Loading...
HomeMy WebLinkAboutSW3191105_Millbridge Phase 7E Revised Sheets_1/21/2020W O. zaw z o-°°o w ,z pow Qo¢ woo ww� oo o �a0 =�o ~ w ozw F -p w�oz Uo z oz ow wY� =UQ ~p= OY� w�Q m w o o m ¢ z< z OZ¢ oo < ozz o w 0 w w¢� ¢�z D w� wwoo 0 Fz w�Q ¢�Im_ mm� p CrFr ow a22E z°w �2P oz8) U-O zzo o2E_ YUF U On lo YmQ �=z o� oo� 0 (I oo= Ow¢ Up PROJECT SITE VICINITY MAP N.T.S. DEVELOPMENT DATA FOR MILLBRIDGE PHASE 7E TAX PARCEL ID: 05168019 05168018 05168018B CONDITIONAL USE ZONING NO. CU-001545-2013 TOTAL ACREAGE: +/- 45.14 ACRES TOTAL AREA IN R/W: TOTAL AREA IN LOTS: TOTAL AREA IN COS: PERIMETER BUFFER: EXISTING POND: REMAINING: TOTAL AREA IN FUTURE 7F ZONING: PROPOSED USE: PROP. DENSITY: BUILDING TYPE: WATERSHED: FIRST WATERCOURSE: +/- 4.37 A.C. +/- 12.39 AC. +/- 7.47 A.C. +/- 0.85 A.C. (+/- 11.4%) +/- 1.01 A.C. (+/- 13.5%) +/- 5.61 A.C. (+/- 75.1 %) +/- 20.91 A.C. CU R4-PRD & CU R-3 (TOWN OF WAXHAW) SINGLE FAMILY RESIDENTIAL 3.10 UNITS/AC. DETACHED SINGLE FAMILY HOMES LOWER CATAWBA 12-MILE CREEK LOT SIZE: MIN LOT SIZE REQUIRED: 6,000 S.F. (0.138 AC.) MIN LOT SIZE PROVIDED: 6,032 S.F. (0.138 AC. - LOT #621-625) AVG. LOT SIZE PROVIDED: 7,135 S.F. (0.164 AC.) MAX LOT SIZE PROVIDED: 10,471 S.F. (0.24 AC. - LOT #678) LOT COUNT: TOTAL NUMBER OF DWELLINGS: 75 LOTS 52' SINGLE FAMILY (DETACHED) 75 LOTS (100%) (52' X 130' TYP.) BUILDING SETBACKS (MIN.) FRONT YARD SETBACK: 20' SIDE YARD SETBACK: 5' (10' CORNER LOTS) REAR LOT SETBACK: 20' *MAXIMUM STRUCTURE HEIGHT TO BE 45'* *MILLBRIDGE PHASE 7E SHALL COMPLY WITH PLAN REVIEW GUIDELINES FOR MILLBRIDGE SUBDIVISION* INTERNAL STREET NETWORK: TOTAL LINEAR FOOT DEEP RIVER WAY: 1,773 LF TOTAL LINEAR FOOT GABARDINE LANE: 481 LF TOTAL LINEAR FOOT BATISTE AVENUE: 548 LF TOTAL LINEAR FOOT WHIPCORD DRIVE: 795 LF TOTAL LINEAR FOOT HANCOCK ROAD: 210 LF INTERNAL STORMWATER RESTRICTIONS: BMP #1 IMPERVIOUS RESTRICTION - 3,500 SQ. FT. PER LOT BMP #2 IMPERVIOUS RESTRICTION - 3,500 SQ. FT. PER LOT BMP #3 IMPERVIOUS RESTRICTION - 3,500 SQ. FT. PER LOT GENERAL NOTES. BOUNDARY INFORMATION BOUNDARY INFORMATION OBTAINED FROM SURVEY PREPARED BY McKIM & CREED SIGNED JUNE 24TH, 2008 AND A SUPPLEMENTAL SURVEY COMPLETED BY SUMMIT OF THE CAROLINAS, P.C. ON NOVEMBER 18TH, 2016 TOPOGRAPHIC INFORMATION TOPOGRAPHY FOR THIS SECTION OF MILLBRIDGE IS A COMPILATION OF AERIAL SURVEY OBTAINED FROM LAND DESIGN, INC. ON OCTOBER 30, 2013. ROADWAY CONNECTIONS WERE OBTAINED FROM PHASE 7ABC CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL VERIFY ELEVATIONS PRIOR TO CONSTRUCTION. WETLAND & FEMA FLOOD INFORMATION WETLAND INFORMATION OBTAINED FROM SURVEY COMPLETED BY SUMMIT OF THE CAROLINAS, P.C. ON NOVEMBER 18TH, 2016. NO WETLANDS EXIST WITHIN MILLBRIDGE PHASE 7E BUT DO EXIST IN MILLBRIDGE PHASE 7F. THIS SITE IS LOCATED WITHIN FEMA FLOOD HAZARD ZONE 'X' PER PANEL 3710446300J. HORIZONTAL REFERENCE: NAD83 VERTICAL REFERENCE: NAVD88 SUBMITTED BY: LANDEAVOR, LLC 9101 SOUTHERN PINE BLVD STE 210 CHARLOTTE, NC 28273 PHONE NUMBER: (704) 525-5998 EMAIL:COOK@LANDEAVOR.COM DEVELOPER: LANDEAVOR, LLC 9101 SOUTHERN PINE BLVD STE 210 CHARLOTTE, NC 28273 PHONE NUMBER: (704) 525-5998 EMAIL:COOK@LANDEAVOR.COM DESIGN ENGINEER: W.K. DICKSON - WESTON BOLES, PE 1213 W. MOREHEAD STREET, SUITE 300 CHARLOTTE, NC 28208 PHONE NUMBER: (704)-334-5348 211 0 �I m 13 MILLBRIDGE PHASE 7E TOWN OF WAXHAW, UNION COUNTY, NORTH CAROLINA FOR LANDEAVOR LLC. 9101 SOUTHERN PINE BLVD, CHARLOTTE, NC 28273 DEC. 2019 I t I � `It I I 1 \ PHASE7D N NOW OR FORMALLY WSLD MILLBRIDGE VI LLC PIN:05165001 / I ZONING CU R4-PRD / L \ STREAM-j BUFFER (TYP.) R i... BMP I r STORMWATER POND (TYP) V. X 629 / \ \ I 630 631 \ �Py w z < 632 oEEP 692 693 16� I 694 _ Z I� BMP � �� ' � 633 STORMWATER \�. 678 POND (TYP) 679 I I 634 _ 75 UNIT MAIL�OX STOP SIGN (TYP.)- 677 C) z . KI OS'K / GOs 691 I D 635 _ - 680- \ I 661 I STREET IG (TYP.) 676 690 I 636 - i u u ! � � - - - �� - - -I '... 681 STORMWATER -i 637 675 � 689 EASEN EMT (TYP) I -i 70 I �/ I 663 v 674 m 688 I I 638 �j 660 01! i 683 HANCOCK ROAD 639 i 640 12' BMP PON - - ACCESS ROAD (TYP.) 641 PROPERTY BOUNDARY (TYP.) I. BMP STORMWATER POND (TYP) I. BMP POND WITH VINYL COATED CHAINLINK SECURITY FENCE AROUND PERIMETER (TYP.):.: WBOLES@WKDICKSON.COM DESIGNER: Know what's below. CONNOR HORN, El 334.5348 Call before you dig (704) CHORN@WKDICKSON.COM 664 r" �t 659 - - ,, m - 665 II658 1 I I 666 II 657 656 667 - - J 673 684 - 1 671 1 672 668 669 670 I 1 I WHIPCORD DRIVE-� 20' NATURAL PERIMETER AIUWAY TREE SAVE (TYP.) CSXR PLAN VIEW SCALE: 1" = 100' 687 686 685 20' UTILITY ` EASEMENT (TYP.) FUTURE PHASE 7E NOW OR FORMALLY WSLD MILLBRIDGE VI LLC PIN:05168018B ZONING: CU R-3 FUTURE PHASE 7F NOW OR FORMALLY WSLD MILLBRIDGE VI LLC PIN 05168018 ZONING: CU R-3 �`�� /. PHASE 7C Sheet List Table SHEET NUMBER SHEET TITLE DRAWING REVISION NUMBER REVISION DATE C1.0 COVER SHEET C 1/21/2020 C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN B 12/18/2019 C3.0 OVERALL SITE PLAN B 12/18/2019 C3.1 SITE PLAN - SHEET 1 B 12/18/2019 C3.2 SITE PLAN - SHEET 2 B 12/18/2019 C4.0 OVERALL GRADING PLAN B 12/18/2019 C4.1 GRADING PLAN - SHEET 1 B 12/18/2019 C4.2 GRADING PLAN - SHEET 2 B 12/18/2019 C4.3 GRADING PLAN - INSET B 12/18/2019 C5.0 PLAN & PROFILE B 12/18/2019 C5.1 PLAN & PROFILE B 12/18/2019 C5.2 PLAN & PROFILE B 12/18/2019 C5.3 PLAN & PROFILE B 12/18/2019 C5.4 PLAN & PROFILE B 12/18/2019 C5.5 PLAN & PROFILE B 12/18/2019 C6.0 OVERALL EROSION CONTROL - PHASE I B 12/18/2019 C6.1 EROSION CONTROL - PHASE I B 12/18/2019 C6.2 EROSION CONTROL - PHASE I B 12/18/2019 C6.3 OVERALL EROSION CONTROL - PHASE II B 12/18/2019 C6.4 EROSION CONTROL - PHASE II B 12/18/2019 C6.5 EROSION CONTROL - PHASE II B 12/18/2019 C7.0 LANDSCAPE PLAN - SHEET 1 B 12/18/2019 C7.1 LANDSCAPE PLAN - SHEET 2 B 12/18/2019 C8.0 GENERAL NOTES B 12/18/2019 C8.1 GENERAL NOTES B 12/18/2019 C8.2 GENERAL NOTES B 12/18/2019 C9.0 DETAILS - SHEET 1 B 12/18/2019 C9.1 DETAILS - SHEET 2 B 12/18/2019 C9.2 DETAILS - SHEET 3 B 12/18/2019 C9.3 DETAILS - SHEET 4 B 12/18/2019 C9.4 DETAILS - SHEET 5 B 12/18/2019 C9.5 DETAILS - SHEET 6 B 12/18/2019 C9.6 DETAILS - SHEET 7 B 12/18/2019 C9.7 DETAILS - BMP #1 C 1/21/2020 C9.8 DETAILS - BMP #2 C 1/21/2020 C9.9 DETAILS - BMP #3 C 1/21/2020 APP-A ALTA SURVEY LANDEA 100 0 100 200 SCALE: 1" = 100' Wl< DICI<SON community infrastructure consultants N N T N T z O I- U U) z O U O LL LU U) O z O Q Cz_ G_ J LU Ir n WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 \\011 I III //,// cgRAL o�'� T � z�;. R,L�INE�� •� �: r1111 ! /r PROFESSIONAL SEAL U U U m z Ir O O Ir z z U LU w LU 0 LLJ 0 U) Z O O LU ii Ir 0 LL wLL LL O O z z O O O cr Ir Ir LU LU LU 0- 0- 0- z z z O O O W W w cr Ir Ir 0 rn rn 0 0 0 w H N co Q Orr I�ImIQI ° cY) I- C\I CID C\I z L H H Oo tr LU = I` U cf) J 0 W Q N LU _ LU = a_ LU Cl) � OQcf) LU � Ir t] W Ir 0 m z J � � m U J W z_ IZ z Ir LU H O 0 rn W Lj.j Z W Z Ir Ir tL � PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C1.0 WKD PROJ. NO.: 20170279.00. C L I o. zaw z pOo w ,z ao¢ woo ww� U= O¢m Sao =�o ~ w ozw z -o ozo WUZ ZOO z Oom wY� =UQ oY, w Doo z< z om¢ z ozz o w 0 w w¢� ¢3:z o�0 wD¢ 0 1Fz w�= ¢�Im_ =w� 0 0Fr zw °� z°w �2P o z 8 U-O Zwo 02= YUF U soo YUQ =z �F oo¢ 0 =Zw F, -'m a�2 ow¢UD INLET PIPE -/ ENERGY DISSIPATOR NOTE TO CONTRACTOR: DAM MATERIAL AND COMPACTION REQUIREMENTS ARE TO BE FIELD DETERMINED BY GEOTECH ENGINEER. ALL WORK REGARDING THE DAM EMBANKMENT MUST BE MONITORED AND APPROVED BY GEOTECHNICAL ENGINEER. DEPENDING UPON SITE CONDITIONS, IT MAY BE NECESSARY TO ADD OUTLET STRUCTURE AN IMPERVIOUS KEYWAY OR ADDITIONAL ANTI- (SEE OUTLET STRUCTURE DETAIL) SEEP COLLARS. COLLARS TO BE SIZED BY GEOTECH. LITTORAL SHELF WITH WETLAND PLANTINGS (6' MIN. WIDTH) RIPRAP BERM AND WEIR CLASS B RIP INVERTED WATER QUALITY ORIFICE RAP 15" MIN. DEPTH 10 YEAR = 569.84' YEAR = 567.75' PERMANENT POOL - 566.50' - - - - - 1 ' -0" 1" = 566.95' - - - - - - - 6: 1 SLOPE ST: _ O o�0 6' LITTORAL SHELF _ Q .... _ POND BOTTOM 558.00' L 2:1 SLOPE STABILIZED I TO POND BOTTOM MAIN POND � TOP OF BERM 2 SEDIMENT FOREBAY 2 _ 12" SEDIMENT STORAGE 557.00' I 10, -' EMERGENCY SPILLWAY 571.80 - L GEOMEMBRANE LINER - (NON -PUNCTURE) CLASS I RIP RAP SPILLWAY SPILLWAY ELEVATION IS EMERGENCY SPILLWAY DETAIL GENERAL NOTES AT THE TOP OF LINER 1. PRECAST STRUCTURES SHALL CONFORM TO LATEST ASTM C-913 SPEC FOR "REINFORCED CONCRETE WATER AND WASTE WATER STRUCTURES." 2. CONCRETE COMPRESSIVE STRENGTH 4000 PSI MINIMUM. 3. STEEL REINFORCING CONFORMS TO LATEST ACI-318 SPECS. FOR REINFORCED CONCRETE. 4. SECTION JOINTS TO BE SEALED WITH BUTYL RUBBER SEALANT SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. EXTERIOR OF JOINTS TO BE WRAPPED WITH 6" BUTYL WRAP SUPPLIED BY VENDOR OF BOX. 5. BARREL (36"0) CONNECTION AND 12" DIP INLET PIPE TO BE SEALED WITH LINK SEAL CONNECTORS SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. 6. SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER BEFORE CONSTRUCTION. 7. GEOTECHNICAL ENGINEER SHALL MONITOR DAM AND OUTLET STRUCTURE INSTALLATION. 