Loading...
HomeMy WebLinkAboutSW4191202_2020-01-20 Stormwater Permit Resubmittal Transmittal_1/20/20206�ad Transmittal Letter Date: January 21, 2020 To: NC Dept of Environmental Quality DEMLR Stormwater Program Attn: Corey Anen 512 N. Salisbury St. Raleigh, NC 27699-1612 919-807-6369 Project: Matcor Metal Fabrication Welcome, NC We Transmit: (X) herewith () under separate cover Project #: 17-042/D Stormwater Permit No. SW4191202 For Your: () approval (X) review and comment () signatures Copies Date Description 2 Revised Plan Sheet C1.8 Storm Pond Plan & Details 1 TDG Response to Request for Additional Information 1 Signed Permission Letter Comment 1 1 Stage — Storage Data for Forebay and Main Pool Comment 2 Revised Calculations (Wet Detention Pond Design Spreadsheet, 1 Average Depth and SA/DA Calculations, Draw Down Time, Forebay Calculations) 1 Revised Wet Pond Sheet of the Supplement EZ form 1 Energy Dissipator Calculation for Pond Inlet (Comment 5 1 Revised Drainage Area Sheet of the Supplement EZ form (Comment 6) Comments: Corey, Please find attached the revised plans and calculations requested in your letter dated January 9, 2020. Please contact me if you have any questions or need additional information. Thank you. Copies: File Submitted by: L. Allan Hill, P.E. Chief Civil Engineer 4807 - C Koger Boulevard, Greensboro, NC 27407 1 T - 336-218-8282 F - 336-218-8010 1 www.triad-designgroup.com