HomeMy WebLinkAbout20001427 Ver 1_Complete File_20010601 (2) Bill Moore NCDENR/ Div. Water Quality Stormwater Group 942 Washington Square Mall Washington, NC 27889 Deborah Sawyer DCDENR/DWQ Wetlands Unit 942 Washington Square Mall l Washington, NC 27889 Bob Zarzecki/ DW hi S ( Todd St. John/ DX Danny Smith/ DWQ 4401 Reedy Creek Rd. Raleigh, NC 27607 Reference: Fairfield Harbour request for permits April 16, 2001 CERTIFIED MAIL May 28, 2001 Gentlemen: We the undersigned residents of Fairfield Harbour live in the Gondolier peninsula area of the community and we are directly affected by the proposed revised stormwater drainage plan submitted to the State on April 16, 2001. It is our understanding that the permit application is presently under consideration and we wish to contribute our comments. We oppose the plan on the basis of the comments listed below and request that you; 1) withhold issuing a stormwater, management permit 2) issue a letter denving a "No Practical Alternatives" determination prior to June 16. 2001 and before expiration of the 60 day_ consideration period per NCAC213.0233 (88)(a)(b). We request that you withhold these approvals until the many fundamental deficiencies of the proposed plan have been addressed and redesigned in strict accordance with all applicable North Carolina Rules. Comments: The Stormwater Permit Application is incomplete, water quality control measures will not work as intended, actual drainage patterns have not been included in the application, and deed/covenant restrictions have been excluded. 1. The project is described by the Applicant on pages 2 and 3 of the No Practical Alternatives request as "an innovative stormwater management system consisting of a hybrid of stormwater control measures, best management practices, roadside ditches, etc" and "we believe that the most practical solution to our problem is the hybrid and innovative stormwater management system that we have proposed...." 2. 15A NCAC 02H.1008 (b) covers innovative systems and states that "Innovative measures for controlling stormwater which are not well established through actual experience may be approved on a demonstration basis under the following conditions" (1) There is a reasonable expectation that the control measures will be successful. 3. We contend that there is not a reasonable expectation that the control measures will be successful. For the stormwater control measures to work as intended, it is fundamental that the design needed to take into account the actual watershed drainage patterns that route runoff to the system as well as the severity of the drainage problems. The Fairfield Harbour stormwater plan was designed with the limitation that the entire system must fit into Property Owners Association greenway buffer common areas, physically far from most of the actual areas where problems exist. The plan was designed and the permit application was submitted without first collecting and applying an array of accurate data that showed actual drainage patterns. This information was required to be submitted with the permit application. &a result. the designed stormwater control measures ( et wetlands, retention ponds, swales, etc) for the most part do not intercept or come close to existing watersheds and standing pop .Actual ?xnerience during rainstorms shows that the vast majority of stormwater will by-pass the system and render it ineffective. Simply stated, the water quality treatment and collection system has been "forced fit' into the POA wooded common areas and the system has not been physically placed where stormwater will flow into it. The application is deficient in that 15A NCAC 02H.1003 (g)(1-9) requires the applicant to submit supporting documents and information including "(4) topographic maps of the project area showing original and proposed contours and drainage patterns". Existing drainage patterns have not been adequately or accurately addressed in the application and important topographic contours have not been considered in the design. Map sheet 4 entitled "preconstruction flooding patterns" is only a rough estimate and it is not accurate enough for detailed design purposes. A detailed study of the site' drainage pattems will reveal that most of the system wii no reeve or intercept stormwater as needed-in man drainage areas to support its proper and intended a ion it is known that water lectbn problems are exacerbated by drainage coming in from outside the delineated watersheds. This has not been taken into account in the system design. This has all resulted in elaborate r and extreme measures being taken to address _ menage pro ms that do not exist, many water quality control devices have been oversized or misplaced, and it will cause unnecessary destruction of large areas of precious wooded greenway buffers. 4. 15A NCAC 02H.1003 (d)(1) states that "the permit shall require recorded deed restrictions and protective covenants to ensure development activities maintain the development consistent with the plans and specifications approved by the division". This has not been included in the application and in actuality the Applicant's existing protective covenants directly oppose the intent of the above covenant requirement It is dear that the State's intent is to ensure that present and future development will direct stormwater to the system's water quality control measures. Fairfield Harbour's covenants have been in effect for decades and have encouraged and/or required all residential development to grade lots to roadside swales. This covenant requirement is still in active use. As a result, the maio of stormwater problems exist along or near roa s ee sw_a_ es nd the new stormwater system remedies have been placed far from the problems, in the forested common areas. There are few if any natural topographic routes to move water to the new stormwater treatment and management system. Most of the stormwater will not reach the new system, rendering it ineffective. 5. Attached is a copy of the Fairfield Harbour Architectural Guidelines and Review Procedures. Certificate of Occupancy/Inspection Guidelines, and Application For Residential Building Permit. All of these documents are directly sanctioned by the protective covenants and require the system of roadside swales to be supported by all new development, thus directing the route of most stormwater away from the proposed new stormwater management system. 6. Attached is a copy of a map of the northern and western areas showing where stormwater had pooled and remained standing on May 29, 2000, 20 hours after a 2.31 " thunderstorm event on May 28, 2000. Rainfall total for the week totaled 7.76" as measured by a rain gauge located in the Gondolier peninsula. This map clearly confirms that the majority of stormwater pools or flows away from and not to the wooded common areas where most of the new system will be placed. 7. The POA has advised all residents that it is their responsibility to transport roadside swale stormwater from the front to rear of lots. Because of long established trees, plantings, grass ana rf one sloping swales between lots, along with only a 10' side set-back in most cases, this is an impractical or impossible requirement. Residents have indicated that they will ignore it and the stormwater will continue o y-pass the new system rn common areas. (reference: July/August 2000 issue of the Fairfield Harbour Beacon newspaper, copy attached). In a recent survey of affected residents in all six defined watersheds, as many as 93% responded that they would not install a swale or a French drain to transport standing water from the front to the back. Infiltration was their preferred way to deal with standing water problems. 8. Although we cannot find where it is addressed directly in North Carolina's rules, construction of the new project will needlessly strip out thousands of mature trees from thousands of lineal feet of common area. These trees have enormous aesthetic value and they are important wooded buffers that enhance resident's privacy between homes and the natural beauty of the neighborhood. Further, they are of importance to local bird habitats. Although we cannot exactly quantify it, we are certain that the trees and vegetation that would be removed have a huge evapotranspiration benefit that helps abate stormwater problems. 9. Important wetland data has not been submitted with the application as required. It is common knowledge that jurisdictional wetlands exist throughout the affected area. In addition to not submitting "topographic maps of the project area showing original and proposed contours and drainage patterns" as required by NCAC 02H.1003 (g)(4), the applicant has not submitted a map that accurately delineates wetlands as required by 02H.1003 (g)(5). This is important since portions of the project may already exist in jurisdictional wetlands and the location of proposed new ponds may cause wetlands to drain directly into the system thus altering their water level contrary to 15A NCAC 213.0231 (b)(1)(5)(f). Created wetlands far exceed their required size and the provisions of NCAC 26.0233 (8)(a)(i)(ii) have not been met in order to support granting a No Practical Alternatives Authorization Certificate 10. The created wetlands proposed for the project are significantly larger than required by the North Carolina Stormwater Best Management Practices design i manual. Ove__r-sizing these critical BMP's will degrade their performance since there will otZe enough water treatment vo{ume available to eep t ewe an b °? L vegetation healthy and functioning prosy. According to data presented in the c t _ application, a total of-1.4 acrefinches of wetland surface area is needed and 2.96 acre/inches has been provided. This is an unnecessary overage of 1.56 acre, inches and an over-sizing factor of 111 %. This approach, in addition to ?._. degrading the wetlands water quality performance, may come dose to unnecessarily doubling the construction and maintenance costs. _ Further, it does not "minimize disturbance" and it will needlessly destroy precious trees and vegetation in greenway buffers. or examp e, acxo Ong to esign da in the proposal, watershed - " has been crammed full of a continuous series of wetland ponds that needlessly consume the entire common area greenway buffer that runs from north to south through the watershed. The required wetland pool surface area for the "D1-D4" area is 0.76acrerinches and 1.83acre/inches has been proposed. This represents a design "overkill" of nearly 2.5 times the required size and will likely cause the created wetlands to malfunction. It is obvious that the project can be accomplished in a manner that would better minimize disturbance and it can be reduced in size and reconfigured and redesigned to better minimize disturbance per NCAC 213.0233 (8)(a)(i) 'j (ii). Watershed areas 1A and 1B have no supporting data as required. 11. No supporting data has been submitted with the permit application for watershed anus 1A and 1 B (Hurricane Court area). The application for these areas is incomplete in accordance with 15A NCAC 2H.1003 (g)(4,5,7,9). It is impossible for DWQ to review and analyze these important areas for design adequacy or unnecessary over-design. Due to the missing data, all comments in this letter are offered exclusive of watershed areas 1A and 1 B. Roadside ditches fail to meet DWQ standards as primary treatment devices. 12. According to the proposal data, 7,393 linear feet of deep roadside ditches are proposed for acceptance and approval as primary water quality treatment control devices in five watersheds i.e.; 213, A2, B2, C3, D5. The majority of these ditches already exist and new lengths are proposed to be added to match and connect to those that already exist. These ditches still fail to meet water quality standards since they "transport runoff' and are not "Matated conveyances" per NCAC 2H. 1-60-5 (3)(a)(i)(ii)(iii? A one year history of use has illustrated that the steep sTopes cannot be effectivef stabilized with vegetative cover and are far steeper r, than 3 1 slope ratio required by NCAC 2H 1008(c)i2). Actual measur s opes?' range from 1.85:1 to 2.5:1 and have destabilized over the past year to the extent that the sedimentation resulted in a DWQ Notice of Violation for sediment deposits (reference: January 16, 2001 NOV, NCAC 2B.0211(2)(c). 13. The proposal explains that 7,393 linear feet of roadside ditches will be converted to "created linear wetlands" by the addition of low detention weirs to create a permanent pool in the ditch bottoms. Aesthetically these water laden ditches look terrible and many nearby residents have objected to their presence and appearance and they will continue to be a breeding ground for mosquitoes. Even with the weir modification, side slope ratios have not changed and erosion will continue. The so-called "linear wetlands" arp nothirK 4gope-than the original "illegal" ditches filled with less than desirable cattails. They still do not meet DWQ's stated requirements -as a pnmary water quality treatment device that will provide 85% TSS removal and 30% nitrogen reduction. The ditches fail to meet the requirements of NCAC 2H.1008 as an alternative design to approved BMP's and the Applicant has not demonstrated that the ditches will provide "equal or better stormwater control or equal or better protection of the waters" of Northwest Creek. It should be noted that the ditches are just 5-7 feet away from and parallel to an active roadway that drains a brew of pollutants to the ditches and down the outfalls to Northwest Creek. Further, the Aoolint has not demonstrated that the NCAC 26.0233. Planting plan is incomplete 14. The DWQ Stormwater Best Management practices design manual requires that all pocket wetlands must have "special emphasis placed on the wetland plantings" (p.19) and that the "source of wetland materials must be specified in the planting plan". The Fairfield Harbour POA has advised residents of their intent to beautify the created wetlands through the use of an elaborate planting plan using special wetland plantings and flowers. However the planting plan that accompanied the application did not show the size, quantity, and planting schedule for each of the wetlands nor was the source of the wetland materials specified in the planting plan per requirements listed on p. 20. (Signature sheets are attached) Signature list to accompany letter to North Carolina Department of Water Quality opposing issuance of permits for the POA drainage plan submitted to the State on April 16, 2001 Dt # i5? 5 Signature list to accompany letter to North Carolina Department of Water Quality opposing issuance of permits for the POA drainage plan submitted to the State on April 16, 2001 Name 1. Danadd. 2. e4;/? 4. v - lu 7. s. 9. street address ye 2_7 G 7> 63 13. lot # ?s 11 ±210 S7 gig 3s -30 37 a3, Signature list to accompany letter to North Carolina Department of Water Quality opposing issuance of permits for the POA drainage plan submitted to the State on April 16, 2001 N CM '?u? / 0"2 3 s 9 1 d wS i. Lruk-e Ca&AawU, 7477 09 Alajwo 8."k C.7.7 4. aid! diaa?3 ,. 5.J 6. 8. 2 Q\Ot NI -1 0-0, 2;2- 2 3 rCtA a e ax-A- Z. 10. low ?- /b 5 ? iGy lG /07 12. 13. 14. 15. Signature list to accompany letter to North Carolina Department of Water Quality opposing issuance of permits for the POA drainage plan submitted to the State on April 16, 2001 12. 13. 14. S 6 b 6 " " IS1601z G-O? et s6 0 ? G? C? Sao 2 G-a--4 c? 4 3/s at lot # 7 S? a Si v ?Ilk l ?7 15. Nine ,p street address /n 1. J A 11 7l "r -r _ Y .-N -Cc?-cc . GEC. 11. Signature list to accompany letter to North Carolina Department of Water Quality opposing issuance of permits for the POA drainage plan submitted to the State on April 16, 2001 1 ` S me _? street add ss -S-z )6-4-ccz 1 6,4, MI 90 0511 GAM4 d Lam., ?,. ?o z k?,? ? cam. 11. 12. 13. 14. 15. lot # 267 r ? as?z 10. Signature list to accompany letter to North Carolina Department of Water Quality opposing issuance of permits for the POA drainage plan submitted to the State on April 16, 2001 Nanj# s et address lot # 2. ?•ai.?yfEza &0i(o4e 1T Ld4?a... l/?i!SwILI? 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. • o • O n C° ' ?iJ al o G ? zm 4 a m y a a8 A 1 y N m a ?? U ?Za Q 33? r 2 aan COQ ,p b o 0. ? 24, 4 , A v o C t r7c?- _LjTf'7pnmD G)ap ngy-?a33N?D m ? p y a m m D D D = D p _ p mvgmg y27 ;2ESES D28110;Dy 1 -? 4223 a 4 rmC c u)p - OnC i-4 z rl oxDmzgz >0>,>i 0 z Tw1 f z zm Cz 3 m { c a N o D o o r r z z -03 ow m mm ?? m o a Sa d U) z N C z < A o c D O z Drainage update project still on By Al Merino ?? The Gondolier peninsula drainage improvements still remain on hold pending a review by State environ- mental agencies. The POA is awaiting a formal re- sponse by the Department of Environment and Natu- ral Resources, Division of Water Quality to our mid- May response concerning their Notice of Violation, Neuse Basin Buffer Rules. A meeting has been ar- ranged for late July between POA drainage project representatives and State environmental representa- tives to visit our flood prone areas, discuss the viola- tion and develop remedies. The POA objective is to resume the drainage work promptly afterenvironmen- tal considerations have been resolved. The drainage improvements in Fairfield Harbour seek to enhance the removal of storm water and storm induced floodwater. This has been the objective since the POA committed to improve drainage in the com- munity starting in 1997. At the heart of this drainage August Deadline Deadline for the next issue of the Beacon is Monday noon, August 14. Please deposit your organization's ni:ws at the Beacon office located in the new POA building. hold project IS the goal to provide drainage ditches that will penetrate into those areas of the community that are known to have the poorest drainage after storms and flooding. These ditches will be placed on the roadside right-of-way or on common property. The POA is not attempting to remove standing water that may be found on any property owner's lot after heavy rains and storms. If a property owner has standing water problems on a lot that has access to a drainage ditch, it is the property owner's responsibility to provide a means of draining this lot by constructing lateral swales or ditches draining into the POA ditch, after obtaining POA approval. Placement of POA drainage ditches in roadside right-of-ways often means having to cut driveways, reset driveway culverts ano remove decorative walls placed at the ends of driveway culverts. Roadside ditches also can interrupt utility lines and pipes, which are expensive to relocate. POA ditches placed on common property often offer the most effective and efficient means of getting the drainage infrastructure into poorly drained sections. This may mean removal of trees and vegetation found there in order to provide a twenty-foot wide path that will contain the drainage ditch and a grass path for maintenance access and mowing. FAIRFIELD HARBOUR PROPERTY OWNERS ASSOCIATION MC. (POC PROPERTY CONTROL COMMITTEE (PCC) 585 Broad Creek Road - New Bern. NC 28560 - (252)633-5500 APPLICATION FOR RESIDENTIAL BUILDING PERMIT 1 This application must be approved by the PCC before a POA Residential Building Permit can be issued. Your contractor will be happy to help you complete this application. However. you must assume full responsibility for compliance with our rules and reguiations during and after construction. :'his appli_ation is intended only Separate applications are required as future remodeling or addi construction of a storage shed, poci. retaining wail, headwalls dock. fence. etc. for a new house. for such projects .lions, and the gazebo. swimming bulkhead. boat The information supplied by you enables the PCC to verify compliance with the Declaration of Pestrictions and the Architectural G,,idel.nes. Additionally. some rules and agreements of particular importance to the PC,- are included in this application Careful attention to details should expedite the review and approval process and minimize potential misunderstandings. No work of any kind. including tree .-emcval. backfilling or grading, is to be started until this application has been approved and a POA Building Permit has been issued. The house is not to be occupied by you. your tenants or others until the PCC is satisfied that all construction work has been completed in conformity with this application. as approved. and a POA Cartificts of occupancy has been issued The Building Permit and Certificate of Occupancy issued by Craven County are not to be considered substitutes for those issued by the Fairfield Harbour POA. This application is to be signed by both you and your contractor. It is to be submitted in duplicate to the PCC at the above address. It must be accompanied by duplicate copies of the proposed house plans and plot plan. Your application must also be accompanied by a $230 check payable to Fairfield Harbour POA to cover the S30 filing fee and the S200 road maintenance fee. Any outstanding ?CA dues and/or lot charges must be paid in full before a POA Building Permit will be issued. 2. inEATZQN ---------------------------------------------------- Section Number: Lot Number: ---------------------------------------------------- Street Address: ---------------------------------------------------- Owners' !James: (please print) ----------------------------------------------- Curren; Mail Addr-ass: ----------------------------------------------------- Current Phone Number: ---------------------------------------------------- Generai Contractor: ---------------------------------------------------- Business Address: --------------------- Business Phone N;imoar Contractor's NC License Nc -------------------------- Authorized Represantativa -------------------------- 3 r-RTTr-'CATTGN we. the undersigned. do hereby certify that we are familiar with the contents of the Declaration of Restrictions. the Architectural Guidelines. and this application form We agree and promise to abide by the rules. policies and agreements contained therein. Signature(s) of Property Owner(s) rX) Also please sign Page 6 (X) Signature of Contractor's Representative: (X1 Also please sign Page 6 Date submitted to PCC: Date Approved by PCC: FCC Signatures:------------------------------------- r Page 2 of 6 Duplicate sets of house plans must accompany this application. They 3ra reviewed by the ?CC for compliance with the restrictions. a harmonious design. a minimum of duplication and consideration for neighbors. Traditional styles of American architecture are encouraged. Geodesic domes. A- frames. pyramids. log cabins and manufactured houses are not permitted. Some size and color restrictions apply. Consideration should be given to an oversize garage to avoid the future need for an outdoor shed to store a golf cart or garden tools i The house plans are tc include front. rear and side elevations. foundation and floor plans. and a typical structural cross-section showing the foundation. framing. sheathing. roofing, siding, flooring and roof overhang. Include details of a storage room or heated living space above the garage. if applicable. If commercial stock plans are used. any changes. deletions or additions must be clearly indicated and signed in ink by the owner or ccntractoc on both copies of the applicable drawings Any changes that increase the overall size of the house must be drawn to scale and dimensioned A plan for each floor of the house is to be provided to show room sizes and arrangements The overall dimensions of the framing. garage. porches. decks and stairways must also be shown. The PCC will reject any provisions for commercial use or for future conversion to a multi-family dwelling. The Declaration of Restrictions specify the minimum area of heated living space on the first floor for many of the lots. Show the calculated area for the proposed house. The elevation drawings are to show sufficient details to illustrate the exterior appearance of the house. Show doors, windows. curtain walls. siding, porches. decks and exterior stairs. If a fireplace is to be provided. show the chimney. The foundation plan must indicate the proposed type of foundation. i.e., whether the house is to be built on piling. concrete slab. perimeter wall and piers. etc. Show any unusual features. such as below grade garage, storage area or basement. ------------------------------------------------------ Provide dimensions on the elevation drawings to