HomeMy WebLinkAbout20020808 Ver 1_Complete File_20020510W
pA T ?R?G
r
> -f
May 10, 2002
Mr. Loftee Smith, PE
Withers and Ravenel
111 MacKenan Drive
Cary, NC 27511
'020808
Subject: Auburn Park
Wake County
Dear Mr. Smith:
This Office is in receipt of the plans for a stormwater management device that includes a man made stormwater
conveyance through a Neuse River protected buffer. This activity requires a formal written application to and written
approval from this Office. Please find the enclosed information that you submitted and an application that can be used for
Neuse Buffer Approvals. Please provide seven copies of the completed application and supporting documents for a formal
review by this Office.
If you have any questions or would like to discuss this project, please contact Bob Zarzecki at (919) 733-1786 or Steve
Mitchell at our Raleigh Regional Office (919) 571 4700.
Attachment
cc: Raleigh Regional Office
Bob Zarzecki
Michael F. Easley
Governor
William G. Ross, Jr., Secretary
Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
Sincerely,
t
JoXnDoJrney
Wetlands Unit Supervisor
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/ncwetiands/
Wetlands Tracking
4015
Facility Name Auburn Park
Project Number 02 0808
Project Type purpose of stonnwater mngmt device
Location
Received From APP
Received Date N1ay 10, 2002
Sent to Region Date
Rcvd Region Date
Last Action Date NIay 10, 2002
Last Action Mold I
Latitude (ddmmss)
Longitude (ddmmss)
error
Certificates Stream
Permit Wetland Wetland Stream Class 'Wetland
Type cert # Type Impact Score ' Index Prim. Supp. Subbasin Class
Buffers 10 Y O N
OY ON
WRP
`Mitigation Project Wetland Wetland Area Length
MitigationType Number Type Class (acres) (feet)
COE ID # Region Raleigh
COE Susp Date Reg. Contact
DCM Susp Date I APPLICATION FEE INFO
TIP Number Payment Date
More Info Requested Amount Paid
More Info Received Payor
Mitigation ? Check #
COC Received Date
County Wake
County2
Area Area Length ! Length
(acres) (acres) (feet) ' (feet)
Req. Appr. Req. Appr.
Total for 401: ,J
Stream Impacts (ft.)
Mitigation
Completion Subbasin Peren- Inter-
Date nial mittent
Total Mitigation:
IookupL'VRP