Loading...
HomeMy WebLinkAbout20191664 Ver 1_USACE Correspondence_20200121Strickland, Bev From: Capito, Rachel A CIV USARMY CESAW (USA) < Rachel.A.Capito@usace.army.mil > Sent: Tuesday, January 21, 2020 10:43 AM To: Jonathan McDaniel Cc: pittmansoil@yahoo.com; Mairs, Robb L Subject: [External] RE: [Non-DoD Source] One Harbor Church - Swansboro CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> HiJonathan, The only agency that can make a determination is a wetland is isolated is the EPA. The Corps works on their behalf as far as field visits and documentation, but the final call can only be made by them. I will have to set up a site visit to review the feature, then pass my determination and field notes to my supervisor for review and then it goes to the EPA for final review. Just so you are aware it is typically not a quick process, that is why the JD information has to be sent to the Corps as soon as possible to get the process started. I understand that you are under a time crunch so here are the two paths forward. Either submit a permit to impact the wetland feature to the Corps as if it was a jurisdictional feature and pay mitigation for the wetland impacts, and the Corps will have 45 days to process the application. Or wait for a site visit and required documentation from the Corps and EPA and move forward with the State's permit. I will let you know that may also take time as I have just received the JD request and I likely cannot get out to the site until potentially February at the earliest. Even after that it will still need to be reviewed by my supervisor and EPA before I can give you their determination. Please let me know how you would like to move forward. Thanks, Rachel -----Original Message ----- From: Jonathan McDaniel[mailto:JMcDaniel@parkerjacksonviIle.com] Sent: Tuesday, January 14, 2020 3:51 PM To: Capito, Rachel A CIV USARMY CESAW (US) <Rachel.A.Capito@usace.army.mil> Cc: pittmansoil@yahoo.com Subject: [Non-DoD Source] One Harbor Church - Swansboro Good afternoon Rachel, John Perrine in my office has got me up to speed with his past communications with Robb Mairs and recent communication with you. I am desperately needing your help here with the One Harbor Church project, and an impact to fill a 0.105 acre isolated wetland. The 2.8 acre site is located in Swansboro at 820 Main Street Extension (right next to the Town's park). Please see the attached PCN Application and Impact Map for processing. This was submitted just to the 401 group back before Thanksgiving (see attached LOT by John) along with other site permits, and the church has since locked in site and building contractors and obtained Erosion Control approval to start clearing. They were hoping to start clearing in the next couple weeks as they have an aggressive construction timeline overall with the building. Please let me know what I can do to help get this impact permit issued as soon as humanly possible (ASAHP). As always, I appreciate your help. I also apologize for the sense of urgency, but I am stuck in a tough spot with helping the church get started and lacking a permit that should have been taken care of months ago. Haywood is copied here, and will be sending his JD items shortly. Thanks, Jonathan L. McDaniel, PE BELL AND PHILLIPS Engineers*Surveyors*Planners 604E Cedar Point Boulevard Cedar Point, NC 28584 (252) 393-6101 Firm License Number - F0108 Blockedwww.BellandPhillips.com