define the external length and width of the walls. Either show the overall length and width of the roof eaves or the width of the overhangs on the front. rear. and sides. Rater to Section 7 on height restrictions and draw two horizontal lines across the bottom of the front elevation, drawing The upper line represents the proposed finished grade elevation surrounding the house foundation. Label the line with the proposed elevation. The lower line represents the average of the two Lot side line mid-point elevations shown on the plot plan Label the Line wich this average elevation. Show the vertical distance from the lower line to the uppermost ridge of the roof. When identifying house colors in the following Data Sheet. use the customary color terminology rather than the manufacturers imaginative trade names. The proposed color schemes are subject to ?CC approval. ---------------------------------------------------- 5. DATA 1:2_M' =1r --- ------------- Architectural style. ---------------------------------------------------- Rooting Material. ---------------------------------------------------- Roofing Color: ---------------------------------------------------- Siding Material (A'. (B) ---------------------------------------------------- Siding Color: (A) (B) ---------------------------------------------------- House Trim Color: ---------------------------------------------------- Garage Door Color: ---------------------------------------------------- Type of Foundation ------------------ ---------------------------------- First Floor Elevation: ---------------------------------------------------- Garage Floor Elevation: ---------------------------------------------------- Roof Height Above Lot Sidelines: ---------------------------------------------------- Type of Heating/Cooling: ---------------------------------------------------- Any De-mucking Required? ---------------------------------------------------- Estimated Cu.Yds. Backfill Regd.: --------------------------------------------------- Heated Area Sq. Ft.: r i ?uolicate copies of a certified plot clan prepared ov a licensed engineer or land surveyor must accompany this application. It should be drawn to a scala no smaller than 30 feet per inch. it will be used by the PCC to verify compliance with setback and height restrictions. The property will be visited to enable the PCC to visualize now the house will harmonize with the nelchborhocd. and the effect it may have on Storm water accumulation and liversion. The initial issue of this certified drawing shows the actual boundaries and elevations of the lot. It also chows the proposed location o; the house and associated improvements. It is referred to as the "proposed plot plan". The final revision shows the actual location of the finished house and other irncrovaments. It is referred to as the "as-ouilt plot plan" and is submitted to the ?rC along with the request for a Certificate of Occupancy Sag Section U. The plot par. must accurateiy daiine the recorded boundary of the lot, if the boundary of a waterfront lot does not coincide with the existing bulkhead or shoreline the plot plan must show the recorded boundary along with those locations where the existing shoreline at mean sea level intersects the lot side lines or extensions thereof -he original. undisturbed ground level alevaticns of the lot are to be indicated on the plot plan at each corner of the lot and on each side line midpoint relative to the proposed location of the house Extend the lot side lines over the street and show the elevations where the side line extensions intersect the roadside swale and the centerline of the road. If the and of a waterfront lot is submerged. show the side line elevations where they cross the raised bank or ridge. or bulkhead. If any portion o! the lot is in a designated wetlands area. show the wetlands boundary as determined by the UT S. Army Corps of Engineers. The building setback lines and the utility and drainage easements are to be shown. See typical plot plans on Page S. Section 12. For most waterfront lots the setback facing the water is 50 feet inside of. and parallel or concentric with the recorded boundary line. However. for pie-shaped lots situated around the end of culs-de-sac. and with a radial depth of less than 200 feet. the set- back facing the water is 25% of the recorded radial depth as measured from the outboard property line. DAtq 3 n+ ---------------------------------------------------- For lots not situated on the water the rear Setback line is 25 feet or 25% of the lot depth. whichever is graacar. measured from the rear boundary of the lot. Show the proposed location of the house and associated improvements. Overall dimensions include roof overhangs, bay Windows. porches. decks. outdoor stairways arc any other type of above ground structures Ailow space. if needed, for a heat pump or fuel scorace tsnk Refer to Section an height rastrictions for application of the 2.3 height to setback ratio Surround the external walls with a dotted line indicating the size and location of roof overhangs Show the proposed outlines of porches_ decks. stairs. atc ?rovice a sufficient nu-mbar of dimensions tc arable the ?CC ver,.fy compiiar,_a with the setback -astrictiins. and as a basis for :cmpar:ng the as- built plot plan .ith the proposed plot plan. All Such d i ^tans ? ,ns to b m w9 u-ad,? a_^?e.. ,a; ••i 1 rr the 1n' b.-,,ndar- tones or the sathark '•rae Any abovs 7rcund par- of the house extending beyond the setback lines requires ?CC approval of a variar.ca. Refer to Section 10 :ndicata the proposed elevations for the first floor of the house and the garage floor. Snow the proposad location of the driveway and walkways Tatra -racautiors prevent rainwater from running down the driveway into the garage or the street. If any part of a paveo driveway extends over a sideline draird;e and utility easement, the owner must agree in writing to ramove and replace paving at his expense if the easement is ever needed. Give careful consideration to selecting the proposed location and elevation of the house. The PCC considers them to be the intended location and elevation. once :hey have been approved by the PCC. there should be no significant difference between the in`_ended or proposed plot plan and the as-built plot plan. Refer to Section S. As-Built Plot Plan r zee. 2 5 7. Hz Tr R-ST7TC'ToNS ---------------------------------------------------- Section 4. House Plans. requires the drawing of two horizontal lines across the bottom of the front elevation view. The uppermost part of the roof shall be no higher than 35 feet above the lower line. Except for a chimney. no part of the house facing either side of the lot shall be any higher than 2.0 times the horizontal setback distance. This ratio also is measured above and along the lower Line. Refer to typical example below. If there is any possibLllty the house may not tit inside the 2.0 height to setback ratio. draw a triangle at each side o! the front alevaticn view to demonstrate compliance with this restriction. Each triangle must be in a vertical place perpar.dicular to the lot side line and located whera the haight :_ setback ratio is the graacasc. 8 The actual house Locaticn and floor elevations must appear on the certitied as-built plot plan. Early confirmation of this data is suggested. Any design changes made during construc:ion require the written approval of the PCC. and i! applicable, they are to be shown on this drawing. This revision o:` the plc: plan shows the as-built locatier,s of the house. porch. deck(s), outdoor stair.+aya. patios. driveway. walkway, heat pump. scrsered or bt-riad f oci tank. and any other imorovements approved by the ?CC at the time the ?OA Building Permit is issued The finished elevations of the first floor of tna house and the garage are to be shown. Any vioiat-ons of the setback and height restric:i:ins are to be clearly indicated. 9 Any par: of -no tic>>a at:achrtents thereto wh.ch extend bevcnd :nil sacba_F 1--nas or exceed the height res:r1C:1Cns re•{ctre a variance The ?CC is raluctart to aoo:-,:vg a var:anca for any reason other than :,? overcome a pr_c:_cal di.°ficui:y or an EXAMPLE extreme hardship. However. should a genuine need develop. the established vartar, cs pr-cedura and fa.--is are avas1a0le in the POA Office. LA.x HEic it 3 5 : i.----------?-p-T ' T ,rz of Q -- -N- --------------- rJ ? ----------------._-------------------------------•---- 1 1 A POA Cor%!iCatd of Occucancy must be Issued by the 27.51 -I J L i PCC before the house can be occupied. Tha 1 contractor should submit his request approximately _ ten Qays prior to the data he expects to have the house ready for inspection. The request is to be ZO t accompanied by duplicate copies of the certified as- built plot plan as described above. 6 _ -_- - A contractor's representative should be present for Ca the Inspection.. A copy of the county certificate a1 .2 - 0 shall be provided to the PCC. All construction l ti t equipment and debris must be removed and the yard ca must be finish graded. Adjoining lots must be .? r cleared of vehicle ruts and scrap material. The PCC CZ7 ~ l will compare the finished house and other l improvements with the previously approved application. The street will be checks-' for I a, - 1 FiNISE GRADE IO pavement damage. and the roadside swaLe and culvert . 13.734A will be inspected. If the project has been 1 7.51 completed to the satisfaction of the PCC. the • certificate will be issued during the next scheduled SIDELINE meeting . Page 5 cf 6 TyPTr-AI -LOT -1-AN __ WATFR--RnNT L= AA 5 Gw Q ? L - If f ` ?• J ! c Floor l? l , 1 ( f ELev.acio-. (?r% 1 r I + - ?' ?rc Ga: age : Loo:; L. ; 30u-3Z. ? Fi (X) Recorded Bo?ndar?(R) (Y) Svale a (%) (X'A Centerline of Street ( ) (R) - Elevation 1. . Distance Required .Z. TYP TCA_- PL OT PLAN __ NON_WA-rERFROMT .12j=1 plat pLaas ,,toss C% iT T?..traca Unique EC oquf:eseents. ,ho. ReoGtd23 r (:{) av aio .ed vats Zh-x app caci.an MLO-. oOa-oc?s .C? a'ene?;C to the stzmdacd3 c? r \ pcsc`co for La: su_rsy2Zy u de__rlsd 'sV :. NC S?aca aaaC ? ? ?;oL+n_oaai Lagiaeecs `5«• f3 j?l \ Lac-' surMYOr3. t t\ ,dGl 15 t ? yvo` r`G ? pP . f', [OJ° 1` ice/ cc, i 1 (x) L ' ? 3atV ded Bur (%) a Rzcot 3 (R) M ( X ) o? S_tee Ce1Yttline i t 3 . QVZrT AI PRS NT] 7Nn MMITTgC Only the U.S. Army Corps of Engineers can verify whether or not your property is located in or encroaches upon a wetlands area. and if so. what federal restrictions will be imposed on the development of your property. You. the owner. are responsible for obtaining such confirmation. It is outside the Jurisdiction of the ?CC. The PCC has no control over storm water run of: or drainage. nor is it responsible for local flooding caused by high tide and storms. An effort is made to foresee and warn of potential problems, but this is limited to comparing the current and proposed elevations in an attempt to equalize runoff or preserve and maintain existing swaies or ditches In connection with the foregoing. the undersigned acknowledge and agree as follows: (1) The PCC assumes no responsibility for delays and hardships caused by or resulting from wetlands restrictions unexpectedly imposed by the U S Army Corps of Engineers. (2) The PCC does not regulate or control storm water drainage and runoff matters and assumes no responsibility for them. (31 The undersigned. jointly and severally, agree to indeminify and to hold harmless the Property Control Committee. the Fairfield Harbour Property Owners Association. Inc and their agents. officers. employees. directors. successors and assignees from all claims. liabilities. demands, actions and proceedings which may be asserted with respect to or arising out of wetlands restrictions. storm drainage and/or runoff matters (including without limitations. the payment of attorneys' fees and costs of defending the same and including without limitation the payment of any judgement or settlement regarding the same). (4) The indemnity and hold harmless agreement set forth in paragraph (3) above shall continue indefinitely and shall be enforceable whether or not the undersigned are than owners of the subject property. I/We do hereby acknowledge the above statements and on this data do set my/our hand. This. the day of (X1 Property Owner(s) Signature(s) 1J The general contractor identified below hereby confirms that he is currently licensed by the State of North Carolina and that he has provided the PCC with current insurance certificates stating the amounts of accident and vehicle liability insurance and workmen's compensation insurance he is carrying on his activities in Fairfield Harbour. Arrangements shat?ld be made to have the certificates automatically renewed. ?CC approval of this application doss not relieve the contractor o° his obligation to comply with the raquir3ments of the North Carolina State Building Cede. The PCC assumes no responsibility for delays and additional costs resulting from Craven County's enforcement of the code. The contractor identified below hereby agrees to comply with the following rules and to instruct his employees, subcontractors and suppliers to do likewise Al' traffic reculations will be observed while operating vehiclss on Fairfield Harbour property Access to the development is restricted to Cassawary Lane and Harbcurside Drive. Steel caterpillar treads ara prohitited an asphalt roads. The contractor will arrange for the supply of water and electricity to the site and will provide a portable toilet during construction. All excavated m?teriais. building supplies. tools and equipment shall be kept within the boundaries of the 'Pt on whici the house is being constructed. All construction debris will be removed and disposed of at frequent intervals. Every effort shall be made to prevent windblown trash. No open burning is permitted at any time. The contractor will restore the roadside ditch or swale (if any) to its original crass-section and install a 15-inch diameter North Carolina D.O.T. approved culvert under the driveway. The driveway will be formed at its junction with the street to provide a straight edge of uniform thickness. The undersigned contractor hereby agrees to reimburse the POA for the cost of repairing any road damage caused by this project. Contracting Firm: (X) Signature of Authorized Representative B26-67-1999 r r• ? r FFH PGA / FCC CERTIFICATE O OCCLPAINICY INSPECTION GUIDELIN93 The 4011,zwing guiielinas shculd be 4c1lowed b;/ members of the property -cntrci Cccitrr tt =_ when inspecting a new ho.-se prior to reccmme^.b i nG the i ssu_-,z_? a' C_rti f i cate c4 Cccupancy: i (jna'aed il-ISPectzr- have in h4 s W, i tten request for a CU, as Well as Fil '? 1?QF= , t?ii„ +. r::: _=. .. minq 'C`% av;]rc`/?? h?. t1Si? Plans, daL ta ?11e I• ??vt? ??I'?J , 'JC?r ?'?1.?., fr7? _. ,. a:' aI CZr+.j Z' ed is fT, tz „rs t daL--e (yt :G 1 f-`!? b r'_.. _ r F ' . r ? 1. 'ha .. Ci•.3 r-,--z I ?'s?.i+_?__i_ rJ .,-_']I Ql_. 3i an_ 7z P. ;i th _k f: ?L--=- =:C= C1 1'_'u 3S CQP' .:]rrns t E=6 _ _?_.-''_ .r h Ais 1Z Tl,l.' ::'ire ,_ _ L, V ?•. _. b _1?3i '7n .-•?•. c. L: -kn.4'3s, i..Cn'-F_r'i C: ''e; i1.z? G= i. i ) Vert 4 thr.: tiiE SvStaM hea3 b a=n fa e, aS a:•__-mvsd and that w,-,tierior companer-ts, h as propane ` s _?`-e yv tanks, gas heater and air to air at p+_uap are installsd in their approved 1--ca=ions- Confirm that Water to air heat pu^p does nat discharge i..nto drainage ditch or adjacent proper _y. ^^ C 3 If t_tr.leckel, Icek inside the house to can- rm that all ccnstruc-?iion work. is assentially complete and house is truly ready for occupancy. If house is locked, lack through windaws or arrange With contractor to unlock hl-Ise. Insure t:1ay .. Coun_ - Li CC LIZI he-gr? issued ]y checking that green tag on front window has been signed .o'f'f cr Check 4or permanent elactrical installation (permanent meter installed and temporary mater removed). -' 1? Feb 91 A .. t FFH POA : PCC CERTI:=ICATE OF OCCUPANCY IaNSPEC':'ION GUIDELiNFS i } Insect Iat to verify that all 'construction dgbris and e_ces_ mr?t_r - has teen r_mrs?ied_ See that finish grading has been satisfactorily completed and try to 4t4en4_4ry any pot2n_ial problems that may be created by storm water riunaf=. Veri=y that the Swale across front cf Itat has been restorad to its original contour. See tfi a*: ad.jac_r: Ic*_s have been pleased a? construction derris and ruts. Ccnf;rtr Chat dumpst,:?r and part-able t?= -a-- have b?er ram,ved. } i!" ?ii'3C'?'?:i??n "`'l??.,S ?riV :?TL?i'??._•??. ?.'? ?. ?'?:'.L?`t ?uc.E I !er and Set t`tai? reso:i /:?d pri•ar tc .., r:_::t ACC Mae4:i1-1s 14 a m-a. cr Problem deveL--ps, ccn_act th•_ P,--C 3v:?C__?.i a:"? t J ?J c• i"c._•?;.,?._,? ;l F: y 12 Feb 91 r DRAINAGE PROGRAM While the POA program to correct major drainage problems is under-way, it is important that we understand what the POA can do and can't do, and where we each can help. Fairfield Harbour is located on a flat sandy coastal plain. There is insufficient elevation to provide adequate slope to drain all excess waters to lakes or creeks. After some horizontal drainage of excess flood waters, the remaining waters will soak into the ground like it normally would before development of the area. Two problems during development of the community have resulted in retention of excess flood waters that should be drained into the lakes and creeks; Roadways were filled and built above the normal elevation and necessary culverts under some roads were omitted by the developer. The POA program will address the installation of culverts to remove excess flood waters. The program does not address standing water on individual lots. In fact, Wetland's permit requirements essentially preclude the POA from working outside the roadside easement in front of the lots. The POA/PCC have adopted the following guidelines which should help drainage on individual lots. Some suggestions may be more appropriate before home construction on the lot. Provide a pronounced slope away from the house to prevent moisture under the house (which can cause excessive mildew inside the house, rotting of the subfloors and attracts termites). Preferably the slope away from the house should be about one foot vertically in the first eight to ten feet horizontally. On property sidelines, the last two feet on the lot should normally be left at the original elevation or lowered to promote