Loading...
HomeMy WebLinkAbout20081730 Ver 1_Triage Comments_20091110?o\ DwQa Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Use this form instead of writing inside the folder Triage Comment Sheet zi?n? r I ?i? lr--- Date: b U Date: Date: Issue Project (Reviewer 1) Issue Project (Reviewer 2) ? Issue with conditions (Reviewer 1) "o,?r-, fi ? Issue with conditions (Reviewer 2) ? More Information (Reviewer 1) ? Return Application (Reviewer 1) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY Project Name: Keith Hill West -Tract A DWQ Project 08-1730v2 Date Received: 10/09/09 Date of Comments: 11/10/09 1) Please provide the following information about the proposed stormwater wetland: a) The following items are missing from the Required Items Checklist: i) Supporting Design Calculations for sizing the wetland, the drawdown calculations for sizing the drawdown device; ii) A Soil Report indicating the following two important parameters: (a) the location (elevation) of the Seasonal High Water Table (SHWT) and (b) the in- situ soil permeability; iii) Notarized Operation and Maintenance Agreement; b) The surface areas of the individual wetland zones indicated on the Supplement Form do not sum up to the total wetland surface area. Please explain or correct the discrepancy. c) The cutout hole/orifice should correctly reflect the proposed dimensions (2.1" x 4.1 "). As shown on plan sheet 10, the hole extends from the permanent pool elevation 126 feet to the temporary pool elevation 127 feet. Also, if possible, configure the device such that it draws water from an elevation below the normal pool to prevent clogging of the orifice hole (use of down-turned orifice is recommended). d) Revise the design rainfall depth (from 0.44 in to 1.0 in) as well as the orifice size (1" diameter) on the Wetland Supplement Form. If a square orifice is proposed, please make a note on the form and indicate the size. If it is acting as an orifice and not a weir, the coefficient of discharge should be changed from 3 to 0.59. e) Please explain how the existing wetlands will not be affected during the construction of the stormwater wetland. Describe any measures in detail on the plans. Any temporary impacts should be identified, clearly described and included in the PCN. f) This office recommends that the deep pools should be lined with impermeable liner - synthetic or clay. g) Planting plan: i) Please provide spacing information for all proposed plants/shrubs/trees. ii) Please provide planting instructions on the plan sheet with the planting schedule. 2) Wetland Impacts: Please furnish this office with an approved wetland jurisdictional determination by the Corps showing all delineated wetlands on the entire project site. (Needed to verify that there are no wetland impacts at the proposed wetland location or any other location on the project site).