Loading...
HomeMy WebLinkAboutNCC200033_NOI Application_20200121 Action History (UTC-05:00)Eastern Time(US&Canada) Subrrit by Anonymous User 1/2/2020 9:10:58 AM(NCG01 NOI Submission) Approve by Farkas,Jim J 1/6/2020 8:34:36 AM(Review-Construction NOI 20118) • The task was assigned to Farkas,Jim J by round robin distribution 1/2/2020 9:11 AM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is:January 6,2020 5:00 PM 1/2/2020 9:11 AM Submit by McCoy, Suzanne 1/21/2020 12:35:05 PM(Payment Verification for NCC200033) * McKim&Creed • McCoy,Suzanne assigned the task to McCoy, Suzanne 1/21/2020 12:34 PM • The task was assigned to DEMLR NCG01 Payment Team.The due date is: February 17, 2020 5:00 PM 1/6/2020 8:34 AM �ThF1 1Construction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Eliminatio em 'D application for•• - .•-under NorthCarolina's General Permit 1 1111:STORIMATER DISCHARGES associated with construction activities(or MORTH CAROLINA Enrlrnnmenfu�Qr�arlry A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* RiverLights AQ Phase 2&3 Lots 185,253,286,287,301,305, 341 &348 2. County* New Hanover 3. Highway or Street 4410 River Road Address* Street name only is acceptable if no address nunber assigned yet 4.City or Townsh ip* Wilmington 5.State* NC 6.Zip Code* 28412 7. Latitude* Enter the latitude in decinal degrees 34.1489 8. Longitude* Enter the longitude in decinal degrees(MJST be negative) -77.9319 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/30/2019 Estimated Construction Project Start Date 10. Date to End* 12/30/2020 Estimated Construction Project End Date 11.SIC(Primary)* Residential, Single Family Houses(SFE) (1521) Standard Industrial Classification for Development 12.Acres to be 1.30 disturbed* (including off-site borrow and waste areas) 13.Total site area 127.16 (acres)* 14. Post- 0.50 construction (Estimated) impervious area (acres)* NCC Project NCC-NEW H-2019-RiverLights AQ Phase 2&3 Lots 185,253,286, Tracking ID 287, 301, 305, 341 &348 Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Cape Fear River Waterbody* Narreof waterbody into which stormwater runoff will discharge 15b.Waterbody 18-(71) Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs* 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration-Legally Fbsponsible Entity and Individual Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Pulte Home Company, LLC Name* 2. First Name* Sidney ff Corporation,enter Fbgistered Agent First Barre 3. Last Name* Dudley ff Corporation,enter Faegistered Agent Last%rre 3b.Title Director of Land Development 4. Permitee E-mail sidney.dudley@PulteGroup.com Address* 5. Permittee (843)860-8485 Telephone No.* 6. Permittee Mailing Street Address Address* 4000 Faber Place Drive, Suite 110 Address Line 2 City State/F rovince/Region North Charleston SC Fbstal/Zip Code Country 29405 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4000 Faber Place Drive, Suite 110 Address Line 2 City State/Frovince/Fbgion North Charleston SC Fbstal/Zip Code Country 29405 us C. Site Contact Information Part C. ^ Roject Site Contact Inforrration ....................................................................................................................................................................................................................................................................................................................................................................................... 1.Type of Non-Government Ownership* 2. Primary Site Jamison Contact-First Name* 3. Primary Site Fair Contact-Last Name* 4.Title 5.Site Contact E- Jamison.fair@pultegroup.com mail Address* 6.Site Contact (910)232-6962 Telephone No.* 7.Organization Name 8.Site Contact Street Address Mailing Address* 4136 Passerine Avenue Address Line 2 City State/Rovince/Fbgion Wilmington NC Fbstal/Zip Code Country 28412 us 9. Consultant Name (Optional) McKim&Creed First and Last narre 10. Consultant E- dcoronado@mckimcreed.com mail This person will be copied on all correspondence. 11. Consultant (910)343-1048 Telephone No. D. E&SC Plan Part D. ^ Erosion&Sediment Control(E&SC)Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 12/17/2019 Approved* 2. E&SC Plan Project 38-16 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* New Hanover County Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. 5. E&SC Plan Permit_AQ2-3_Take 36_Executed.pdf 1.16MB Approval Wst be RDFforrrat letter/documentation 6. NOI Certification NCG01_AQ2-3_Take 36_Executed.pdf 400.07KB Form Mist be R7Fforrrat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66(1) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Artcle;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II(Stormwater Pollution Prevention Plan)of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature 52PNi--Y PVPL�-_Y Type Name* Sidney Dudley Title Director of Land Development Organization Pulte Group Date* 01/02/2020 F. Tracking and COC Info NOI Tracking No. 20118 NC Reference No. NCG01-2020-0033 Uses'count_nurrber'variable(increrrented by SP) Certificate of NCC200033 Coverage (COC) Uses'count number'variable(increrrented by SP) No.* Count Number 33 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed(used to assign YY digits after"NOC'in COCno.)