drainage. Dirt fill under the house should be higher than on the outside of the foundation. The low point along the side of the house should be on the property line. The slope away from the house foundation to the property line creates a swale, a slight ditch running along the property line with gradual slopes on both sides. It may be possible to slope the swale along the property line to the roadside ditch and to the rear of the lot if there is an adequate drain system behind the house. If there is insufficient slope beside the house and the soil has suitable percolation, drainage from gutters can be carried away from the house with an underground drain line to an area with a lower elevation. Use perforated six inch drain line that is wrapped with drain cloth to keep out sand. Direct the hole side of the pipe down. t the low discharge end, build a box of loose brick (no concrete needed). Cover with a layer of brick horizontally so the holes point up. Top of the brick cover should be just below the level of the cut grass. Excess water will flow up out of the pipe and drain across the grass. Water left in the pipe will soak into the subsurface under the pipe. r Lot front property lines end about 20 feet from the road side and this easement along many roads is the drainage ditch for adjacent properties. Plantings in this easement area should not restrict flow. If drainage ditches need to be reshaped in the future, the contractors will have to remove plantings which restrict flow. Roadside ditches that have been filled or where grass growth has raised the bottom of the ditch may need to be excavated to restore drainage along the road. In small areas which dry slowly, it may be possible to improve the rate water will soak down into the sand. Do n::)t deposit leaves and grass clippings in low areas where they will hold up water and reduce percolation. Installation of a "drain hole" may expedite drying by getting the water into a lower more porous soil layer. This approach has worked well on some driveways where grass growing above the pavement has created a pool. B35-DRAINAGE i Architectural Guidelines and Review Procedures Fait-field Harbour Craven County, North Carolina Revised January 2000 (originally published May 1985) *Change 01, September 12, 2000 #Change #2. December 19, 2000 ARCHITECTURAL.GUIDELINES AND RHVXZW PROCEDURES FOR FAIRFIELD HARBOUR, CRAVEN COUNTY, NORTH CAROLINA TABLE OF CONTENTS I. PURPOSE 1 II. DEVELOPMENT PHILOSOPHY I III. DECLARATION OF RESTRICTIONS 1 IV. PROPERTY CONTROL COMMITTEE 2 V. ARCHITECTURAL REVIEW PROCESS 2 VI. ARCHITECTURAL OBJECTIVE CRITERIA 3 A. Lot Dimensions and Sizes 3 B. Height Restrictions 4 C. General Setback Requirements 4 D. Site Utilization 5 1. Driveways and Off-Street Parking 5 2. Fences 5 3. Landscaping and Planting- 6 4. Miscellaneous Site Elements 7 a. Exterior Antennas 7 b. Swimming Pools 7 c. Site Lighting 7 d. Trash Cans 7 e. Play Equipment 7 f. Outbuildings/House Additions 7 g. Gazebos 8 h. Fuel Storage Tanks 9 VII. ARCHITECTURAL SUBJECTIVE CRI'T'ERIA 10 A. General Philosophy 10 B. Construction 10 C. Materials - Walls, Exterior 11 D. Roofing Materials 12 E. General Architectural Styles 12 VIII. DRAINAGE 13 IX. INFORMATION SHEETS 14 r that have been used in the adjacent areas. VIII. DRAINAGE Fairfield Harbour is located on a flat sandy coastal plain. There is insufficient elevation to provide adequate slope to drain all excess waters to lakes or creeks. After some horizontal drainage of excess flood waters, the remaining waters will soak into the ground like it normally would before development of the area. Two problems during development of the community have resulted in retention of excess flood waters that should be drained into the lakes and creeks. Roadways were filled and built above the normal elevation and necessary culverts under some roads were omitted by the developer. The POA program includes the installation of culverts and improvements to ditches. The program usually will not address standing water on individual lots. If the area is wetlands normally the POA will not be able to make any improvements to it unless it is possible to acquire a Wetlands Permit. The following guidelines should help drainage on individual lots. Some suggestions may be more easily adopted when building a new house. A pronounced slope away from the house (six inches vertically in the first eight feet horizontally) and fill under the house higher than the ground outside the foundation should help prevent excessive mildew under the house, rotting subfloors and termites. The slope away from the foundation to the property line should create a swale along the property line. On property sidelines the last two feet on the lot should normally be left at the original elevation or lower to promote drainage. It may be possible to slope the swale along the property sidelines to the roadside ditch and/or to the rear of the lot if there is adequate drainage behind the house. If poor percolation or insufficient slope beside the houses prevents downspout water from draining away from the house, an underground drain line may be necessary. Use perforated six inch drain line that is wrapped with drain cloth to keep out sand. Place the hole side of the pipe down. At the discharge end, build a box of loose brick (no concrete needed). Cover with a layer of brick horizontally so the holes point up. The top of the brick cover should be just below the level of the cut grass. Excess water will flow up out of the pipe and drain across the grass. Water left in the pipe will soak into the subsurface under the pipe. Front property lines are usually 30 feet from the centerline of the road. The area between the property line and the road is where drainage ditches are normally located. This property is owned by the POA or Fairfield Communities. Lot owners are prohibited from adding fill dirt or other materials to road side drainage ditches unless approved in writing by the PCC. DOT approved culverts for driveways shall be set at elevations.. specified by the PCC if available. Installation of driveway walls is discouraged. If the POA has to 13