HomeMy WebLinkAbout20200089 Ver 1_B-5671_Permit_Drawings_Buffer20191204_20200117See Sheet I -A For Index of Sheets
See Sheet 1-B For Conventional Symbols
STATE OF NORTH CAROM INA
� DIVISION OF HIGHWAYS PERMIT DRAWING
Z SHEET 1 OF 5
ED G-rECOMBE COUNTY
.4111
1*
LOCATION: REPLACE BRIDGE NO. 87 OVER SWIFT CREEK
ON NC 97
TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE
BUFFER IMPACTS
STATE
aREET
B-5671
aTATE VROl.N0.
.A.PEOI.NO.
OL+9CRIP]TON
4562 6.1.1
P. E.
45626.2.1
RNV & UTIL.
45626.3.1
CONSTR.
� u\
S 15/
�_- )
SITE 1 s —1
H SITE 1
\ \ SITE 2
E Fq'QM R�q� — — TO NC 33
BEGIN BRIDGE
s�
BEGIN T lP PROJECT B -567/ —L— STA. I6+00.00 END BRIDGE
-L- STA.12+00.00 -L- STA.I8+00.00
SITE 1 I END T lP PROJECT B -567/
-L ST A. 22 +00.00
DOCUMENT NOT CONSIDERED FINAL
THIS PROJECT IS NOT WITHIN MUNICIPAL BOUNDARIES. UNLESS ALL SIONAruRES coMPLErED
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
Pre red the Office of: Plops Prepared For:
HYDRAULICS ENGINEER
x 1 Assoelates P.^.
DIVISION OF HIGHWAYS
Rmd,
4505 FF.alls ofNeuse Road, Suite 400
50 25 0 50 100
ADT 2020 = 3434
Raleigh, NC 27609
Ph-a(919)783-9z14
1000 Birch Ridge Dr.
Raleigh NC, 27610
g
�®�P�,
ADT 2040 = 4600
K — 8 %
D = 55 %
LENGTH OF ROADWAY TIP PROJECT B-5671 = .151 MILES
LENGTH OF STRUCTURE TIP PROJECT B-5671 = .038 MILES
�,,�F,«m Fax
EE.
®�
® sr
60,
z018STANDARD SPECIFICATIONS
DEWAYNE L. SYKES, P.E.
PLANS
RIGHT OF WAY DATE.
50 25 0 50 100
T = 13 %
V = 60 MPH
TOTAL LENGTH OF TIP PROJECT B-5671 = .189 MILES
SEPTEMBER 3, 2019
PROJECTENGINEER
BRYAN E. HOUGH, P.E.
SIGNATURE:
�'A a
ROADWAYDESIGN
ENGINEER
LETTING DATE:
PROFILE (HORIZONTAL)
TTST = 5% DUAL 8%
MAY 19, 2020
�� O E
PROJECTDESIGNENGINEER
10 5 0 10 20
FUNC CLASS =
8���
NCDOT CONTACT. DAVID STUTTS, P.E.
STRUCTURES MANAGEMENT UNIT
MAJOR COLLECTOR
REGIONAL TIER
SIGNATURE: P.E.
PROFILE (VERTICAL)
o-
U
BUFFER I
IMPACTS ZONE 1 ZONE 2
s� SITE IMPACTS IMPACTS
\ SITE 2 0 SF 1167 SF
�I�\
..
,00S jr 6�
\ SITE 2
f
15" PIPE
W/2 ELBOWSJS / ..
---.15,
B27 PUE PU
h
�!5
SITE I �!s\
\ � s
CLASS B
RIPRAP PAD
EST 1 T N
ES G �
7
F E'�
e O 1 ��
i OF
i
p 'v
a +
MJ34Fq 0 � � J
�1�;'AN�R�
Rw
PUE - R F
PUE
BUFFER
ZONE 1
ZONE 2
IMPACTS
IMPACTS
IMPACTS
SITE
SITE 1
2198 SF
1115 SF
SITE 1
PERMIT DRAWING
SHEET 2 OF 5
N
SITE 1 / ESI I ION
EST 5 SY GT
PROJECT REFERENCE NO.
SHEET NO.
B-567/
BUF-2
W SHEET NO. 4
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
INCOMPLETE ]PLANS
DO NOT UM FOR N/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
BUFFER
ZONE 1
ZONE 2
15" PIPE
IMPACTS
IMPACTS
IMPACTS
\ 2 ELBOWS
SITE
SITE 1
1841 SF
968 SF
' \ P1�
/
PUE
PWE
�� Pl
,� PUE
+te
F
— — _
E—wLB N M. ANDERSON FARMS I
—�--
— —�,
- — —wLB— —
— —
` wooDS
BS_"l. Riw
OB 1613 PG 956
PC 4 SLIDE 140-A — -
MB 16 PC 44 _
PUE �P F R � qU E E E
I
��� PUE
\\ '� P E DON M. ANDERSON FARMS INC
OB 1613 PG 956
,� '� `� PC 1 SLIDE 140-A
MB I \ SITE 1 J ,/
G
BUFFER
IMPACTS
ZONE 1
IMPACTS
ZONE 2
IMPACTS
SITE
SITE 1
1815 SF
862 SF
IMPACTS LEGEND
ALLOWABLE IMPACTS ZONE 1
® ALLOWABLE IMPACTS ZONE 2
MITIGABLE IMPACTS ZONE 2
n_
BUFFER ZONE 1 ZONE 2
IMPACTS
IMPACTS
IMPACTS
SITE
SITE 1
2160 SF
1039 SF
FOR -L- PROFILE SEE SHEET 5
BUFFER
ZONE 1
ZONE 2
IMPACTS
IMPACTS
IMPACTS
SITE
SITE 2
0 SF
1167 SF
BUFFER
ZONE 1
ZONE 2
IMPACTS
IMPACTS
IMPACTS
SITE
SITE 1
2160 SF
1039 SF
� 3 �
\ 15 O RIPRAPgR
W/2 ELB W BEST 1 T G �
�Ta� 6Il
PUE —SUE
3 \
o
< WOO,
_sx_
2 PUE
� PUE J
1�
BUFFER ZONE 1 ZONE 2
IMPACTS
IMPACTS
IMPACTS
SITE
SITE 1
2198 SF
1115 SF
lb
PROJECT REFERENCE NO. SHEET NO.
B R,W SHEET
8UF-3
•�� RNJ SHEET NO. 4
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
�z AINC®NiIDL1E E ]PLANS
4O 'YC \ a DO NOT USH POR / W ACpUISITION
8� C^
e
sr DOCUMENT NOT CONSIDERED FINAL
`9> UNLESS ALL SIGNATURES COMPLETED
4 m
q6 \
�4
CLASS 8 /
RIPRAP PAD s "
� SITE 1 s EST 1 TO.
EST 5 SY GT
se
1� BUFFER ZONE 1 ZONE 2
15" PIPE IMPACTS IMPACTS IMPACTS
W/2 ELBOWS SITE
� 1 SITE 1 1841 SF 968 SF
PUE PUE �e �v ��
�u
J
a ,F ON R
/ MS IN
\w`e�,� '�
ID
r Be B �TNc s MB I AG 4
z 5
_ @s
-- — °s — N 44'28'026" ----- —
°` m NC 97
ss sB
UE
�P wooc
tic
'r— .� ti '� / \ DON . ANDERS FAR
01'E 09i, 13 956
SLIDE 140 5A
MB P 44
s� a
SITE 1 r—�/
BUFFER
ZONE 1
ZONE 2
IMPACTS
IMPACTS
IMPACTS
SITE
SITE 1
1 1815 SF
1 862 SF
a> I/
IMPACTS LEGEND
ALLOWABLE IMPACTS ZONE 1
® ALLOWABLE IMPACTS ZONE 2
MITIGABLE IMPACTS ZONE 2
FOR —L— PROFILE SEE SHEET 5
RIPARIAN BUFFER IMPACTS SUMMARY
IMPACTS
BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
Site Station Structure ROAD PARALLEL
No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
CROSSING IMPACT (ft) (ft) (ft) (ft) (ft) (ft2) (ft) (ft)
1
15+87 TO 16+60
BRIDGE
X
2160.0
1039.0
3199.0
1
15+96 TO 16+77
BRIDGE
X
2198.0
1115.0
3348.0
1
17+31 TO 18+05
BRIDGE
X
1841.0
968.0
2809.0
1
17+60 TO 18+15
BRIDGE
X
1815.0
862.0
2677.0
2
12+70 TO 14+24
ROADWAY
X
0.0
1167.0
1167.0
TOTALS*:
8014
3984
12033
0
1167
1167
0
0
NOTES:
Revised 2018 Feb
WETLANDS IN BUFFER IMPACTS SUMMARY
WETLANDS IN
BUFFERS
SITE NO.
STATION
(FROWTO)
ZONE 1
(ft)
ZONE 2
(ft)
1
STA 16+43
897
TO 16+77 RT
1
STA 17+61
3
TO 17+65 LT
1
STA 17+65
85
TO 17+86 LT
ITOTAL: 1 900 1 85 1
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
9/19/2019
EDGECOMBE COUNTY
B-5671
45626.1.1
Revised 2018 Feb SHEET 5 OF 5
Rev.Jan 2009