HomeMy WebLinkAbout20190289 Ver 1_More Info Received_20190614M STxiTEa O STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR June 14, 2019 U. S. Army Corps of Engineers Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 ATTN: Mr. David Bailey NCDOT Coordinator JAMES H. TROGmN, III SECRETARY Subject: NCDOT Response to Request for Additional Information Dated April 22, 2019, and subsequent Application Modification for the Widening of US 70 from Mt. Hope Church Road to Sun Lake Road in Guilford County. NCDOT Division 7, TIP No. U-2581 BA, WBS 34840.1.4. Dear Sir: The North Carolina Department of Transportation (NCDOT) is in receipt of your request for additional information dated April 22, 2019. Item number 4, section "a" request profile/cross section views for stream impact Sites 1, 2, 3, and 6. Pursuant to this request and subsequent conversations, the drawings were revised by way of: Site 1 Detail 10 was added to display the cross section of the stabilization impact at the pipe outlet. The rip -rap will be "keyed -in" to stabilize the system, but not impede aquatic passage. Site 2 Detail 11 was added to display the cross section of the stabilization impact at the pipe outlet. Site 3 Detail 10 was added to display the cross section of the stabilization impact at the pipe outlet. The rip -rap will be "keyed -in" to stabilize the system, but not impede aquatic passage. While re -reviewing Site 3, the engineer increased the size of the rip rap at this location. This increased the permanent impact from 11 to 13 feet, and decreased the temporary impact from 16 to 13 feet. Please find included DMS Mitigation Acceptance for the 2 additional feet of impact (increasing project totals from 298 to 300 feet). Table 2 from the January application has been revised below to reflect this change. Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Telephone: (919) 707-6000 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 1000 BIRCH RIDGE DRIVE RALEIGH NC 27610 Site 6 Detail 10 was added to display the cross section of the stabilization impact at the pipe outlet. The rip -rap will be "keyed -in" to stabilize the system, but not impede aquatic passage. Revised Table 2: Stream Impacts (values in linear feet) Permit Stream Name/ Status/ Perm. Temp. ACOE DWR Site NRTR ID Class/ Channel Channel Required Required Impact Description Index Impacts Impacts Mitigation Mitigation UT to Little Perennial The existing 24" reinforced concrete pipe 1 Alamance WS-IV NSW 10 19 10 _ will be upgraded to a 30". The impact is a Creek* 16-19-3-(0.5) result of the pipe and riprap pad installation. A 24" base ditch will outlet adjacent to the stream. Due to the small size of this 2 6 10 6 system, it would not be possible to use bank UT to Little Perennial stabilization without impacting the channel Alamance Creek WS-IV NSW bottom. As such, the impact was accounted SC 16-19-3-(0.5) for as loss of water. The 15" corrugated metal pipe will be 3 4413 4-6 1 44 13 -- replaced with a 30" reinforced concrete pipe. UT to Little Perennial The 46-foot long 10' x 6' culvert will be 5 Alamance Creek WS-IV NSW 251 33 251 -- replaced with a 127-foot long, 10' x 8' SB 16-19-3- 0.5 culvert with sills. The existing 18" reinforced concrete pipe UT to Little Perennial will be upgraded to a 24" reinforced 6 Alamance Creek WS-IV NSW 20 15 20 -- concrete pipe. The impact is the result of ** 16-19-3-(0.5) raising the grade of the road as well as the larizer pive. 93 Total Stream Impacts � 0 3 9 0 Total Requested from DMS: 300 * This system was outside of the original NRTR study limits. It was included due to the need to capture stormwater on the lane taper/transition. **This stream was outside of the original NRTR study limits. Raising of the grade of this intersecting road was not originally accounted for. The buffer drawings have been revised to match the changes in the drawings. However, there are no changes to Buffer Impacts as a result of these revisions. Thank you for your assistance with this project. Please do not hesitate to contact me for additional questions or concerns at maturchy@ncdot.gov or (919) 707-6157. Sincerely, ,�e2 Philip S. Harris III, P.E., C.P.M. U Environmental Analysis Unit Head cc: Mr. John Fisher, Publix ROY COOPER Governor MICHAEL S. REGAN Secretary TIM BAUMGARTNER Director Mr. Philip S. Harris, P.E., CPM Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: NORTH CAROLINA Environmental Quality June 3, 2019 Subject: DMS Mitigation Acceptance Letter: U-2581BA, US 70 (Burlington Road) from West of SR 3045 (Mount Hope Church Road) / SR 2819 (McCleansville Road) to just East of SR 3175 (Birch Creek Road), Guilford County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the stream, wetland and buffer mitigation for the subject project. Based on the information supplied by you on June 3, 2019, the impacts are located in CU 03030002 of the Cape Fear River basin in the Central Piedmont (CP) Eco- Region, and are as follows: Stream and Wetlands River Basin CU Location Eco- Region Stream Wetlands Cold Cool Warm Riparian P Non- Coastal Riparian Marsh Impacts Cape 03030002 CP 0 0 300.0 0.11 0 0 Fear *Some of the impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. All buffer mitigation requests and approvals are administrated through the Riparian Restoration Buffer Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR's Buffer Authorization Certification, DMS will transfer funds from the NCDOT 2984 Fund into the Riparian Restoration Buffer Fund. Upon completion of transfer payment, NCDOT will have completed its riparian buffer mitigation responsibility for TIP Number U-2581BA. Subsequently, DMS will conduct a review of current NCDOT ILF Program mitigation projects in the river basin to determine if available buffer mitigation credits exist. If there are buffer mitigation credits available, then the Riparian Restoration Buffer Fund will purchase the appropriate amount of buffer mitigation credits from NCDOT ELF Program. RE Q North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W.Jones Street 11652 Mail Service Center I Raleigh. North Carolina 27699-1652 919.707.8976 Mr. Harris June 3, 2019 Page Two NCDOT TIP U-2581BA Buffer River Basin + CU Impacts Cape Fear 03030002 — Jordan —Haw Eco- Buffer Impacts Region Zone 1 Zone 2 1 TOTAL CP 11,763.0 I 4,355.0 16,118.0 This mitigation acceptance letter replaces the mitigation acceptance letter issued on February 15, 2019. The impacts and associated mitigation needs were not projected by the NCDOT in the 2019 impact data. DMS will commit to implement sufficient compensatory stream and wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts increase, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. 8420. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707- Sincerely, James S tifill DMS Asset Management Supervisor Cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NC Division of Water Resources File: U-2581BA Revised L E, ­ _Carolina Department of Environmental Quality I Division of lvihigation Services 217 W. Jones Street 1 1652 Mail Service Center I Raleigh, north Carolina 27699u1652 919107.8976 PROJECT REFERENCE NO. SHEET NO. -Yl- PT Sta.I2+64.86 -L- CURVE DATA -Y2- CURVE DATA Rd'I1�'AIN ( x/ U-25818A 4 0 Pl Sta 17+66.4I Pl Sta /3+49.93 DETAIL 10 CLASS B 9�P ItAP 1 I I Z RES SHEET NO. _ /2. 58' /U' (LT) A = /4. 39' 42.3' (LT) PIPE OUTLET CHANNEL STABILIZATION ROADWAY DESIGN HYDRAULICS EST 2 TOSS ENGINEER ENGINEER I N°n° sum°I N 1,,,°la d EST 7 SYo I %' D = P 13' 08.6" D = 2 06' 23 3' Eler°;°" GEOTEXTIB b 41 _ m a L = 1A63.91' L = 696.04' I + RETAIN SYSTEM T = 534.24' T = 349°93' "°°" I INCOMP DO NOT USE LE E PLANS R = 4,700A0' R = 2,720.00' RETAIN _ —==15 RCP p SMON SE = 0.025 SE = 0.04 —Al. o — RO = 105' RO = l44'"°" BEGIN CONSTRUCTION Leng,M1= 10 F. h .. II B INC = 42' T'R° U.— LL B wrR°P - Kaye -Yl - POT Sta.13+45A0 w �z I I III i AT STA. 21 +07 -L- LT DETAIL 1 rj5 A3 III SPECIAL BACK OF CURB CUT DITCH I rJV DOCUMENT NOT CONSIDERED FINAL WITH RIP RAP �? 3 I ( UNLESS ALL SIGNATURES COMPLETED (NOT TO SCALE) MIB.D=1.e Ff. THOMAS Lam.. ) PAYNE w 3 I I ^ I 15" RCP -IV 11 ONE WAY p,e areab GROUND M^..d=1.o EL DB 3829 PG 416 I. `� 2 I BAPTISIT CHURCH p r �� PB 98 PG 89 zll E„ �j II +35 BE IN 2'-6'C DB 4354 PG 1434 s4� I+5 -Y/- PB 113 PG 25 ii �_� D 3" f�. I LV I 641 V„ \ d ` PS Ilb I? III m i?i �9wn�inrer11 NC. Pc. (C--377 5) Ge°lexnI. Type of U.•,- CLA55 B .,.p II11 FROM STA. 20+75 TO STA. 26+88 -L- RT C d~ v I ¢ u II I II gin_ 15 RCP -IV +85 END r- &G PERMIT D RAW I N G \ JURISDICTIONAL � I � +isrs -I- mm STREAM =' I p l �� II EG/N C&G w SHEET 2 OF 14 +40%6 rl Les \ TEMP SURFACE ®N N N 41 W WATER IMPACT X pl so' o' so' LP III Z I LP D I REMOV I I I h II II \ I U N I II e III II- GRAPHIC SCALE ca I I � 25' 0' 25' N � � \ UBBXY O� mwm / �I I o PS INSET SCALE w � I o. L— mam z BEGIN TIP PROJECT U-2581BA &G -RETAIN _ _ W I - I o WOODED S 73.2'55' E 168.22 S 69'00'09' E 5 74°23'56' E -L- PC STA. 12 + 32.17 \ -- - 3°6.04' E ~ I q�W 5E'S2' �3 °°•61" �' � C 46.04' I' I 4.I 73' 4.55' BEGIN MILL/RESURFACE &G BEGIN WIDENING (LT SIDE ONLY) 'In'-• I II i V'R� RCP -IV � $ I I I II REMmOVE LARRY MICHAEL OVERBY I N \7_ I� DB 3983 PG 562 POND PBCIF�PLE44EMENT PB 105 PG 114 BEGIN CONSTRUCTION Q $ END r-e c&c I U I " REMOVE 3 +35 -YI- _ -L- POT Sta. 11+85.00 \ SITE 1 � � lLL I I I O �3 N SURFACE I m I W�I WATER I I z-o -L- PT Sta. 22+96A9 , I END Ig2o O \ IMPACT I I +79r2 -n- a 65.62' NC DOT 57 -L- POC Sta.18+37.75= _ (II I BST $^G PIPE OUTLET I- 1 p� g4jp CHANNEL THOMAS EDWARD PAYNE �, �� -y/- POT Sta. 20+24.64 _ _ c Oy w� PB 8 STABILIZATION TONI DUKE PAYNE _ BEGIN 2'-6'C 4 CH B RIP RAP DB 7430 PG 2333 Z -Y2- PC SYa.1p+00.00 1 _ cR I� 35 G 38 w EST 5 TONS PB 8 PG 38 a\ — — GR LL 1 O +l/36 -Yl- _ LADY LUCK LLC SY MCLEANSVILLE „� M `_ �IIr�I - GEOTEXTILE O I WH' - •'NIA \ DB 8313 P� 2180 - SEE DETAIL 10 LIONS CLUB rI I 1 \ 20+00 INVESTMENTS, LLC PS 188 PG 76 w O "`WWW �3 REMOVE EXISTING m ITE 1 040 24" RCP AND . DB 2850 PG 529 / 1 I 1 DB 7804 PG 1634 I PB 98 PG 89 Izl + PB 191 PG 44 ISFp/ REPLACE. IT $ P'1 ,m RETAIN ? m 30" RCP iO \ CB 4 222B'''E6' >&L I I I I w f0 63 SYSTEMI/J u rcw WOOD X L-� 36• CHL O / I —1 -. I I 2 1� � �5 !=x M I � ¢ 1 2 EIP P I CAP I E LP / 0.70' LT 18" RCP -IV ILL U END `W 4P `'� \ +57 -L- 1 -L- I I131 h '�` BEG/N 2'�'C&G I 1 DE `m - ;1 0 +14: TTX +EGIN ER WOODED 15+� 72' LT 90' LT q 00 ;n I + I BAY W 7T LT LT 90' LT US 70 (BURLINGTON RD-) AT MT HOPE CHURCH RD. p 3770 0 6310 2019 ADT _ 2639 1550 3240 u 440 , 520 US 7o us 70 (BURLINGTON RD. 15430 (BURLINGTON RD.) 13030 25890 2330 1040 21500 2790 1120 a ci O= 5150 = u 6460 _ V �������..� �C�7w�f�--- ' • Ann ���� - �►�T -_/71�1�1✓�� x� �1Fff�\�REbo ''•r.e %Tad.. _ - ,. __ -_�_ I` iW�J►�' 1 ,� -c - - e -ems �. YbTEM r _ _ �c s _ �T_ _ �D ,5• G u1i 1 INV_72792' E ESfgppO T-�- m RETAIN SYSTEM CItY ExlsTmc R/w sH E' LVr — . END E Q rn 24•BLK WALL of Greensboro, l6 O `IG� O I D 1 GRgSS qu SYSTEM 8 p TRAFFIC SIGNAL .PVC o O I FUEL TANKS D9 49eT TC l0e m\ BEGIN 2'-'C&G O {0 8 GRASS O O'• ^m �� ,too . m +800- WOODED L°5 C1 CURB CUT DITCH -L- POT Sta. IO+OOAO 1 pp BAy T O O O ®O 8 O Q O Oa oAf 6ll' RT 9 -L- +04 -L SPECIAL BACK OF 70MB ONES O Corp„ 3pp PAIR, COPPER O (p O' Oi �. REMOVE AND REPLACE AT&T EX/STING C&G — ___ APER �\ / SEE DETAIL 1 lAPPROX.IO'J W �' BEGIN 2Y2-C&G 9 RT 9' RT 88' RT u I IT +3026 DFIE : SPENCE & ESTATROBINE, ON � ; y.--------- 350'R/GF/T TURN � \ � I REAL ESTATE, LLC 01 �^ m, co CULTIVATED FIELD E Z C „) 1 A ,,,"L� � 2S6K0 DB 8847 PG 925 cl EDDIE P. NORRIS o D V O ELIDE BETH C. PG NOR2RIS MT. PLEASANT qaR 15 I I I7 PS I w METHODIST CHURCH +99 -Y2 DB 5332 PG 809 DB 173 PG 180 9 - R M w IIO 75' LT DB 200 PG 694 w DENOTES IMPACTS IN O +a"s°�a6 /W STA.12+00.00 (SEE SHEET 101 SURFACE WATER 53 BE /N 2 6 C&G PROP. 4" CONCRETE SIDEW BEGIN GRADE + MATCI-ILINE YZ- FOR -L- PROFILE SEE SHEET 11 ~ DENOTES TEMPORARY END MILL/RESURFACE �� -L- POC STA.13+50.00 EXISTING SIGNAL TO BE MODIFIED FOR -Yl- & -Y2- PROFILES SEE SHEET 14 �= IMPACTS IN SURFACE WATER 50' 0' 50' GRAPHIC SCALE 25' 0' 25" INSET SCALE I-l1 �i 4 1liiir � L � —1 / GR / pU PUE PUE / BL OW -- CONC w RICKY N. ITI� DB 4014 PG 163 -� LLI PB 17 PG 94 rn 62 15 N Q a r REMOVE CONC N E NO CLAIM J G a / ROGER I scorT O LL x" a TONILYN J. A s u DB 4 010 PG C � N REMOVE rn _ DONNA-G- CONC = N BA PG 885 59 � NO CT o L D c C 0 G3GODR R/W RAP NS 0 _7_S ---D GEOTE%TILE GR a w 03000M 'I .~. R/W _ w � MEGAN J/T R/S EIKER SHAUN J/T R/S EIKER DB 7347 PG 1 N PB 17 PG 94 '^ ° y Q = 0 - II`SITE 4 'ia PI W '•.GR POT '•I / LI 01�r. W I 11 .00 SITE 2 Op ' OC Ij�(,'',^,� PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING SHEET4 OF 14 U-2W 6 SHE RM/ SHEET NO. RO4ENGIN ERDWAYSIGN ENGINEERS DETAIL 7 STANDARD BASE DITCH I Nol to Scale) NaNrol Natuwl Gwand 7/ .),� Ground d O Geowil. B Min. D=1.S 11. Moz. d=1.0 Ft. 'When B is < 6.0' B=2.0 Ft. Typo of Line,- CLASS B Ri AT STA. 12+30a Y4- LT DETAIL 10 PIPE OUTLET CHANNEL STABILIZATION INCOMPLE E PLANS Nolto 6wla) t 1Bed DO NOT USE FOR /W ACQUISITION Elevation wl z Gwaa sae 0' Geaenile Channel Bed 00 IVo ble) length= B F. (.J I TYDe el liner- <L B Rip-ROP - KeYedJn \N AT STA. 11+35 -Y5- LT O DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DETAIL 11 Prepared by J RIP RAP AT EMBANKMENT y' (Notto Scale) Rj L FILL IN WETLAND 0mi". Ditch 1.5, VHB�Engin �dn9 NpPC.IC-�p05) 1.0'min. GwdW : kigh Rcn�S•� GEOTEXTILE / Ct -L- PC Sta. 46+50J/ Pe anise,- 10 ro CL ee_R�$o /�ryyL�/ / w ^O FROM STA. 12+40 TO STA. 12+47 -Y4- LT G / =pea to DEBORAH 0. WAY FRED E*BURGIN CHARLES R. OVERBY, JR. KATHY A* BU IN DB 7901 PG 1530 DAMESi. eAL1RED/ <Uo PR R, JDDY5 B. 4LW 9 IC -L- POC Sta. 47+7OD7= PB 16, ;&.1 �1 -Y5- POT Sto. IO+OOAO �C SOP/ EIP EIP -L- PlI RAP 49 .l2 GR / WO CLASS,B RI RAP / - EST 1 TO�I �, 50 EST S GE9TETILE \\ SI 4 \ Ir WOODED _ IPUE PUE 15" PUE WOODED PUE L)T _ _ —F55— _ — — _ — — — — — — .. — AT&T OB j® D CorP.. 4 Cl+y f Greensboro 16 '.DIP E F E E D 6 85To I REMO O I I`_ AT&T Cor 600 PAIR COPPER GRASS Y-��'C GRASS 'Q F P•• _ I WOODED �' 7 ' & 3SBW BsT CON, OW AT&T Corp.. 2 ', COND IT I I - - ---J PU WOODED OW I I \ / HTR MTL ISFD / Q T�x SHED ti LL ll/I +OOU Y4- s F x 2 LT Q \SO4o I I TONYA D. COLE\\ 2 GKL RONNIE D.GOVERBY x W D DARRYL © BEAN 3 \ RONNIE D. OVERBY DB 6958 PG 849 II IDS 4515 PG 2171 s R"IE OVERBY TERESA M. BEAN c 2Q DB 7707 PG 2835 PR "' " 94 \ E OVE PB 17 PG 94 I PB 17 PG 94 m D'B T/�9 PG 1131 DB 7314 PG 2672 'tm �� / ROBERT C. MCDONALD 2`Z \ I +70 -Y4- �+ Pp 17 RRGG 94 PB 17 PG 94 - DPB717 PGG9431 21 \ I II 23.7T LT G \ yjl x T BASE DITCH TIMOTHY A. AYER SITE 2 I W/CLASS B RIP RAP I \ SEE DETAIL 7 I / <. NO MA J. AYERS o \ I DB 6020 PG 4 o I SLOPE TONS de \ PJ� PB 17 PG 9ST 10 4 —SST 25 SOY GEOTEXT IL I D CONSTRUCTION p 62 06 `ST 15 CY DDE C / St.___ tIRISDIC IotAr _ -Y5- POT Sta.11+85A0 ' RETAIN OR = _ END CONSTRUCTION o SITE 2 a II Or 1 -Y4- POT Sta.12+43.00 I W II REM VE VID D. HARRIS I • .c,,F?� I DAVID E. RYALS tsu' _ RISTIE H. HARRIS DRIP RAP AT LAURA F. RYALS �I 315" RCP DB 4553 PG 2076 I I~ EMBANKEMENT SEE DETAIL 11 DB 5071 PG 916 NI T PB 17 PG 94 2 END GRADE BARBARA SUE GAULIN -Y3- POT Sta.13+25.00 MARY P. I I DB 6347D G 981 W R MBE — 63 • 60 CLASS B RIP EST 2 TONS o EST 7 SY DONALD G. BATES GEOTExrILE ERNESTINE C. BATES END CONSTRU DB 2601 PG 742 -Y3-. POT Sta. I4+00e00 PB 17 PG 94 STANDARD V DITCH SEE DETAIL 4 SLOPE -2.0% EST 5 CY DDE DONALD G. BATES ERNESTINE C. BATES o DB 2793 PG 171 PB 17 PG 94 2002 BE 1217 � W BST PB 17 PG 94 - m i �i GR rcc,r-IV CB _— 7 iE BE ih fF 1E % if il• dB C ' 00,0 30' RCP IV 61 SITE 4 S ARADGE PIPE OUTLET ALINL r TABILIZEL DB 3572 PG 4 1, J CLASS B RIP RAP 29 • • EST 5 TONS EST 14 SY JD D. POWELL GEOTEXTILE FI •I. POWFI I SEE DETAIL 10 ANTER 6 a 61 4s�ivW Q DAVID E. RYALS O T I SITE 3 LAURA F. RYALS MARY LEE RIGNEY PG L _ c MARY ANN RIGNEY I� N DPB 5071 171 9 PG 94 DB 2949 PG 963 K o -�--X= PB 17 PG 94 N I m — RACHEL M. 48cRL DENOTES FILL IN e E ENS 62 { a F F WETLAND / RETAIN • PB 17 PG 94 E3© I� GR 8 i - SHIRLEY M. p�R DENOTES MECHANIZED TAYLOR o DB 046 PG 2194 467'RTs " 1F 1� CLEARING PB 17 PG 94 4$0' RT WINFRED LEE RIGNEY \ m m I RACHEL M. LEVENS - MARY ANN RIGNEY DB 7 PG 655 1 F. PG 94 o DENOTES IMPACTS IN w — ` - DB 2PG 757 Q - � - = �� 11 SHIRLEY M. PB 17 PG 94 SURFACE WATER TAYLOR 17 \ \ DB 2569 63 CGNC s, PB '- 104 IQ DENOTES TEMPORARY -Y4- POT Sta.15+46.72 IMPACTS IN SURFACE WATER Iw BST - 1 92 BY5-13 ' 3'SPECIAL LATERAL BASE DITCH SEE DETAIL 6 37 CALVARY BAPTIST CHURCH, INC. OF MCLEANSVILLE DS 5T26 PG 196 i ti4 N O RIP RAP w N Ns E END C&E +3/.9 n I . iI ,I II I : / 1 I I I I BEGIN CONSTRUCTION I / -Y6- POT Sta 12+90.00 / -L- CURVE DATA P1 Sta 78+3/.90 I -Y6- PC Sta 12+99.38 3�'26 p L = 10' 12 58.5' (RT) f34\ I I ggeq0 D = 0' 42' 10.9' UE L = 1,453.20' III, 1 II I R = 840.00' i I SE = NC W m SITE 6 50' 0' 50' �a BZ2 I r 24" R8ZCP-D� —Y6— PT Sta. /3+34.64 1 GRAPHIC SCALE 1, fm Ids N�� IICC� i * Ilaw �o f 42 0-,-, , , r, JOHN P. PAISLEY, SR AND.o WIFE, EULA K. PAISLEY c DB 2958 PG 595 RETAIN i I 'p I Qm �Ix, s _II - II PZ I S 85'37'13' E BW 202.14' W I �pz I of BURCH CREEK FARM,LLC m;l ROBERT W.DARNELL & o ,I LYNN D.THOMPSON ROBERT ARTHUR DARNELL I DB 6226 PG 1416 , DB 6594 PG 1190 URISDICTIONAL 9 STREAM 25' 0' 25' � ---� MORRIS PHILIP ALLISON SARA LYN SZOSTAK DB 7928 PG 2602 INSET SCALE p �M70VE PB 21 PG 15 r- i0K'6 L Z9 z PIPE OUTLET CHANNEL N 1p950, 44 STABILIZATION CLASS B RIP RAP EST 5 TONS ,5g02 E MORRIS E. CARTER AND EST 14 SY GEOTEXTILE ,D N 1p853 WIFE, BARBARA G. SEE DETAIL 10 CARTER DBTI3 PG 515 —Y6— PC Sta. 15+87.60 N 82°43'16' E DB 4-- N 82` 34'17' E 101.95 _ 104.48' CLASS B RIP RAP EST 2 TONS 2'-6C&G SOUTHERN NET, INC. EST 7 SY -Y6- DB 3342 PG 815 GEOTEKTILE PB 21 PG 15 MORRIS PHILIP ALLISON SARA LYN SZOSTAK MORRIS PHILIP ALLISON I MORRIS PHILIP ALLISON _ 45 DB 7928 PG 2602 SARA LYN SZOSTAK PB 21 PG 15 DB 7928 PG 2602 SARA LYN SZOSTAK PB 21 PG 15 DB 7928 PG 2602 HT l00' B 4$ Ta 47 P B 21 PG 15,4PER a 4'H DUTHERN EE INC. 1147 PG 81 - _ E z PASTURE Nln D. M PUF D �1i= m E P -- 90 I I W \ D IELD 1 BEGIN 2'-6'C&G +0 -L- 5230'RT SPECIAL BACK OF CURB \ SET DETADITCILI9 -L- POC Sta.79+09.64= -Y6- PT Sta. 18+09.82 I-- \ -D-RW2- POT Sta.10+00.00 �1� i TO Ri --TFO----_ Crc m u 091 CB IM59 -RIP as E E IN ----__ROBERT W. PUBLIX UR LYNN D. DARNELL DETAIL 10 D6226 PG 1PIPE °OUTLET CHANNEL STABILIZATION ,II DBS 6594 PG 1190190 De.efi°� a°roi e.a Ga°reeile CM1°nnel0ed L gth- 0 H. rvpripdicl A o Type o Liner= CL B Ni Rpp - Keyed -AT STA. 14+62 -Y6- LT DENOTES IMPACTS IN DETAIL 6 SURFACE WATER SPECIAL LATER�°ASeBASE DITCH BY -131 NNuml oT Fiu Ground 47 D �� \Ta Slope DENOTES TEMPORARY S Min.D=1.5 Ft B . e I IMPACTS IN SURFACE WATER -11ATSTA.14+68 =3.0 Ft. y STA. 17+ 60 Y6- RTOM STA.14+68 78+ 45- L- LT PERMIT DRAWING \ E SHEET 12 OF 14 00 0 j.p556 6 \ Z BZ 2 /6\5000 MORRIS PHILIP ALLISON SARA LYN SZOSTAK o P-III DOPG 2 BPB o x _ 28 PG ?5 -TEMP. SURFACE WATER IMPCAT JURISDICTIONAL STREAM N 8129'25•E - x �— MORRIS PHILIP ALLISON SARA LYN SZOSTAK AN B% -I r' DB 7928 PG 2602 PB 21 PG 15 oIQI \ W SITE 6 49 I MORRIS PHILIP ALLSON SARA LYN SZOSTAK x N 6 *'' \ 37.c 85-1-00 DB 7928 PG 2602 50 PB 21 PG 15 BEGIN CONSTRUCT/ON z MORRIS PHILIP ALLISON -Y7- POT Sta. //+00.00 CLASS B RIP RAP _ SARA LYN SZOSTAK " WOODED' EST 3 TONS DB 7928 PG 2602 EST 10 SY p6 21 PG 15 GEOTEXTILE WOODED I / \\ '`— x /WOODED ISBKD N� C&G Pu7 LIExl /�o 000 +/332 �nn x � Ilw Doro, 7B"'DI� - �� ��- m/ PUE—PQE mc� B WOODED STONE CB OVE _ — — — E -L- PT Sta. DETAIL 9 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCAU) NATuwD GROUND FROM STA.80+65 TO STA.81+65 A RT DETAIL 2 SPECIAL CUT DITCH I Notro sw1R1 From Dirch N°Nml � 3', e`B Slope Ground o'.7 D F\� � Min. D-1.5 Ft, FROM STA.90+63 TO STA.91+40 -L- LT EXISTING SIGNAL TO BE MODIFIED PROJECT REFERENCE NO. SHEET NO. U-258/BA 9 RM/ SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR / W ACQUISCCION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED XI N I akigh ricn 916'04' W 101.53'' 10+00.00 L,7 - I N \ x { AHMAD H. HAMZI DB 7661 PG 3026 PHIUP A I I t1 PB 20 PG 59 a L T Q �isIS P P 602 f N � PB PG 15 I 'CHL I )81041IV x 5 52.93' _ 85T II X= P0R7 48• CHL x x N 86°I8'29' W 1 RETAIN 100.00, W h —JMro GLADYS BARRERA 3 FL DB 7741 PG 1802 Q AHMAD H. HANZE a PB 20 PG 59 DB 7661 PG 3026 " �I PS 20 PG 59 + 19H DITCH L I I ISFD B RIP +66g7 I5A4'LT SEE DETAIL EST GEO )RILE I A I C GRAS _ GRASS I I G RETAIN CB - pq2 GRASS - F P CF6 -_-- C CB —E RE F— J CULTIVATED FIELD E E I -L- POT Sta. 90+ 4 \ 43 -Y7- POT Sto.12+76.776.74 BEGIN O-O C&G BURCH CREEK FAR. +3622 -L- ROBERT W.DARNELL & LYNN D.THOMPSO, 42'RT ROBERT ARTHUR DARNELL DB 6226 PG 1416 DB 6594 PG 1190 END TIP PROJECT U-2581BA -L- POT STA. 91 + 00.00 FOR -L- PROFILE SEE SHEET /3 FOR -Y6- & -Y8- PROFILES SEE SHEET 16 WETLAND AND SURACE WATER IMPACTS SUMMARY Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 12+02/12+07 -L- LT 30" RCP < 0.01 < 0.01 10 19 2 10+86/12+50 -Y4- RT Roadway Fill/24" Pipe 0.02 0.01 < 0.01 < 0.01 6 10 3 11+30/11+50 -Y5- 30" RCP 13 13 4 49+00/50+47 -L- Roadway Fill 0.05 0.03 5 54+92/55+93 -L- 1@10'x8' RCBC/Roadway Fill < 0.01 0.05 < 0.01 251 33 6 14+60/14+66 -Y6- LT 24" RCP < 0.01 < 0.01 20 15 TOTALS*: 0.07 0.04 0.05 < 0.01 300 90 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb PROJECT REFERENCE NO. SHEET NO. —Yl— PT Sta. /2+6486 —L— CURVE DATA —Y2— CURVE DATA Rd'I1T'AIN I x/ U-258/BA 4 0 Pl Sta 17+66.4I Pl Sta /3+49.93 DETAIL 10 CLASS B 9�P ItAP 1 I I Z RES SHEET NO. _ /2 58' //J' (LT) 0 = /4 39 42 3' (LT) PIPE OUTLET CHANNEL STABILIZATION ROADWAY DESIGN HYDRAULICS EST 2 TOSS ENGINEER ENGINEER IH°n° sum°I N I°p;&d EST 7 SY. I %' D = P 13' 08.6" D = 2' 06' 23.3' E,eVO°° GEOTEXT18i L = 1A63.9/' L = 696.04' I + RETAIN SYSTEM T = 534.24' T = 349.93' "°°° I �1 INCOMP LE E PLANS DO NOT USE MSMON R = 4,700A0' R = 2,720.00' RETAIN—� •� LL o = _ =1s RCP p SE = 0.025 SE = 0,04 Gac nlle -- — RO = 105' RO = 144' L°n9,R— 10 N. rv=."aei�i' BEGIN CONSTRUCTION INC = 42' Type U.— a B NP R°P - K.R.d-I° —Yl — POT Sta.13+45A0 AT A. 2 ST1 +07 -L- LT Ci I US 70 (BURLINGTON RD.) AT MT HOPE CHURCH-RD. p 3770 0 6310 2019 ADT _ 2639 f D 1550 3240 u 440 , 520 US 70 US 70 (BURLINGTON RD.'- D. 15890 (BURLINGTON RD.) 13030 25890 2330 1 1040 21500 2790 1120 a c O= 5150 = u 6460 _ V DETAIL 1 SPECIAL BACK OF CURB CUT DITCH 55 +85 - - O/ 56 DOCUMENT NOT CONSIDERED FINAL 50.' 1 1 3 I III UNLESS ALL SIGNATURES COMPLETED \ -( WITH O SCALE) Mia.D=1.e Ft. THOMAS L--RD PAYNE Lu I ? I 15" RCP -IV ONE WAY Prepared by GRNATUML OUND Mo.. d=1.o Ff. DB 3829 PG 416 `� 2 I BAPTISIT CHURCH PB 98 PG 89 F-�,� eo.oG• I I II +35 BE IN 2'-6C DB 4354 PG 1434 ,i 3.7+5 -Y/- PB 113 PG 25 As p3 f�. ~ I 641 \ d r- I> ' B E ireang Nc PC (o--37 5) Geolexnle Type of Ua" CLASS B Rip -Rap III1 Im 11 FROM TA. 20+75 TO STA. 26+88 -L- RT I I C dl v I 117n_ I u 5 RCP -IV +85 END r &G — +85 -ri- BUFFER D RAW I N G \ I w - m m I +/5J3 /- 70' RT I p 1 �� ° dEGIN 6 YI C&� w SHEET 2 OF 7 w JURISDICTIONAL ® m a III - I 41 I .- m� \ STREAM N rc l II W E 50' 0' 50' z \ 80' LT w DEp8T LT REMOV m I s GRAPHIC SCALE I \\� g I � III P I II �UI is' o' 25' 03 / 04 I I� IV __ 03 > I I I I III L UBILXY O m i d N PS I I I INSET SCALE BEGIN TIP PROJECT U-2581BA J �x � I moo I L— I ST ,� Z W I o WOODED S 73•p'55' EE I6� S 69.00'09' E S 74'23',, 0 4/—L— PC STA. 12 + 32.17 \ S 3.04'20' E ~ I 5E.52'T P D RETAIN— —1— 46.04' I 74.55' BEGIN MILL/RESURFACE REMOVEBEGIN WIDENING (LT SIDE ONLY) 6 ~ $ I I IILARRY MICHAEL OVERBYCQ((J p I 15 m DB 3983 PG 562 P0� pg01�9PGE4<EM�T PB 105 PG 114 BEGIN CONSTRUCTION END 2'-6' C&G " +35 -Yl- REMOVE —L— POT Sta.1I+85.00 SITE 1 a lLLl I I w 3O N +55 -Yl- I I m I I W 7o' RRT 50T I I 2'-6' C&G \ o- —L— PT Sta. 22+96A9 END IF2a,�T O \ p I l II +79J2 -YI- 4NO Bs.Gz' NC DOT 57 � o. —L— POC Sta.18+37.75= (II I BST PIPE OUTLET 2 1 p� g970 CHANNEL THOMNI EDWARD PAYNE �� —Y/— POT Sta. 20+24.64 _ _ LLI 3 O cap O Cy WQ pB 8 STABILIZATION TONI DUKE PAYNE _ \ BEGIN 2'-6'C 4 3 O �� 3 CLASS B RIP RAP DB 7430 PG 2333 Z -Y2— PC $to. IO+OO'OO 1 _ n cR I� 3I G 38 w EST 1670N5 PB 8 PG 38 °-\ — — GR LL I O +l/36 -Yl- _ LADY LUCK LLC Z.MCLEANSVILLE „� M `_ �IIr�I - GEOTEXTILE O l WH;T ""'TE \ DB 8313 P6 2180 - SEE DETAIL 10 LIONS CLUB rl I 1 \+QO INVESTMENTS, LLC pB 186 PG 76 O "`WWW a:� REMOVE EXISTING w �3 "' n DB 2850 PG 529 / 1 I \ Olw - DB 7804 PG 1634 I ITE 1 <2D 24" RCP AND PB 98 PG 89 Izl + O PB 191 PG 44 oA ISFO/ REPLACE, IT $ N N RETAIN 1 m 30�C RCP .I I CB 4 I w 1 222B'''3 &G SYS7EMJ pw W00 ED X L-i 36• C1{JL I II 2 \11 +35 -Yl- f0 z M P cAP LP O p 0 LT 58.61' LT EIP / I 18" RCP -IV I I - �q hL END 2' C&G FI,J BEGIN 2'-6' C&G I� " 1 N \ +57 -L- 1 -L- +22.85 -ri- a 0 +/462 X-jjj"`'aa.�l-- 4P I _ P Po - .. /5 ' 90' LT 50, Rr 4 00 a +3053 + / BAS" ER r tttlll C p•-Ca' - CAP IP ",' -. ODED 7.86 LT -- WO +� 72 LT 4 80' LT � 042 5 /GIiT 1 + 4L +31 L �'. 1 c IV � END 2"�'C&G BST sF'PfasTF 451.79 L LT I B _!\ a +6391 BST acFi4s 11 Lu _ 40 REMOVE I 81 LT P B 15" RCP -IV W RCP-�.�m-3`�• C&G RETAIN � ®ols - � .. .. .. � E r - C tV of Greensboro• 16 •, DIP / PUE q 5 UE Us 70/BURUNG7 BEG/N 2'�C - - w c E ExIsTING R/w®- - +24 -L- 9- ON RB 59'BST YZ � RlCP-IV — — _ 41.26' LT S 6256" h \ 24" RCP -I 1 18" RCP -IV -W= - - _ 40 B• C8 � —u 59.- E END UNK 9 _ I _ _s ss ti REMOVE 40 m .l5• CP - - -- US 70/BURLINGTON RD 5q BST QSYSTEM GRASS 1P _ _ Xp9 2\I I E N N _ 1 /�y- —_ �T---- _---T FO-- --_--- W = RETAIN SYSTEM \ \ \ ELT / U P \ 4' CPP X0 �E 30 A15 6, in 1 INV_727.92' EST`3HRp .. _ _T_ _ _ _ _ I ' m RETAIN SYSTEM / 1 —�- E%ISTING R/W - — ST �� ~ --- --- --� E FU- Cr -T— �\ `IG N+01.09'-YZ- I E Q rn 24'BLK WALL / RETAIN\ \ CItY of eensboro,(6 O • 1 D „ I I 1 GRASS pI SYSTEM 8 p TRAFFIC SIGNAL .PVC t� O I W \ j O - \ �L FUEL o TANKS \ 09 4<eT YC l0e tm\ BEGIN 2'�'C&G O ( 8 GRASS // �00 75' LT m +800 WOODED L°S C1 86'CURB CUT DITCH —L— POT Sta. l0 /OOAO ----- oo BAy r O O ®O 8 O Q O Oa oAf 611' RT 9 -L- +OA -L SPECIAL BACK OF 70MB ONE O Corp„ 3pp PAIR, COPPER O (p O' Oleo / SEE DETAIL 1 �. REMOVE AND REPLACE AT&7 EXISTING C&G — — _ _ APER \ (APPROX. l0'J _ W �' BEGIN 2'-6' C&G 9 RT 9' RT 88' RT ', u I IT +3026 -Y2- : SPENCE & ROBINSON c ; +-------- 350'R/GHT TURN r= m n ;. \ I c? CULTIVATED FIELD REAL ESTATE, LLC ° EDDIE P. NORRIS `o 1 258KD DB 6647 PG 925 i ELIZABETH C. NORRIS MT. PLEASANT ~ �, i I I 12' P S. O I METHODIST CHURCH . I w DB 5332 PG 1809 +759 LT 2 N DB 173 PG 180 9 `y x xxxxx ALLOWABLE IMPACTS ZONE\l DB zoo Pc 694 j R � 10) END 2'-6'C&G W SEE SHEET 53 +468/ -Y2- D p0 _ PROP. 4" CONCRETE SI DEW BEGIN GRADE B+�f."46� 2C&G Y2 STA• 12+00. ° MpTCHL1NE - \ END MILL/RESURFACE FOR —L— PROFILE SEE SHEET 11 ALLOWABLE IMPACTS ZONE 2 —L— POC STA.13+50.00 EXISTING SIGNAL TO BE MODIFIED FOR —YI— & —Y2— PROFILES SEE SHEET 14 o� � IN N II,� i i PROJECT REFERENCE NO. SHEET NO. III aIII I 'I I I • I BEGIN CONSTRUCTION -Y6- POT Sta 12+90.00 N I I -Y6- PC Sta.12+99.38 N 6z 0q0 ~ W II +34\ 11 I I a PUE 1 SITE 3 / / 11Ij1j I I . a Ip I w f i I a IIIJ;m I BZ 2 BST 92 I w 2a'BZ I III -Y6- PT Sta. /3+34.64 II vmi JURISDICTIONAL STREAM 92 92 92 MORRIS PHILIP ALLISON \ II G SARA LYN SZOSTAK DB 7928 PG 2602 BUFFER DRAWING U 2W 9 SHEET RM/ SHEET NO. SHEET6 OF 7 (V� ROAENGINEER DWAY SIGN ENGINEERYDRAULI S (� 00 50' o' 50' o Q INCOMPLE E PLANS GRAPHIC SCALE Z \ DO NOT USB FOR / W ACQUISITION N6j'o5p0 �5 25' o' 25' MORRIS PHILIP ALLISON SARA LYN SZOSTAK o INSET SCALE / z DB 7928 PG 2802 y 6 PB 21 PG 15 11'L1'2 N E2' w o X ; I DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 250 > s N 81°29'25' E _ Ii6.08' MORRIS PHILIP ALLISON v � 6-I II AN BX z SARA LYN SZOSTAK o DB 7928 PG 2602 $I I I Prepared by PB 21 PG 15 N so BY5-130 I pp PB 21 PG 15 '" VHBE n NC PG (C3705) I REOVE rn I o,'°., wire wp 3' SPECIAL LATERAL I y' r PIPE OUTLCHANNELET SITE 3 ,kphwcn BASE DITCH I N B9.16'04' W SEE DETAIL 6 III In b 29 z STABILIZATION n I III p. W '}�} CLASS B OR RAP C 50.00, N 8916'04' W 101.53' / I -Y7- POT Sta.10+00.00 I EST 5 TONS 02 _ EST 14 Sv 10°5^ ,20 \ x m O N { AHMAD H. HAMZ 37 I fn I;x MORRIS E.CARTER AND GEOTEXTILE N t08`'� + I� - DB 7661 PG 3026 NII WIFE, BARBARA G. SEE DETAIL IO ALLOWABLE IMPACTS°� W Pe zD PG Se CALVARY BAPTIST I III / / W DBC4 73 PG 515 -Y6- PC Sta. /5+$7.60 N B2°43'I6• E X X X X X X I CHURCH, INC. Q,.95' ZONE 1 MO IS PHILIP A I OF 5T26 SVILLE I I _ N g2°34'IT• E �, SAF LYN SZ T DB 5T26 PG 196 i p l I I loa aB _ MORRIS PHILIP ALLISON a DBPB PG 1502 f x o 2�1j 8 II I I SARA LYN SZOSTAK � �3�j— II I' CLASS BRIP RAP DB 7928 PG 2602 \\ \ \ \ \ \ ALLOWABLE IMPACTS I I�i50 EST 2 TONS PB 21 PG 15 \� ' CHL II I I I BEGIN 2'-6C&G SOUTHERN NET, INC. EST 7 SY \ ZONE 2 BST PG ,1 n 69°080 W� I I I +18.68 -Y6- DO 212 PG 195 MORRIS PHILIP AWSON 49 MORRIS PHILIP ALLISON N 4•W X II X� PORT -X 48• CHL x X N 86°I8'29' W II I - SARA LYN SZOSTAK 3,,05' S2.93' SARA LYN SZOSTAK MORRIS PHILIP AWSON Z a� I II O DB 7928 PG 2602 MORRIS PHILIP ALLISON 85-1-pO DB 7928 PG 2602 - s I RETAIN RIP RAP - 45 SARA LYN SZOSTAK O INS j 111 R OVE PB 21 PG 15 IDS 7928 PG 2602 SARA 92 SZOSTAK PB 21 PG 15 f E END C I 11 �+PB 21 PG 15 OIIL� BEGIN CONSTRUCT/ON I ,; DB 7928 PG 2602 5L -� END I IIII I 4V PB 21 PG 15 BST l I I l00'B T,4PER O a z MORRIS PHILIP ALLISON -Y7- POT StO. lI+OO.00 R =pro a CLASS B RIP RAP SARA LYN SZOSTAK WOODED' W ~ ES7 3 TONS DB 7928 PG 2602 f 5 Do I I I 1 NEThINCN +/ - 47 �� ES7 l0 SY PB 21 PG 15 a GLADYS BARRERA 3 DB 47 PG 81 091 P -/- GE.TEI.LE a 51 m FLORES Q.t + 1 DI 2 B E WOODED ? DB 7741 PG 1802 Q = I E z \ PASTURE I / I r rj m PB 20 PG 59 N I p11C _ D k AHMAD H. HAMZE OO O o � WOODED :S.KD:�D_Nc&c DB7881 PG3026 E 0 +1332 -Y7C I PB 20 PG 59 w - - - S Fw \ ISFD O __ - - - - - - - _ - _—_ 1 JC.• x—�^ XZr _ X ,F a I 1m Ian I IL IISLASSTSBy�RIP +66.6 I SEE DETAIL O PUE GEOVXTILE } I Yr�i Ions Services Inc.-Fa,Ip� STONE O1 C GRAS GRASS I 1 G RETAIN - � CP-IY - - N N �I T— GRASS GRAS �� II O H exl iw - - - — - - - - - - ------ _ _ � �5• RCP IS' RCP EI 1 -T liJ 1 .• p_V 15'• CB 90 _ 091 CB L1S5 RS�a#`eensbo 16 •, DIP - - - - - =----- __ � —_- 15" RCP -IV - - - - - _ _ F CB () \ E ® E E E 1 E E 92 IV CB P-I - 2 - - T- - 'S 70 URUNGTON RO 39'BST C NLPe U' N I I W \ 1 —E—E .. REMOVE _ F -o I^'° I BEGIN 2'-6'C&G —�E E F E ENDC �. 5238' CULTIVATED FIELD -X—X \ I 52.30'RT SPECIAL BACK OF CURB 725'LANE DROP TRANS/T/ON I ® r�G 9- ROP.MONOUTHIC I CUT DITCH 6R \ SEE DETAIL 9 ISD CONGLAN` \ \ -L- PT Sta.85+56.57 END 2'-6'C&G — \ \ -L- POC Sta. 79+09 64= + 2 90+16J5= EST 2 -L- E �° \ I \ -ZSR-Y6- PT Sta. 18+09.82 42' RT+� LASS B RIP RAP a_W2- POT Sta.10+00.00 -L- POT Sta° TONS SY s r \ 43 -Y7- POT Sta. 12+76.74 �N, GEOTEXTILE BEGIN 2'-6' C&G � Bd TAPER '2 \ I\ -_ ORW2-_ . , • • DETAIL 9 BURCH CREEK FAR. +3622 -L- TIE TO EX/ST/NG 42 Q A� 1 I n \\ ROBERT W. PUBUX - LYNN D. THOMPSON SPECIAL BACK OF CURB CUT DITCH ROBERT W. DARNELL & LYNN D. THOMPSOi 42'RT !RT SIDE ONLY) DETAIL 10 ROBERT ARTHUR DARNELL cv - �• `�. \ ROE _ ,UR DARNELL (NOT TO SCA1P) JOHN P. PAISLEY, SR AND- ,� 1 �N` I PIPE OUTLET CHANNEL STABILIZATION DB 6226 PG 1416 `II \ DB 6226 PC 1416 IN°u° xn1.l "ATOM DB 6594 PG 1190 = WIFE, EULA K. PAISLEY o o 41 \� DB 6594 PG 1190 ° ro Eie oB.a GROUND END TIP PROJECT U-2 581 BA In DB 2958 PG 595 O— m RETAIN �� --- G..°°� ro°°a 7 ,6.�—_ N p I I I m 43 -L- POT STA. 91 + 00.00 o m O XI Ga.reeii. Ch .i B.a FROM STA. 80+65 TO STA. 81+65 -L- RT O _ I I Lenglh= 8 N, rv.riobl.l �. I z o Ty, of D Ni°..- CL B R.p - K. d-i° DETAIL 2 - I AT STA. 14+62 -Y6- LT SPECIAL C T DITCH EL D CONSTRUCTION U1 POT Sta9%80.00 I pm 0 I Di,ch N I 1 N.luml 3', o`wt Slop. 0 I DETAIL bcl a°°na a7 D Fro+` 1 SPECIAL LATERAL BASE DITCH Min. D=1.5 H. W I I I INo„o Scale) ~ I FROM STA.90+63 TO STA.91+40 -L- LT �I3'E _ B y BY -131 NN.m1 ,ot Fi�� FOR —L— FROFILE SEE SHEET /3 Ground 4.7 O� xxat Slope 1 B MI^' °=,.6 Ft. EXISTING SIGNAL TO BE MODIFIED FOR —Y6— & —YS— PROFILES SEE SHEET 16 W O zf h 3:1 AT STA. 14+68 B=3.0 Ft. � BURCH CREEK FARM• LLC i n FROM STA. 14+68 -Y6- 70 a ROBERT W. DARNELL & m STA. 17+60 -Y6- RT = 78+45 -L- LT O E LYNN D.THOMPSON 8I M-o ROBERT ARTHUR DARNELL I m �= DB 6226 PG 1416 o DB 6594 PG 1190