and/or Drawings: I 12128104 0 Division of Water Quality Facility Number O Division of Soil and Water Conservation ® Other Agency Type of Visit 0 Corylpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: / a -L &f 1 Arrival Time: !tl 0 U Departure Time: County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Owner Email: Phone: Onsite Representative:y6N19LZ,1 Mz_L'e_6 rL Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine Phone No: Operator Certification Number: Back-up Certification Number: Latitude: = o = = Longitude: = ° = 1 Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑ Non -Layer ❑ Wean to Finish ❑ Wean to Feeder ❑ Feeder to Finish `li 1 L 1100 ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Other ❑ Other Dry Poultry ❑ La ers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle ' Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE El Yes El No El NA El NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes 9'<o ❑ NA ❑ NE ❑ Yes 2 No ❑ NA ❑ NE Page 1 of 3 12128104 Continued Facility' Number: Date of Inspection Ga Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: C.l46roviO l (A LL Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3(4 q L 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes O No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes E�'No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or enviro ental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance/improvement? ❑ Yes dNo ❑ NA ❑ NE ❑ Yes [J No ❑ NA ❑ NE ❑ Yes �N 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes No ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soi: ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) El NA ❑NE El NA El NE 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes El No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes El NA NNo El NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination?❑ Yes ,L,rJ, _ �No NA El NE 17. Does the facility lack adequate acreage for land application? ElYes ❑ NA El NE 18. Is there a lack of properly operating waste application equipment? El Yes �"N No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any, recommendations or any other comments.• . Use drawings of facility to better explain situations. (use additional pages as necessary): %) LA &tm-o / Z AJ& C--o S 44 A XJJ7WA� ,> CC AL Reviewer/Inspector Name J o H� /pf�-X1 /J�(,L, Phone: 916 7A 7t Reviewer/Inspector SignatureDate: o A. Page 2 of 3 16ALS/v4 - uontinuea B Facility Number: — 7 Date of Inspection Reauired Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ElYes 2J No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the a ropirate box pp ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �o El NA El NE 23. If selected did the facilityfail to install and maintain rainbreakers on irrigation equipment? El Yes Z ElNA ElNE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes pl o ❑ NA ❑ NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No El NA El NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document El Yes D o ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 2 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ZN ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes : Nj ❑ NA ❑ NE 33. Does facility require a follow-up visit by same agency? ❑ Yes No ❑ NA ❑ NE Additional Comments and/or Drawings: Page 3 of 3 12128104 Division of Water Quality , f Facility Number 0 Division of Soil and Water Conservation L/ - - - -- --- - - 0 Other Agency Eof Visit/Q-Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance n for Visit_,& Routine 0 Complaint 0 Follow up 0 Referral 0 Emergency 0 Other ❑ Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other ❑ Other Owner Email: Phone: No: Integrator• ®1��� Operator Certification Number: Back-up Certification Number: Latitude: = o = f = Longitude: = o = i Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer 1� IQ Non -Layer Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ urkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifer ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocker ❑ Beef Feeder ❑ Beef Brood Cow i Number of Structures: i b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Page I of 3 ❑ Yes J/ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No [:]Yes ,21'No ❑ NA ❑ NE ❑ Yes -dNo ❑ NA ❑ NE 12128104 Continued Facility Number: ?� Date of Inspection Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Structure 4 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 7 U 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ;E3 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes �TNo ❑ NA ❑ NE [:]Yes ,ETNo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 2 No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes 1;2No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes EfNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ,ONo ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes El"No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Wirtclo El /j video4cp of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) I('c!/0 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [2'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ?-'No ElNA ElNE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination ? ❑ Yes No 11 ElNA ElNE 17. Does the facility lack adequate acreage for land application? ElYes /0 J] No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 0 No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name v �� Phone: Reviewer/Inspector Signature: Date: Page 2 of'3 12MIU4 Gonttnuea Facility Number: — Date of Inspection Required Records & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes A No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑ WUp ❑ Checklists l ❑ Design El Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. 0 Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking [Z Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0 No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [A No ❑ NA ❑ NE 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No © NA ❑ NE 25. Did the facility fail to conduct a sludge survey as required by the permit? ❑ Yes ❑ No [71 NA ❑ NE 26. Did the facility fail to have an actively certified operator in charge? ❑ Yes E5 No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? ❑ Yes ❑ No ❑ NA Q NE Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes P'No ❑ NA ❑ NE 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ Yes F_j No ❑ NA ❑ NE and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ff No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by ❑ Yes ZNo ❑ NA ❑ NE General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE Page 3 of 3 12128104 A, b6l - --- -- I g. Water ConservaWn­-,z­.. 0f0 -v th Type of Visit d Co pliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit' 7Routine 0 Complaint 0 Follow up 0 Emergency Notification' 0 Other [3 Denied Access Date of Visit: Z49Aji Time: Facility Number EZID-ME-C] rO Not Operational 0 Below Threshold 0 Permitted [3 Certified 13 Conditionally Certified El Registered Date Last Operated or Above Threshold: ......................... Farm Name: ............I~.. 4 k fAejTV-%.5 County: ...... D.UPL:.r4j .................................. ....................... ........................................................................................................... OwnerName: ................................................... ........................................................................ Phone No: ...................................................................................... MailingAddress: ..................................................................................................................... ..................................................................................... .......................... FacilityContact: .............................................................................. Tide: ................................................................ Phone No::................................................... Onsite Representative:........ j- E WUDSO........................................................ A Integrato*r: ....... . Y .................................................. .. ... .............. ............ Certified Operator: ................................................... ............................................................. Operator Certification Number:.......................................... Location of Farm: El Swine [3 Poultry [] Cattle [] Horse Latitude 0 49 Longitude 0 4 94 "ur-11 eAgn., jjjjj` __ ;3� , I—, , 11 1 ­­1 ent bDesign Design "Current ""q �wi aa pldi ity �p6puli&fi pflatbi n:­ ty-1 11a "C'Cattier', ['WeatoFeeder Layer Dairy Feeder to Finish ❑Non-Layer Non -Dairy Farrow to Wean ❑ Other Farrow to Feeder K'� Farrow to Finish El Gilts ❑ Boars _o Number of La"" 1E X, Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: [] Lagoon [] Spray Field E] Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? [I Spillway Structure I Structure 2 Structure 3 Structure 4 Structure 5 Identifier: ..................................................... ................................... .................................... ................................... ................................... ....... Freeboard (inches): 39 12112103 [] Yes MjO 0 Yes El No El Yes D No ❑ Yes 03 NUO ❑ Yes INN wl� ❑ Yes VNq ; /No 0 Yes Structure 6 Continued Facilify Number:, Date of Inspection 2 6 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or ❑ Yes No closure plan? (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes L�Zo 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level ❑ Yes elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes [�] IN0 11. Is there evidence of over application? If yes, check the appropriate box below. ❑ Yes ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ❑ Frozen Ground ❑ Copper and/or Zinc 12. Crop type C5U) 021'r1rc(L ANOUA S 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes p 14. a) Does the facility lack adequate acreage for land application? ❑ Yes 7NUX6 b) Does the facility need a wettable acre determination? ElYes c) This facility is pended for a wettable acre determination?ElYes FNo 15. Does the receiving crop need improvement? ❑ Yes 16. Is there a lack of adequate waste application equipment? El Yes Odor Issues 17. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge attor below ❑ Yes No liquid level of lagoon or storage pond with no agitation? / 18. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes d 19. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ElYes No roads, building structure, and/or public property) 20. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional ❑ Yes /No Air Quality representative immediately. ' mments'; irefer..to. uestiain E lairi YES ttsw"rsan'd/o ,an 'wr"ecommendat onsfo'c:an oEl►erico'` {...,; _ ,q. > . > . .,� _ p . any, a e y.. Usedrawmgs,of faciLlyta betterex lain>sifuiations="(use additiaiial: a es as tiecessaiy};=F ` ;P.;. P.,-9 '`❑ Field Copy ❑Final Notes 77 i �►�R �- C Can �S S.►J Ga e> Slafl PE T �•u' e�`•r _� <�m eµ�^S i .`€, ^ .yN= `�'";tkd ., tiF�-..z+2, `6y.�',-�. _':%� .}=r ..`.5%.x:�t Reviewer/Inspector Name t A, R.NC,:tl .' ' 3 * .,' u�z�: �-. �.��. �...�. ��,.��. Reviewer/Inspector Signature: Date: (o O 12112103 Continued Facifity Number: 3 —3 q,71 Date of Inspection Required Records & Documents 21. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes /No 22. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes 23. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �No ❑ Waste Application ❑ Freeboard ❑ Waste Analysis ❑ Soil Sampling 24. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes 25. Did the facilityfail to have a actively certified operator in charge? ❑ Yes 7Nq Y P 26. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes YN o27. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yeso 28. Does facility require a follow-up visit by same agency? ❑ Yes o 29. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes No NPDES Permitted Facilities 30. Is the facility covered under a NPDES Permit? (If no, skip questions 31-35) ❑ Yes /No 31. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 32. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 33. Did the facility fail to conduct an annual sludge survey? ❑ Yes ❑ No 34. Did the facility fail to calibrate waste application equipment? ❑ Yes ❑ No 35. Does record keeping for NPDES required forms need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Stocking Form ❑ Crop Yield Form [:]Rainfall ❑ Inspection After 1" Rain ❑ 120 Minute Inspections ❑ Annual Certification Form 12112103 A Division of Water Quality Facility Numbeir, 3 j �f �J � 7 ', 0 Division of Soil and Water Conservation O, Other Agency Type of Visit C,00m�pliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit XJ Routine O Complaint O Follow up O Referral O Emergency 0 Other ❑ Denied Access Date of Visit: �% d Arrival Time: 0�3 D1 Departure Time: County: Region Farm Name: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: 1e. dudso Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder pr Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Owner Email: Phone: Phone No: Integrator: q Operator Certification Number: Back-up Certification Number: Latitude: = o = l = Longitude: = o = S = « Design Current Design Current Capacity Population Wet Poultry Capacity Population ❑ Layer ❑Non -La et— - - - - - - - -- Other ❑ Other - - - ----- - - - - --- - - Dry Poultry ❑ Layers ❑ Non -Layers ❑ Pullets ❑ Turkeys ❑ Turkey Poults ❑ Other Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other a. Was the conveyance man-made? Design Current Cattle Capacity Population ❑ Dairy Cow ❑ Dairy Calf ❑ Dairy Heifej ❑ Dry Cow ❑ Non -Dairy ❑ Beef Stocket ❑ Beef Feeder ❑ Beef Brood Cow Number of Structures: 7:1 b. Did the discharge reach waters of the State? (If yes, notify DWQ) c. What is the estimated volume that reached waters of the State (gallons)? d. Does discharge bypass the waste management system? (If yes, notify DWQ) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any adverse, impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes ZNO ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes EfrNo ❑ NA ❑ NE ❑ Yes _0No ❑ NA ❑ NE 12128104 Continued i Facility Number: 1,7 ) — Date of Inspection G ! v Waste Collection & Treatment 4. A storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o To ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 01,4o ❑ NA ❑ NE (ie/ large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed ❑ Yes 2<o ❑ NA ❑ NE through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ 7. Do any of the structures need maintenance or improvement? ❑ Yes 2No ❑ NA ❑ NE 8. Do any of the stuctures lack adequate markers as required by the permit? ❑ Yes ['No ❑ NA ❑ NE (Not applicable to roofed pits, dry stacks and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ;2'No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 127No ❑ NA ❑ NE maintenance/improvement? 11. Is there evidence of incorrect application? If yes, check the appropriate box below. ❑ Yes .2No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or l0 lbs ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Area 12. Crop type(s) 13. Soil type(s) 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ;?] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes FZr%Io ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre determination % ❑ Yes_,2No ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes O No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes PJ'No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any recommendations or any.other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): Reviewer/Inspector Name Phone: Reviewer/Inspector Signature: % Date: -7 \ 12/28/0 Continued i Facility Number: — Date of Inspection O Required loecords & Documents 19. Did the facility fail to have Certificate of Coverage & Permit readily available? ❑ Yes ,ONo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check 01yes ❑ No ❑ NA ❑ NE the appropirate box. ❑ WUP El Checklists Design ❑Maps El Other 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,ONo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Annual Certification ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rain Inspections ❑ Weather Code 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Did the facility fail to conduct a sludge survey as required by the permit? 26. Did the facility fail to have an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessment (PLAT) certification? Other Issues 28. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 29. Did the facility fail to properly dispose of dead animals within 24 hours and/or document and report the mortality rates that were higher than normal? 30. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately 31. Did the facility fail to notify the regional office of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 32. Did Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 33. Does facility require a follow-up visit by same agency? ❑ Yes .ErNo ❑ NA ❑ NE ❑ Yes ❑ No ,0NA ❑ NE ❑ Yes ❑ No ZNA ❑ NE ❑ Yes ❑ No E2'NA ❑ NE ❑ Yes 2rNo ❑ NA ❑ NE ❑ Yes ErNo ❑ NA ❑ NE ❑ Yes VNo ❑ NA ❑ NE ❑ Yes Eallo ❑ NA ❑ NE ❑ Yes ( Ko ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes E54o ❑ NA ❑ NE Additional Comments and/or Drawings: 49, CGof�) O(\e5lc�� OVA 12128104 DSWC Animal..Feedlot Operation Ievievv ❑ ... ,. ®DWQ An><mal Feedlot Operation Site Inspection IG Routine 0 Complaint 0 Follow-uR of DWQ inspection 0 Fo[low-up of DSWC review 0 Other Date of Inspection °b Facility Number I Time of Inspection : y 24 hr. (hh:mm) Total Time (in fraction of hours Farm Status: ❑ Registered ❑ Applied for Permit (ex:.1.25 for I hr .15 min)) Spent on Review [Certified ❑ Permitted or Inspection includes travel andprocessing) ❑`` Not Operational Date Last Operated: ............................................................................................................................................rp....,.�.. FarmName: .... 14A...14...... Y :..................................................................... County:.D.,ji.�:1.4-,..................................... . I... ►... . Land Owner Name:...a..o.§..V....... ... ..ta.. ......................... ......... Phone No: 4xia �. �� /� FacilityConctact:.................................................................................. Title:.....:.......................................... Phone No:.......................................................... Mailing Address:.....`i.1......�9.`................e.R......................... M.s�:�l.!!.....i..�.b.�l.�....0 ........6er. Onsite Representative:.. c� .�. h...... Y.A-w.'!..✓........................................ Integrator:..... Certified Operator:. �,��. ....... t-4.,......... � � �...................................... Operator Certification Number: ... Location of Farm: �a...!^ti r !e.4':.0 . .......5.5. ..�.....'D .......s,......C�.. .., Y A.i�.�..![Vb..Q1.... ........... .s.. .....all!\.9..b.�<R..... ... z... '...r...... W." ....S.P .I.&Q1......... I:uf....... � .....Tnx..s. a.V.x%... ..r r. .....R..� ..��.� rR......................................�y Latitude Longitude2.9 ?7 • ® General 1. Are there any buffers that need maintenance/improvement? ❑ Yes Iff No 2. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Surface Water? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 3. Is there evidence of past discharge from any part of the operation? 4. Were there any adverse impacts to the waters of the State other than from a discharge? 5. Does any part of the waste management system (other than lagoons/holding ponds) require 4/30/97 maintenance/improvement? ❑ Yes a No ❑ Yes Q No ❑ Yes E No ` 1 ❑ Yes E[No ❑ Yes 5'No [:]Yes EKNo 21 Yes ❑ No Continued on back Facility Number: .31........ —... H... 6. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ENo 7. Did the facility fail to have a certified operator in responsible charge? ❑ Yes 0,No 8. Are there lagoons or storage ponds on site which need to be properly closed? ❑ Yes R1No Structures (Lagoons and/or Holding Ponds) 9. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Yes KNo Freeboard (ft): Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 ;' Structure 6 �..�............ ............................ ............................ ............................ ..........................f ............................ 10. Is seepage observed from any of the structures? ❑ Yes 'gNo 11. Is erosion, or any other threats to the integrity of any of the structures observed? [Yes ❑ No 12. Do any of the structures need maintenance/improvement? ® Yes ❑ No (If any of questions 9-12 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 13. Do any of the structures lack adequate minimum or maximum liquid level markers? ❑ Yes No Waste Application 14. Is there physical evidence of over application? ❑ Yes No (If in excess of WMP, or runoff entering waters of the State, notify DWQ) 15. Crop type r ........ . i1 �... .............. .4... .gin........ . �r.Y,......................... .C_ah±O.�....................... 16. Do the receiving crops differ with those designated in the Animal Waste Management Plan (AWMP)? ❑ Yes [9 No 17. Does the facility have a lack of adequate acreage for land application? ❑ Yes 19No 18. Does the receiving crop need improvement? ❑ Yes 91No 19. Is there a lack of available waste application equipment? ❑ Yes ® No 20. Does facility require a follow-up visit by same agency? 19 Yes ❑ No 21. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes IgNo For Certified Facilities Only 22. Does the facility fail to have a copy of the Animal Waste Management Plan readily available? ❑ Yes allo 23. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes O No 24. Does record keeping need improvement? ❑ Yes E,No Comments (refer. to `question#) Explain any. answers'and/or any recommendations, or any other comments: Use drawings of. facility to better explain situations.. (use additional pages'as necessary) 5. C v r re ` d k i v. S t� L. a�v`Q, q ( e- W dti' Q 0V Q_'l v ./ I Z• D e- cl Lrro S 1' 0 v, c u o d 'J �., 0- 11 • T1n v,, e- e4- t-0 b e L l e o- cl v e,v4L l LL e .Q—t u ". f� l 'C'-1 Q l/1 i. I/l 'Q. L Ci i� to �, I :�1. S' �9 �i V I O, Y ✓WO W .A o r e,V @ > a �-� A Y-q � e_ � Reviewer/Inspector Name _ I, Reviewer/Inspector Signature: Date: 41 If cc: Division of Water Quality, Water Quality Section, Facility Assessment Unit 4/30/97 Divisioneof Water Quality _ Q Division of Soil and Water Conservation '® Other Agency Type of Visit-.6compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit -0 Routine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access E: Facility Number Date of Visit: Time: �i''sa Printed on: 10/26/2000 �) 3 y � t5� I' ® Not Operational ® Below Threshold Permitted ® Certified ® Conditionally Certified ® Registered Date Last Operated or Above Threshold: ......................... FarmName: ........ .. ... ��` ''.s............................................................................ County: 1 v�J �ft:!`........................................................ Owner Name: �c �e�)'' fl ............................ �.?u:.:..6"................................................................... Phone No:....................................................................................... Facility Contact: .................................................. Title:................................................................ Phone No: ............................................................................... MailingAddress:.......................................................................................................................................................................................................... .......................... L, . Integrator: .....................................................r^w-LSOnsite Representative:0� .i...j.45A..........0 ttsI.. ......................... Certified Operator: ................................................... ............................................................. Operator Certification Number:.......................................... Location of Farm: []Swine []Poultry ❑ Cattle ❑ Horse Latitude ' ` " Longitude • 6 G9 Design Current Swine Canacity Population ❑ Wean to Feeder ffPeeder to Finish 0 ❑ Farrow to Wean ❑ Farrow to Feeder ❑ Farrow to Finish ❑ Gilts ❑ Boars Design Current Design Current Poultry Capacity Population Cattle Capacity Population ❑ Layer I I ❑ Dairy I I --d ❑ Non -Layer I ::::j ❑ Non -Dairy ❑ Other Total Design Capacity Total SSLW Number of Lagoons ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Fietd Area Holding Ponds / Solid Traps ❑ No Liquid Waste Management System Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ElSpray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharue is observed. what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? Structure 1 Structure 2 Structure 3 Identifier: ................................................................................................... Freeboard (inches): -Z 5100 ❑ Yes Ef No ❑ Yes '] No ❑ Yes No ❑ Yes 0 No ❑ Yes 4-7 No ❑ Yes 0 No ❑ Spillway ❑ Yes © No Structure 4 Structure 5 Structure 6 .............................................................................................................. Continued on back Facility Number:?/ Date of inspection T 6 V Printed on: 7/21/2000 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, ❑ Yes fi�No seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑Yes{"No (If any of questions 4-6 was answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? ❑ Yes] No 8. Does any part of the waste management system other than waste structures require maintenance/improvement? ❑ Yes r--A'No 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes 91 No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes No 11. Is there evidence of over application? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload ElYes XE No 12. Crop type .So j� & A Vol 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes —RNo 14. a) Does the facility lack adequate acreage for land application? ❑ Yes ❑ No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes �'No 16. Is there a lack of adequate waste application equipment? ❑ Yes F6(No Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? ❑ Yes No 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑Yes 7 N 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ® No 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes ] No 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes No 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes No 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes V'No 24. Does facility require a follow-up visit by same agency? ❑ Yes -0 No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes 15f No 13: Nd-yiolati6iis;or• deficiencies -*ere ilgted- during this 'visit: - ;Y;oit will-eeeeive do further - : . correspondence. about this visit . ................... . .....:...:...:...:...:... . .Comments (refer to question #): Explain any YES answers and/or any recommendations or any other comments. Use drawings of facility to better explain situations. (use additional pages as necessary): , 'OLV1tt t, ,G% 1 S Y(O °i ci--tse.q Orn�� i't�oMOuuU� -t `ra-� ie,Id v Sgd G� S' �, r� ry �"�� �' ���o y1t � �'°'`r't�hl �'a6 e� "1 vt vci 5� a tz rriC &e 0 w4i lt tie xr C' r'�' p 1',e -i �/; s ►°S w � r a ,� o O(d via / �� O-� O.'fj/7d 9 J t"^iu t" iN 7 r'I Y�. '-1' ,!74 df, ad 0;1 Ike a C�o� - r,✓ e vl-{e✓ �d h 6'1 v� < / �e- ��y�''c.f �tGC re °Lo"ved)�J�cr1 / e Reviewer/Inspector Name 157, t,+,c-�wGl, l �A t S Reviewer/Inspector Signature: - Date: 31-30 0 1 5100 Facility Number: — SL[17 Date of Inspection Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below ❑ Yes 'g ] No liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes FrNo 28. Is there any evidence of wind drift during land application?. (i.e. residue on neighboring vegetation, asphalt, El Yes JR No roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes ® No 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes ®No 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes fj No 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? ❑ Yes ❑ No NdditionaLCommentss'` and/or rawmgs: k 7 F J Division of Water Quality iviision,of Soil and Water Conservation,' a 0 Other Agency Type of Visit .Compliance Inspection O Operation Review O Lagoon Evaluation Reason for Visit E outine O Complaint O Follow up O Emergency Notification O Other ❑ Denied Access Facility Number Date of Visit: ime: Printed on: 7/21/2000 —rf 0 Not O erational 0 Below Threshold Permitted ® C rt' ied Conditionally Certified ® Registered Date Last Operat Above T reshold: Farm Name: r,��41�4.tCounty ...F/L.?(�� ........... ....... ...................................................... 1....... OwnerName: ................................................... ........................................................................ Phone No:....................................................................................... FacilityContact: ................................................... :.......................... Title:................................................................ Phone No:................................................... MailingAddress: ............................................................................................................................................................................................. .......................... cr- Onsite Representative:..,...,... ntegrator:...... „,,. , Certified Operator: ................................................... ............................................................. Operator Certification Number:.......................................... Location'of Farm: Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude �• �� ��� Longitude �• �� ��� Design Current Design Current Design_ Current Swine : C ap4citv Population Poultry Capacity Population Cattle Capacity Population, ❑ Wean to Feeder ❑Layer I JEI Dairy Feeder to Finish �/ ❑ Non -Layer I j JE1 Non -Dairy ❑ Farrow to Wean ❑ Farrow to Feeder ❑Other ❑ Farrow to Finish Total Design Capacity `"' ❑ Gilts E ❑ Boars Total ssm Nuutber."o£Lagoons ] ❑ Subsurface Drains Present ❑ Lagoon Area 10 Spray Field Area Folding Ponds Solid Traps ❑ No Liquid Waste Management System Discharnes & Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes $,No Discharge originated at: El Lagoon [I Spray Field El Other a. If discharge is observed, was the conveyance man-made? ❑ Yes ❑ No b. If discharge is observed. did it reach Water of the State? (If yes, notify DWQ) [] Yes ❑ No c. If dischar,,e is observed. what is the estimated flow in galhnin? — d. Does discharge bypass a lagoon system? (If yes, notify DWQ) ❑ Yes ❑ No 2. Is there evidence of past discharge from any part of the operation? ❑ Yes No 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? ❑ Yes NfNo Waste Collection & Treatment \\ 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway ❑ Yes 4No Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ...... .....�...r.................................................. ............................................................................................................................................... Freeboard (inches): 5100 Continued on back I — Wfij� Facility Number: — Date of Inspection V47 'I Printed on: 7/21/2000 5. Are there any mm diate threats to the integrity of any of the structures obser ed ie/ trees, severe erosion, ❑ Yes [$�No seepage, etc.) / \ 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes KNo (If any of questions 4-6 was answered yes, and the situation poses an \ immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? Waste Application 10. Are there any buffers that need maintenance/improvement? 11. Is there evidence of over ap ication? ❑ Excessive Ponding ❑ PAN ❑ Hydraulic Overload 12. Crop type `/7 13. Do the receiving crops di fer with those designated in the Certified Animal Waste Management Plan (CAWMP)? 14. a) Does the facility lack adequate acreage for land application? b) Does the facility need a wettable acre determination? c) This facility is pended for a wettable acre determination? 15. Does the receiving crop need improvement? 16. Is there a lack of adequate waste application equipment? Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit readily available? 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? 21. Did the facility fail to have a actively certified operator in charge? 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative'? 24. Does facility require a follow-up visit by same agency? 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? 13: -io •viol'atidris'or• clef ciencies •were inoted• during •thisMsIC • Y;oit'Will -t. eceive lid further' corres�oncTence.a�oul this.visit. .•. .. .. . . . ........................' ❑ Yes ONO ❑ Yes XNo ❑ Yes MNo ❑ Yes R410 ❑ Yes C(No ❑ Yes Wo ❑ Yes KNo ❑ Yes r0 El Yes No ❑ Yes ONO [:]Yes kNo ❑ Yes RNo ❑ Yes P(No ❑ Yes WNo ❑ Yes o ❑ Yes OrNo ❑ Yes No ❑ Yes MNo 7—\ ❑ Yes 0& Comments (refer to question #): Explain any YES answers and/or any recommendations or Any 'other comments. Use drawings of facility to better exp 'n situations. (use additional pages as n cessary [� e2�� MA l b� 2 o S beer\-. 4a-O� &,L-� v/ I Reviewer/Inspector Name Reviewer/Inspector Signature: Facility Number: - ZUT Date of Inspection Dt7t7 Printed on: 7/21 /2000 Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge At/or below ❑ Yes KNb liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? ❑ Yes 'No'No 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, ❑ Yes '94LNo roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? ❑ Yes o 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) ❑ Yes RNo 31. Do the animals feed storage bins fail to have appropriate cover? ❑ Yes 1Y0 5100 +�. if�vl~sion of Soli sad �?ntex Conservation � >" ' Q°Othe - r envy Type of Visit Ig'Compliance Inspection 0 Operation Review 0 Lagoon Evaluation Reason for Visit routine 0 Complaint Q Follow up O Emergency Notification O Other ❑ Denied Access Date of Visit: //+ Time: L rO Facility Number 3j 3 Not Operational 0 Below Threshold ® Permitted ® Certified ® Conditionally Certified 13 Registered Date Last Operated or Above Threshold: Farm Name: d t:& � " on S County: 4 zi10/it/'7 Owner Name: Mailing Address: Facility Contact: Onsite Representative: 61 414Zr� Certified Operator: Location of Farm: Title: Phone No: Phone No: / Integrator: Operator Certification Number: ❑ Swine ❑ Poultry ❑ Cattle ❑ Horse Latitude ' 1 a Longitude ' 4 u ;.Design : -Current_ Desigu� re°Current_°r ° '-°',.._ ' .:'Design Current Swine " .Caacity 'Population °°'Pouttr ._ea0aciw, Population,'--"Cattle°a: �: 'Ca aci Pojiulation; ❑ Wean to Feeder 3 , ❑ Layer l ❑Dairy ®Feeder to Finish 9ri ti ❑Non -La er I!�, ❑ Non -Dairy ❑ Farrow to Wean ❑ ❑ Farrow to Feeder Other ❑ Farrow to Finish Total Design�Capacity ❑ Gilts " ❑Boars"gtal" SSLW ; Nujnber of,Laooris, ; , �'-; <�=,"` ❑Subsurface Drains Present ❑ Lagoon Area 10 S ray Field Area },;" :'Holding Ponds !.Solid Traps y 0 . ° `„ ° _ ❑ No Liquid Waste Management S stem Discharges & Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Lagoon ❑ Spray Field ❑ Other a. If discharge is observed, was the conveyance man-made? b. If discharge is observed, did it reach Water of the State? (If yes, notify DWQ) c. If discharge is observed, what is the estimated flow in gal/min? d. Does discharge bypass a lagoon system? (If yes, notify DWQ) 2. Is there evidence of past discharge from any part of the operation? 3. Were there any adverse impacts or potential adverse impacts to the Waters of the State other than from a discharge? Waste Collection & Treatment 4. Is storage capacity (freeboard plus storm storage) less than adequate? ❑ Spillway Structure l Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Freeboard (inches): ❑ Yes ®IdV— ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes EINV— ❑ Yes G5 F — ti ❑ Yes ®-Nv- Structure 6 05103101 Continued a Facility Number: 3/ — ,3If 7 Date of Inspection 5. Are there any immediate threats to the integrity of any of the structures observed? (ie/ trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? (If any of questions 4-6 was, answered yes, and the situation poses an immediate public health or environmental threat, notify DWQ) 7. Do any of the structures need maintenance/improvement? 8. Does any part of the waste management system other than waste structures require maintenance/improvement? 9. Do any stuctures lack adequate, gauged markers with required maximum and minimum liquid level elevation markings? ❑ Yes El-Ni o ❑ Yes [3 o ❑ Yes �o ❑ Yes E-No ❑ Yes [-No Waste Application 10. Are there any buffers that need maintenance/improvement? ❑ Yes [9-No 11. Is there evidence of over application? ❑l Excessive/�P'�onnding❑ PAN [I Hydraulic Overload El Yes [9-No 12. Crop type �f/z� �s-� 54 .��'v,� ZWl '4/ / 'e -411r 13. Do the receiving crops differ with those designated in the Certified Animal Waste Management Plan (CAWMP)? ❑ Yes E-No 14. a) Does the facility lack adequate acreage for land application? ❑ Yes [�No b) Does the facility need a wettable acre determination? ❑ Yes ❑ No c) This facility is pended for a wettable acre determination? ❑ Yes ❑ No 15. Does the receiving crop need improvement? ❑ Yes 0 o 16. Is there a lack of adequate waste application equipment? ❑ Yes [moo Required Records & Documents 17. Fail to have Certificate of Coverage & General Permit or other Permit readily available? ❑ Yes EiNo 18. Does the facility fail to have all components of the Certified Animal Waste Management Plan readily available? (ie/ WUP, checklists, design, maps, etc.) ❑ Yes ES -No 19. Does record keeping need improvement? (ie/ irrigation, freeboard, waste analysis & soil sample reports) ❑ Yes ❑ 44e, 20. Is facility not in compliance with any applicable setback criteria in effect at the time of design? ❑ Yes QLLo 21. Did the facility fail to have a actively certified operator in charge? ❑ Yes [}Plea. 22. Fail to notify regional DWQ of emergency situations as required by General Permit? (ie/ discharge, freeboard problems, over application) ❑ Yes ®.Hoo. 23. Did Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ Yes [9 i 24. Does facility require a follow-up visit by same agency? ❑ Yes RL.No 25. Were any additional problems noted which cause noncompliance of the Certified AWMP? ❑ Yes Rio_ EJ—No violations or deficiencies were noted during this visit. You will receive no further correspondence about this visit. Cbmnients'(refer to question #):" E�cpiaih',:any:YES`answervan&or' airy recomnienciatioais°or any,�Ciier.comment5 Use drawings of facility to better explain situations: (use addit#onat pages;as necessaryjr ` °, ':- :,❑Field Ganv 'ElFinal Notes T T ._ ., ... _,.„, .... ,. ....._.. e.,,_.,,.._..„.._ .. .w,_.... _.mow.., __ .. _._. _. ... Reviewer/Inspector Name / Reviewer/Inspector Signature: J Date: G 05103101 D Continued Facility Number: Sf — j Date of Inspection - Odor Issues 26. Does the discharge pipe from the confinement building to the storage pond or lagoon fail to discharge at/or below liquid level of lagoon or storage pond with no agitation? 27. Are there any dead animals not disposed of properly within 24 hours? 28. Is there any evidence of wind drift during land application? (i.e. residue on neighboring vegetation, asphalt, roads, building structure, and/or public property) 29. Is the land application spray system intake not located near the liquid surface of the lagoon? 30. Were any major maintenance problems with the ventilation fan(s) noted? (i.e. broken fan belts, missing or or broken fan blade(s), inoperable shutters, etc.) 31. Do the animals feed storage bins fail to have appropriate cover? 32. Do the flush tanks lack a submerged fill pipe or a permanent/temporary cover? Additional Comments and/or Dra-wings:, O5103101 ❑ Yes ❑ Yes [9 d6 ❑ Yes ❑ ino ❑ Yes (3-no ❑ Yesn-r o ❑ Yes ES� ❑ Yes [!�' o