Loading...
HomeMy WebLinkAbout20181249 Ver 2_R-2828_Wetland_Impact_Summary-6 totals_20200117WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 81 -Y22RPDE- 29+50 (RT) Roadway Fill (WEU) 0.04 82 -Y22FLYBD- 113+30 (RT) HSB Outlet SEH, WFN(2) < 0.01 < 0.01 10 82 -Y22FLYBD- 113+30 (RT) 12" Pipe Stabil. (SEH) < 0.01 15 82A 2SEC2- 382+00 - 386+00 ( Channel Change (SEM) 0.04 < 0.01 422 20 83 -Y22SEC2- 396+50 (LT) Channel Change (SEK, WFF) < 0.01 < 0.01 < 0.01 30 10 84 -Y22SEC2- 405+00 (LT) 60" CMP & 72" WSP (SEL) < 0.01 < 0.01 22 10 84 -Y22SEC2- 405+00 (LT) Pipe Stabilizatoin (SEL) < 0.01 58 85 -Y22SEC2- 416+00 (LT) 30" RCP Pipe Extension (SEV) < 0.01 < 0.01 69 10 85 -Y22SEC2- 416+00 (LT) Pipe Stabilizatoin (SEV) < 0.01 19 87 -Y22SEC2- 474+20 (LT) 42" Pipe (SES) < 0.01 10 87 -Y22SEC2- 474+20 (LT) Pipe Stabilization (SES) < 0.01 10 88 Y22SEC2 (LT) - 80+00 (LT 48" RCP (SES) 0.02 < 0.01 244 20 88 Y22SEC2 (LT) - 80+00 (LT Pipe Stabilizatoin (SES) < 0.01 30 SHEET 1 SUBTOTALS* 2.34 < 0.01 0.08 0.18 3.88 0.02 2479 100 SHEET 2 SUBTOTALS* 6.83 0.30 0.85 0.85 3.40 < 0.01 1834 57 SHEET 3 SUBTOTALS* 4.15 0.04 0.46 1.70 0.03 2932 286 SHEET 4 SUBTOTALS* 3.18 0.28 1.31 0.45 0.10 3942 501 SHEET 5 SUBTOTALS* 0.12 0.02 1.56 0.36 0.03 4166 414 TOTALS*: 16.66 < 0.01 0.42 1.79 3.73 9.87 0.19 16272 1448 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb