January 14, 2020
Jimmy Cook, Public Utilities Director
Town of Angier
P.O. Box 278
Angier, NC 27501
Subject: Permit No. WQ0041384
Town of Angier
Andrewes Landing Townhomes
Wastewater Collection System Extension Permit
Harnett County
Dear Mr. Cook:
In accordance with your application received December 20, 2019, we are forwarding herewith
Permit No. WQ0041384 dated January 14, 2020 to Town of Angier for the construction and
operation upon certification of the subject wastewater collection system extension. This permit
shall be effective from the date of issuance until rescinded, and shall be subject to the conditions
and limitations as specified therein. This cover letter shall be considered a part of this permit and
is therefore incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition II.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition ILA: Requires that the wastewater collection facilities be properly operated and
maintained in accordance with 15A NCAC 2T .0403 or any individual system-
wide collection system permit issued to the Permittee.
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
225 Green Street, Suite 714, Fayetteville, NC 28301
Phone: 910-433-3300 \ Internet: www.ncwaterquality orb
An Equal Opportunity \ Affirmative Action Employer — Made in part by recycled paper
Town of Angier
Permit No. WQ0041384
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Trent Allen at (910)
433-3336 or via e-mail at trent.allen@ncdenr.gov.
Sincerely,
IDocuSignedby
) � a—Ut ,
5189=3DD5C42B...
Trent Allen, Regional Supervisor
Water Quality Regional Operations Section
Fayetteville Regional Office
Division of Water Resources, NCDEQ
cc: C. Scott Brown, PE, 4D Site Solutions Inc., 409 Chicago Dr., Ste. 112, Fayetteville, NC
28306
Laserfiche File
Page 2 of 9
STATE OF NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENTAL QUALITY
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina
as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to
the
Town of Angier
Harnett County
for the construction and operation of approximately 225 linear feet of 8-inch gravity sewer to
serve as part of the Andrews Landing Townhomes project, and the discharge of 3,240 gallons per
day of collected domestic wastewater into the North Harnett Regional Wastewater Treatment
Plant existing sewerage system, pursuant to the application received December 20, 2019, and in
conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other
supporting data subsequently filed and approved by the Department of Environmental Quality
and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
specified conditions and limitations contained therein.
DocuSignedd by:
D_Ut v
Trent KNTWbHbl Supervisor
Division of Water Resources, NCDEQ
By Authority of The Environmental Management Commission
Permit Number: WQ0041384
Permit Issued: January 14, 2020
Page 3 of 9
SUPPLEMENT TO PERMIT COVER SHEET
Town of Angier
is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection
extension. The sewage and wastewater collected by this system shall be treated in the North
Harnett Regional Wastewater Treatment Plant in accordance with Permit Number NC0021636.
Permitting of this project does not constitute an acceptance of any part of the project that does
not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February
12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically
mentioned herein. Division approval is based on acceptance of the certification provided by a
North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's
responsibility to ensure that the as -constructed project meets the appropriate design criteria and
rules.
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)]
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or surface
water standards.
Page 4 of 9
b. A map of the sewer system shall be developed and shall be actively maintained.
c. An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected everyday (i.e. 365
days per year). Pump stations that are connected to a telemetry system shall be inspected at
least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are
documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance
with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina
General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three
years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Fayetteville
Regional Office, telephone number (910) 433-3300, as soon as possible, but in no case more than 24
hours, following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Page 5 of 9
Voice mail messages or faxed information is permissible, but this shall not be considered as the initial
verbal report. Overflows and spills occurring outside normal business hours may also be reported to
the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.
Persons reporting any of the above occurrences shall file a spill report by completing and submitting
Part I of Form CS-SSO (or the most current Division approved form) within five days following first
knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to
ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved
form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form attached to this permit shall be submitted with the required supporting
documents to the address provided on the form. A complete certification is one where the form is
fully executed and the supporting documents are provided as applicable. Any wastewater flow made
tributary to the wastewater collection system extension prior to completion of this Engineer's
Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles
of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately
filed with the applicable County's Register of Deeds office shall be submitted with the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines & force
mains) of the wastewater collection system extension. Final record drawings should be clear on
the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are
marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity,
pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge
protection, detention time in the wet well, and force main, ability to flush low points in force
mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or
pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities
and the rotation schedule of the portable power source or pump, include travel timeframes, shall
be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in
non-compliance with this permit (including pipe length increases of 10% or greater, increased flow,
pump station design capacity design increases of 5% or greater, and increases in the number/type of
Page 6 of 9
connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to
the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit.
Please note that variances to the Minimum Design Criteria should be requested and approved during
the permitting process prior to construction. After -construction requests are discouraged by the
Division and may not be approved, thus requiring replacement or repair prior to certification &
activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greaterthan ten percent below the minimum required slope perthe Division's
Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until
corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting
the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of
the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's
Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials may subject the Permittee to an enforcement action by
the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C,
construction of additional or replacement wastewater collection facilities, and/or referral of the North
Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T
.0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement facilities.
[15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local
government agencies which have jurisdiction or obtaining other permits which may be required by
the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)]
Page 7 of 9
CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer:
Certification Review Date:
Project Name:
WQ00 Project County:
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address,
change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑ Yes ❑ No
3) Final Engineering certification? ❑ Yes ❑ No
• If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase, what was previously certified (if applicable), and what is left to be certified.
4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h).
6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable, specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? ❑ Yes ❑ No
• If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with
the appropriate language.
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including but not
limited to pipe length changes of 10% or greater, change in flow, pump station design capacity design change of 5% or
greater, and/or change in the number/type of connections)? ❑ Yes ❑ No
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.
NC DWR— Water Quality Regional Operations Section 225 Green St, Fayetteville, NC Zip 28301
Fayetteville Regional Office Phone: (910)-433-3300 FAX: (910)-486-0707
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
Town of Angier
PERMIT #:
WQ0041384
PROJECT:
Andrews Landing Townhomes
ISSUE DATE:
January 14, 2020
This project shall not be considered complete nor allowed to operate in accordance with Condition
7 of this permit until the Division has received this Certification and all required supporting
documentation. It should be submitted in a manner that documents the Division's receipt. Send
the required documentation the Regional Supervisor, Water Quality Regional Operations Section
at the address at the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to
completion of this Certification shall be considered a violation of the permit and shall subject the
Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial
certifications up until a final certification is received. A Final Certification shall be a complete set
of record drawings and design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the
construction of the project name and location as referenced above for the above Permittee hereby
state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance of
this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer
Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum
Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1,
2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date ...............................................
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
...............................................:
NC DWR — Water Quality Regional Operations Section 225 Green St., Fayetteville NC 28301
Fayetteville Regional Office Phone: (910)-433-3300