Loading...
HomeMy WebLinkAbout20181249 Ver 2_R-2828_Wetland_Impact_Summary-3_20200117WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 26A 709+00 Roadway Fill (SCM) 0.01 < 0.01 266 35 26A 709+00 Culvert Stabilization (SCM) < 0.01 65 27 705+75 - 714+00 Roadway Fill (WDH) 2.50 0.04 0.26 28 711+00 - 714+00 (LT) Roadway Fill (SCN) 0.02 < 0.01 213 10 29 726+50 - 728+00 (RT) Drain Pond PY 1.40 30 728+00 - 734+50 (RT) Channel Change (SCQ) 0.06 673 31 736+00 Roadway Fill (WDJ, SCQ) 0.38 0.09 0.03 < 0.01 130 58 32 736+70 (LT) - 738+00 (RT) 2 @ 8'x9' RCBC (SCP) 0.07 0.02 379 92 32 736+70 (LT) - 738+00 (RT) Culvert Stabilization (SCP) < 0.01 44 32 736+70 (LT) - 738+00 (RT) Bank Stabilization (SCP) < 0.01 7 33 759+00 (RT) - 759+82 (LT) Roadway Fill (WDM) 0.38 0.03 34 767+65 (RT) Roadway Fill (WDN) < 0.01 35 782+00 (LT) 9'x8' RCBC (SCT) 0.05 < 0.01 421 48 35 782+00 (LT) Culvert Stabilization (SCT) < 0.01 55 35 782+00 (LT) Bank Stabilization (SCT) < 0.01 31 36 785+50 Roadway Fill (WDO) 0.71 < 0.01 0.07 37 785+90 (RT) - 787+70 (LT) 48" RCP (SCV) 0.03 < 0.01 413 30 37 785+90 (RT) - 787+70 (LT) Pipe Stabilizatoin (SCV) < 0.01 36 38 788+00 (LT) Roadway Fill (WDP) 0.01 < 0.01 39 812+00 - 813+00 (LT) Roadway Fill (WDS) 0.08 40 812+90 - 813+37 (LT) Channel Change (SDB) < 0.01 54 40 813+50 Channel Change (SDC) < 0.01 93 40A -Y21- 40+00 Roadway Fill (WDR) 0.09 40B -Y21- 44+40 Roadway Fill (SCZ) < 0.01 < 0.01 52 13 TOTALS*: 4.15 0.04 0.46 1.70 0.03 2932 286 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb