HomeMy WebLinkAboutNCG030436_Inspection Report_20200115Compliance Inspection Report
Permit: NCG030436 Effective: 11/01/18 Expiration: 05/31/21 Owner: Accu Fab Inc
SOC: Effective: Expiration: Facility: Accu Fab Incorporated
County: Wake 801 Beacon Lake Dr
Region: Raleigh
Raleigh NC 27610
Contact Person: Sonya O Walsh Title: Phone: 919-212-6400 Ext.155
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 01/15/2020 Entry Time: 08:30AM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 11:45PM
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030436 Owner - Facility: Accu Fab Inc
Inspection Date: 01/15/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The site map must be updated to include outfall locations, the building addition, the storm drains and the flow direction of the
storm drains, and the stormwater sheet flow directions. In addition, the site map is to include storage and containment areas
which may include drums, roll offs, and material storage areas. A spill sheet for the previous 3 years must be
documentation. The documentation must include any spills or leaks that have occurred. If no spills or leaks did not occur
within the year, add "no spills" to the document. Any feasible alternatives to current practices must be added, which can
include the addition of rip rap. Formal stormwater training must be conducted for applicable employees. The training must
be conducted yearly and when a new employee starts. Include a sign -in sheet to document which employees received the
training. The Spill Prevention and Response Plan and the Preventative Maintenance and Good Housekeeping Plan need to
be more site -specific. Rearrange the responsible parties by order of contact. Sampling for zinc and copper are to be
conducted following the Tier 3 procedures.
During the inspection of the facility, roll -offs were leaking cutting fluid. The roll -off containers should either be completely
sealed or covered. Outfall 2 had a visible sheen possibly due to the fluid leaking from the roll -offs. All drums are to be
capped off regardless of whether they are empty or not. Personal materials were found outside covered in grease. All
facility -owned and personal materials are to follow stormwater guidelines.
To qualify for a tier relief, the permittee must submit a letter requesting relief from Tier 3 sampling requirements. This is to
include documentation on how the facility identified the source of the problem and what was conducted to alleviate the issue.
Page 2 of 3
Permit: NCG030436 Owner - Facility: Accu Fab Inc
Inspection Date: 01/15/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑
❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: Documentation needs to be updated. Formal training and documentation needs to be
performed. Additional information provided in the summary.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment: The facility has sampled bi-annually but has not followed Tier 3 procedures for the zinc
exceedance at both outfalls.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: The facility has sampled bi-annually but has not followed Tier 3 procedures for the zinc
exceedance at both outfalls.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: Facility must inspect each outfall during dry weather annually to confirm there are no
non-stormwater discharges as required in their permit for illicit discharge monitoring. Results
should be included within the documentation.
Page 3 of 3