8. CONTRACTOR TO ENSURE POND BOTTOM AND SIDES HAVE 0.1 FT/DAY INFILTRATION RATE THROUGH TESTING OF NATIVE SOILS OR INSTALLATION OF MINIMUM 12" THICK LAYER OF CLAY SOIL. 9. ANTI -SEEP COLLARS SHALL BE SPACED EVENLY ALONG THE ENTIRE STORM PIPE RUN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER SHOULD THIS SPACING NOT BE ATAINABLE 10. PERMANENT POOL SHALL BE DRAINED WITH A SUMP PUMP FOR PERIODIC MAINTENANCE. WET DETENTION POND #1 - - - _ -ANTI-SEEP i COLLARS (TYP.) ' TURTLEHEAD WHITE 6" PVC SCREW - TYPE PLUG 6" PVC TEE TOP OF BERM 10.0' 573.00 (MIN.) EMERGENCY SPILLWAY 571.80 6'-0" x6$-0" x 1'-6 CONCRETE ANTI -FLOATATION PAD #4 REBAR, 6" OC EACH WAY 3" COVER OF ALL REINFORCEMENT TEMPORARY POOL PERMANENT POOL 6" PVC STUBBED INTO BOX 6" PVC CAP WITH 1.75" HOLE DRILLED WATER QUALITY ORIFICE DETAIL TOP OF STRUC CLASS I RIP RAP SPILLWAY (8) ANTI -SEEP COLLARS R 7n' TOP OF STRUCTURE WEIR (SEE WEIR AND ORIFICE 'ROPOSED PIPE DETAIL) WQ i (SEE SS B CRETE SECTION ANTI -SEEP COLLAR N.T.S. REMOVABLE 4'X4' STEEL GRATE WATER QUALITY ORIFICE PIPE CONNECTION (SEE DETAIL) WEIR AND ORIFICE DETAIL I I LEGEND OTANICAL NAME COMMON NAME SIZE QTY GITTARIALATIFOLIA DUCK POTATO 2"x5" PLUG 125 CORNUS CALAMUS SWEETFLAG 2"x5" PLUG 122 K ISCUS COCCINEUS SCARLET ROSE MALLOW 2"x5" PLUG 107 BELIA CARDINALIS CARDINAL FLOWER 2"x5" PLUG 91 HELONE GLABRA WHITE TURTLEHEAD 2"x5" PLUG 1 131 A rE SECTION A -A N TS OUTLET STRUCTURE DETAIL PLAN VIEW A URE N.T.S. GENERAL BMP CONSTRUCTION SEQUENCE NOTES 1. AFTER SITE HAS BEEN STABILIZED AND SEDIMENT BASIN IS READY TO BE CONVERTED TO WET POND, DE -WATER BASIN, REMOVE ANY ACCUMULATED SEDIMENT AND LEGALLY DISPOSE OF MATERIAL. MATERIAL MAY BE DISPOSED OF ON -SITE IN AREAS NOT REQUIRING STRUCTURAL FILL. 2. EXCAVATE FOREBAY AND MAIN BAY OF BASIN. FINAL GRADE BASIN AND CONSTRUCT LITTORAL SHELF. VERIFY GRADES CONFORM TO THE ELEVATIONS AT THE BOTTOM AND TOP OF THE TOTAL AREA: 2,248 SF LITTORAL SHELF, THE PERMANENT POOL ELEVATION, AND TOP OF EMBANKMENT AND VERIFY I TOTAL PLANTS REQUIRED: 562 PLANTS (2,248 SF x 0.25) ALL GRADED ELEVATIONS ARE AS SHOWN ON THESE PLANS. \ J I TOTAL PLANTS PROVIDED: 576 PLANTS 3. PROVIDE TEMPORARY SEEDING AS NEEDED TO STABILIZE SLOPES. 4. SUBMIT PRELIMINARY TOPOGRAPHIC SURVEY OF BASIN TO ENGINEER OF RECORD PRIOR TO INSTALLATION OF PLANTS ALONG LITTORAL SHELF OR INSTALLATION OF PERMANENT \ BMP PLANTING NOTES STABILIZATION MEASURES/SEEDING. CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND - - 1. SIZE, QUALITY AND OVERALL HEALTH OF ALL PLANT MATERIAL USED THIS PHASE UNTIL APPROVAL OF PRELIMINARY TOPOGRAPHIC SURVEY IS GRANTED BY \ SHALL CONFORM TO THE LATEST EDITION OF ANSI Z60 "AMERICAN ENGINEER OF RECORD. - - \ STANDARD FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN 5. REMOVE ANY TEMPORARY BLOCKAGES OR MODIFICATIONS TO CONTROL STRUCTURES \ \ NURSERY AND LANDSCAPE ASSOCIATION. REQUIRED FOR EROSION CONTROL AND VERIFY STRUCTURES CONFORM TO DETAILS. 'SCARLET \ \ \ \ 2. ALL PLANT MATERIALS SHALL BE GUARANTEED TO BE IN HEALTHY 6. SPREAD TOP SOIL AMENDED WITH ORGANIC FERTILIZER TO A DEPTH OF 2" OVER ENTIRE DSE MALLOW \ \ \ CONDITION FOR (1) YEAR AFTER FINAL ACCEPTANCE OF ALL PLANT LITTORAL SHELF AND TILL INTO THE TOP 6" OF THE LITTORAL SHELF. CONTRACTOR SHALL o \ C� \ MATERIAL BY OWNER. 3. ALL CONSTRUCTION MATERIALS AND METHODS OF CONSTRUCTION SHALL BREAK UP AND TILL ALL CLODS GREATER THAN 3" IN LARGEST DIMENSION AND INTEGRATE WITH SOIL. ANY ROCKS, GRAVEL, AND DEBRIS LARGER THAN 1" IN LARGEST DIMENSION SHALL ty \ CONFORM WITH TOWN OF WAXHAW AND UNION COUNTY STANDARDS ✓ 1 20 DUCK BE REMOVED FROM LITTORAL SHELF AND DISPOSED OF PRIOR TO INSTALLING PLANTINGS PER 4. IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY THE LANDSCAPE SCHEDULE. RECOMPACT SHELF USING HAND TOOLS AND VERIFY A UNIFORM POTATO / POTATO s 572 573 570 568 566 564 \ \ 66 / FORBAY / 0-- S/ - � S \ S�� ES-100 _ / \ Sig ° 8 / O FOFE: 583 00 J i WET DETENTION POND #1 PLANTING DETAIL 6'9 , � SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT SURFACE WITH SLOPE OF 10:1 IS PROVIDED. S 24 SWEETFLAG WILL BE A WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE 25 SWEETFLAG 6j \ � 7. INSTALL PLANT MATERIAL PER BMP PLANTING PLANS. DO NOT INSTALL PLANTINGS WHERE s-6' \ \ PROVIDED WITH CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE INFLOWS FROM STORM PIPES WILL DISLODGE OR DAMAGE PLANTS. ANCHOR PLANTINGS TO 26 WHITE S6 AND GROW AS OPTIMALLY AS POSSIBLE. SHELF USING SOD STAPLES OR COMPARABLE METHOD OR DEVICE. / SO 5. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY SEVERAL # 23 SCARLET TURTLEHEAD 06 � � \ ( 8. APPLY FERTILIZER PER SPECIFICATIONS. / S O TIMES DAILY WHEN WEATHER IS HOT). 9. PROVIDE TEMPORARY IRRIGATION FOR WET POND PLANTINGS FOR A PERIOD OF NO LESS THAN 16 SWEETFLAG / / / ROSE MALLOW 6. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE � 30 DAYS OR UNTIL ESTABLISHMENT. IF INSTALLATION OCCURS DURING SUMMER MONTHS / / / / \ BOTTOM OF POND WITH 12" BENT WIRE PINS. 7. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF ADDITIONAL IRRIGATION BEYOND 30 DAYS WILL BE NECESSARY TO ESTABLISH PLANTINGS. TRANSPLANTING. �26 CARDINAL \ 10. INSTALL MEASURES NECESSARY TO PREVENT DESTRUCTION OF VEGETATION BY WILDLIFE � � 8. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS SUCH AS GEESE AND DEER. MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO: ORANGE / 24 CARDINAL , / / - FLOWERS CONSTRUCTION FENCING, ALLIGATOR DECOYS, INSTALLATION OF HUMANE DETERRENT FLOWERS - - - 24 WHITE SHOULD NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY DEVICES SUCH AS GOOSE GUARDIAN OR AWAY WITH GEESE UNIT. TURTLEHEAD UNTIL THEY ARE PLACED IN THEIR PERMANENT POSITIONS. 11. PROVIDE AS-BUILTS OF BASIN. AS-BUILTS SHALL BE DONE PRIOR TO THE RELEASE OF THE BMP MAIN POND 29 DUCK 9. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE POND. c.0v POTATO TIME OF TRANSPLANTING. 12. MAINTENANCE EASEMENT SHALL BE RECORDED PRIOR TO THE RELEASE OF THE BMP POND. 10. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH 25 SWEETFLAG 0 1.5"x2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE 27 SCARLET / BLACK. INSTALL WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE ROSE MALLOW - BOTTOM LAYER OF THE FABRIC TO THE GROUND WITH 10-12" PINS. Sse 562 o / FENCING TO REMAIN IN PLACE FOR A PERIOD OF ONE YEAR POST / Sg 24 DUCK 56 �G - _ INSTALLATION OF PLANT MATERIAL. POTATO 56 28 WHITE 6 - %` 11. STAKE PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON / STURTLEHEAD /o \ PLAN. g / S ? 56 27 WHITE 12. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN S 64 �69 TURTLEHEAD THEIR GROUPS ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER 6g ��1 3' \ IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 28 DUCK Sg> % 5 5'1 \ 13. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO POTATO / 17 CARDINAL 15 / INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN FLOWERS j / \ PLANTED. 32 SWEETFLAG \ \ 30 SCARLET ROSE MALLOW Wl< L D I C 1<S0 N community infrastructure consultants \ N.T.S. • a Know what's below. Call before you dig N N T N T LU Q O 0- z O U U) z O U IIr O LL LU U) O Z O i Q z 2 J LU WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 \`011 I III //,// .`��,- N cq R0 /- _. O O 2 INS 0NI G I G. T3 PROFESSIONAL SEAL U U U m p z Ir O O CE z z C15 U LU w z C3 p 0 LU 0 O 0 U) z U U LU ii °C °__ u_ ~ u- u- w O O z z 0 0 0 0- 0- 0- e O O rDLDLD cr Ir Ir o rn rn 0 0 0 w N N aQ p r r Ic)M< ° C CV W H LU c) cf) I- _ cf)W J 0 CID < _j _j U D_ CO a_ CE LU z 0�0 crO LU O oLLwa- � Fr 0 z 0 Q _j Z W IY W J_ � � U O 0 rn li.i li.i 2 _j z w z Ir Ir p PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.7 WKD PROJ. NO.: 20160181.00.CL I O. zaw z pOo OJU ozw ao¢ woo ww� U= o'. �a0 =�o ~ w ozw z -o oz zo zo z O om wY� =UQ ~F_ OY� w Doo z< z OZ¢ ozz O w 0 w w¢� ¢�z o�0 wD¢ 0 1Fz w�= ¢�Im_ =w� 0 U'Fr Zw °2P z°w �2P o z 8 U-O zzo o2_ YUF U soo YUQ =Z ~U oo¢ 0 =Zw 00= a�2 Ow¢ UD NOTE TO CONTRACTOR: DAM MATERIAL AND COMPACTION REQUIREMENTS ARE TO BE FIELD DETERMINED BY GEOTECH 10.0' ENGINEER. ALL WORK REGARDING THE DAM LITTORAL SHELF WITH (MIN.) EMBANKMENT MUST BE MONITORED AND APPROVED WETLAND PLANTINGS BY GEOTECHNICAL ENGINEER. DEPENDING UPON (6' MIN. WIDTH) �. SITE CONDITIONS, IT MAY BE NECESSARY TO ADD OUTLET STRUCTURE AN IMPERVIOUS KEYWAY OR ADDITIONAL ANTI- SRO (SEE OUTLET STRUCTURE DETAIL) SEEP COLLARS. COLLARS TO BE SIZED BY GEOTECH. �F RIPRAP BERM AND INVERTED WATER TIC WEIR CLASS B RIP QUALITY ORIFICE RAP 15" MIN. DEPTH F/ 10 YEAR = 562.13' OQ 2 YEAR = 561.16' PERMANENT POOL- 55-8.50' `7 1'-0" 1=559.92' -_ - -_ - - - - - - - - - SLOPE 6 � 6:1 SLOPE Sow �oP�..:.:' .,::.` 6 0„ INLET PIPE 6' LITTORAL SHELF Q .. _ _ POND_BOTTOM 553.00' 9;... ENERGY DISSIPATOR 2:1 SLOPE STABILIZED TO POND BOTTOM r _ 6'-0" x 6'-0$$ x 1'-0" CONCRETE ANTI -FLOATATION PAD TOP OF BERM MAIN POND #4 REBAR, 6" OC EACH WAY3" 2 SEDIMENT FOREBAY 2 -_ 12" SEDIMENT STORAGE COVER OF ALL REINFORCEMENT I 552.00' 10' EMERGENCY SPILLWAY 563.95 - Ll r�_- GEOMEMBRANE LINER I I - IIIIII-III- II ' (NON -PUNCTURE) CLASS I RIP RAP SPILLWAY SPILLWAY ELEVATION IS GENERAL NOTES AT THE TOP OF LINER EMERGENCY SPILLWAY DETAIL 6" PVC SCREW TYPE PLUG 1. PRECAST STRUCTURES SHALL CONFORM TO LATEST ASTM C-913 SPEC FOR "REINFORCED CONCRETE 6" PVC TEE TEMPORARY POOL WATER AND WASTE WATER STRUCTURES." 2. CONCRETE COMPRESSIVE STRENGTH 4000 PSI MINIMUM. PERMANENT POOL 3. STEEL REINFORCING CONFORMS TO LATEST ACI-318 SPECS. FOR REINFORCED CONCRETE. 4. SECTION JOINTS TO BE SEALED WITH BUTYL RUBBER SEALANT SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. EXTERIOR OF JOINTS TO BE WRAPPED WITH 6" BUTYL WRAP SUPPLIED BY VENDOR OF BOX. 5. BARREL (36"0) CONNECTION AND 12" DIP INLET PIPE TO BE SEALED WITH LINK SEAL CONNECTORS 6" PVC STUBBED INTO BOX SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. 6. SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER BEFORE CONSTRUCTION. 6" PVC CAP WITH 7. GEOTECHNICAL ENGINEER SHALL MONITOR DAM AND OUTLET STRUCTURE INSTALLATION. 2.3" HOLE DRILLED 8. CONTRACTOR TO ENSURE POND BOTTOM AND SIDES HAVE 0.1 FT/DAY INFILTRATION RATE THROUGH WATER QUALITY ORIFICE DETAIL TESTING OF NATIVE SOILS OR INSTALLATION OF MINIMUM 12" THICK LAYER OF CLAY SOIL. 9. ANTI -SEEP COLLARS SHALL BE SPACED EVENLY ALONG THE ENTIRE STORM PIPE RUN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER SHOULD THIS SPACING NOT BE ATAINABLE 10. PERMANENT POOL SHALL BE DRAINED WITH A SUMP PUMP FOR PERIODIC MAINTENANCE. WET DETENTION POND #2 \ \ 560 ANTI -SEEP J COLLARS (TYP.) L 1 29 DUCK POTATO 30 SCARLET _ ROSE MALLOW 31 SCAF \ 22 DUCK ROSE M. POTATO \ # `\ 28 SCARLET \ SS /ROSE MALLOW \ 9 S �^ h N 31 WHITE SSA 2TURTLEHEAD / 7 WHITE � - TURTLEHEAD \\ \ \\M IA N POND\ \ 1 \ \ \ \ \ 32 CARDINAL FLOWERS,, 34 CARDINAL \ \ \ \ 22 SCARLET FLOWERS 34 DUCK ROSE MALLOW / POTATO SWEET LAGS ' - �37 SWEETFLAG�- 32 CARDINAL-c WHITE FLOWERS - RTLEHEAD 570 - 575 580 \ IN 585 WET DETENTION POND #2 PLANTING DETAIL LANDEA I 558 •1 562 .1 Slim �� M '�.Mi !z�Ti 1 565 57� S� - I � Wl< DICI<SON community infrastructure consultants Oki 6'cr TOP OF BERM 565.00 -EMERGENCY SPILLWAY 563.95 CLASS I RIP RAP SPILLWAY (4) ANTI -SEEP COLLARS �: �: �r I L�: I I I I I I I I I �, i I- - R R 5' TOP OF STRUCTURE WEIR (SEE WEIR AND ORIFICE 'ROPOSED PIPE DETAIL) SS B CRETE SECTION ANTI -SEEP COLLAR N.T.S. REMOVABLE 4'X4' STEEL GRATE TOP OF STRUC rE WATER QUALITY ORIFICE PIPE CONNECTION (SEE DETAIL) WEIR AND ORIFICE DETAIL LEGEND BOTANICAL NAME COMMON NAME SIZE QTY SAGITTARIA LATIFOLIA DUCK POTATO 2"x5" PLUG 115 ACORNUS CALAMUS SWEETFLAG 2"x5" PLUG 90 HIBISCUS COCCINEUS SCARLET ROSE MALLOW 2"x5" PLUG 111 LOBELIA CARDINALIS CARDINAL FLOWER 2"x5" PLUG 123 CHELONE GLABRA I WHITE TURTLEHEAD 2"x5" PLUG 1 92 TOTAL AREA: 2,091 SF TOTAL PLANTS REQUIRED: 523 PLANTS (2,091 SF x 0.25) TOTAL PLANTS PROVIDED: 531 PLANTS BMP PLANTING NOTES 1. SIZE, QUALITY AND OVERALL HEALTH OF ALL PLANT MATERIAL USED SHALL CONFORM TO THE LATEST EDITION OF ANSI Z60 "AMERICAN STANDARD FOR NURSERY STOCK" AS PUBLISHED BY THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION. 2. ALL PLANT MATERIALS SHALL BE GUARANTEED TO BE IN HEALTHY CONDITION FOR (1) YEAR AFTER FINAL ACCEPTANCE OF ALL PLANT MATERIAL BY OWNER. 3. ALL CONSTRUCTION MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM WITH TOWN OF WAXHAW AND UNION COUNTY STANDARDS. 4. IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT WILL BE A WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE PROVIDED WITH CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE AND GROW AS OPTIMALLY AS POSSIBLE. 5. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY (SEVERAL TIMES DAILY WHEN WEATHER IS HOT). 6. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE BOTTOM OF POND WITH 12" BENT WIRE PINS. 7. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF TRANSPLANTING. 8. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS SHOULD NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY UNTIL THEY ARE PLACED IN THEIR PERMANENT POSITIONS. 9. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE TIME OF TRANSPLANTING. 10. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH 1.5"x2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE BLACK. INSTALL WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE BOTTOM LAYER OF THE FABRIC TO THE GROUND WITH 10-12" PINS. FENCING TO REMAIN IN PLACE FOR A PERIOD OF ONE YEAR POST INSTALLATION OF PLANT MATERIAL. 11. STAKE PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON PLAN. 12. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN THEIR GROUPS ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 13. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN PLANTED. A WQ i (SEE SECTION A -A N TS OUTLET STRUCTURE DETAIL PLAN VIEW A 'TURE N.T.S. GENERAL BMP CONSTRUCTION SEQUENCE NOTES 1. AFTER SITE HAS BEEN STABILIZED AND SEDIMENT BASIN IS READY TO BE CONVERTED TO WET POND, DE -WATER BASIN, REMOVE ANY ACCUMULATED SEDIMENT AND LEGALLY DISPOSE OF MATERIAL. MATERIAL MAY BE DISPOSED OF ON -SITE IN AREAS NOT REQUIRING STRUCTURAL FILL. 2. EXCAVATE FOREBAY AND MAIN BAY OF BASIN. FINAL GRADE BASIN AND CONSTRUCT LITTORAL SHELF. VERIFY GRADES CONFORM TO THE ELEVATIONS AT THE BOTTOM AND TOP OF THE LITTORAL SHELF, THE PERMANENT POOL ELEVATION, AND TOP OF EMBANKMENT AND VERIFY ALL GRADED ELEVATIONS ARE AS SHOWN ON THESE PLANS. 3. PROVIDE TEMPORARY SEEDING AS NEEDED TO STABILIZE SLOPES. 4. SUBMIT PRELIMINARY TOPOGRAPHIC SURVEY OF BASIN TO ENGINEER OF RECORD PRIOR TO INSTALLATION OF PLANTS ALONG LITTORAL SHELF OR INSTALLATION OF PERMANENT STABILIZATION MEASURES/SEEDING. CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND THIS PHASE UNTIL APPROVAL OF PRELIMINARY TOPOGRAPHIC SURVEY IS GRANTED BY ENGINEER OF RECORD. 5. REMOVE ANY TEMPORARY BLOCKAGES OR MODIFICATIONS TO CONTROL STRUCTURES REQUIRED FOR EROSION CONTROL AND VERIFY STRUCTURES CONFORM TO DETAILS. 6. SPREAD TOP SOIL AMENDED WITH ORGANIC FERTILIZER TO A DEPTH OF 2" OVER ENTIRE LITTORAL SHELF AND TILL INTO THE TOP 6" OF THE LITTORAL SHELF. CONTRACTOR SHALL BREAK UP AND TILL ALL CLODS GREATER THAN 3" IN LARGEST DIMENSION AND INTEGRATE WITH SOIL. ANY ROCKS, GRAVEL, AND DEBRIS LARGER THAN 1" IN LARGEST DIMENSION SHALL BE REMOVED FROM LITTORAL SHELF AND DISPOSED OF PRIOR TO INSTALLING PLANTINGS PER THE LANDSCAPE SCHEDULE. RECOMPACT SHELF USING HAND TOOLS AND VERIFY A UNIFORM SURFACE WITH SLOPE OF 10:1 IS PROVIDED. 7. INSTALL PLANT MATERIAL PER BMP PLANTING PLANS. DO NOT INSTALL PLANTINGS WHERE INFLOWS FROM STORM PIPES WILL DISLODGE OR DAMAGE PLANTS. ANCHOR PLANTINGS TO SHELF USING SOD STAPLES OR COMPARABLE METHOD OR DEVICE. 8. APPLY FERTILIZER PER SPECIFICATIONS. 9. PROVIDE TEMPORARY IRRIGATION FOR WET POND PLANTINGS FOR A PERIOD OF NO LESS THAN 30 DAYS OR UNTIL ESTABLISHMENT. IF INSTALLATION OCCURS DURING SUMMER MONTHS ADDITIONAL IRRIGATION BEYOND 30 DAYS WILL BE NECESSARY TO ESTABLISH PLANTINGS. 10. INSTALL MEASURES NECESSARY TO PREVENT DESTRUCTION OF VEGETATION BY WILDLIFE SUCH AS GEESE AND DEER. MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO: ORANGE CONSTRUCTION FENCING, ALLIGATOR DECOYS, INSTALLATION OF HUMANE DETERRENT DEVICES SUCH AS GOOSE GUARDIAN OR AWAY WITH GEESE UNIT. 11. PROVIDE AS-BUILTS OF BASIN. AS-BUILTS SHALL BE DONE PRIOR TO THE RELEASE OF THE BMP POND. 12. MAINTENANCE EASEMENT SHALL BE RECORDED PRIOR TO THE RELEASE OF THE BMP POND. N.T.S. • a Know what's below. Call before you dig N O N T N T z 0 U U) z 0 U IIr 0 LL LU U) 0 z 0 i Q z 2 J LU r,r WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 `0 111It///, CARo�'� Q 0 , T � z<t\ R,LGINE�� r1111 ! /r PROFESSIONAL SEAL U U U m p z Ir O O CE z z C15 U LU w z C3 p 0 LU 0 O O U) z U U LU ii °C °__ u_ ~ u_ u_ w O O z z 0 0 0 cr Ir Ir LU w w e 0 0 LD LD LD 0 rn rn 0 0 0 w N N N QQ o r r I�ImIQI ° C CV W I- co Cn I- LU (n JiN Q J J U a_CO 2 0Wz 00 CrLU 0 O 0LL<a-0 LU J Ir 0 cr OJ Q m z LUIr W J F = t� � � U O 0 rn li.i li.i g J I- z U z W Ir o PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.8 WKD PROJ. NO.: 20160181.00.CL I O. zaw z pOo OJU ozw ao¢ woo ww� U= O¢m �a0 =�o ~ w ozw z -o oz zo zo z O om wY� =UQ ~F_ OY� w Doo z< z OZ¢ ozz O w 0 w w¢� ¢�z o�0 wD¢ 0 1Fz w�= ¢�Im_ =w� 0 0Fr zw °2P z°w �2P o z 8 U-O zzo o2_ YUF U soo YUQ =z �F oo¢ 0 =Zw 00= a�2 Ow¢ UD NOTE TO CONTRACTOR: DAM MATERIAL AND COMPACTION REQUIREMENTS ARE TO BE FIELD DETERMINED BY GEOTECH 10.0' ENGINEER. ALL WORK REGARDING THE DAM LITTORAL SHELF WITH (MIN.) EMBANKMENT MUST BE MONITORED AND APPROVED WETLAND PLANTINGS BY GEOTECHNICAL ENGINEER. DEPENDING UPON (6' MIN. WIDTH) �. SITE CONDITIONS, IT MAY BE NECESSARY TO ADD OUTLET STRUCTURE AN IMPERVIOUS KEYWAY OR ADDITIONAL ANTI- SRO (SEE OUTLET STRUCTURE DETAIL) SEEP COLLARS. COLLARS TO BE SIZED BY GEOTECH. �F RIPRAP BERM AND INVERTED WATER TIC WEIR CLASS B RIP QUALITY ORIFICE RAP 15" MIN. DEPTH F/ 10 YEAR = 571.85' OQ 2 YEAR = 570.92' PERMANENT POOL- 56-8.50' `7 1'-0" 1=569.58' - -_ - - - - - - - - - SLOPE 6 � 6:1 SLOPE Sow �oP�..:.:' 6 0„ INLET PIPE 6' LITTORAL SHELF F ;..:..: a.... .. ::.,.+..:. ,:. .' POND BOTTOM 564.00' L ENERGY DISSIPATOR 2:1 SLOPE STABILIZED I I I I TO POND BOTTOM � � M � M I = SEDIMENT FOREBAY 6'-0" x 6'-0" x 1'-6" CONCRETE ANTI -FLOATATION PAD TOP OF BERM MAIN POND #4 REBAR, 6" OC EACH WAY3" 2 2 12" SEDIMENT STORAGE COVER OF ALL REINFORCEMENT 1 1 I 563.00' 10' EMERGENCY SPILLWAY 574.00 GEOMEMBRANE LINER -I _ IIIIII-III- II ' (NON -PUNCTURE) CLASS I RIP RAP SPILLWAY SPILLWAY ELEVATION Is AT THE TOP OF LINER EMERGENCY SPILLWAY DETAIL 6" PVC SCREW GENERAL NOTES TYPE PLUG 1. PRECAST STRUCTURES SHALL CONFORM TO LATEST ASTM C-913 SPEC FOR "REINFORCED CONCRETE 6" PVC TEE TEMPORARY POOL WATER AND WASTE WATER STRUCTURES." 2. CONCRETE COMPRESSIVE STRENGTH 4000 PSI MINIMUM. PERMANENT POOL 3. STEEL REINFORCING CONFORMS TO LATEST ACI-318 SPECS. FOR REINFORCED CONCRETE. 4. SECTION JOINTS TO BE SEALED WITH BUTYL RUBBER SEALANT SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. EXTERIOR OF JOINTS TO BE WRAPPED WITH 6" BUTYL WRAP SUPPLIED BY VENDOR OF BOX. TOP OF BERM 575.00 -EMERGENCY SPILLWAY 574.00 CLASS I RIP RAP SPILLWAY (3) ANTI -SEEP COLLARS I �Tii::IW I�:I;,::,W TOP OF STRUC 5 93' TOP OF STRUCTURE WEIR (SEE WEIR AND ORIFICE 'ROPOSED PIPE DETAIL) SS B CRETE SECTION ANTI -SEEP COLLAR N.T.S. REMOVABLE 4'X4' STEEL GRATE A WQ i (SEE SECTION A -A N TS A 5. BARREL (24"0) CONNECTION AND 12" DIP INLET PIPE TO BE SEALED WITH LINK SEAL CONNECTORS 6" PVC STUBBED SUPPLIED BY VENDOR AND INSTALLED BY CONTRACTOR. INTO BOX WQ ORIFICE PRECAST CONCRETE ELEV. 568.50 STRUCTURE 6. SHOP DRAWINGS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER BEFORE CONSTRUCTION. 6" PVC CAP WITH 7. GEOTECHNICAL ENGINEER SHALL MONITOR DAM AND OUTLET STRUCTURE INSTALLATION. 1.7" HOLE DRILLED WATER QUALITY 8. CONTRACTOR TO ENSURE POND BOTTOM AND SIDES HAVE 0.1 FT/DAY INFILTRATION RATE THROUGH WATER QUALITY ORIFICE DETAIL ORIFICE PIPE PRECAST STRUCTURE TESTING OF NATIVE SOILS OR INSTALLATION OF MINIMUM 12" THICK LAYER OF CLAY SOIL. CONNECTION (SEE DETAIL) WEIR AND ORIFICE DETAIL OUTLET STRUCTURE DETAIL 9. ANTI -SEEP COLLARS SHALL BE SPACED EVENLY ALONG THE ENTIRE STORM PIPE RUN. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER SHOULD THIS SPACING NOT BE ATAINABLE PLAN VIEW 10. PERMANENT POOL SHALL BE DRAINED WITH A SUMP PUMP FOR PERIODIC MAINTENANCE. WET DETENTION POND #3 N.T.S. / - ---I- - - I I I I . 1 / LEGEND 7/� � \ 1 ANTI -SEEP ROSE COLLARS (T ♦i♦��ii.c_ ♦.�♦,mot .ii w 0 \ O N GAKLtz I \ E MALLOW 19 CARDIN Hipis ►�� ,��NEW" V ENCY/SECONDARY /2�/ V STONE SPILLWAY / WET DETENTION POND #3 PLANTING DETAIL WH ITE RTLEHEAD \ s�7 AI I BOTANICAL NAME COMMON NAME SIZE QTY SAGITTARIA LATIFOLIA DUCK POTATO 2"x5" PLUG 80 ACORNUS CALAMUS SWEETFLAG 2"x5" PLUG 85 HIBISCUS COCCINEUS SCARLET ROSE MALLOW 2"x5" PLUG 93 LOBELIA CARDINALIS CARDINAL FLOWER 2"x5" PLUG 76 CHELONE GLABRA WHITE TURTLEHEAD 2"x5" PLUG 87 1 I TOTAL AREA: 1,655 SF - I ) ) TOTAL PLANTS REQUIRED: 414 PLANTS (1,655 SF x 0.25) TOTAL PLANTS PROVIDED: 421 PLANTS \ ° BMP 1. PLANTING NOTES SIZE, QUALITY AND OVERALL HEALTH OF ALL PLANT MATERIAL USED SHALL d'�,, _ CONFORM TO THE LATEST EDITION OF ANSI Z60 "AMERICAN STANDARD FOR \ NURSERY STOCK" AS PUBLISHED BY THE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION. 2. ALL PLANT MATERIALS SHALL BE GUARANTEED TO BE IN HEALTHY CONDITION FOR (1) YEAR AFTER FINAL ACCEPTANCE OF ALL PLANT MATERIAL BY OWNER. 3. ALL CONSTRUCTION MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM WITH TOWN OF WAXHAW AND UNION COUNTY STANDARDS. ° 4. IF BARE ROOT SPECIMENS ARE NOT TO BE USED WITHIN 4 DAYS, THEY SHOULD BE PLANTED IN SUITABLE BEDS WITH THE ASSUMPTION THAT IT WILL BE A \ I WHILE BEFORE THEY CAN BE USED, AND THEY SHOULD BE PROVIDED WITH I CONDITIONS MAKING IT POSSIBLE FOR THEM TO SURVIVE AND GROW AS \ \ ` OPTIMALLY AS POSSIBLE. 5. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY (SEVERAL TIMES \ \ \ DAILY WHEN WEATHER IS HOT). \ \ 6. PIN ALL SUBMERGED/FLOATING PLANT MATERIAL SECURELY TO THE BOTTOM i 3 ° \ \ \ \ \ \ ) OF POND WITH 12" BENT WIRE PINS. I \ \ \ \ \ 7. CUT BACK TALL AND EASILY BROKEN LEAVES AND STEMS AT THE TIME OF \ \ TRANSPLANTING. \ \ \ \ \ \ \\ 8. NEWLY RECEIVED NURSERY STOCK AND DISTURBED TRANSPLANTS SHOULD I \ \ \ 6 NOT BE EXPOSED TO DIRECT SUN ANY MORE THAN NECESSARY UNTIL THEY \ \ \1l \ \ ARE PLACED IN THEIR PERMANENT POSITIONS. \ \ SQ. FT. ) FIDE: 587.0 \ ) 9. INSERT DRY FERTILIZER TABLETS OR SPIKES NEAR THE PLANTS AT THE TIME \ )) ) ) ) ) OF TRANSPLANTING. mQ U-) 'D -u / J ) ) ) ) e 10. FENCE ENTIRE PLANTING AREA WITH 36" TALL PLASTIC FENCING WITH 1.5"x2" OPENINGS. PLASTIC SHALL BE UV STABLE. COLOR SHALL BE BLACK. INSTALL / / / / WITH STEEL POSTS SPACED AT 10' O.C. MAX. PIN THE BOTTOM LAYER OF THE M � FABRIC TO THE GROUND WITH 10-12" PINS. FENCING TO REMAIN IN PLACE FOR 11. A PERIOD OF ONE YEAR POST INSTALLATION OF PLANT MATERIAL. STAKE PLANTING ZONES PRIOR TO INSTALLATION AND VERIFY AREAS ON PLAN. 12. PLANTS ARE TO BE INSTALLED IN A RANDOM ARRANGEMENT WITHIN THEIR GROUPS ZONES. INDIVIDUAL SPECIES MAY BE PLANTED TOGETHER IN GROUPS OF 3 TO 5. PLANTS MAY ALSO BE PLANTED INDIVIDUALLY. 13. PLANT QUANTITIES ARE TO BE VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION. PLANTS SHALL NOT BE COMPLETELY SUBMERGED WHEN / / / ° / / PLANTED. ) __T 7T -0/ Wl< L DICI<SON community infrastructure consultants GENERAL BMP CONSTRUCTION SEQUENCE NOTES 1. AFTER SITE HAS BEEN STABILIZED AND SEDIMENT BASIN IS READY TO BE CONVERTED TO WET POND, DE -WATER BASIN, REMOVE ANY ACCUMULATED SEDIMENT AND LEGALLY DISPOSE OF MATERIAL. MATERIAL MAY BE DISPOSED OF ON -SITE IN AREAS NOT REQUIRING STRUCTURAL FILL. 2. EXCAVATE FOREBAY AND MAIN BAY OF BASIN. FINAL GRADE BASIN AND CONSTRUCT LITTORAL SHELF. VERIFY GRADES CONFORM TO THE ELEVATIONS AT THE BOTTOM AND TOP OF THE LITTORAL SHELF, THE PERMANENT POOL ELEVATION, AND TOP OF EMBANKMENT AND VERIFY ALL GRADED ELEVATIONS ARE AS SHOWN ON THESE PLANS. 3. PROVIDE TEMPORARY SEEDING AS NEEDED TO STABILIZE SLOPES. 4. SUBMIT PRELIMINARY TOPOGRAPHIC SURVEY OF BASIN TO ENGINEER OF RECORD PRIOR TO INSTALLATION OF PLANTS ALONG LITTORAL SHELF OR INSTALLATION OF PERMANENT STABILIZATION MEASURES/SEEDING. CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND THIS PHASE UNTIL APPROVAL OF PRELIMINARY TOPOGRAPHIC SURVEY IS GRANTED BY ENGINEER OF RECORD. 5. REMOVE ANY TEMPORARY BLOCKAGES OR MODIFICATIONS TO CONTROL STRUCTURES REQUIRED FOR EROSION CONTROL AND VERIFY STRUCTURES CONFORM TO DETAILS. 6. SPREAD TOP SOIL AMENDED WITH ORGANIC FERTILIZER TO A DEPTH OF 2" OVER ENTIRE LITTORAL SHELF AND TILL INTO THE TOP 6" OF THE LITTORAL SHELF. CONTRACTOR SHALL BREAK UP AND TILL ALL CLODS GREATER THAN 3" IN LARGEST DIMENSION AND INTEGRATE WITH SOIL. ANY ROCKS, GRAVEL, AND DEBRIS LARGER THAN 1" IN LARGEST DIMENSION SHALL BE REMOVED FROM LITTORAL SHELF AND DISPOSED OF PRIOR TO INSTALLING PLANTINGS PER THE LANDSCAPE SCHEDULE. RECOMPACT SHELF USING HAND TOOLS AND VERIFY A UNIFORM SURFACE WITH SLOPE OF 10:1 IS PROVIDED. 7. INSTALL PLANT MATERIAL PER BMP PLANTING PLANS. DO NOT INSTALL PLANTINGS WHERE INFLOWS FROM STORM PIPES WILL DISLODGE OR DAMAGE PLANTS. ANCHOR PLANTINGS TO SHELF USING SOD STAPLES OR COMPARABLE METHOD OR DEVICE. 8. APPLY FERTILIZER PER SPECIFICATIONS. 9. PROVIDE TEMPORARY IRRIGATION FOR WET POND PLANTINGS FOR A PERIOD OF NO LESS THAN 30 DAYS OR UNTIL ESTABLISHMENT. IF INSTALLATION OCCURS DURING SUMMER MONTHS ADDITIONAL IRRIGATION BEYOND 30 DAYS WILL BE NECESSARY TO ESTABLISH PLANTINGS. 10. INSTALL MEASURES NECESSARY TO PREVENT DESTRUCTION OF VEGETATION BY WILDLIFE SUCH AS GEESE AND DEER. MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO: ORANGE CONSTRUCTION FENCING, ALLIGATOR DECOYS, INSTALLATION OF HUMANE DETERRENT DEVICES SUCH AS GOOSE GUARDIAN OR AWAY WITH GEESE UNIT. 11. PROVIDE AS-BUILTS OF BASIN. AS-BUILTS SHALL BE DONE PRIOR TO THE RELEASE OF THE BMP POND. 12. MAINTENANCE EASEMENT SHALL BE RECORDED PRIOR TO THE RELEASE OF THE BMP POND. N.T.S. Know what's below. Call before you dig N N T N T z 0 U U) z 0 U IIr 0 LL LU C) 0 Z 0 i Q z 2 J LU WK DICKSON community infrastructure consultants 1213 W. MOREHEAD STREET SUITE 300 CHARLOTTE, NC 28208 (t) (704) 334-0078 (f) (704) 334-5348 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 \`011 I III //,// CA qo //� Q 0 , T � R,LGINS �� r1111 ! /r PROFESSIONAL SEAL U U U m p z Ir O O CE z z C15 U LU w LLJ 0 LU 0 � : U) z O O LU ii Ir 0 u_ ~ u_ u_ w O O z z 000 cr Ir Ir LU LU LU e O O LD LD LD o rn rn 0 0 0 w N N aQ o r r I�ImIQI ° C CV W I- co Cn I- C\j co LU (n JiN Q J J U a_a_IrWz 0�0 �O LU LU o0w�F --- J Ir c Q m zWor LU J � _ � O U 0 rn li.i li.i z U Z W Ir Ir � p PROJ. MGR.: WGB DESIGN BY: CJH DRAWN BY: CJH PROJ. DATE: DEC. 2019 DRAWING NUMBER: C9.9 WKD PROJ. NO.: 20160181.00.CL