HomeMy WebLinkAboutSW4191202_EZ Wet Pond Spreadsheet_1/20/2020WET POND
area number
2T sign volume of SCM (cu
Boni mnr eonu nau insn
31
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H: V)?
3:1
6
Does the SCM have retaining walls, gabion wa[is or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewstaring the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat ccm ply with
General MDC (10)?
Yes
74
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MQC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
Iwr-r nnNn runr PRniu row 9n53
18
Method used
SA IDA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (frnsl)
807,00
211
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
808,00
221
Elevation of the bottom of the vegetated shelf (fmsi)
$11.50
23
Elevation of the permanent pool (fmsl)
812,00
24
Elevation of the top of the vegetated shelf (fmsl)
812.50
25
Elevation of the temporary pool (fmsl)
813.75
26
Surface area of the main permanent pool (square feet)
3747:1
27
Volume of the main permanent pool (cubic feet)
10959 Cr
28
Average depth of the main pool (feet)
3.32 ft
29
Average depth equation used
Equation 3
30
If using equation 3, main pool perimeter (feet)
236.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
3,0 ft
32
Volume of the forebay (cubic feet)
3168 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
12 in
35
Design volume of SCM (cu ft)
11370 cf
36
1 Is the outlet an orifice or a weir?
Orifice
371
if orifice, orifice diameter (inches)
12 in
381
if weir, weir height (inches)
391
If weir, weir length (inches)
401
Drawdown time for the temporary pool (days)
3.79
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
24 in
44
Depth of forebay at exit (nches)
60 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6-1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
51
Are fountains proposed? [If Y, please provide documentation that
MDC(9) is met.}
Is a trash rack or other device provided to protect the outlet system?
No
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Tall Fescue
54
as a planting plan been provided r the vegetated shetf?
Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
55 wet ponds}:
f
Wet Pond 1 2:17 PM 1/17/2020